HomeMy WebLinkAbout002 Preliminary Plat 2Stucky Rd.S. 19th Ave. (ROW width varies)S. 17th Ave.Arnold St.
D
D
BLOCK 3, LOT 1A
8.840 AC, 385,071 SQFT
BLOCK 3, LOT 1B
8.636 AC, 376,169 SQFT
STUDENT DRIVE ROW
0.938 AC, 40,881 SQFT
ARNOLD ROW- 0.454 AC, 19,774 SQFT
Student Dr.
Lot 4 of Block 1, Yellowstone Theological
Institute Minor Subdivision Plat No. 494
City Park 3
South University
District Phase 3
Plat J-695
Block 2 Lot 1South UniversityDistrict Phase 3Plat J-695 City Park 4South UniversityDistrict Phase 3Plat J-695(R&M)(R&M)(R&M)(R&M)(R&M)(R&M)
(R&M)
(R&M)
(R&M)(R&M)(90' ROW per Doc.# 2410416)(70' ROW per J-695)(35' ROW previously dedicated on J-695)
35' ROW dedicated per MS-494
NW Cor.Sec.24,calc. fromRM's perCCR#2241963 S24S13S23S14 S. 17th Ave.(70' ROW per J-695)NW 116TH COR
SEC. 24
OPC
18342LS
LEGEND
OF 3
PROFESSIONAL ENGINEERS & SURVEYORS
STAHLY ENGINEERING & ASSOCIATES
HELENA
Phone:(406)442-8594
CODY
Phone:(307)509-5541
851 BRIDGER DR. STE 1
BOZEMAN, MT 59715
Phone:(406)522-9526
BILLINGS
Phone:(406)601-4055
PRELIMINARY PLAT OF SUD PH.3 BLOCK 3
LOCATED IN THE SOUTHWEST ONE-QUARTER (SW14) OF SECTION 13 & THE NORTHWEST (NW14) OF SECTION24, TOWNSHIP 2 SOUTH, RANGE 5 EAST, P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA PRELIMINARY PLAT OF LOT 1, BLOCK 3 SOUTH UNIVERSITY DISTRICT PH. 3 (PLAT J-695)KNOWN AS 'SOUTH UNIVERSITY DISTRICT PHASE 3 Block 3 SUBDIVISION'
2
SCALE IN FEET
NOTES:
1.Purpose of Survey: Subsequent Minor Subdivision.
2.Date of Preparation: May, 2026
3.Owners/Commissioned by: RTR Holdings II LLC,
22 Turtle Rock Court
Tiburon, CA 94920-1300
4.Access will be provided to all lots from South 17th Avenue, South 19th Avenue,
Stucky Road, Student Drive and Arnold Street.
5.Areas:
5.1.Right-of-Way: (Student Drive & Arnold Street ROW Lots) = 1.392 Acres
5.2.Block 3 Lot 1A & Lot 1B = 17.476 Acres
5.3.Gross Area = 18.868 Acres (record area 18.85 Acres)
6.Conflicting historic right-of-way surveys along 19th Avenue have been reconciled
with Plat J-605 and J-695. Specifically, this plat accepts Plat J-605 reference
monument status.
7.All new lot boundaries have 10' wide utility easements along them.GRID