HomeMy WebLinkAbout015_Appendix N - Sewer Engineering Design ReportEngineering Report
Sewer Main Extension
South University District
Phase 3 - Block 3
Preliminary Plat
Updated August 2026
Submitted to:
City of Bozeman Engineering Department
20 East Olive
Bozeman, MT 59715
Prepared by:
Stahly Engineering and Associates
851 Bridger Drive, Suite 1
Bozeman, MT 59715
(406) 522-8594
Sewer Mains 1 8/5/2026
Engineering Report
Contents
Note: The Engineering Report format follows DEQ-2 organization. Additional
information required by the City of Bozeman Design Standards is added where
required.
Report Narrative
Chapter 10 – Engineering Reports & Facility Plans
11.1 Engineering Report - General Information
11.11 Problem Defined
11.12 Design Conditions
11.13 Impact on Existing Wastewater Facilities
11.14 Project Description
11.15 Drawings
11.16 Design Criteria
11.17 Site Information
11.18 Alternate Selection/Analysis
11.19 Environmental Impacts
Figures and Tables
Figure 1. Vicinity Map, Bozeman, Montana
Figure 2. C3.0 - Sewer Plan
Figure 3. Sewer Capacity Analysis
Table 1A. Block 3 Lot 1A Estimated Sewer Flows
Table 1B. Block 3 Lot 1B Estimated Sewer Flows
Table 2. Capacity of 8” SDR 35 PVC Sewer Main
Table 3A. Impact on Capacity of Existing Sewer Mains
Table 4. Sewer Flows and Infiltration by Basin/Bub-basin
Appendices
SUD Phase 3 Sewer Engineering Report
City of Bozeman Memorandum Re: South University District Downstream
Sanitary Sewer Capacity Summary
Sewer Mains 2 8/5/2026
11.1 Engineering Report – General Information
The proposed South University District Phase 3 Block 3 Subdivision
consists of 17.51 Acres located southeast of the intersection of 19th Avenue
and Stucky Road. The Block 3 subdivision will consist of 2 lots with the
north lot being approximately 8.84 acres and the south lot being 8.65 acres.
The total subdivision area including required offsite improvements is 23.26
acres.
This Block 3 Subdivision is designed with the intention of there being 256
residential units between the two lots to create a diversified neighborhood in
a growing part of town, adjacent to the Montana State University Campus.
The project will be served by extension of City of Bozeman water and sewer
mains throughout the project. City of Bozeman water and sewer mains
currently exist along the west side of the project site.
The developer’s contact information is:
RTR Holdings II, LLC
Randy Hecht
22 Turtle Rock Court
Tiburon, CA 94920
Water supply and wastewater treatment will be provided by the City of
Bozeman’s municipal systems. The system owner’s contact information is:
City of Bozeman Public Service Department
PO Box 1230
Bozeman, MT 59771-1230
Sewer Mains 3 8/5/2026
The location of the South University Block 3 Development is shown on the Vicinity
Map in Figure 1.
Figure 1. Vicinity Map, Bozeman, Montana
11.11 Problem Defined
Sanitary sewer will be provided through existing and proposed sewer mains
in adjacent City streets. There is an existing 18” sewer main running along S
19th Ave and an existing 8” sewer main in Stucky Rd. There are proposed 8”
mains in S 17th Ave, Arnold St and Student Dr. This project will provide 3218
linear feet of new sewer main and 17 new manholes. The proposed sewer
system improvements are shown on the Sewer Plan (Figure 2: C3.0 –
Sewer Plan) at the end of this report.
It is anticipated that future lot development will require on-site main
extensions. Sewer main stubs are provided to lot lines where the on-site
main extensions are envisioned.
Sewer Mains 4 8/5/2026
11.12 Design Conditions
Estimated wastewater generation for Block 3 has been determined utilizing
values provided in City Design Standards and Specifications Policy and is
shown in Table 1 and Table 2. However, for sewer main sizing, typical City
design flows are utilized.
The estimated residential wastewater generation is based on the City of
Bozeman Design Standards. Typical design flow is 64.4 gallons per day
(gpd) per capita, with an average population of 2.17 people per home. In
accordance with DEQ-2 a peaking factor of 4.09 was used to determine the
peak hour flow rate.
