HomeMy WebLinkAbout018 L000 Overall Site PlanSSSSSSSSSSSSSSSSSSWWWWWWWWWSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHESD
W W W W W W W W W W W W W W W W W W WSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGASGASGASGASGASGAS GASGASGASGASGASGASGASGASGASGASGASGASSSFOPTFOPTSSWOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSWWWWWWWWWWWWWWWWWWWWWWWW
WWSSSSSSSSSSSSSSCRACRAAGSAGSAGSCRACRACRAAGSAMUAMUAMUAMUAMUAGSCRAAGSAGSAGSAGSCRAAMU25'30'25'AMU12'-8"IRR11'-7"WL22'-10"HYDRANT18'-8"LP12'-3"LP 10'WL10'LP17'-8"LP15'-2"LP11'-7"WL14'-4"LP 29'-2"CRA25'25'20'-8"10'-3"SIGN25'25'25'25'24'-6"HYDRANT12'-4"SIGN16'-6"SIGN25'-4"22'SIGN17'-9"POST25'25'10'-3"SIGN17'-2"SIGN30'-2"35'35'33'-4"22'-5"LP30'30'37'-2"HYDRANT30'30'-11"30'-1"30'30'30'30'15'-9"VALVE11'-8"LP11'-3"SIGN25'-10"SIGN30'30'31'-3"30'30'10'GAS 20'-4"GAS30'35'HYDRANT25'HYDRANT30'30'30'30'30'30'33'-7"30'10'WL10'-8"WL10'WL10'WL10'16'SEWER 10'-1"SIGN24'-7"LP10'-1"LP14'-8"SIGN22'-4"SIGN41'-6"HYDRANT STUCKY ROADSOUTH 19TH AVESOUTH 19TH AVE
SOUTH 17TH AVE SOUTH 17TH AVESTUDENT DRIVEARNOLD STREET11222111111233333333333PROJECT DATASOUTH UNIVERSITY DISTRICTBLOCK 3 SUBDIVISIONPROJECT OWNERRTR Holdings IIENGINEERStahly Engineering & Associates, IncJared Fabian851 Bridger Drive, Suite #1Bozeman, MT 59715(406) 522 - 8594LANDSCAPE ARCHITECTDESIGN 5, LLCTroy Scherer111 N. TracyBozeman, MT 59715(406) 587 - 4873BOZEMAN, MONTANA CODE OF ORDINANCESSOUTH UNIVERSITY DISTRICT - BLOCK 3 SUBDIVISIONSITE INFORMATIONACRES: 18.85 ACRESZONING: REMULANDSCAPE DESIGN PATHWAY - PRESCRIPTIVE-IN ACCORDANCE WITH THE PRESCRIPTIVE PATHWAY, THERE IS NO TURF SOD IN THEPROJECT, AND ONLY DROUGHT TOLERANT SPECIES PROPOSED.DROUGHT TOLERANT SPECIES-REQUIRED: A LANDSCAPE PLAN MUST PROVIDE 75% OF GREATER OF THE PROPOSEDTREES AND SHRUBS AS DROUGHT TOLERANT SPECIES.-PROVIDED: THE LANDSCAPE SCHEDULES ON SHEET L001 PROVIDE 100% OF THEPROPOSED TREES AND SHRUBS AS DROUGHT TOLERANT SPECIES FOR PLANTINGSON SITE. SEE SHEET L001 FOR PLANT SCHEDULES THAT IDENTIFY ALL PROPOSEDDROUGHT TOLERANT TREES AND SHRUBSSTREET FRONTAGE LANDSCAPING SECTION 38.260.050-REQUIRED: ONE STREET TREE MUST BE PLANTED IN THE BOULEVARD STRIP ONAVERAGE EVERY 25-30 FEET ON CENTER DEPENDING ON SPECIES.-WHEN THIS REQUIREMENT CONFLICTS WITH OTHER REQUIREMENTS OF THISCHAPTER, SUCH AS VISION TRIANGLES, STREET ACCESSES, OR UTILITY PROTECTION,THE REVIEW AUTHORITY MUST RELAX THIS STANDARD TO REACH AN OPTIMALBALANCE IN PUBLIC INTERESTS, PROVIDED THAT SPACING DOES NOT EXCEED 50FEET ON CENTER, EXCLUDING STREET ACCESS POINTS.STREET FRONTAGE FOR SOUTH 19TH AVENUE: 1,097' LF = 37 TREESSTREET FRONTAGE FOR STUCKY ROAD: 488' LF = 20 SMALL TREES-REQUIRED: ONE LARGE CANOPY TREE FOR EACH 30' MAX SPACING FOR TOTALFRONTAGE-REQUIRED: ONE LARGE CANOPY TREE FOR EACH 25' MAX SPACING-FRONTAGE ROUNDED TO THE NEAREST WHOLE NUMBER.