Loading...
HomeMy WebLinkAbout10-19-26 Public Comment - E. Johnson - Proposal for uniting the Gallatin Valley and building an established transit networkFrom:Ethan Johnson To:Bozeman Public Comment Subject:[EXTERNAL]Proposal for uniting the Gallatin Valley and building an established transit network Date:Monday, October 19, 2026 11:43:32 PM Attachments:Gallatin Valley Connected.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. I have already sent this to Jeff Butts, but now I see that there is a place for public comment. Iwould like to send the same email I sent to him here. I truly believe the proposal and plan is of extreme value to the identity, economic growth, and prosperity of the Gallatin Valley. Theemail is as follows: My name is Ethan Giles Johnson and I am an alumni of Montana State University since 2015. I am sending this email in hopes of beginning a conversation about enhancing the economicconnectivity and mobility of the Gallatin Valley, and connecting Bozeman, Four Corners, Belgrade, and the Airport via a public transit system that would bring in massive amounts ofjobs, infrastructure boosts, property value, and boost tourism in the region, all while decreasing traffic, increasing opportunity for locals, and fostering a wider community. The proposal is being linked here; however, I would like to introduce it in this email. It is theconstruction of a tram way system that unites the Gallatin Valley. I know there are many things that go into such an endeavor, but the outcome is indespensible. Such technology hasexisted in the coldest of environments on the planet, and Gallatin Valley would be able to pioneer the systems, rules, and implementation of such in the United States, making it a leaderin public transit systems. International communities across Europe are already accustomed to such methods of travel and advertising of this would bring in untold numbers hoping to seeMontana while at the same time expecting the comforts of mobility afforded to their own two feet, not to mention what they would bring to the local united economies. Children would be able to make it to school, Students would be able to easily get to local jobsand the community would have a new space along which the local culture might open up and flourish, offering a new space for both conversation and advertising from events andbusinesses. The local community would gain jobs both in operations and in connection to this new means of exploring and navigation of these three spaces, only available to one by car,bus, or taxi in any normal capacity. There is far more I could say and open up about, but I would like to save this for an in person meeting or conversation over the phone soon. I am currently in Bozeman and am eager tomeet and discuss this. I will depart on the 1st or 2nd of November for a conference in Singapore; still, I will return on or around the 10th of November. My contact is this email or the alternative at the bottom which is my company email. I am alsoavailable my phone: 601-817-3527 Whatsapp: +420 777 595 314 I am certain this proposal will be of interest to you, and I am hoping that you can afford me some time to discuss such a development in detail on the how, why, what, when, and where. Many Regards,Ethan Giles Johnson Director at Education Innovations s.r.o.ethangiles@educationinnovations.net GALLATIN VALLEY CONNECTED A regional tramway & economic development vision Bozeman • Four Corners • Belgrade • Airport • MSU PRELIMINARY STAKEHOLDER DISCUSSION | OCTOBER 2026 Google Maps Street View © Google LLC | AI concept T H E I N V E S T M E N T T H E S I S Build the connections. Multiply the opportunities. The goal is not merely to operate a tram. It is to make the Gallatin Valley work better as one economic region. BUSINESSES More people able to reach Main Street, Belgrade and Four Corners storefronts. WORKFORCE Reliable access to jobs, shifts, apprenticeships and campus without a car. VISITORS A simple airport-to-city journey and destinations that can be explored on foot. COMMUNITY Shared public spaces, safer late-night options and mobility in winter. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 02 W H Y N O W A region already generating travel demand The economic opportunity is real. Actual tram ridership must still be measured. 128,740 Gallatin County residents 2025 Census estimate 2.81M BZN passengers 2025 arrivals + departures 17,477 Montana State students Fall 2026 enrollment Not additive markets: residents, students and travelers overlap. These figures establish scale, not forecast rail boardings. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 03Census QuickFacts; BZN 2025 traffic; MSU Fall 2026 R E G I O N A L CO N C E P T One connected valley. Several economic destinations. Illustrative service logic—not a mapped right-of-way or finalized operating plan. BOZEMAN FOUR CORNERS BELGRADE BZN AIRPORT POTENTIAL FRONTAGE ROAD RETURN TO BOZEMAN MSU • 11th Ave • Main St • N 7th Later option: Bridger Dr / M trailhead GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 04Diagram not to geographic scale; corridors require GIS & ROW study DESTINATION 01 · BOZEMAN MAIN STREET Bring more customers to local doors. An accessible downtown connection expands the pool of people who can visit restaurants, shops, cultural venues and hotels—without parking at every stop. Potential increase in storefront foot traffic Walkable dining, retail and cultural circuits More convenient car-free evenings LOCAL SPENDING & STREET LIFE GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 05Base imagery: Google Maps Street View © Google LLC | AI-edited concept | For direct email correspondence only; not for public circulation. DESTINATION 02 · MSU / 11TH AVENUE Turn education into economic access. A campus connection would open up