In accordance with City design standards, infiltration and inflow of 150
gpd/acre is added to the domestic wastewater generation. The total design
flow from the Block 3 Lot 1A development is approximately 19,217 gpd, with
a peak hour flow of 54.61 gpm. The total design flow from the Block 3 Lot
1B development is approximately 19,185 gpd, with a peak hour flow of
54.53 gpm.
Table 1A – Block 3 Lot 1A Estimated Sewer Flows
Site Area (acres)8.86
Residential Units 128
Residential Occupants (2.17/unit)277.76
Per Capita Use (gpd)64.4
Residential Flow (gpd)17,888
Commercial Area (sf)0
Commercial Use (gpd/1000 sf)0
Commercial Flow (gpd)0
Commercial and Residential Flows (gpd)17,888
Commercial and Residential Flows (gpm)12
Inflow & Infiltration (gal/ac/day)150
Inflow & Infiltration (gpd)1329
Design Sewer Use + Inflow & Infiltration (gpd)19217
Peaking Factor (PF)4.09
Design Sewer Peak Hour Flow 54.61
Sewer Mains 5 8/5/2026
Table 1B – Block 3 Lot 1B Estimated Sewer Flows
An 8” sewer main at minimum slope (0.4%) has sufficient capacity to provide
sewer service for Block 3 Lot 1A and Lot 1B at the estimated flow of 54.6 gpm and
54.5 gpm respectively. Table 2 shows that an 8” main has a 75% flow depth
capacity of 313 gpm installed at a minimum slope of 0.4%.
Table 2 Capacity of 8" SDR 35 PVC Sewer Main
Site Area (acres)8.65
Residential Units 128
Residential Occupants (2.17/unit)277.76
Per Capita Use (gpd)64.4
Residential Flow (gpd)17,888
Commercial Area (sf)0
Commercial Use (gpd/1000 sf)0
Commercial Flow (gpd)0
Commercial and Residential Flows (gpd)17,888
Commercial and Residential Flows (gpm)12
Inflow & Infiltration (gal/ac/day)150
Inflow & Infiltration (gpd)1298
Design Sewer Use + Inflow & Infiltration (gpd)19185
Peaking Factor (PF)4.09
Design Sewer Peak Hour Flow 54.53
Sewer Main
Location Lot 1A Lot 1B
Pipe Diameter (in)8 8
Minimum Pipe Slope (ft/ft)0.004 0.004
Coefficient of Roughness (n)0.013 0.013
Depth in Pipe at 75% Full (in)6 6
Depth of Flow (ft)0.5 0.5
Pipe Radius (in)4 4
Pipe Radius (ft)0.33 0.33
Wetted Perimeter 1.40 1.40
Area of Flow (ft2)0.28 0.28
Hydraulic Radius 0.20 0.20
Velocity (ft/sec)2.48 2.48
Maximum Pipe Flowrate (gpm)312.8 312.8
Peak Hour Flow (gpm)54.6 54.5
Peak Flow % of Max Capacity 17%17%
Sewer Mains 6 8/5/2026
11.13 Impact on Existing Wastewater Facilities
Off-site sewer impacts were evaluated as part of the SUD Phase 3
Subdivision infrastructure review process. The sewer flow contributions for
the proposed development were determined using the City of Bozeman
Design Standards. The sanitary sewer main extensions that will serve the
proposed development will connect to the existing sewer mains in Stucky
Rd and South 19th Ave. Block 3 Lot 1A will be served by the proposed
sewer mains in S17th Ave and Stucky road. Block 3 Lot 1B will be served
via the proposed sewer mains in Arnold St, S 17th Ave and Student Dr. The
sewer mains in Stucky Rd and South 17th Ave drain north via S 17th Ave to
the 10” main in Kagy Boulevard and Willow Way, constructed during SUD
Phase 2. The proposed sewer in Arnold St. and Student Dr. will flow into the
18” Sewer in S 19th Ave. The existing sewer in S. 19th Ave turns to the west
at Stucky Road.
Sewer flows generated in Phase 3 of the SUD development will be collected
in the ‘Farmer’s Canal Drainage Basin’ as identified by the City. The
analysis of the existing system has determined that these sewer flows feed
or ‘jump’ into the Cattail Creek Drainage Basin at the Lincoln Street & South
19th Avenue connection. It has been verified that the east-west Lincoln
sewer main crosses underneath the north-south 19th avenue sewer main to
enter the Cattail Creek Drainage Basin. This configuration was established
in 2017 during the “South University Area Sewer Main Interceptor Project”.