-PROVIDED:--34 LARGE CANOPY TREES AT SOUTH 19TH AVENUE--18 SMALL TREES AT STUCKY ROAD (DUE TO OVERHEAD POWER LINE)ACCEPTABLE LANDSCAPE MATERIALS-THE PLANT MATERIAL FOR THE PROJECT MEET THE STANDARDS OF SEC. 38.550.030G. SEE PLANT SCHEDULES ON SHEET L001 FOR SPECIES AND SIZES OF PLANTMATERIAL.CITY OF BOZEMAN SITE SOIL QUALITY REQUIREMENTS-ALL LANDSCAPED AREAS MUST HAVE A MINIMUM DEPTH OF 6" (INCHES)THROUGHOUT THE ENTIRE PLANTING AREA.-A SOIL TEST SHALL BE CONDUCTED AND SOIL SHALL BE AMENDED PER RESULTS, ORIMPORT SOIL AMENDED PRIOR TO RECOMMENDATION OF SOIL TEST-A SOIL ANALYSIS MUST BE CONDUCTED BY AND INDEPENDENT, STATE OPERATED ORUNIVERSITY - OPERATED SOIL LAB WITH THE CAPABILITY AND EXPERIENCE TOCONDUCT THE REQUIRED TESTING.-THE SOIL TEST SHALL BE DATED NO MORE THAN 60 DAYS PRIOR TOPRE-INSTALLATION MEETING AND MUST BE PROVIDED TO REVIEW AUTHORITY At THEPRE-INSTALLATION MEETING.-SOIL SAMPLES MUST REPRESENT A UNIFORM AREA.-RECOMMENDED RATE SHOULD BE 1 SAMPLE PER 5,000 SF OF LANDSCAPED AREA-SOIL ANALYSIS MUST TEST THE FOLLOWING:--SOIL TEXTURE--PERCENTAGE OF ORGANIC MATTER--SOIL REDUCTION (ACIDITY/ALKALINITY pH VALUE)--SOLUBLE-SALT CONTENT--NUTRIENTS: INCLUDING NITROGEN, PHOSPHORUS, POTASSIUM, ZINC, IRON,COPPER, MANGANESE, AND LIME.PER THE SOIL ANALYSIS, VERIFY THE SOIL REMEDIATION METHOD WITH LANDSCAPEARCHITECT***APPLICANT MUST CONTACT CITY OF BOZEMAN WATER CONSERVATION DIVISION ANDSCHEDULE PRE-INSTALLATION MEETING PRIOR TO COMMENCING ANY WORK.***SHEET INDEXL000-OVERALL SITE PLANL001-NOTES AND LEGENDSL002-LANDSCAPE COVERAGE CALCULATIONSL300-BOULEVARD TREES ENLARGEMENT AL301-BOULEVARD TREES ENLARGEMENT B, C, & DL500-LANDSCAPE DETAILSL600-IRRIGATION NOTES AND CRITICAL ANALYSISL601-IRRIGATION NOTES AND OVERALL LAYOUTL602-IRRIGATION LAYOUT PLAN - AL603-IRRIGATION LAYOUT PLAN - B,C, & DL700-IRRIGATION DETAILSL 701-IRRIGATION DETAILS1PROPERTY LINEKEYNOTES234UTILITY EASEMENT, SEE CIVILSTREET VISION TRIANGLE, SEE CIVILBOULEVARD SEEDING, SEE SOD/SEED SCHEDULE: SHEET L001Overall SitePlanL 00060300120N1L0001" = 60'-0"Overall Site PlanVICINITY MAP:STUCKY ROADS. 19TH AVE
PROJECT SITEARNOLD ST.S. 11TH AVE.W. KAGY BLVD.ENLARGEMENT ASHEET: L300ENLARGEMENT BSHEET: L301ENLARGEMENT CSHEET: L302ENLARGEMENT DSHEET: L303design5la.com406.587.4873dateissue05/26/26PRELIM PLATdrawn by:checked by:filename:z:\sud block 3\autocad\01_sheets\l000_sud-block3_d5_landscape_prelim_plat_updates.dwg
South University District
Block 3 - Subdivision
Bozeman, Montana
ZS/GO TMS