jobs, internships, shopping, recreation and services to students and staff who prefer not to drive. Connect student activity with local retail Improve access to entry-level employment Better mobility for workers and visitors EDUCATION & WORKFORCE GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 06Base imagery: Google Maps Street View © Google LLC | AI-edited concept | For direct email correspondence only; not for public circulation. DESTINATION 03 · FOUR CORNERS Make Four Corners a place to arrive—not only pass through. A regional interchange can connect customers and workers with growing commercial areas. Its exact design must respect US-191 and MT-85 intersection operations. Business-to-business regional connections Potential transfer hub between corridors Access without new parking at every destination COMMERCIAL CONNECTIVITY GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 07Base imagery: Google Maps Street View © Google LLC | AI-edited concept | For direct email correspondence only; not for public circulation. DESTINATION 04 · BELGRADE Link Belgrade directly to the valley economy. More options to reach work, services and retail can reinforce Belgrade’s own center while shortening the practical distance to Bozeman and MSU. Cross-community labor market access Downtown and neighborhood mobility Coordinate with planned Jackrabbit underpass ECONOMIC INCLUSION GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 08Base imagery: Google Maps Street View © Google LLC | AI-edited concept | For direct email correspondence only; not for public circulation. DESTINATION 05 · BZN AIRPORT Make the arrival part of the destination. With 2.81 million passenger movements in 2025, the airport offers a major opportunity to introduce travelers to car-light exploration of the region. An understandable airport-to-town connection Potential stopovers and local spending A distinctive welcome to the Gallatin Valley VISITOR ECONOMY GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 09Base imagery: Google Maps Street View © Google LLC | AI-edited concept | For direct email correspondence only; not for public circulation. DESTINATION 06 · NORTH 7TH Give nightlife an alternative to driving. A reliable, genuinely late-running service could support restaurants, music venues, entertainment and service workers—and offer an option after drinking. More evening activity and local visits A potential impaired-driving reduction tool Safety depends on service hours and adoption EVENING ECONOMY & SAFETY GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 10Base imagery: Google Maps Street View © Google LLC | AI-edited concept | For direct email correspondence only; not for public circulation. FUTURE EXTENSION · BRIDGER DRIVE / MT-86 Connect the valley to the outdoors. Trailhead access could link recreational trips with the regional network. This segment is a future possibility—not part of the initial core business case. Less pressure on recreation parking Stronger tourism and outdoor connections Protect trail, landscape and right-of-way PHASED RECREATION ACCESS GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 11Base imagery: Google Maps Street View © Google LLC | AI-edited concept | For direct email correspondence only; not for public circulation. E CO N O M I C I M PA C T PAT H WAY S Five ways a tram network could create value These are hypotheses to test—not guaranteed outcomes or quantified local forecasts. 01 Business revenue More visitors and customers who can reach multiple places in a day. 02 Worker access Larger hiring reach for hospitality, retail, airport and university employers. 03 Visitor spending Airport arrivals connected to lodging, dining, arts and shopping. 04 Local supply chain Civil works, electrical, design, stations, operations and maintenance jobs. 05 Tax base & district activity Potential stronger property and sales activity, subject to state/local tax structure. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 12 LO C A L E M P LO Y M E N T Build it with local hands—and global expertise. Capital projects create work during construction; a permanent system supports skilled operations and maintenance roles. PRECONSTRUCTION Surveyors · planners · civil engineers · environmental analysts CONSTRUCTION Earthworks · utilities · trackwork · power · signaling · trades OPERATIONS Operators · dispatch · safety · cleaning · customer service MAINTENANCE Fleet technicians · electricians · snow response · track crews National context: APTA projects that $1B of public-transit investment can support ~41,400 jobs across the U.S. economy. This is NOT a Gallatin Valley job estimate. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 13Source: APTA 2026 economic impact analysis; national estimate D E M A N D : A F I R S T S E N S I T I V I T Y T E S T Airport trips alone will not make the case. If different fractions of 2025 BZN passenger movements used one tram trip: 1%28,094 annual boardings 3%84,283 annual boardings 5%140,471 annual boardings Illustration only: 2,809,419 airport passenger movements × capture rate. No survey, mode-choice model, or ridership forecast has been performed. Resident and worker trips must carry much of the demand. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 14Base: BZN 2025 passenger traffic = 2,809,419 AC C E S S A S I N F R A S T R U C T U R E A network that works all day, all year. The project should be designed around trips people actually need—not just scenic travel. 06:30 Work & school Early shifts, students and commuters 12:00 Business & errands Shoppers, medical appointments, city services 18:00 Dining & culture Restaurants, events, evening work 23:00+ Safe late travel Potential nightlife service; subject to funding Winter reliability requires tested traction, drainage, snow clearance, switches, de-icing, power resilience and defined service standards. