HomeMy WebLinkAbout008_GeotechnicalReport PEOPLE WHO MAKE IT HAPPEN PEOPLE WHO MAKE IT HAPPEN G e o t e c h n i c a l R e p o r t PEOPLE WHO MAKE IT HAPPEN dowl.com BOZEMAN HEALTH EMERGENCY DEPARTMENT EXPANSION BOZEMAN, MT February 2026 Prepared By: 1283 North 14th Avenue, Suite 101 Bozeman, Montana 59715 Project No. 4691.000617.01 Prepared For: 915 Highland Boulevard Bozeman, Montana 59715 PEOPLE WHO MAKE IT HAPPEN PEOPLE WHO MAKE IT HAPPEN BOZEMAN HEALTH EMERGENCY DEPARTMENT EXPANSION Building Additions to South and North of Emergency Department Prepared for: 915 Highland Boulevard Bozeman, Montana 59715 Prepared by: 1283 North 14th Avenue, Suite 101 Bozeman, Montana 59715 Principal Author: David J. Barrick, P.E. Reviewed By: Dennis A. Russell, P.E. February 2026 4691.000617.01 \\dowl.com\j\projects\91\000617-01\91geoscience\report\bozeman health ed expansion final geo report.docx Page I TABLE OF CONTENTS 1.0 INTRODUCTION .................................................................................................. 1 1.1 Project Understanding ............................................................................................ 1 1.1.1 Existing Site Conditions ........................................................................... 1 1.1.2 Proposed Construction ............................................................................ 3 2.0 INVESTIGATION .................................................................................................. 5 2.1 Historic Geotechnical Field Investigation ................................................................ 5 2.2 Geophysical Field Investigation .............................................................................. 7 2.3 Geophysical Analysis and Interpretation................................................................. 8 2.3.1 Seismic Analysis ...................................................................................... 8 2.3.1.1 Seismic Refraction Method ....................................................................... 8 2.3.1.2 MASW Method .......................................................................................... 9 2.3.1.3 Seismic Interpretation ............................................................................... 9 2.3.2 Resistivity Analysis and Interpretation ................................................. 11 2.3.2.1 Resistivity Line – North Addition ............................................................. 11 3.0 SUBSURFACE CONDITIONS ........................................................................... 12 3.1 Site Geology ........................................................................................................ 12 3.2 Observed Soil Conditions ..................................................................................... 12 3.3 Groundwater ........................................................................................................ 13 3.3.1 Groundwater Information Center Research .......................................... 13 3.4 Seismicity ............................................................................................................. 14 3.4.1 Faulting ................................................................................................... 14 3.4.2 Design Accelerations ............................................................................. 14 3.4.3 Liquefaction ............................................................................................ 14 4.0 ENGINEERING ANALYSIS AND RECOMMENDATIONS ................................ 15 4.1 Foundations ......................................................................................................... 15 4.1.1 Engineered Aggregate Piers .................................................................. 16 4.1.2 Drilled Shafts .......................................................................................... 17 4.1.3 Helical Piles ............................................................................................. 19 4.2 Lateral Earth Pressures ........................................................................................ 20 4.2.1 Seismic Earth Pressure .......................................................................... 21 4.2.2 Coefficient of Friction ............................................................................. 22 4.3 Slabs-on-Grade .................................................................................................... 22 4.3.1 Interior Slabs and Helipad ...................................................................... 22 4.4 Low Height Concrete Block Retaining Walls ......................................................... 22 4.5 Pavement Surfacing ............................................................................................. 23 4.5.1 Traffic ...................................................................................................... 23 4.5.2 Design Parameters ................................................................................. 23 4.5.3 Flexible Pavement .................................................................................. 24 4.5.4 Rigid Pavement ....................................................................................... 24 4.5.5 Pavement Construction Considerations ............................................... 25 4.6 Drainage .............................................................................................................. 25 4.6.1 Surface Drainage .................................................................................... 25 4.7 Earthwork ............................................................................................................. 26 4.7.1 Subgrade Preparation ............................................................................ 26 4.7.2 Excavation............................................................................................... 26 4.7.3 Dewatering .............................................................................................. 27 4.7.4 Structural Fill .......................................................................................... 27 Page II 4.7.5 Compaction Requirements .................................................................... 27 4.7.6 Testing and Observations ...................................................................... 28 4.7.7 Cold Weather Construction ................................................................... 28 4.7.8 Wet Weather/Soil Construction ............................................................. 29 4.7.9 Geosynthetics ......................................................................................... 29 4.8 Soil Chemistry and Corrosion ............................................................................... 29 5.0 GEOTECHNICAL DESIGN CONTINUITY ......................................................... 30 6.0 LIMITATIONS ..................................................................................................... 31 7.0 REFERENCES ................................................................................................... 32 PHOTOGRAPHS Photograph 1: Collecting Seismic Data Near Existing Helipad – View Northeast ........................ 2 Photograph 2: Geophysical Survey of Northeast Addition – View Southeast ............................... 2 FIGURES Figure 1: Vicinity and Project Location ....................................................................................... 4 Figure 2: Borehole and Geophysics Array Location Map ............................................................ 6 TABLES Table 1: Geotechnical Exploration Summary ............................................................................. 5 Table 2: Geophysical Exploration Summary ............................................................................... 7 Table 3: Seismic Survey Parameters ......................................................................................... 8 Table 4: Electrical Resistivity Survey Parameters ...................................................................... 8 Table 5: Range of Seismic Velocities (feet per second) ........................................................... 10 Table 6: Depth to Gravel Deposits ........................................................................................... 13 Table 7: Groundwater Depths .................................................................................................. 13 Table 8: Documented Faults .................................................................................................... 14 Table 9: Seismic Design Parameters ....................................................................................... 14 Table 10: Substation Drilled Pier Recommendations Parameters ............................................ 18 Table 11: L-Pile Drilled Pier Recommendations Parameters .................................................... 19 Table 12: Helical Pier Capacities.............................................................................................. 20 Table 13: Lateral Earth Pressures ............................................................................................ 21 Table 14: Floor Slab Recommendations .................................................................................. 22 Table 15: Traffic Loading ......................................................................................................... 23 Table 16: Pavement Design Parameters .................................................................................. 24 Table 17: Fill Specifications...................................................................................................... 27 Table 18: Compaction Specifications ....................................................................................... 28 Table 19: Soil Chemistry Test Results ..................................................................................... 30 APPENDICES Appendix A Exploration Logs Appendix B Geophysics Outputs Page III EXECUTIVE SUMMARY DOWL prepared this geotechnical report for Bozeman Health. This report specifically provides recommendations for the proposed additions to the south and north sides of the existing Bozeman Health Emergency Department (ED). Because of the sensitive nature of the area regarding an active helipad, underground utilities, and active emergency vehicles, the geotechnical recommendations were developed from a combination of historical geotechnical boreholes and near-surface geophysics. Based on the information obtained from our subsurface exploration, the site can be developed for the proposed project. We identified the following geotechnical considerations: • The subsurface investigation consists of a combination of historical geotechnical boreholes and near-surface geophysics. Nine historical boreholes were drilled for the construction of the existing emergency department or ICU structures. The existing emergency department consists of a two-story structure that daylights at two elevations. The surface elevations of the historical boreholes were based on multiple survey datums and may vary when compared to the current topography survey. The surface elevations of the 2008 historical geotechnical boreholes are approximately three to four feet lower than Sanbell’s topography survey. South of the existing ED, the site is relatively flat with a helipad. However, on the northeast side, the site slopes downwards towards the hospital’s Entrance #1. • The lithology consists of undocumented fill or medium-stiff to stiff lean clay overlying gravel deposits. The depth of the gravel deposits ranges from approximately 19.0 to 35.4 feet below the second floor’s finish floor elevation of 4,914.5 feet. Tertiary sediment classified as silty sand underlies the gravel deposits and extends beyond the maximum depths explored. • No groundwater was observed during the geotechnical or geophysical investigations, with the exception of two perched water tables. • The 2009 geotechnical report for the existing ED structure provided foundation recommendations consisting of: drilled shaft, helical piles, and overexcavation and replacement with structural fill. This report provides all those recommendations and for engineered aggregate piers as well. • Close monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We therefore recommend that DOWL be retained to monitor this portion of the work. This section is only a summary. Recognize that we do not provide details in this section; read the report in its entirety for a comprehensive understanding of the items contained herein. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 1 1.0 INTRODUCTION DOWL completed a near-surface geophysical investigation of the proposed emergency department (ED) additions at the Bozeman Health facility in Bozeman, Montana (see Figure 1). The scope of geotechnical services consisted of reviewing existing geotechnical and geological information, field observations, a seismic and electrical near-surface geophysical survey, engineering analyses, and preparing this Geotechnical Report. The purpose of these services is to provide geotechnical-related recommendations for project planning and design. We conducted this referencing our proposal to Sanbell, dated December 3, 2025. Our geotechnical engineering scope for this project included the initial site visit, a seismic and electrical near-surface geophysical survey, and review of three historical geotechnical boreholes with depths ranging from 26.5 to 31.5 feet below historical site grades, and engineering analyses to provide foundation recommendations. 