Loading...
HomeMy WebLinkAbout003_C2.1_OverallExistingConditions&DemolitionPlanPROJECT SURVEY CONTROL Point # 1 3 21 23 29 41 42 43 44 45 Northing 10858.94 10783.31 10538.56 11269.58 10511.80 11795.87 11596.81 11450.70 10711.76 11596.99 Easting 9842.57 10460.22 9887.59 10126.73 10247.29 10450.99 10528.03 10949.91 9851.88 10664.10 Elevation 4911.77 4914.09 4919.58 4899.15 4918.13 4875.49 4889.91 4888.67 4912.16 4892.95 Description CP SPIKE CP SPIKE CP SPIKE CP SPIKE CP SPIKE CP SPIKE CP /SPIKE CP /SPIKE CP /SPIKE CP /SPIKE CP#42 CP#45 CP#44 CP#43 CP#41 CP#29 CP#1 CP#3 CP#21 CP#23 PRELIMINARY - FOR REVIEWFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION915 HIGHLAND BOULEVARDOVERALL EXISTING CONDITIONS AND DEMOLITION PLANBOZEMAN HEALTHBOZEMAN, MTC2.1 RPE17095.16_EXISTING_PROD.DWGDME06/22/2026SITE PLAN SUBMITTAL--------------17095.160 80 SCALE: 1" = 80' 1604080 SITE DEMOLITION NOTES: 1.ALL LOCATIONS AND DIMENSIONS OF EXISTING AND PROPOSED FEATURES ARE APPROXIMATE AND THE PROJECT DRAWINGS MAY NOT INCLUDE ALL EXISTING FEATURES WITHIN THE PROJECT BOUNDARIES. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE SITE PRIOR TO BIDDING AND CONSTRUCTION TO BECOME FAMILIAR WITH THE EXISTING SITE FEATURES AND CONDITIONS. IF DISCREPANCIES ARE FOUND BETWEEN THE PROJECT DRAWINGS AND FIELD CONDITIONS THE CONTRACTOR SHALL CONTACT THE PROJECT ENGINEER FOR CLARIFICATION. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PAYING FOR ALL PERMITS NECESSARY TO COMPLETE THE PROPOSED WORK INCLUDING DEMOLITION, RIGHT-OF-WAY AND ENVIRONMENTAL PERMITS. 3.ALL PUBLIC AND PRIVATE UTILITY TERMINATIONS, DISCONNECTS AND REMOVALS TO BE COORDINATED WITH THE APPLICABLE UTILITY PROVIDERS AND PERFORMED IN ACCORDANCE TO THEIR RESPECTIVE STANDARDS AND SPECIFICATIONS. 4.ALL EXISTING MATERIALS TO BE REMOVED AND PROPERLY DISPOSED IN ACCORDANCE TO ALL FEDERAL, STATE AND LOCAL REGULATIONS. 5.ALL REMOVED, DISTURBED OR DAMAGED EXISTING ASPHALT AND PAVEMENT MARKINGS TO BE RESTORED IN ACCORDANCE WITH MTPWSS, 7TH EDITION, APRIL, 2021. ALL ASPHALT MATCH LINES SHALL BE SAW CUT TO PROVIDE FLUSH TRANSITION AND SEALED. 6.ALL EXCAVATIONS OR VOIDS CREATED DURING DEMOLITION SHALL BE BACKFILLED AND COMPACTED IN A CONTROLLED MANNER PER THE PROJECT GEOTECHNICAL REQUIREMENTS. SEE REQUIREMENTS IN THE GEOTECHNICAL REPORT. 7.ALL UTILITY JUNCTION BOXES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. 8.ALL TREES AND SHRUBS SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. PROJECT DATUM: LOW DISTORTION PROJECTION COORDINATE SYSTEM (LDP MT83-BOZ-IF) NORTH AMERICAN DATUM OF 1983. SURVEYED: JANUARY 2026 BY: SANBELL ENABLING SITE WORKP:\17095_16_Bozeman_Health_ED_&_BT_Expansion\CADD_C3D\PRODUCTION_DWG\17095.16_EXISTING_PROD.dwg, C2.1, 6/22/2026 1:02:11 PM, mbasile, 1:1