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 15 F I N A N C I A L S U S TA I N A B I L I T Y Multiple value streams. No magical farebox. A public system can generate revenue, but operating subsidies may still be necessary. Fares / passes Compare with existing zero-fare Streamline policy. Employer & campus contracts Institutional payments for access or service. Station & vehicle advertising Local businesses gain high-visibility placements. Airport / visitor partnerships Potential agreements benefiting access to terminals and hotels. Public funding & value capture Subject to legal authority, votes, budgets and feasibility. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 16Streamline is currently zero-fare; sources: Streamline Bus T E C H N O LO G Y D E C I S I O N Test the service first. Choose the mode second. A credible rail proposal must outperform a practical bus alternative on value, capacity and reliability. STREET-RUNNING TRAM Strong identity & permanence Best where stops, pedestrian design and urban economic activity can justify construction disruption. DEDICATED LIGHT RAIL More reliable operations Best where a separated alignment can actually be acquired and the demand supports rail capacity. BUS RAPID TRANSIT Lower-cost benchmark Must be modeled seriously: rapid service and dedicated lanes may deliver many benefits sooner. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 17 W H AT D I L I G E N C E W I L L D E C I D E Real engineering questions—not artistic assumptions. Images illustrate potential streetscapes; they are not right-of-way surveys or approved traffic plans. Crossings BNSF and planned Jackrabbit underpass in Belgrade. Right-of-way Road width, access, utilities, property, stop location. Winter operations Snow/ice, braking, switches, drainage, accessibility. Travel demand Mode shift, travel times, frequency, parking, density. Procurement Montana engineers + Czech tram experts; Buy America rules. Long-term costs Fleet, depot, staffing, insurance, renewal, reserve. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 18Source for underpass: Montana DOT 2026 Belgrade Urban design F U N D I N G S T R AT E G Y Finance the evidence before the infrastructure. Proposed fundraising targets for discussion—not vendor quotations or committed funding. $25k–$75k ORGANIZE Coalition, legal structure, initial route screening $100k–$350k PRE-FEASIBILITY Demand study, rail/BRT comparison, corridor constraints $0.5M–$2M+ FORMAL STUDIES Alternatives, survey, engineering, financial and environmental work Only after this work: establish a route-specific capital estimate, local match, financing plan and operations subsidy. National rail projects often require major public funding and multi-year approvals. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 19Illustrative development targets; no funding pledged D E V E LO P M E N T R OA D M A P Ask for a study. Earn the right to build. A staged process controls risk and keeps the public informed. 0–6 MONTHS Regional scoping Coalition, preliminary corridor map, transportation agency feedback 6–18 MONTHS Pre-feasibility Ridership screen, rail/BRT comparison, candidate phase 1 18–36 MONTHS Formal development Lead sponsor, engineering, finance plan, environmental pathway LATER YEARS Approval & construction Only after designs, funding, public process and approvals GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 20Timelines illustrative; not commitments THE FIRST REQUEST Convene the regional partners. A 45-minute initial meeting to decide whether an independent feasibility and mode-choice study should be scoped. Gallatin Valley MPO + Bozeman + Belgrade Gallatin County + Montana DOT + Streamline MSU + BZN airport + local employers Jeff Butts, MPO Manager • jbutts@bozeman.net GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 21MPO contact: City of Bozeman Google Maps Street View © Google LLC | AI concept A MORE CONNECTED VALLEY IS A MORE PROSPEROUS VALLEY. The aim: turn individual destinations into a year-round network of opportunity for residents, workers, businesses and visitors. START WITH A REGIONAL FEASIBILITY & ALTERNATIVES STUDY GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 22Visual reference: Google Maps Street View © Google LLC | AI-edited concept A P P E N D I X Evidence, definitions & visual-use notes Source links are included for independent verification. U.S. Census • Gallatin 2025 https://www.census.gov/quickfacts/fact/table/gallatincountymontana/RHI825224 BZN • 2025 traffic https://yellowstoneairport.com/about-the-airport/yearend2025 MSU • Fall 2026 enrollment https://www.montana.edu/news/25576/montana-state-enrolls-record-17-477-students-welcomes-largest-ever-incoming-first-year-class Gallatin Valley MPO • LRTP goals https://www.bozemanmt.gov/services/gvmpo/plans/long-range-transportation-plan Streamline • Zero-fare policy https://streamlinebus.com/zero-fare/ Montana DOT • Belgrade Urban https://www.mdt.mt.gov/pubinvolve/jackrabbit/ FTA • Capital Investment Grants https://www.transit.dot.gov/CIG APTA • Economic impact benchmark https://www.apta.com/resource/economic-impact-of-public-transportation-investment/ IMAGE CREDIT & SCOPE Tram scenes are AI-edited conceptual illustrations informed by user-supplied Google Maps Street View screenshots (source imagery © Google LLC). Street geometry, tracks, buildings and traffic may differ from real conditions; no route is approved or engineered. Google does not endorse this project. Attribution does not grant reuse rights; check Google Geo Guidelines before further distribution. GALLATIN VALLEY CONNECTED • PRELIMINARY CONCEPT 23 Street View attribution and usage policy • https://about.google/brand-resource-center/products-and-services/geo-guidelines/