1.1 Project Understanding 1.1.1 Existing Site Conditions The area proposed for ED expansion includes an ambulance drop-off garage and driveway, helipad, a medical trailer, and parking lots with associated landscaping. Hospital Entrance #1 is directly north and downhill of the proposed expansion area. The ED provides two access levels with the higher helipad elevation and the lower basement entrance (same elevation as Entrance #1). South of the ED, the site is relatively flat with the helipad slightly elevated above the parking lot. The elevation of Entrance #1 is approximately ten feet below the helipad elevation. A small fence surrounds the helipad area. Vegetation consists of a maintained lawn, shrubs, and small conifer trees. Private waterlines (potable and irrigation) are located on-site in the vicinity of the proposed project. Other existing underground utilities consist of electricity and communications. Since geotechnical boreholes were not drilled, one-call was not performed. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 2 Photograph 1: Collecting Seismic Data Near Existing Helipad – View Northeast Photograph 2: Geophysical Survey of Northeast Addition – View Southeast Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 3 1.1.2 Proposed Construction Two additions are proposed for the Emergency Department. The south addition will be slab-on- grade and will not include a basement. The proposed finished floor elevation of the south addition will be 4,914.5 feet. The northeast addition will include a basement that matches the existing structure. The basement finish floor elevation will be 4,899.2 feet to match the existing ED elevation. The proposed construction will be steel-framed with concrete on metal deck at elevated floors and untopped metal deck at roof levels. The south or driveway addition will be approximately 6,800 square feet, and the north addition will be approximately 9,100 square feet. Per information provided by Tom Kujawa, representative of Hicks Engineering, the approximate structural loads for the additions are as follows: • Point loads = 350 kips (service), and • Exterior wall loads = 10 kips per linear foot (service). BOZEMAN HEALTH ED ADDITION GEOSCIENCE INVESTIGATION VICINITY AND LOCATION MAP FIGURE 1 BOZEMAN HEALTH ED ADDITION - BOZEMAN, MONTANA VICINITY MAP NOT TO SCALE LOCATION MAP HAVRE GLASGOW SIDNEY GLENDIVE MILES CITY HARDIN BILLINGS BOZEMAN DILLON BUTTE HELENA MISSOULA KALISPELL LEWISTOWN GREAT FALLS SHELBY DEER LODGE PROJECT LOCATION Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 5 2.0 INVESTIGATION 2.1 Historic Geotechnical Field Investigation DOWL (formerly HKM Engineering and MSE-HKM) performed historical geotechnical fieldwork in the years 1998, 2000, 2008, and 2017, consisting of site observations and drilling nine geotechnical boreholes. We present the borehole locations in Figure 2. The drilling contractors advanced the geotechnical borings to depths of 24.0 and 36.5 feet below the historical ground surface. Table 1 organizes the borehole information. Table 1: Geotechnical Exploration Summary Borehole Number Borehole Depth (feet) Surface Elevation (feet) Date Drilled Geotechnical Report Name BH-4-08 31.5 4,911.0 December 1, 2008 Emergency Room & Patient Wing Addition BH-5-08 26.5 4,910.0 December 2, 2008 Emergency Room & Patient Wing Addition BH-6-08 31.5 4,913.7 December 1, 2008 Emergency Room & Patient Wing Addition HKM DH 101 36.5 4,913.4 June 1, 1998 Emergency Room Addition HKM DH 102 31.0 4,911.9 June 1, 1998 Emergency Room Addition BH-206 26.5 4,901.8 October 24, 2000 Bozeman Deaconess Option 1 BH-207 32.5 4,900.3 December 12, 2000 Bozeman Deaconess Option 1 B-8-17 26.5 4,902.0 December 21, 2017 ICU Addition B-9-17 24.0 4,901.8 December 21, 2017 ICU Addition The borehole surface elevations come from multiple geotechnical investigations with varying survey methods. Treat the borehole surface elevation data as approximate. The first five boreholes in Table 1 were drilled at an elevation similar to the finish floor elevation of the proposed south addition. The bottom four boreholes in Table 1 were drilled at an elevation similar to the basement of the proposed north addition. HazTech Drilling, Hanson Drilling, or SK Geotechnical drilled the borings under the direction of a DOWL geotechnical engineer or geologist using a BK-81, CME-75, or CME-55 truck-mounted drill rigs. The drill rig was equipped with 4.5-inch I.D. hollow stem augers. We provide historical exploration logs in Appendix A, which includes soil and groundwater conditions as well as SPT information. Stratification boundaries on the exploration logs represent the approximate location of changes in soil types; in situ, the transition between materials may be gradual and may vary. B-4-08 B-5-08 B-6-08 B-8-17 B-9-17 HKM DH 101 BH-206 BH-207 HKM DH 102 BOZEMAN HEALTH - ED EXPANSION GEOSCIENCE INVESTIGATION TRANSECT LOCATION MAP FIGURE 2 B-4-08 LEGEND EXISTING GEOTECHNICAL BOREHOLE LOCATIONS SOUTH (DRIVEWAY) ADDITION GEOPHYSICAL TRANSECT NORTH ADDITION GEOPHYSICAL TRANSECT START START END END Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 7 2.2 Geophysical Field Investigation Geophysical data was collected at both addition sites. The south addition (ambulance driveway) transect starts with the conifer trees south of the medical trailer and ends northeast of the helipad. The north transect starts at the ED basement door and ends east of the helipad. The north transect consisted of both seismic and electrical resistivity, while the driveway alignment consisted of seismic only. Only seismic was performed at the driveway because of constant ambulance traffic. The geophysical transects were “field-fit” to maximize data collection while considering the efficiency of equipment, cable, and geophone placement. DOWL performed two seismic transects, 225 feet in length, as shown in Figure 2. General information for the geophysical transects is provided in Table 2. Two seismic data collection methodologies were implemented along each transect: the Multichannel Analysis of Surface Waves (MASW) and seismic refraction methods. The seismic refraction data were collected in general accordance with ASTM D5777-18, Standard Guide for Using the Seismic Refraction Method for Subsurface Investigations. Electrical resistivity was performed to supplement seismic data. DOWL collected the electrical resistivity data in general accordance with ASTM D6431-18, Standard Guide for Using the Direct Current Resistivity Method for Subsurface Site Characterization. Table 2: Geophysical Exploration Summary Transect Transect Length (feet) Transect Start (Latitude & Longitude) Transect End (Latitude & Longitude) Description Driveway* 225 46° 10’ 45.63” N 112° 47’ 44.61” W 46° 10’ 46.56” N 112° 47’ 40.71” W South Addition Existing Driveway Area North Addition 225 46° 10’ 46.75” N 112° 47’ 43.30” W 46° 10’ 45.41” N 112° 47’ 42.50” W Northeast Addition *Seismic only The location and elevations used for the tomograms were taken in the field using a Bad Elf GPS. The elevations were modified to match the topography elevations provided by Sanbell. Seismic Data Collection The seismic source (shot) or energy introduced into the ground was initiated by a 20-pound sledgehammer striking a plate on the ground surface. Four hammer hits were used at each shot location and summed to reduce background ambient noise. Sixteen shot locations were implemented along each profile. Shot spacings were determined based on subsurface ray path coverage suitable for seismic refraction tomography (SRT) and subsequent use in MASW analysis. Seismic survey parameters used for all data collection transects are summarized in Table 3. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 8 Table 3: Seismic Survey Parameters Parameter Equipment, Method, or Software Recording Instrument Geometrics Geode Geophone Natural Period 4.5 Hertz Number of Geophones 24 Sample Rate 0.125 millisecond (MASW) Number of Samples 6,000 per channel MAM Data Collection 30 minutes Record Length 1.5 seconds Geophone Spacing 7.5 feet Seismic Source 20-pound sledgehammer Stack Number 4 Refraction Analysis Software Rayfract® Surface Wave Analysis Software SeisImagerSW™ Geometrics, Inc. MASW 1D SWprocess MASW 1D Surface Wave Wizard/Geoplot Geometrics, Inc. MASW 2D Electrical Resistivity Data Collection Electrical Resistivity Tomography (ERT) data were collected by inserting 48 3/8-inch metal electrodes in the ground in an array and injecting a low-voltage direct current. The electrical method estimates the depth of variable geomaterials via an electrical resistivity inversion of the field data when a contrast of conductivity is present. Electrical resistivity survey parameters used for all data collection transects are summarized in Table 4. Table 4: Electrical Resistivity Survey Parameters Parameter Equipment, Method, or Software Recording Instrument ABEM Terrameter LS2 Number of Electrodes 48 Array Gradient Error Limit 1% Acquisition Time 1.5 seconds Maximum Stack Number 4 Data Filtering Software ABEM Toolbox® Resistivity Analysis Software Res2Dinv® 2.3 Geophysical Analysis and Interpretation 2.3.1 Seismic Analysis 2.3.1.1 Seismic Refraction Method The seismic refraction method calculates subsurface compressional wave velocity (Vp). This approach uses seismic body waves, in contrast to the MASW method, which employs seismic surface waves. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 9 Using the same first arrival times, a tomographic solution can be calculated by discretizing the subsurface into cells instead of layers. The tomographic approach thus lends itself to characterizing laterally variable subsurface media. 2.3.1.2 MASW Method The MASW method provides a shear wave velocity (Vs) result as a 1D profile located at the center of the geophone spread. Optimal MASW data collection requires the seismic source (shots) to be offset from the nearest geophone, ideally ranging between 10 and 30 percent of the geophone spread length. Thus, shots taken inside the geophone spread will not give accurate results for MASW analysis. MASW uses the velocity dispersion characteristics of the high-amplitude surface wave (Rayleigh wave) to calculate Vs with depth. SeisImagerSW and SWprocess software was used for the MASW analysis. The project site’s Seismic Site Classification per the 2016 edition of the American Society of Civil Engineers 7 (ASCE 7-16) Minimum Design Loads and Associated Criteria for Building and Other Structures Table 20.2-1 are attached in Appendix B. 2D MASW profiles are attached. 2D MASW uses Common-Mid-Point (CMP) gathers to generate shear wave velocities. Although the 2D s-wave velocity profiles resemble discretized velocity models, the 2D profiles are formed from 1D s-wave velocity profiles calculated at two times the geophone spacing. The starting model was set to 12 layers for the calculations. Thus, the resolution of the MASW 2D model is twice the geophone spacing horizontally and 12 layers vertically, resulting in a coarser resolution than SRTs. The figures are the gridded and contoured results from the individual 1D s-wave depth velocity profiles. 2.3.1.3 Seismic Interpretation Interpretations of the seismic data are attached. The seismic profiles represent the corresponding calculated 2D SRTs of compressional wave velocity (Vp) and 2D (MASW) tomograms. The shear wave velocities for geomaterials are typically 40 to 60 percent of the compression wave velocities if there is no groundwater table. If there is a groundwater table, the shear wave velocities are approximately 20 percent of the compression wave velocity. Groundwater does not impact the shear wave velocities, as water has no shear strength. In geotechnical engineering terms, compression waves can be regarded similar to total stress parameters as they tend to induce volume change, and their propagation velocity in saturated soil is practically identical to that of compression waves in water. Shear waves impose only shear deformation, and the velocity can be considered an effective stress parameter. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 10 DOWL researched published representative p-wave velocities to interpret depths to bedrock or dense sediment below the existing ground surface. Table 5 lists published seismic wave velocities for various materials (Press, 1966). Shear wave velocities were calculated and tabulated based on the following rule-of-thumb relationships (Burger, Sheehan, and Jones, 2006): • Vs = 0.6Vp for crystalline rocks • Vs = 0.5Vp for sedimentary rocks • Vs = 0.4Vp for soils and unconsolidated sediment materials. Table 5: Range of Seismic Velocities (feet per second) Unconsolidated Materials Competent Bedrock (no groundwater) P-wave Velocities S-wave Velocities* P-wave Velocities S-wave Velocities* Alluvium 1,640-6,560 660-2,620 Granite 16,400-19,680 9,840-11,810 Clay 3,610-8,200 1,444-3,280 Basalt 17,710-20,990 10,630-12,600 Unsaturated Sand 660-3,280 262-1,310 Metamorphic Rocks 11,480-22,960 6,890-13,780 Saturated Sand 2,620-7,220 262-1,310 Sandstone and Shale 6,560-14,760 3,280-7,380 Unsaturated Sand and Gravel 1,310-1,640 525-660 Limestone 6,560-19,680 3,280-9,840 Saturated Sand and Gravel 1,640-4,920 525-660 Non-geomaterials Unsaturated Glacial Till 1,310-3,280 525-1,310 P-wave Velocities S-wave Velocities Saturated Glacial Till 2,630-6,550 525-1,310 Water 4,592-5,248 N/A Very Dense Glacial Till 3,940-6,890 1,574-2,760 Air 1,087 N/A *S-waves were calculated using the rule of thumb listed above. Velocities are in feet per second and converted from published meters per second. As shown in Table 5, saturated unconsolidated material or sediment has a higher p-wave velocity range than unsaturated sediments. However, S-wave velocities don’t change with the presence of groundwater. The following two sections are the interpretation of two geophysical transects perform for each of the two additions. DOWL interprets the compressional wave velocity (Vp) for the sound geomaterials (gravel deposits and underlying silty sand) as 2,500 feet per second. The shear wave velocities from MASW data are interpreted as 1,250 feet per second. Seismic (compressional refraction and MASW) was only performed at the south addition because of ambulance traffic. The MASW 1D for the determination of seismic site class was obtained from the south addition array. The geophysics at the north addition consisted of compressional and shear wave refraction, MASW, and electrical resistivity. DOWL combined the compressional and shear wave refraction from the north addition to investigating the presence of a groundwater table. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 11 Seismic Line – South Addition – Ambulance Driveway The seismic refraction tomography (Profile 1) and MASW 2D (Profile 2) profiles just south of the helipad illustrates interpretative gravel deposits at approximate elevations ranging from 4,890 to 4,878 feet with the seismic refraction showing more undulations. This interpretation of the seismic geophysics correlates well with the depth to gravel deposits shown in Table 6. The nine historical boreholes show the elevations of the gravel deposits range from 4,895.5 to 4,879.1 feet. The 2D seismic investigation consisted of compressional seismic refraction and MASW 2D. Profile 3 of Appendix B illustrates the MASW 1D profile to calculate seismic site classification. Appendix B also lists Table 20.3-1 from ASCE 7-16 for Seismic Site Classification. The 1D MASW method estimates that the 1D shear wave profile extends at least 100 feet for Vs100 determination and is located at the center of the seismic spread. Based on the 1D MASW profile, the Vs100 is estimated to be 1,213.4 feet per second. Profile 4 of Appendix B illustrates the MASW 1D profile to calculate seismic site classification from an open-source software called SWProcess. SWProcess allows for the deeper analysis of the site’s surface wave dispersion data and quantifying its uncertainty. The Vs100 determined from SWProcess was estimated to be 1,168 feet per second with a standard deviation of 56 feet per second when comparing three different shear wave profile models. Seismic Line – North Addition A seismic line was performed for the north addition and both compressional (Profile 5) and shear wave (Profile 6) refraction, as well as MASW 2D (Profile 7). The data was collected on a hillside but the interpretative depth to gravel deposits remains fairly consistent with depth. This indicates that the depth to gravel deposits does not parallel the surface contours. As for the south addition, the interpretative elevation of the gravel deposits range from approximately 4,890 to 4,880 feet. Because there was no ambulance traffic while collecting data for the north addition, DOWL was able to create a Vp/Vs ratio by combining the compressional and shear wave refraction profiles. DOWL interprets the presence of a groundwater table if the Vp/Vs ratio is greater than 4.0. As shown on Profile 8 in Appendix B, the highest Vp/Vs ratio is approximately 2.7. Section 3.3 expands on groundwater data from past geotechnical investigations. 2.3.2 Resistivity Analysis and Interpretation The ERT method utilizes differences and contrasts in electrical resistivity to identify the subsurface materials, depth to water, and subsurface structures. This method measures the subsurface bulk (apparent) electrical resistivity, providing information about changes in subsurface lithology and groundwater saturation. The measured apparent resistivity is a function of different parameters, such as porosity, groundwater salinity, clay content, water saturation, and how the subsurface conducts electricity. 2.3.2.1 Resistivity Line – North Addition The resistivity investigation reveals two distinct geomaterials in the upper 40 feet of the subsurface. At approximately elevation 4,890 feet and above, we recorded lower resistivity values indicating undocumented fill and native lean clays. Higher resistivities were recorded below the 4,890-foot elevation, indicating the gravel and silty sand deposits. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 12 The resistivity profile may also illustrate the existence of an underground utility with the underlying bedding material at approximately station 70 feet. All geophysics outputs are in Appendix B. 3.0 SUBSURFACE CONDITIONS 3.1 Site Geology The Gallatin Valley is an intermountain basin within the Rocky Mountains. The Bridger and Gallatin Mountain Ranges flank the valley on the east and south of the Horseshoe Hills from the northern boundary, and the topographic divide between the Gallatin and Madison Rivers bounds the valley on the west. The south and east sides of the Gallatin Valley are bordered by coalescing alluvial fans that slope rather steeply from the Gallatin and Bridger Ranges. These alluvial/fluviatile deposits range in age from Tertiary to Quaternary. Geologic mapping of the Gallatin Valley indicates that the project site is located on the Sixmile Creek Formation (Tsc). The lithology of the Sixmile Creek Formation is predominately light brown to light gray, poorly stratified and poorly sorted, tuffaceous siltstone. The formation also includes discontinuous, lenticular layers of fluvial channel conglomerate, unaltered white volcanic ash, and mudstone. 3.2 Observed Soil Conditions The nine historical boreholes were drilled at a preexisting parking lot with asphalt surfacing or topsoil of landscaping areas. None of these boreholes were drilled within the proposed expansion footprint and the conditions beyond these boreholes may differ. The soil conditions were observed to be relatively consistent with undulations regarding the depth to gravel deposits layer. Tertiary sediment underlies the gravel deposits and extends beyond the maximum depths explored of 36.5 feet. Undocumented fill was observed in seven of the nine boreholes with depths ranging from 2.4 to 10.0 feet from the ground surface. Below the fill, native medium-stiff to very-stiff lean clay was observed with medium brown color. Underlying the clay, alluvial gravel deposits were observed at depths ranging from 12.2 to 28.5 feet below the drilled ground surface, and the gravel deposits were observed at approximate elevations ranging from 4,895.5 to 4,879.1 feet. Table 6 outlines the depths to gravel and the elevation of the gravel deposits from four past geotechnical investigations of nearby structures. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 13 Table 6: Depth to Gravel Deposits Borehole Surface Elevation (feet) Depth to Gravel Deposits (feet) Elevation of Gravel Deposits (feet) BH-4-08 4,911.0 19.5 4,891.5 BH-5-08 4,910.0 14.5 4,895.5 BH-6-08 4,913.7 22.5 4,891.2 HKM DH 101 4,913.4 28.5 4,884.9 HKM DH 102 4,911.9 19.6 4,892.3 BH-206 4,901.8 22.7 4,879.1 BH-207 4,900.3 20.0 4,880.3 B-8-17 4,902.0 13.8 4,888.2 B-9-17 4,901.8 12.2 4,889.6 In Appendix A we present the historic exploration logs with lithology descriptions as well as other engineering properties. In the following paragraphs, we provide a general description of the soil strata. 3.3 Groundwater A perched groundwater table was encountered at two of the nine geotechnical boreholes at depths of 3.0 and 14.0 feet, respectively. These observations represent groundwater conditions only at the time of the observations and may not be indicative of other times or locations. Groundwater conditions can change with varying seasonal and weather conditions and other factors. Consider the possibility of groundwater fluctuations when developing design and construction plans for the project. Table 7 lists the groundwater depths and the static groundwater elevations observed during the four geotechnical investigations. Table 7: Groundwater Depths Boring Groundwater Depth (feet) Borehole Surface Elevation (feet) Static Groundwater Elevation (feet) B-4-08 Not Encountered 4,911.0 -- B-5-08 Not Encountered 4,910.0 -- B-6-08 3.0 – Perched 4,913.7 4,910.7 HKM DH 101 Not Encountered 4,913.4 -- HKM DH 102 14.0 - Perched 4,911.9 4,897.9 BH-206 Not Encountered 4,901.8 -- BH-207 Not Encountered 4,900.3 -- B-8-17 Not Encountered 4,902.0 -- B-9-17 Not Encountered 4,901.8 -- 3.3.1 Groundwater Information Center Research We researched the Montana Bureau of Mines and Geology's Groundwater Information Center (GWIC, 2023) website to estimate static water levels from Section 17 of Township 2 South, Range 6 East. GWIC data is for informational purposes only and contains historical well logs, some of which may not be accurate. Based on the GWIC research, static groundwater levels range from 10 to 87 feet below the existing ground surface with an average depth of 43.7 feet. This data was calculated from 15 wells located within this section. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 14 Bozeman Health owns five wells in this section, with three wells having static groundwater data. The static groundwater data range from 45.1 to 53.0 feet. 3.4 Seismicity 3.4.1 Faulting The proposed development is located in an area of Quaternary faulting. Based on the USGS Quaternary Fault Fold Database (USGS, 2025), four Quaternary faults exist within the project vicinity: Table 8: Documented Faults Fault Name Distance from Project Site (miles) Recent Earthquake Published Slip Rate (mm/yr) Fault Length (km) Average Strike Bridger Fault ~5 Unknown < 0.2 48 N9°W Gallatin Range Fault ~7.5 Unknown < 0.2 26 N63°E Central Park Fault ~20 Unknown < 0.2 30 N77°E Elk Creek Fault ~25 Unknown < 0.2 28 N62°W Available publications do not include documentation that these faults have been offset during the Holocene (last 15,000 years). However, the proposed structure is in an area of high seismic activity. 3.4.2 Design Accelerations DOWL utilized site soil and geologic data, our knowledge of local geology, MASW 1D methods, the project location, the 2016 American Society of Civil Engineers 7 (ASCE 7), and the National Earthquake Hazards Reduction Program (NEHRP) to estimate Seismic Site Classification of "D" at the project site. We recommend seismic design based to the seismic parameters provided in Table 9, which are based on the soil conditions and project location: Table 9: Seismic Design Parameters Period (seconds) Modified Acceleration Coefficient for Site Class D (g) 0.0 (peak) PGAM = 0.383 0.2 (short SDS = 0.562 1.0 (long) SD1 = 0.275 3.4.3 Liquefaction Liquefaction is the partial or total loss of strength of soils that can occur during strong earthquake shaking of significant duration. Liquefaction is a process where high shear deformations result in progressive build-up of pore water pressure. Because the seismic load occurs rapidly, soil does not have time to drain, and the effective stress may be reduced to near zero, resulting in a temporary loss of shear strength. Earthquake-induced liquefaction generally occurs only under particular conditions, which include saturation, strong earthquake ground shaking of long duration, and loose granular soil. Liquefaction can also occur in silts and fine-grained soils. Typically, Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 15 liquefaction occurs where the groundwater table is shallow (5 to 10 feet deep) and generally only at depths less than approximately 50 feet. Based on SPT N-values observed in each soil unit for this site and the lack of groundwater, it is our opinion that the risk of liquefaction is very low at this site. 4.0 ENGINEERING ANALYSIS AND RECOMMENDATIONS 4.1 Foundations The assumed finish-floor elevation for the basement floor is assumed to be 4,899.2 feet, and the second floor to be 4,914.5 feet. As discussed previously, soil conditions encountered during historical investigations indicate medium-stiff to lean clay overlie dense to very dense gravel deposits. Dense to very dense silty sand typically underlies the gravel deposits. The gravels were observed at elevations ranging from 4,895.5 to 4,879.1 feet in the geotechnical boreholes. These observed borehole depths to gravel match well with the geophysical transect depths of 2,500 feet per second for compressional waves and 1,250 depths per second for shear waves. As shown in the historical boreholes and near-surface geophysics, the gravel deposits undulate at the site. The lean clay is not suitable to support conventional footings with high loads unless significant over-excavation is performed. The lean clays are moderately compressible and may contain layers that have collapse potential. Differential settlement is always a concern when placing additions to existing structures. Up to 10 feet of undocumented fill was also observed in the historical boreholes. Undocumented fill is also not suitable to support conventional footings. Based on preliminary assumptions, DOWL estimates that all the lean clay soil would need to be over-excavated to reduce the settlement potential of the point load footings. Without over- excavation, the settlement of the spread footings has an estimated settlement potential of over one inch. Since the project consists of two additions, any settlement of the new footings will therefore be considered differential to the existing structure. Expansion joints should be incorporated at the interface areas between the new construction and the existing building. Excavation adjacent to the existing footings should extend no closer than that defined by a line projected at a one-to-one slope from the outside edge of the existing footings to the bottom of the excavation. For example, the edge of an excavation 4 feet deep below an existing footing should be no closer than 4 feet horizontally from the footing. If deemed necessary, underpinning of the existing footings should be considered to ensure movement does not occur during excavation of the new basement adjacent to the existing frost wall footing area. Additionally, to minimize the potential for additional stress on existing footing foundations from the new footing loads, new footings should not be placed closer than one- and one-half footing widths to existing footings. The structural engineer may elect to rigidly connect new foundation elements to existing foundation in discrete locations, provided that the combined behavior of the new and existing building are properly evaluated and the existing building foundation is determined to be capable of supporting any additional loads or effects thereof. For the north addition that will have a basement, the basement’s finish floor elevation will be 4,899.2 feet. DOWL performed a overexcavation analysis and it is probably not feasible. With maximum point loads of 350 kips, the entire clay layer must be removed to reduce settlement to less than one inch. Because the gravel deposits undulate, the overexcavation will range from 3.7 to 20.1 feet. Because of the uncertainty in the depth to gravel depoits, DOWL recommends deep foundation elements for both additions. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 16 We provide specific recommendations in the following sections. 4.1.1 Engineered Aggregate Piers The proposed structures can be supported on conventional foundation overlying soil reinforced by aggregate pier elements. The piers are constructed by drilling 24- to 36-inch diameter holes extended below the base of the foundation and backfilling the holes with thin lifts of compacted aggregate. Each lift is compacted using high-energy, low-frequency impact hammers that deliver vertical ramming energy that densifies the aggregate and increases lateral stress in the soil matrix. The system serves to reduce settlement by remediating the appropriate depth of loose poorly graded sand with a denser composite soil matrix. We have spoken to GeoTech Foundation Company–West regarding the suitability of installing the aggregate pier system at the project site. DOWL estimates the allowable bearing capacity using aggregate piers will be between 8,000 and 10,000 psf. It is recommended to use a coefficient of friction of 0.5 between cast-in-place concrete and EAP improved subgrade. In addition, the energy imparted by ramming aggregate into the native clays will densify the surrounding soil, thereby reducing the settlement potential. Aggregate Pier Installation Recommendations If an aggregate pier-enhanced foundation system is selected, we recommend that the following issues be considered prior to construction: • Specifications for aggregate pier foundation systems should be prepared by the design- build contractor. • All of the aggregate pier element installations should be conducted under the observation of the geotechnical engineer’s representative to verify proper installation procedures and document any changes in the explored soil conditions. After the foundation soils have been reinforced with aggregate pier elements, adequate protection of the reinforced ground is required. This includes proper drainage to eliminate ponding water and maintaining excavation distance from the installed piers. Prior to foundation installations, the reinforced ground surface should be cleared and cleaned to the satisfaction of the geotechnical engineer, and shallow foundations installed at grade. Excavations for foundations and final grade cuts to slab subgrade elevations should be performed with smooth-bladed equipment to minimize the disturbance of the aggregate piers and the surrounding soil. Cobbles and boulders may exist within the gravel deposits. The granular substrates will most likely slough during excavation of the aggregate piers. As a result, excavations that penetrate into granular layers may need to be cased during installation. Settlement Based on anticipated loading information, the aggregate pier manufacturer estimates that bearing capacities up to 10 ksf are possible while keeping settlement estimates at less than one inch. The aggregate pier manufacturer should perform settlement calculations when loading information is made available. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 17 4.1.2 Drilled Shafts Based on the subsurface conditions encountered within the exploration borings, the results of the laboratory testing, and the nature of the proposed construction, drilled shaft end bearing within the sand and gravel deposits or silty sand and lean clay underlying the gravel deposits can be utilized. Install concrete drilled shafts in accordance with ACI 336.1 – Specification for the Construction of Drilled Piers. The following are general suggestions for the installation of concrete drilled piers: 1. Reinforced concrete, straight-shaft, drilled piers, and grade beams/pier caps may be used to support all loads of the proposed structures to limit potential vertical movement. Grade beams/pier caps should be designed to span between pier locations while carrying the imposed loads. 2. Piers should be founded with a 5-foot minimum penetration into the gravel deposits. The final pier lengths will depend on the final structure elevations. Table 10 provides end bearing and skin friction options depending on the substrate the drilled piers terminate. 3. We recommend a minimum diameter of 18 inches to facilitate proper cleaning and inspection of the pier excavations. 4. We recommend a pier spacing of not less than three pier diameters measured from the outside edge to the outside edge of the piers for vertical loads. Piers will behave as a group for pier spacing less than three pier diameters, and individual pier capacities must be reduced. The capacity reduction will depend upon pier spacing and the number of piers within the group. If closer spacings are required, DOWL should be notified so that appropriate reduction factors can be provided based on the actual pier layout. Group reductions for laterally loaded piers will depend on the orientation of pier groups compared to the direction of loading. Such reductions may be required for pier spacings of less than eight pier diameters. 5. The foundation driller should be equipped with appropriate drilling equipment and be prepared for any difficulties resulting from drilling into gravels, cobbles, or possible boulders. We anticipate that casing will be necessary for each hole. The length of the casing should be sufficient to extend from slightly above the ground surface to the planned drill depth. 6. It is imperative that all loose slough is removed from the bottom of the pier excavations. Loose material in the bottom of the hole will be compressible and may cause excessive settlement of the pier if not removed. The contractor shall use the appropriately sized cleaning bucket to remove all slough from the bottom of the excavation. 7. Cast-in-place concrete piers should fill the entire hole. Where casing is necessary, it should be withdrawn as the concrete is poured while maintaining the casing bottom below the top of the concrete. Concrete should be directed so that it does not come in contact with the sidewall of the excavation and so that it has minimal contact with the reinforcing steel. Volume calculations should be conducted during concrete placement to verify placed volume relative to excavation volume. This is to confirm that caving of the excavation sidewall did not occur. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 18 8. Concrete should not be poured into pier excavations with more than two inches of standing water. If approved by a qualified geotechnical engineer, alternate construction methods, such as pumped or tremied concrete from the pier bottom up, may be acceptable if proper pier-bearing conditions can be verified. 9. Once drilling and cleaning are complete, DOWL must observe and approve the depth of each pier excavation. 10. Place concrete immediately after the completion of drilling. 11. Concrete placed in pier excavations should have a slump of 4 to 6 inches while maintaining minimum 28-day strength requirements. Concrete placed with temporary casing should have a slump of 6 to 8 inches. Concrete placed through tremie methods (wet condition) should have a slump of 8 to 9 inches to prevent voids from forming around reinforcing steel. Table 10: Substation Drilled Pier Recommendations Parameters Minimum Drilled Pier Penetration (feet) Soil Type Maximum Net Allowable End Bearing Pressure (psf) Allowable Skin Friction (in compression) (psf) Allowable Skin Friction (in tension) (psf) -- Lean Clay -- 200 120 5.0 Gravels 12,000 250 130 5.0 Silty Sand 14,000 275 160 Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 19 Table 11 lists are the recommended L-Pile parameters for drilled shafts for proposed south expansion. The surface elevation is assumed to be 4,914.5 feet. Table 11: L-Pile Drilled Pier Recommendations Parameters Layer No. Depth (feet) LPile Soil Type Parameter Recommended Value 1 0.0 to 2.0 Undocumented Fill Silty Sand (Loose Sand) Effective Unit Weight, ɣ 100 pcf Friction Angle,  28° Top - p-y Modulus, k (dry) 20 pci Bottom - p-y Modulus, k (dry) 25 pci 2 2.0 to 23.0 Lean Clay (Soft Clay) Effective Unit Weight, ɣ 88 pcf Undrained Shear Strength, Su 500 psf Soil Modulus 100 pci (static) Top – Strain Factor, ε50 0.015 Bottom – Strain Factor, ε50 0.010 3 23.0 to 27.0 Gravels (Dense Sand) Effective Unit Weight, ɣ 125 pcf Friction Angle,  36° Top - p-y Modulus, k (dry) 220 pci Bottom - p-y Modulus, k (dry) 225 pci 4 27.0+ Silty Sand (Dense Sand) Effective Unit Weight, ɣ 120 pcf Friction Angle,  34° Top - p-y Modulus, k (dry) 220 pci Bottom - p-y Modulus, k (dry) 225 pci Maximum settlement estimates using drilled shafts are on the order of less than one inch. Differential settlement is estimated to be less than ½ inch. 4.1.3 Helical Piles In our opinion, helical piers are a suitable foundation option. Helical piers are screw piles that can be embedded directly in anew grade beam or pier cap. We provide design parameters for both HELI-Pile and AB Chance brand piers in the following tables. Local contractors commonly use both in the project area. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 20 Table 12: Helical Pier Capacities HELI-PILE Helical Piers Square shaft 1.5 inch 1.5 inch 1.75 inch Allowable shaft capacity 27.5 kips 35 kips 55 kips Minimum installation torque 5,500 ft-lbs 7,000 ft-lbs 11,000 ft-lbs Shaft yield strength 70 ksi 90 ksi 90 ksi Helix yield strength 80 ksi 80 ksi 80 ksi A. B. Chance Helical Piers Square shaft 1.5 inch 1.5 inch 1.75 inch Allowable shaft capacity 27.5 kips 35 kips 50 kips Minimum installation torque 5,500 ft-lbs 7,000 ft-lbs 10,000 ft-lbs Shaft yield strength 70 ksi 95 ksi 95 ksi Helix yield strength 50 or 80 ksi 80 ksi 80 ksi A double-lead helix will likely be necessary to obtain the installation torque to achieve the capacities shown in the table above. Based on the boring logs, the consistency of the gravel varies, and so helical pier depths will likely range from 20 to 35 feet below the finish floor elevation of 4,914.5. Test helical piles should be considered to evaluate depth of embedment into the underlying strata and to obtain adequate or required torque. The helical piers provide very little lateral resistance; the lateral loads will be resisted by the passive soil pressure, or piers can be battered to provide lateral resistance. Based on lab testing for determining soil resistivity, resulting in a pH ranging from 6.9 to 8.2 and resistivity ranging from 1,610 to 1,680 ohm-cm, we estimate weight loss to be approximately 1.0 oz/ft2/year and the expected life (for 1/8" shaft loss) is approximately 60 years. Maximum settlement estimates using helical piers are on the order of less than one inch. Differential settlement is estimated to be less than ½ inch. 4.2 Lateral Earth Pressures Design below-grade walls for building, landscape, and retaining walls and any structure retaining soil to resist both lateral earth pressures from the retained soil adjacent to the structure, as well as hydrostatic pressures from retaining water (if undrained, not recommended). Also, account for lateral surcharge loads from equipment, slopes, or vehicles adjacent to the walls in the structural wall design. We provide recommended lateral earth pressures for below-grade wall design, which are provided in Table 13. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 21 Table 13: Lateral Earth Pressures Lateral Earth Pressure Case Equivalent Fluid Pressure - Unsaturated (pcf) Structural Fill At-rest (no wall movement) 60 Active (wall moves away from soil mass) 36 Passive (wall moves into soil mass) 420 Native Gravels (GP) At-rest (no wall movement) 55 Active (wall moves away from soil mass) 35 Passive (wall moves into soil mass) 400 Native Lean Clay (CL) At-rest (no wall movement) 60 Active (wall moves away from soil mass) 43 Passive (wall moves into soil mass) 258 Based on the moist unit weight of 135 pcf and friction angle of 35 degrees for Structural Fill (GW), 125 pcf and friction angle of 34 degrees for native gravels, and 105 pcf and friction angle of 25 degrees for lean clays (CL). • The above equivalent fluid pressures assume fully drained conditions and no hydrostatic forces acting on the wall. • Construct below-grade walls, retaining walls, or other retaining structures with adequate drainage systems as specified by the Structural Engineer. • The retaining walls move away from or toward the soil to develop active and passive resistance. For walls that cannot tolerate movement, structurally design walls utilizing at- rest equivalent earth pressures. • We based the above equivalent fluid pressures on the assumption that the surface of the backfill adjacent to the walls slopes down and away from the wall a minimum of 5 percent for 10 feet to provide drainage. • Lateral surcharge pressures due to traffic, equipment, slopes, storage loads, etc., are not included in the above lateral earth pressure recommendations. Use the lateral earth pressure coefficient of 0.5, acting over the below-grade wall height, to estimate the lateral surcharge loads from equipment, adjacent foundations, and slopes behind and above walls. 4.2.1 Seismic Earth Pressure We recommend using the Mononobe-Okabe approach to determine the additional earth pressures due to earthquakes. For the retained earth at this project, a unit weight of 120 pcf should be used for the onsite soils (gravel and clay mixture) and 130 pcf should be used for structural fill. Using the design peak horizontal ground acceleration of 0.34g, we estimate the equivalent additional fluid (active) earth pressure acting on the walls will be: 17.6 pcf and 14.6 pcf for the gravel and clay mixture or structural fill, respectively. We calculated this value using ½ the peak ground acceleration in the horizonal direction. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 22 4.2.2 Coefficient of Friction We recommend using a coefficient of friction of 0.45 between cast-in-place concrete and structural fill, 0.30 between cast-in-place concrete and undocumented fill, clayey sand soil, and 0.20 between the cast-in-place concrete and native sands. The friction value may be combined with the passive pressure to resist horizontal loads. 4.3 Slabs-on-Grade 4.3.1 Interior Slabs and Helipad The native, silt soils can be used to support lightly loaded floor slabs; however, compacted structural fill must be placed between the slab and the native soil. Design the floor slabs using the recommendations in the table below. Table 14: Floor Slab Recommendations Description Value Interior floor system Slab on-grade concrete. Floor slab subgrade Scarify, moisture condition and recompact at least 8 inches of on-site soil. Base layer Place a minimum of 8 inches of structural fill, compacted in accordance with Section 4.7.5 of this report. Modulus of subgrade reaction 190 pounds per cubic inch (pci) Some differential movement of a slab-on-grade floor system is possible if the moisture content of the subgrade soils is increased. To reduce the effects of some differential movement, separate floor slabs from bearing walls and columns with expansion joints, which allow vertical movement. Use floor slab control joints to reduce damage due to shrinkage cracking. 4.4 Low Height Concrete Block Retaining Walls At the time of this report, the location and height of proposed retaining walls are unknown. This section provides recommendations for low-height (less than four feet tall) concrete block retaining walls. From the historical geotechnical boreholes and near-surface geophysics, the subsurface geology will consist of undocumented fill or native lean clays in the upper 13 feet soil horizon. DOWL recommends the following material parameters similar to Montana Department of Transportation’s Low Height Concrete Block Retaining Wall Special Provision: • Construct precast concrete wall blacks capable of retaining a soil cut up to four feet in height, via gravity resistance, without internal soil reinforcement. The soil slope above and behind the wall is considered to be level to nearly level. • The leveling pad and wall backfill material be constructed of granular material meeting the requirements of Section 4.7.4 Structural Fill. • Provide geotextile-wrapped 4-inch Corrugated ADS N-12 Drainage Pipe with perforations for backfill drainage pipe (or approved equal). DOWL recommends Marafi 1120N filter fabric (or approved equal) to wrap the drainage pipe. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 23 • Provide splices, fittings, and connectors that will not impede flow or damage the drainage pipe and have sufficient strength to withstand construction handling and permanent loading. • Excavate the leveling pad area a minimum of two feet below the planned wall base elevation and a minimum of 3.0 feet wider than the width of the bottom concrete blocks. • Scarify the top 12 inches of the footing subgrade and compact in accordance with Section 4.7. • Construct the wall according to the manufacturer’s recommendations, up to a maximum height of four feet of retained soil. 4.5 Pavement Surfacing An engineering evaluation has been conducted to assess the subgrade conditions and determine a recommended pavement section for the parking areas and access lanes. Subgrade soil conditions have been described under the Observed Soil Conditions in Section 3.2. The subgrade is comprised predominantly of lean clay with sand or sand with variable clay or silt. Occasional gravel and cobbles were observed within the proposed subgrade during the investigation. 4.5.1 Traffic The expected traffic will consist of ambulances, traditional car traffic, vans, and maintenance vehicles. Traffic will consist of emergency vehicles and patients parking at adjacent parking lots. We calculated equivalent single axle loads (ESALs) as shown in Table 15. If future projects that impact general traffic routes are planned, contact DOWL to revise our recommendations as necessary. Table 15: Traffic Loading Vehicle Description ADT (Design Lane) Axle Load (kips)* Passenger Car 500 2S 2S Pickup Truck/Van 250 2S 4S Ambulance 200 4S 4S Delivery Trucks 10 4S 14S Front Wheel Loader 4 8S 8S 250/0 and 350/0 4 4S 4S Calculated 18-kip ESALs 32,478 (flexible) *S-Single 4.5.2 Design Parameters We used the pavement design parameters shown in Table 16. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 24 Table 16: Pavement Design Parameters Pavement Design Parameter Design Value Source Initial Serviceability 4.2 AASHTO 1993 Terminal Serviceability 2.0 AASHTO 1993 Reliability 85% AASHTO 1993 Drainage Coefficient 0.9 AASHTO 1993 Flexible Pavement Design Life 20 years AASHTO 1993 Standard Deviation 0.45 AASHTO 1993 Asphalt Layer Coefficient 0.40 AASHTO 1993 Base Layer Coefficient 0.14 AASHTO 1993 Subbase Layer Coefficient 0.08 AASHTO 1993 Subgrade Resilient Modulus 4,500 psi Estimated CBR value 4.5.3 Flexible Pavement Based on our design calculations, anticipated traffic, and field conditions, we recommend the pavement sections shown below for the proposed new pavement areas for the parking lot. The separation fabric will help prevent the migration of fines into the overlying crushed aggregate course. Flexible Pavement - Parking Lot Section • 3-inches of asphalt • 8-inches of crushed aggregate course • Separation Fabric (Mirafi HP570 or approved equal) • Subgrade prepared in accordance with Section 4.7. 4.5.4 Rigid Pavement For areas subject to concentrated and repetitive loading conditions, such as dumpster pads and ingress/egress aprons, we recommend using a reinforced concrete pad at least 6.5 inches thick underlain by at least six inches of granular base. The granular base must overlie a geotextile recommended in Section 4.7.9. In addition, we recommend that signage and/or curbing be used to restrict truck traffic in car parking and drive lane areas. Provide sawed or hand-formed joints at spacings not greater than 15 feet on center. Construct the joints to be at least one-fourth of the slab thickness. Provide expansion joints at the end of each construction sequence and between the concrete slab and adjacent structures. For pedestrian sidewalks, DOWL recommends 4.0 inches of reinforced concrete underlain by at least six inches of granular base. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 25 4.5.5 Pavement Construction Considerations Compact fill in 8-inch loose lifts to at least 95 percent of maximum dry density at plus or minus three percentage points of optimum moisture content according to ASTM D 698 (Standard Proctor). DOWL must observe the subgrade soil prior to fill placement for fill or suspect soils. Prior to fill placement, scarify the existing subgrade to a depth of at least eight inches and compact to not less than 95 percent of maximum dry density near optimum moisture content according to ASTM D 698 (Standard Proctor). If undocumented fill is observed, proof roll and obtain 95 percent of the Standard Proctor. If compressible, replace with general fill or structural fill. Drying or moisture conditioning of the subgrade soils may be required to achieve the specified compaction. All subgrades should be proof rolled with a loaded dump truck or water truck prior to placing base gravel. Areas where compaction criteria cannot be met or soft areas revealed by proof rolling must be sub-excavated to a minimum depth of twelve inches and replaced with compacted approved fill. Areas of loose or organic fill, if encountered, should be sub-excavated to remove all unsuitable material and replaced with compacted granular fill. All paving materials should meet and be installed in accordance with Montana Public Works Standard Specifications. Compact base materials to not less than 98 percent of maximum dry density at plus or minus two percent of optimum moisture according to ASTM D 698. 4.6 Drainage Drainage is critical to the long-term performance of the water tower and mechanical building. In the following sections, we provide recommendations for surface and subsurface drainage. 4.6.1 Surface Drainage To reduce the potential for movement due to an increase in the moisture content of subgrade soil, we strongly encourage the implementation of the following recommendations. • Per the 2020 IBC, slope the ground surface within 10 feet of the structure downward a minimum of 5 percent away from the structure. Slope the ground surface beyond 10 feet of structures downward at least two percent away from the structure. • Apron slabs and pavement may be used to further reduce infiltration adjacent to structures. Aprons should consist of asphalt or Portland cement concrete pavement placed directly adjacent to the foundation stem walls. An elastomeric sealant should also be considered between aprons and foundation stem walls to further reduce the potential for moisture to infiltrate the area directly adjacent to the foundations. Slope apron slabs and pavement a minimum of 2 percent, downward, away from the building. • Install eve gutters, downspouts, and extensions to dispose of water a minimum of 10 feet away from the structure. • Do not irrigate within five feet of the proposed or existing structures. Periodically inspect and flush irrigation systems to detect potential leaks and avoid saturation of foundation backfill. • Install and maintain basement window well covers. • Replace sidewalk or driveway pavement sections that slope toward the foundation. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 26 • Seal cracks in sidewalks, driveway and apron slabs, floor slabs, and foundation and basement walls. Maintain sealant between adjacent slabs and between slabs and adjacent walls. • Remove or repair landscaping, curbs, or other barriers that impair drainage. • Do not construct infiltration basins adjacent to or up gradient of the structures. If detention is required by statute, infiltration basins should be located down gradient and at least 30 feet from the foundations. 4.7 Earthwork 4.7.1 Subgrade Preparation • Soil containing vegetation and organics (topsoil) extended approximately two to three inches below the existing ground surface in the locations explored. Remove soil containing vegetation and organics below planned improvements or structures. • Remove uncontrolled fill below planned improvements or structures. Prepare final native subgrades with smooth blade equipment. To maintain an undisturbed, native soil subgrade condition, the contractor must carefully plan and implement excavation to avoid disturbance. Scarify, moisture condition, and compact subgrade soil as specified in the table in Section 4.7.1. • Grade the exposed subgrade surfaces to remove mounds and depressions, which could prevent uniform compaction. If unexpected fills or obstructions are encountered during site clearing or excavation, remove such features and clean the excavation prior to placing backfill and construction. • The site soil is moisture sensitive, susceptible to disturbance when moist or wet, and may pump or rut under construction traffic. Soil disturbance negatively impacts the soil's performance. Disturbed soil is prohibited below any structure or pavement, especially at footing or slab subgrades. • Moisture condition and compact disturbed soil or fill placed to achieve site grades to the requirements in Table 18. This may require considerable moisture conditioning and soil processing due to the clayey nature of the on-site soil. • Remove pumping or rutting subgrade areas to depths between 12 and 18 inches or as directed by DOWL. • Replace over excavations with granular structural fill. Contact DOWL's geotechnical engineer to review and approve the exposed subgrade. • Once prepared and approved by the DOWL, it is the contractor's sole responsibility to protect subgrades from degradation. 4.7.2 Excavation Based on the materials encountered in the soil borings, conventional earthmoving equipment should be capable of excavating the site soils. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 27 4.7.3 Dewatering Groundwater will most likely not be encountered during construction. DOWL does not expect dewatering to be needed. 4.7.4 Structural Fill Consider fill placed within the water tower or mechanical building footprint as structural fill. The on-site undocumented fill or elastic silt subgrade are not suitable for use below the foundations. Soils to be reused on site must satisfy the Fill Specifications specified in Table 17. Table 17: Fill Specifications Soil/Fill Product Allowable Use Material Specifications Non-Structural Fill (Landscape Fill) Any area that will not have structures (typically landscape areas) • Soil classified as GM, GW, SM, SW, SC, CL, CH, or ML according to the USCS. • Soil may not contain particles larger than 8 inches in median diameter. • Soil must have less than three percent of deleterious substances such as wood, metal, plastic, and waste. • Approved by Landscape Architect. General Fill • Site grading outside the building footprint. • Utility backfill areas • Non-structural fill • Foundation wall backfill • Soil classified as GP, GM, GW, GC, SP, SM, SW, SC, CL, or ML according to the USCS. • Site soil must have less than three percent vegetation, organics, and debris. • Soil may not contain particles larger than 6 inches in diameter. • The soil must contain less than 3% (by weight) of organics, vegetation, wood, metal, plastic, or other deleterious substances. Structural Fill • General fill • Over-excavations • Soil improvements • Retaining Wall backfill • Soil classified as GP, GM, GW, SP, SM, or SP with at least 30 percent retained on a number 4 sieve and less than 15 percent passing a number 200 sieve. • Soil may not contain particles larger than 2 inches in diameter. • The soil must contain less than 3% (by weight) of organics, vegetation, wood, metal, plastic, or other deleterious substances. Unsatisfactory Soil NONE • Soil classified as MH, OH, CH, OL, or PT may not be used at the project site. • Any soil type not maintaining moisture contents within 5% of optimum during compaction is unsatisfactory soil that must be moisture-conditioned prior to disposal and replacement. • Any soil containing more than 3% (by weight) of organics, vegetation, wood, metal, plastic, or other deleterious substances. 4.7.5 Compaction Requirements Place fill material in lifts not exceeding eight inches in uncompacted thickness. Moisture condition and compact fill according to Table 18. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 28 Table 18: Compaction Specifications Application Moisture Content (% of optimum) Minimum Compaction Subgrade ±4 95% ASTM D698 Below Foundations ±4 98% ASTM D698 Below Slabs-On-Grade ±4 97% ASTM D698 Base and Subbase Courses ±4 95% ASTM D698 Utility Trenches ±4 95% ASTM D698 Site Grading Fill ±4 95% ASTM D698 Foundation Backfill ±4 95% ASTM D698 4.7.6 Testing and Observations We recommend the following compaction testing frequencies: • Structural Fill below Footing and Subgrade - One compaction test every 50 linear feet of footing trench or 2 tests per wall line, whichever results in the greater number of tests, per each 1-foot lift of fill. • Foundation/Retaining Wall Backfill - One compaction test every 100 linear feet of wall or 2 tests per wall line (interior and exterior sides), whichever results in the greater number of tests, per each 1-foot lift of backfill. • Interior and Exterior Slab Subgrade - One compaction test every 1,000 square feet of slab area or 2 tests per slab area, whichever results in the greater number of tests, per 1- foot lift of fill. • Trenches - One compaction test every 150 linear feet or 2 per trench, whichever results in the greater number of tests, per each 1-foot lift of backfill To verify that construction conforms to the intent of the specifications, we recommend that DOWL be retained to observe and record the following: • Site preparation, including grubbing, stripping, excavating, and proof-rolling, • Removal of topsoil and root zone beneath slabs and pavements, • Interior and exterior slab subgrades, • Excavations and sub-excavations prior to placing backfill/fill materials or prior to construction of footings and slabs, and • Approve additional excavation, replacement, or stabilization if the geotechnical engineer identifies unsuitable soil during excavation or proof-rolling operations. 4.7.7 Cold Weather Construction Do not place concrete, pavement, or fill on frozen soil. Do not use frozen soil as fill or backfill. Remove frozen soil, snow, and ice from the subgrade or fill soil prior to continuing with construction. Limit winter excavations to areas small enough to be refilled to finished grade or higher on the same day. Contact DOWL to monitor fill placed during freezing conditions to reduce the potential for placing frozen material. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 29 4.7.8 Wet Weather/Soil Construction • Ideally, perform earthwork construction when the soil moisture content is less than two percent above optimum. • The site clay is susceptible to pumping or rutting from heavy loads such as rubber-tired equipment or vehicles at any time of the year. • If possible, do not perform earthwork after rainfall when the soil is wet. Allow the soil to dry sufficiently to allow construction traffic without disturbing the subgrade. • If the subgrade soil becomes wet, it may be necessary to perform earthwork with track- mounted equipment that reduces vehicular pressure applied to the soil if construction commences in wet areas or before the soil can dry enough to support wheeled vehicles. • Even though the undocumented fill subgrade is firm, it may be easily disturbed when wet. The elastic silt subgrade is very weak. If necessary, the contractor may place an initial 12- inch lift of granular structural fill to help reduce the compaction energy on the unstable subgrade. Thicker structural fill lifts can only be installed over sensitive subgrades at DOWL's recommendation during construction. Initial thicker fill lifts and over-excavations to remove soft, wet soil can only be placed after the contractor has attempted to moisture condition and recompact the native soil and was unsuccessful. • Depending on precipitation, runoff, and perched groundwater conditions, the site soil will be near optimum moisture content. The contractor should expect these conditions and be prepared to install runoff management facilities and replace wet or disturbed soil with structural fill. 4.7.9 Geosynthetics Geosynthetic fabrics are applicable when constructing on soft or wet soil, for foundations soil improvement applications, and as separation fabrics between drainage aggregate, below the construction access road, and at the base of slab over-excavations. Where required, apply geosynthetics directly on approved subgrades, taut, without wrinkles, and over-lapped at least 12 inches. Consult DOWL to review geosynthetic applications or other subgrade improvement alternatives. Geogrid is required to help support any area that exhibits unusually high groundwater, soft pumping, or rutting conditions. Geotextile fabric placed at the bottom of the footing excavation must meet the requirements for separation/stabilization geotextile in Section 716, Geotextiles, of the Montana Department of Transportation Standard Specifications for Road and Bridge Construction. As a separation/stabilization fabric in flexible, concrete, mechanical building foundations, and gravel surfacing areas, DOWL recommends a Mirafi HP570 or approved equal. 4.8 Soil Chemistry and Corrosion Based on the results in Table 19, concrete in contact with the on-site soil classifies as exposure class S0 according to ACI 318 table 19.3.1.1 (ACI, 2014). The S0 exposure class recommends a minimum compressive strength of 2,500 psi at 28 days and there are no exposure class restrictions for S0. Details can be found in the above ACI reference and in the Portland Cement Association publication "Design and Control of Concrete Mixtures." Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 30 According to Corrosion/Degradation of Soil Reinforcement for Mechanically Stabilized Earth Walls (FWHA, 2009), the soil at the site is "corrosive” to steel. Based on that publication and the test results below, we estimate a corrosion rate of 0.95 to 0.97 ounces per square foot per year for carbon steel and 0.26 to 0.27 ounces per square foot per year for galvanized steel. The data in Table 19 was taken from February 23, 2009 Emergency Room and Patient Wing geotechnical report. Table 19: Soil Chemistry Test Results Sample Location Soluble Sulfate (mg/kg) Resistivity (ohm-cm) pH B-1-08 at 5.0 to 6.5 feet – ICU Report Nondetectable 1,680 8.15 B-1-08 at 30.0 to 31.5 feet – ICU Report Undetectable 1,610 6.89 5.0 GEOTECHNICAL DESIGN CONTINUITY Geotechnical design continuity will be an important aspect of the successful completion of this project. In our opinion, geotechnical continuity can occur in three stages: planning, design, and construction project aspects. Specifically, we recommend that DOWL maintain the geotechnical design continuity in the following aspects: • Plan and Specification Review: We recommend you retain DOWL to review final design and construction plans and specifications to verify that our geotechnical recommendations are incorporated into construction documents and provide additional recommendations based on the final design concepts. These efforts can help provide document continuity and reduce the potential for errors as the project concepts evolve. • Geotechnical Design Confirmation: The potential soil variation may have a significant impact on foundation construction. As such, we recommend you retain DOWL to provide geotechnical engineering oversight during site grading and foundation excavation to observe the potential variability in the soil conditions and provide consultation regarding potential impacts on foundation construction. • Construction Observation and Testing: We recommend that you retain DOWL to provide foundation-related observation during site preparation, grading, structural fill placement, and backfilling to verify compliance with the recommendations presented in this report. We recommend hiring an accredited laboratory to perform construction testing. Having DOWL provide oversight during this process will reduce the potential for an unforeseen construction error, which may ultimately impact the project. If we are not retained to perform the recommended services, we cannot be responsible for related construction errors or omissions. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 31 6.0 LIMITATIONS DOWL based the conclusions and recommendations presented in this report on the assumption that site conditions are not substantially different than those exposed by the explorations. If subsurface conditions are different during construction from those encountered in the explorations, advise DOWL at once to review those conditions and reconsider recommendations if necessary. The geotechnical recommendations provided herein are based on the premise that an adequate program of tests and observations will be conducted during construction to document compliance with DOWL's recommendations and confirm conditions exposed during subgrade preparations. DOWL geotechnical personnel must review final designs to verify that recommendations provided herein have been properly implemented. If there is a substantial lapse of time between the submission of this report and the start of work at the site, and especially if conditions have changed due to natural causes or construction operations at or near the site, contact DOWL to review this report and to evaluate the applicability of the conclusions and recommendations presented herein. DOWL prepared this report for Bozeman Health and their Consultants to use on this project. DOWL recommends making this report available to prospective contractors only for information and factual data, but not as a warranty of subsurface conditions. DOWL prepared this report, including engineering analyses, recommendations, figures, and design details for the above- referenced site. These recommendations do not apply to other construction sites. Do not separate the figures from the text for independent use. DOWL performed these services in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar time and budgetary constraints. No warranty is made or implied. Any conclusions made by a construction contractor or bidder relating to construction means, methods, techniques, sequences, or costs based upon the information provided in this report are not the responsibility of Bozeman Health or DOWL. Bozeman Health Emergency Department Expansion Building Additions to South and North of Emergency Department February 2026 Page 32 7.0 REFERENCES ACI. (2014). Building Code Requirements for Structural Concrete. American Concrete Institute. ASCE. (2021). Minimum Design Loads and Associated Criteria for Buildings and Other Structures. American Socienty of Civil Engineers. DOWL (2017). Bozeman Health Deaconess Hospital, Intensive Care Unit (ICU) Addition and Renovation - Bozeman, MT. DOWL HKM (2009). Geotechnical Investigation Report - Bozeman Deaconess Hospital Proposed Emergency Room and Patient Wing Additions. FWHA. (2009). Corrosion/Degradation of Soil Reinforcement for Mechanically Stabilized Earth Walls. Publication No. FHWA-NHI-09-087. Federal Highways Administration. GWIC. (2026). Ground Water Information Center. Retrieved from Montana Technological Univesity: http://mbmggwic.mtech.edu ICC. (2020). 2021 International Building Code. Country Club Hills: International Code Council. Lacroix, Y., & Horn, H. (1973). Direct Determination and Indirect Evaluation of Relative Density and Its Use on Earthwork Construction Projects: in Evaluation of Relative Density and Its Role in Geotechnical Projects involving Cohesionless Soils. ASTM Special Technical Publication 523, 251-280. USGS. (2018). Earthquake Hazards - Quaternary Fault and Fold Database of the United States. Retrieved January 25, 2026, from https://www.usgs.gov/natural-hazards/earthquake- hazards/faults?qt-science_support_page_related_con=4#qt- science_support_page_related_con USGS. (2026). Earthquake Hazards: Quaternary Fault and Fold Database of the United States. (United States Geotechnical Survey) Retrieved January 25, 2026 from https://www.usgs.gov/natural-hazards/earthquake-hazards/faults?qt- science_support_page_related_con=4#qt-science_support_page_related_con Vantassel, J. P. & Cox, B. R. (2022). "SWprocess: a workflow for developing robust estimates of surface wave dispersion uncertainty". Journal of Seismology. Geotechnical-Engineering Report Important Information about This Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. While you cannot eliminate all such risks, you can manage them. The following information is provided to help. The Geoprofessional Business Association (GBA) has prepared this advisory to help you – assumedly a client representative – interpret and apply this geotechnical-engineering report as effectively as possible. In that way, you can benefit from a lowered exposure to problems associated with subsurface conditions at project sites and development of them that, for decades, have been a principal cause of construction delays, cost overruns, claims, and disputes. If you have questions or want more information about any of the issues discussed herein, contact your GBA-member geotechnical engineer. Active engagement in GBA exposes geotechnical engineers to a wide array of risk-confrontation techniques that can be of genuine benefit for everyone involved with a construction project. Understand the Geotechnical-Engineering Services Provided for this ReportGeotechnical-engineering services typically include the planning, collection, interpretation, and analysis of exploratory data from widely spaced borings and/or test pits. Field data are combined with results from laboratory tests of soil and rock samples obtained from field exploration (if applicable), observations made during site reconnaissance, and historical information to form one or more models of the expected subsurface conditions beneath the site. Local geology and alterations of the site surface and subsurface by previous and proposed construction are also important considerations. Geotechnical engineers apply their engineering training, experience, and judgment to adapt the requirements of the prospective project to the subsurface model(s). Estimates are made of the subsurface conditions that will likely be exposed during construction as well as the expected performance of foundations and other structures being planned and/or affected by construction activities. The culmination of these geotechnical-engineering services is typically a geotechnical-engineering report providing the data obtained, a discussion of the subsurface model(s), the engineering and geologic engineering assessments and analyses made, and the recommendations developed to satisfy the given requirements of the project. These reports may be titled investigations, explorations, studies, assessments, or evaluations. Regardless of the title used, the geotechnical-engineering report is an engineering interpretation of the subsurface conditions within the context of the project and does not represent a close examination, systematic inquiry, or thorough investigation of all site and subsurface conditions. Geotechnical-Engineering Services are Performed for Specific Purposes, Persons, and Projects, and At Specific TimesGeotechnical engineers structure their services to meet the specific needs, goals, and risk management preferences of their clients. A geotechnical-engineering study conducted for a given civil engineer will not likely meet the needs of a civil-works constructor or even a different civil engineer. Because each geotechnical-engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. Likewise, geotechnical-engineering services are performed for a specific project and purpose. For example, it is unlikely that a geotechnical- engineering study for a refrigerated warehouse will be the same as one prepared for a parking garage; and a few borings drilled during a preliminary study to evaluate site feasibility will not be adequate to develop geotechnical design recommendations for the project. Do not rely on this report if your geotechnical engineer prepared it: • for a different client; • for a different project or purpose; • for a different site (that may or may not include all or a portion of the original site); or • before important events occurred at the site or adjacent to it; e.g., man-made events like construction or environmental remediation, or natural events like floods, droughts, earthquakes, or groundwater fluctuations. Note, too, the reliability of a geotechnical-engineering report can be affected by the passage of time, because of factors like changed subsurface conditions; new or modified codes, standards, or regulations; or new techniques or tools. If you are the least bit uncertain about the continued reliability of this report, contact your geotechnical engineer before applying the recommendations in it. A minor amount of additional testing or analysis after the passage of time – if any is required at all – could prevent major problems. Read this Report in Full Costly problems have occurred because those relying on a geotechnical- engineering report did not read the report in its entirety. Do not rely on an executive summary. Do not read selective elements only. Read and refer to the report in full. You Need to Inform Your Geotechnical Engineer About Change Your geotechnical engineer considered unique, project-specific factors when developing the scope of study behind this report and developing the confirmation-dependent recommendations the report conveys. Typical changes that could erode the reliability of this report include those that affect: • the site’s size or shape; • the elevation, configuration, location, orientation, function or weight of the proposed structure and the desired performance criteria; • the composition of the design team; or • project ownership. As a general rule, always inform your geotechnical engineer of project or site changes – even minor ones – and request an assessment of their impact. The geotechnical engineer who prepared this report cannot accept responsibility or liability for problems that arise because the geotechnical engineer was not informed about developments the engineer otherwise would have considered. Most of the “Findings” Related in This Report Are Professional Opinions Before construction begins, geotechnical engineers explore a site’s subsurface using various sampling and testing procedures. Geotechnical engineers can observe actual subsurface conditions only at those specific locations where sampling and testing is performed. The data derived from that sampling and testing were reviewed by your geotechnical engineer, who then applied professional judgement to form opinions about subsurface conditions throughout the site. Actual sitewide-subsurface conditions may differ – maybe significantly – from those indicated in this report. Confront that risk by retaining your geotechnical engineer to serve on the design team through project completion to obtain informed guidance quickly, whenever needed. This Report’s Recommendations Are Confirmation-Dependent The recommendations included in this report – including any options or alternatives – are confirmation-dependent. In other words, they are not final, because the geotechnical engineer who developed them relied heavily on judgement and opinion to do so. Your geotechnical engineer can finalize the recommendations only after observing actual subsurface conditions exposed during construction. If through observation your geotechnical engineer confirms that the conditions assumed to exist actually do exist, the recommendations can be relied upon, assuming no other changes have occurred. The geotechnical engineer who prepared this report cannot assume responsibility or liability for confirmation-dependent recommendations if you fail to retain that engineer to perform construction observation. This Report Could Be Misinterpreted Other design professionals’ misinterpretation of geotechnical- engineering reports has resulted in costly problems. Confront that risk by having your geotechnical engineer serve as a continuing member of the design team, to: • confer with other design-team members; • help develop specifications; • review pertinent elements of other design professionals’ plans and specifications; and • be available whenever geotechnical-engineering guidance is needed. You should also confront the risk of constructors misinterpreting this report. Do so by retaining your geotechnical engineer to participate in prebid and preconstruction conferences and to perform construction-phase observations. Give Constructors a Complete Report and GuidanceSome owners and design professionals mistakenly believe they can shift unanticipated-subsurface-conditions liability to constructors by limiting the information they provide for bid preparation. To help prevent the costly, contentious problems this practice has caused, include the complete geotechnical-engineering report, along with any attachments or appendices, with your contract documents, but be certain to note conspicuously that you’ve included the material for information purposes only. To avoid misunderstanding, you may also want to note that “informational purposes” means constructors have no right to rely on the interpretations, opinions, conclusions, or recommendations in the report. Be certain that constructors know they may learn about specific project requirements, including options selected from the report, only from the design drawings and specifications. Remind constructors that they may perform their own studies if they want to, and be sure to allow enough time to permit them to do so. Only then might you be in a position to give constructors the information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Conducting prebid and preconstruction conferences can also be valuable in this respect. Read Responsibility Provisions Closely Some client representatives, design professionals, and constructors do not realize that geotechnical engineering is far less exact than other engineering disciplines. This happens in part because soil and rock on project sites are typically heterogeneous and not manufactured materials with well-defined engineering properties like steel and concrete. That lack of understanding has nurtured unrealistic expectations that have resulted in disappointments, delays, cost overruns, claims, and disputes. To confront that risk, geotechnical engineers commonly include explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvironmental Concerns Are Not Covered The personnel, equipment, and techniques used to perform an environmental study – e.g., a “phase-one” or “phase-two” environmental site assessment – differ significantly from those used to perform a geotechnical-engineering study. For that reason, a geotechnical-engineering report does not usually provide environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated subsurface environmental problems have led to project failures. If you have not obtained your own environmental information about the project site, ask your geotechnical consultant for a recommendation on how to find environmental risk-management guidance. Obtain Professional Assistance to Deal with Moisture Infiltration and Mold While your geotechnical engineer may have addressed groundwater, water infiltration, or similar issues in this report, the engineer’s services were not designed, conducted, or intended to prevent migration of moisture – including water vapor – from the soil through building slabs and walls and into the building interior, where it can cause mold growth and material-performance deficiencies. Accordingly, proper implementation of the geotechnical engineer’s recommendations will not of itself be sufficient to prevent moisture infiltration. Confront the risk of moisture infiltration by including building-envelope or mold specialists on the design team. Geotechnical engineers are not building-envelope or mold specialists. Copyright 2019 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind. Any other firm, individual, or other entity that so uses this document without being a GBA member could be committing negligent Telephone: 301/565-2733 e-mail: info@geoprofessional.org www.geoprofessional.org G e o t e c h n i c a l R e p o r t PEOPLE WHO MAKE IT HAPPEN dowl.com Appendix A Exploration Logs SOIL CLASSIFICATION/LEGEND Relative Density or Consistency Utilizing Standard Penetration Test Values Cohesionless Soils(a)Cohesive Soils(b) Density(c)N blows/ft(c) Relative Density (%)Consistency N blows/ft(c) Undrained Shear Strength(d) (psf) Very loose 0 to 4 0 - 15 Very soft 0 to 2 <250 Loose 5 to 10 15 - 35 Soft 3 to 4 250 - 500 Med. Dense 11 to 29 35 - 65 Medium Stiff 5 to 8 500 – 1,000 Dense 30 to 49 65 - 85 Stiff 9 to 15 1,000 – 2,000 Very Dense Over 50 >85 Very Stiff 16 to 30 2,000 – 4,000 Hard Over 30 >4,000 (a) Soils consisting of gravel, sand and silt, either separately or in combination, possessing no characteristics of plasticity and exhibiting drained behavior. (b) Soils possessing the characteristics of plasticity, and exhibiting undrained behavior.(c) Undrained shear strength = ½ unconfined compressive strength. (d) Qp - Denotes pocket penetrometer field measurement (tons per square foot) approximation to unconfined compressive strength. Component Definitions By Gradation Component Size Range Boulders Greater than 12-in. Cobbles 3-in. to 12-in. Gravel 3-in. to No. 4 (4.75 mm) Coarse gravel 3-in. to ¾-in. Fine gravel ¾-in. to No. 4 (4.75 mm) Sand No. 4 (4.75 mm) to No. 200 (.075 mm) Coarse sand No. 4 (4.75 mm) to No. 10 (2.0 mm) Medium sand No. 10 (2.0 mm) to No. 40 (0.425 mm) Fine sand No. 40 (0.425 mm) to No. 200 (0.074 mm) Silt and Clay Smaller than No. 200 (0.075 mm) Silt and Clay Descriptions Description Typical Unified Designation Silt ML (non-plastic) Clayey Silt CL-ML (low plasticity) Silty Clay, Lean Clay CL Clay, Fat Clay CH Plastic Silt MH Organic Soils OL, OH, Pt Descriptive Terminology Denoting Components Proportions Descriptive Terms Range of Proportion Trace or Scattered 0 - 5% Few 5 - 10%Some or Adjective(a)15 - 30% And 30 - 50% (a)Use gravelly, sandy or silty as appropriate. Unless otherwise noted, drive samples advanced with 140-lb. hammer and 30-in. drop. Unified Soil Classification System Criteria for Assigning Group Symbols and Names Soil Classification Generalized Group Descriptions COARSE-GRAINED SOILS GRAVELS CLEAN GRAVELS GW Well-graded gravels More than 50%More than 50% of Less than 5% fines GP Poorly-graded gravels retained on coarse fraction GRAVELS w/ FINES GM Gravel and silt No. 200 sieve retained on No. 4 More than 12% fines mixtures sieve GC Gravel & clay mixtures SANDS CLEAN SANDS SW Well-graded sands 50% or more of Less than 5% fines SP Poorly-graded sands coarse faction SANDS with FINES SM Sand and silt mixtures passes No. 4 sieve More than 12% fines SC Sand and clay mixtures FINE-GRAINED SOILS SILTS & CLAYS CL Low-plasticity clays 50% or more passes Liquid limit INORGANIC ML Non-plastic and low- the No. 200 sieve less than 50 plasticity silts Non-plastic and low plasticity organic claysORGANICOL Non-plastic and low- plasticity organic silts SILTS & CLAYS CH High-plasticity clays Liquid limit INORGANIC MH High-plasticity silts greater than 50 High-plasticity organic clays ORGANIC OH High-plasticity organic soils HIGHLY ORGANIC SOILS Primarily organic matter, dark in color and has an organic odor PT peat Soil Moisture Dry Absence of moisture, dusty, dry to the touch Slightly Moist Minor existence of moisture, not dusty, but still dry to the touch Moist Damp but no visiblewater Very Moist Zones of visible moisture and usually above the water table Wet Visible free water, usually soil is below water table Groundwater Elevation Water Elevation Noted During Drilling Water Elevation Recorded After Drilling Complete Samples Split Spoon Sampler (2.0” OD) Ring Sampler (3.0” OD)* *Indicates increased blow counts due to sampler size. Shelby Tube Sampler (3.0” OD) Bulk Sample (auger cuttings) Core Barrel 0 5 10 15 20 25 30 35 4910 4905 4900 4895 4890 4885 4880 5-inches Asphalt pavement 0.4 4910.6Base Gravel 24" +/- (Poorly graded gravel with sand (GP), moist, brown) (fill)2.4 4908.6Lean clay (CL), medium stiff to stiff, moist, light brown with white mottling/mineral deposits (native soil) 19.5 4891.5Poorly graded sand/poorly graded gravel (SP/GP), dense to very dense, moist, grayish brown to reddish brown (alluvium) 12" sand lense @ 22.5' 26.2 4884.8Silty sand (SM), medium dense to dense, moist, orange brown, scattered black carbon grains (tertiary sediment) 31.5 4879.5Boring terminated at 31.5' No groundwater observed 234 357 335 272422 182020 252526 81420 81426 7 12 8 46 40 51 34 40 13/18 72% 12/18 67% 12/18 67% 10/18 56% 12/18 67% 15/18 83% 22/18 122% 20/18 111% 51 Project No.: 4531.10033.01 LOG OF BOREHOLE B-4-08 CLIENT Bozeman Deaconess Hospital PROJECT Proposed Emergency Room Addition BORING LOCATION Near the southwest corner of the proposed addition SITE Proposed Addition DOWL HKM 920 Technology Blvd., Suite A Bozeman, Montana 59718 Telephone: (406) 586-8834 Fax: (406) 586-1730 STARTED 12/1/08 FINISHED 12/1/08 DRILL CO.Haz Tech DRILL RIG BK-81 DRILLER Paul Bray HAMMER Automatic LOGGED BY N. Peterson APPROVED BY G. UnderhillDEPTH (FT.)MATERIAL DESCRIPTION GRAPHIC LOGELEVATION (FT.)BULKSAMPLES DRIVEN/PUSHBLOWS PER 6"N BLOWS/FTNUMBERIN. RECOVEREDIN. DRIVENPOCKET PENE-TROMETER, TSFTESTS 10 20 30 40N VALUE BLOWS/FT PL LL ADDITIONAL DATA/ REMARKS Surface Elevation: 4911 M.C. Sheet 1 of 1 0 5 10 15 20 25 30 35 4905 4900 4895 4890 4885 5-inches Asphalt pavement 0.4 4909.6Base Gravel 18" +/- (Poorly graded gravel with sand (GP), moist, brown) (fill)1.9 4908.1Lean clay with sand (CL), medium stiff, moist, light brown (possible fill) Organics at 5' 6.5 4903.5Lean clay (CL), stiff to very stiff, moist, medium brown (native soil) 14.5 4895.5Poorly graded sand/poorly graded gravel (SP/GP), very dense, moist, grayish brown to brown (alluvium) Possible sand lenses 19 to 20' 21.0 4889Silty sand (SM), very dense, moist, orange brown (tertiary sediment) 26.5 4883.5Boring terminated at 26.5' No groundwater observed 533 6912 222822 50/ 2" 152236 6 21 50 50 58 11/18 61% 24/24 100% 9/1850% 10/18 56% 0/2 0% 22/18 122% 58 Lab Sample #23495: USCS=CL Gravel=0% Sand=4% Fines=96% Liquid Limit=43Plasticity Index=20 Nat Moisture=22.5% Dry Unit Wt=102.1pcf Unconfined (qu)=6.02ksf Cohesion (qu/2)=3.01ksf Project No.: 4531.10033.01 LOG OF BOREHOLE B-5-08 CLIENT Bozeman Deaconess Hospital PROJECT Proposed Emergency Room Addition BORING LOCATION Near the southeast corner of the proposed addition SITE Proposed Addition DOWL HKM 920 Technology Blvd., Suite A Bozeman, Montana 59718 Telephone: (406) 586-8834 Fax: (406) 586-1730 STARTED 12/2/08 FINISHED 12/2/08 DRILL CO.Haz Tech DRILL RIG BK-81 DRILLER Paul Bray HAMMER Automatic LOGGED BY N. Peterson APPROVED BY G. UnderhillDEPTH (FT.)MATERIAL DESCRIPTION GRAPHIC LOGELEVATION (FT.)BULKSAMPLES DRIVEN/PUSHBLOWS PER 6"N BLOWS/FTNUMBERIN. RECOVEREDIN. DRIVENPOCKET PENE-TROMETER, TSFTESTS 10 20 30 40N VALUE BLOWS/FT PL LL ADDITIONAL DATA/ REMARKS Surface Elevation: 4910 M.C. Sheet 1 of 1 0 5 10 15 20 25 30 35 4910 4905 4900 4895 4890 4885 4-inches Asphalt pavement 0.3 4913.4Base Gravel 30" +/- (Poorly graded gravel with sand (GP), moist, brown) (fill)2.8 4910.9Lean clay with sand (CL), medium stiff, very moist, light brown, scattered organics and scattered fine gravel (fill) 10.0 4903.7Lean clay (CL), medium stiff, moist, reddish brown with white mottling/mineral deposits (native soil) 20.0 4893.7Lean clay with sand and gravel (CL), hard, moist, reddish brown, subangular gravel (native soil/colluvium)22.5 4891.2Poorly graded sand/poorly graded gravel (SP/GP), very dense, moist, brown (alluvium)25.0 4888.7Poorly graded sand with clay (SP-SC), dense, moist, orange brown, scattered angular gravel (tertiary sediment)27.5 4886.2Silty sand (SM), dense to very dense, moist, orange brown, cemented in part (tertiary sediment) 31.5 4882.2Boring terminated at 31.5' Groundwater observed at 3' that appears to be a "perched aquifer" 335 345 455 81126 182527 151427 152540 152539 8 9 10 37 52 41 65 64 18/18 100% 13/18 72% 15/18 83% 18/18 100% 13/18 72% 18/18 100% 18/18 100% 18/18 100% 52 65 64 Project No.: 4531.10033.01 LOG OF BOREHOLE B-6-08 CLIENT Bozeman Deaconess Hospital PROJECT Proposed Emergency Room Addition BORING LOCATION North side of the proposed addition SITE Proposed Addition DOWL HKM 920 Technology Blvd., Suite A Bozeman, Montana 59718 Telephone: (406) 586-8834 Fax: (406) 586-1730 STARTED 12/1/08 FINISHED 12/1/08 DRILL CO.Haz Tech DRILL RIG BK-81 DRILLER Paul Bray HAMMER Automatic LOGGED BY N. Peterson APPROVED BY G. UnderhillDEPTH (FT.)MATERIAL DESCRIPTION GRAPHIC LOGELEVATION (FT.)BULKSAMPLES DRIVEN/PUSHBLOWS PER 6"N BLOWS/FTNUMBERIN. RECOVEREDIN. DRIVENPOCKET PENE-TROMETER, TSFTESTS 10 20 30 40N VALUE BLOWS/FT PL LL ADDITIONAL DATA/ REMARKS Surface Elevation: 4913.7 M.C. Sheet 1 of 1 0 4 8 12 16 20 24 28 100 96 92 88 84 80 6" +/- Topsoil,OH/OL; frozen, black, organics 0.5 102.3 Fill, Lean Clay, CL; slightly moist, soft, medium brown, trace roots 6.0 96.8 Fill, Gravel (GW), dry, gray, 3/4" crushed possible utility trench 6.5 96.3 Lean Clay, CL; moist, soft, light brown, mottled 10.0 92.8 Plastic Clay, CH: moist to wet, soft, tan 11.0 91.8 Lean Clay, CL; slightly moist, medium stiff, light brown, mottled 13.8 89 Silty Clayey Gravel and Sand, GC-GM; moist, dense, light brown to gray to multicolored, sub rounded coarse to fine gravel 16.3 86.55 Lean Clay and Silt, CL-ML; moist, very stiff, light brown 23.5 79.3 Silty Gravel, GM; slightly moist, very dense, light brown to gray to multicolored 26.5 76.3 Boring terminated at 26.5 feet No groundwater observed 2 4 5 3 1 1 2 2 4 5 415 17 1913 6 1114 9 1622 15 41 50/ 3" 9 2 6 19 32 25 38 91 1 2 3 4 5 6 7 8 16/18 89% 13/18 72% 13/18 72% 18/18 100% 18/18 100% 18/18 100% 18/18 100% 14/18 78% 91 Elevation based on North Entrance Door Slab Elevation = 100.0 feet Project No.: 4531.12105.01 LOG OF BOREHOLE B-8-17 CLIENT Bozeman Deaconess Hospital PROJECT ICU Addition at Bozeman Deaconess Hospital BORING LOCATION South Portion of Addition SITE Bozeman Deaconess Hospital DOWL 2090 Stadium Drive Bozeman, Montana 59715 Telephone: (406) 586-8834 www.dowl.com STARTED 12/21/17 FINISHED 12/21/17 DRILL CO.Haztech DRILL RIG BK-81 DRILLER Paul Bray HAMMER Auto LOGGED BY J. Potts APPROVED BY G. UnderhillDEPTH (FT.)MATERIAL DESCRIPTION GRAPHIC LOGELEVATION (FT.)BULKSAMPLES DRIVEN/PUSHBLOWS PER 6"N BLOWS/FTNUMBERIN. RECOVEREDIN. DRIVENPOCKET PENE-TROMETER, TSFTESTS 10 20 30 40 N VALUE BLOWS/FT PL LL ADDITIONAL DATA/ REMARKS Surface Elevation: 102.80 M.C. Sheet 1 of 1 0 4 8 12 16 20 24 28 100 96 92 88 84 80 6" +/- Topsoil,OH/OL; frozen, black, organics 0.5 102.09 Fill, Lean Clay, CL; slightly moist, soft, medium brown, trace roots. 2.5 100.09 Fill, Gravel (GW) 2.5 to 3.0 3.0 99.59 Lean clay, CL; most, medium stiff, light brown, trace mottling 12.2 90.39 Silty Clayey Gravel and Sand, GC-GM; slightly moist, very dense, light brown to gray to multicolored, sub rounded coarse to fine gravel, possible cobbles no cobbles 18 to 22.2 22.2 80.39 Silt, ML; slightly moist, very dense, reddish brown 24.0 78.59 Boring terminated at 24 feet No groundwater observed 2 2 2 3 2 3 4 4 6 22 3250/ 4" 15 2950/ 4" 19 3144 13 2339 4 5 10 82 79 75 62 1 2 3 4 5 6 7 11/18 61% 13/18 72% 16/18 89% 14/18 78% 14/18 78% 17/18 94% 16/18 89% 82 79 75 62 Elevation based on North Entrance Door Slab Elevation = 100.0 feet Project No.: 4531.12105.01 LOG OF BOREHOLE B-9-17 CLIENT Bozeman Deaconess Hospital PROJECT ICU Addition at Bozeman Deaconess Hospital BORING LOCATION South Portion of Addition SITE Bozeman Deaconess Hospital DOWL 2090 Stadium Drive Bozeman, Montana 59715 Telephone: (406) 586-8834 www.dowl.com STARTED 12/21/17 FINISHED 12/21/17 DRILL CO.Haztech DRILL RIG BK-81 DRILLER Paul Bray HAMMER Auto LOGGED BY J. Potts APPROVED BY G. UnderhillDEPTH (FT.)MATERIAL DESCRIPTION GRAPHIC LOGELEVATION (FT.)BULKSAMPLES DRIVEN/PUSHBLOWS PER 6"N BLOWS/FTNUMBERIN. RECOVEREDIN. DRIVENPOCKET PENE-TROMETER, TSFTESTS 10 20 30 40 N VALUE BLOWS/FT PL LL ADDITIONAL DATA/ REMARKS Surface Elevation: 102.59 M.C. Sheet 1 of 1 G e o t e c h n i c a l R e p o r t PEOPLE WHO MAKE IT HAPPEN dowl.com Appendix B Geophysics Outputs Seismic Refraction Tomography –Compressional Wave Velocities Driveway Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Start End Legend Interpretive Gravel Deposits Geophysics Alignment Crossing Geophysics Transect PROFILE 1 North Addition Geophysics Transect 4850 4860 4870 4880 4890 4900 4910 Elevation (ft) 25 35 45 55 65 75 85 95 105 115 125 135 145 155 165 175 185 195 205 Distance (ft) S-wave velocity cross-section : Line ID=Driveway MASW 2D (ft/s) S-wave velocity 357 682 1007 1333 1658 1983 2308 Multichannel Analysis of Surface Waves (MASW) 2D – Shear Wave Velocities Driveway Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Start End PROFILE 2 Legend Interpretive Gravel Deposits Geophysics Alignment Crossing Geophysics Transect North Addition Geophysics Transect Multichannel Analysis of Surface Waves (MASW) 1D – Shear Wave Velocities - SeisImager Driveway Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Start End PROFILE 3 Legend Geophysics Alignment MASW 1D Profile Location 0 10 20 30 40 50 60 70 80 90 100 110Depth (ft) 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 2500 2600 S-wave velocity (ft/s) S-wave velocity model (inverted) : 1015.dat Average Vs to 100ft = 1213.4 ft/sec 412 3.2 454 6.7 530 10.5 600 14.7 893 19.3 1075 24.2 1294 29.5 1360 35.1 1373 41.1 1425 47.4 1505 54.0 1645 61.1 1953 68.4 2129 76.1 2226 84.2 2452 92.6 2484 101.4 2556 Multichannel Analysis of Surface Waves (MASW) 1D – Shear Wave Velocities - SWprocess Driveway Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Start End PROFILE 4 Legend Geophysics Alignment MASW 1D Profile Location Vs100 - Shear Wave Velocities Results Driveway Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 End Legend Geophysics Alignment MASW 1D Profile Location Bozeman Health – Emergency Department – South Addition (Ambulance Driveway) Center of Transect Location Vs100 (feet per second)Site Class MASW 1D – Center of Seismic Array - SeisImager 1,213.4 CD MASW 1D – Center of Seismic Array - SWProcess 1,168.0 CD ASCE 7-22 – Table 20.2-1 – Site Classification Site Class Rock/Soil Type Sum of Vs Calculated Using 1D Shear Wave Velocities (feet per second) A Hard Rock >5,000 B Medium Hard Rock 3,000 to 5,000 BC Soft Rock 2,100 to 3,000 C Very Dense Sand or Hard Clay 1,450 to 2,100 CD Dense Sand or Very Stiff Clay 1,000 to 1,450 D Medium Dense Sand or Stiff Clay 700 to 1,000 DE Loose Sand or Medium Stiff Clay 500 to 700 E Very Loose Sand or Soft Clay ≤500 F Soils Requiring Site Response Analysis See Section 20.2.1 of ASCE 7 Start End Seismic Refraction Tomography – Compressional Wave Velocities North Addition Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Start End Legend Interpretive Gravel Deposits Geophysics Alignment Crossing Geophysics Transect PROFILE 5 Driveway Geophysics Transect Seismic Refraction Tomography – Shear Wave Velocities North Addition Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Legend Interpretive Gravel Deposits Geophysics Alignment Crossing Geophysics Transect PROFILE 6 Driveway Geophysics Transect Start End 4850 4860 4870 4880 4890 4900 4910 Elevation (ft) 25 35 45 55 65 75 85 95 105 115 125 135 145 155 165 175 185 195 205 Distance (ft) S-wave velocity cross-section : Line ID=North Addition (Hill) MASW 2D (ft/s) S-wave velocity 434 768 1102 1436 1770 2104 2438 Seismic Refraction Tomography – Shear Wave Velocities North Addition Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Legend Interpretive Gravel Deposits Geophysics Alignment Crossing Geophysics Transect PROFILE 7 Start End Seismic Refraction Tomography – Vp/Vs Ratio North Addition Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 PROFILE 8 Driveway Geophysics Transect Note: Vp/Vs above 4.0 indicates a free-flowing groundwater table. Legend Geophysics Alignment Crossing Geophysics Transect Start End Electrical Resistivity Tomography (ERT) – Ohm-meters North Addition Transect Analysis by: David Barrick Project: Bozeman Health Emergency Department Additions Date: December 15, 2025 Project No.: 4691.000617.01 Legend Undocumented Fill/Lean Clay Contact with Gravel and Silty Sand Deposits Geophysics Alignment Crossing Geophysics Transect PROFILE 9 Driveway Geophysics Transect Buried Utility with Pipe Bedding? Start End PEOPLE WHO MAKE IT HAPPEN dowl.com G e o t e c h n i c a l R e p o r t Alaska Anchorage 907.562.2000 5015 Business Park Blvd. Street, Anchorage, AK 99503 Fairbanks 907.374.0275 3535 College Road, Suite 100, Fairbanks, AK 99709 Juneau 907.780.3533 9085 Glacier Highway, Suite 102, Juneau, AK 99801 Arizona Tempe 480.753.0800 4686 East Van Buren Street , Tempe, AZ 85008 Montana Billings 406.656.6399 222 N. 32nd Street, Suite 700, Billings, MT 59101 Bozeman 406.586.8834 1283 North 14th Avenue, Suite 101, MT 59715 Helena 406.442.0370 1300 Cedar Street, Helena, MT 59601 Nevada Elko 775.738.2121 421 Court Street, Elko, NV 89801 Reno 775.8514.788 5510 Longley Lane , Reno, NV 59511 Oregon Bend 541.385.4772 963 SW Simpson Avenue, Suite 200, Bend, OR 97702 Eugene 541.683.6090 920 Country Club Road, Suite 100B, Eugene, OR 97401 Lake Oswego 503.620.6103 5 Centerpoint Drive, Suite 350, Lake Oswego, OR 97035 Medford 541.774.5590 831 O'Hare Parkway, Medford, OR 97504 Portland 971.280.8641 309 SW 6th Avenue, Suite 700, Portland, OR 97204 Salem 503.589.4100 4275 Commercial St SE, Ste 100, Salem, OR 97302 Washington Redmond 425.869.2670 8420 154th Avenue NE, Redmond, WA 98052 Vancouver 360.314.2391 7200 NE 41st Street, Suite 204 Vancouver, WA 98660 Wyoming Sheridan 307.672.9006 1833 South Sheridan Avenue, Sheridan, WY 82801 1283 North 14th Ave. │ Bozeman, MT 59715 (406) 586-8834 Lab 222 N. 32nd Street │ Billings, MT 59101 (406) 656-6399