Block 3 Lot 1B is the only exception with its sewer flows collecting directly
into the Cattail Creek Drainage Basin.
Flows generated by the SUD Phase 3 development were combined with the
estimated flows from zoned parcels, as well as existing developments (see
Figure 3: Sewer Capacity Analysis) to determine the impact of capacity
within the downstream mains. The estimated residential wastewater
generation is based on the City of Bozeman Facility Plan. Typical design
flow is 64.4 gallons per day (gpd) per capita, with an average population of
2.17 people per home. The estimates for SUD Phase 3 Block 1, 2, 3, and 4
have been updated based on current or proposed development and
included in Table 3A numbers. The estimated pipe capacities and their
respective flow allocations based on existing developments, zoned parcels
and SUD phase 3, are shown in Table 3A.
Sewer Mains 7 8/5/2026
Table 3A: Impact on Capacity of Existing Sewer Mains
1 Slopes either proposed or as-built 2 150 gal/ac/day per COB Design Standards
3 Lincoln sewer main contributing area - Map # Designations: 1-17
4 Willow sewer main contributing area - Map # Designations: 11-17
5 Kagy sewer main contributing area - Map # Designations: 14-17
6 19th main contributing area - Map # Designations: 18
7 19th flow conditions only represent SUD flows
The flows from Willow Way, Mandeville and Tai Lane subbasins, are
allocated based on Table 4: Sewer Flows and Infiltration by Basin/Sub-
basin. The combined peak flows and infiltration that eventually end up in the
15” Lincoln Street main are estimated to be 994 gpm; this includes a 90
gpm peak for MSU home football games (established from monitoring), plus
an additional 22.2 gpm for infiltration within the sewer drainage sub-basins.
The anticipated peak flow and infiltration of 994 gpm is under the capacity of
a 15” main at minimum slope (0.19%) flowing 75% full (1,152 gpm).
The approximate 850 LF of sewer main installed within Kagy Blvd
(extending west from the intersection of Willow Way) was conservatively
sized as a 10” main flowing at only 44% Q/Q75.
(in)(%)(gpd)(unitless)(gpm)(gpm)(gpm)(in)(gpm)(%)
Lincoln 15 0.19%402,863 3.15 972 22.2 994 11.25 1,152 86%
Willow 10 0.97%193,426 3.44 462 8.0 470 7.5 883 53%
Kagy 10 0.28%79,651 3.74 207 4.2 211 7.5 475 44%
19th 18 1.85%17,882 4.09 51 1.0 52 13.5 5,847 1%
Infiltration2 Peak Flow +
Infiltration Depth of Flow
75%
Depth
Capacity
Flowrate
Capacity
Q/Q₇₅Pipe Size Slope1 Avg Daily
Flow
Peaking
Factor Peak FlowSewer
Main
Sewer Mains 8 8/5/2026
Table 4: Sewer Flows and Infiltration by Basin/Sub-basin
1 Numbers Correlate with Figure 3
2 Rates taken from Table V-1 City of Bozeman Design Standards and Specifications Policy (p. 49)
3 Infiltration calculated at 150 gal/ac/day per City of Bozeman Design Standards and Specifications
Policy
11.14 Project Description
The project description is provided at the beginning of the Engineering
Report.
11.15 Drawings
Please see sheet C3.0 Sewer Plan, at the end of this report which shows
the proposed sewer improvements. Plan and profile drawings will be
submitted with the infrastructure design submittals.
11.16 Design Criteria
The Block 3 sewer main extensions will be designed in accordance with
Montana Department of Environmental Quality Circular 2, and the City of
Bozeman Design Standards and Specifications Policy.
Map # Designation1 Description Sub Basin Subbasin
Subtotal
Subbasin
Area
(sf)(ac)
#Units or
Beds (gal/ac/day)(gpd)(gpd)(ac)
(gpm)(gpd)(gpd)
1 RC Mandeville 824,613 18.93 -2800 53,005
2 RD Mandeville 158,037 3.63 -2800 10,158 66,548
3 County A Mandeville - 0.00 -0 0
4 County B Tai Lane - 0.00 -0 0
5 B1 Tai Lane 460,873 10.58 -1100 11,638
6 R4 Tai Lane 463,928 10.65 -2800 29,821
7 B-2M Tai Lane 676,957 15.54 -2800 43,514 157,333
8 MSU Stadium Tai Lane 799,299 18.35 -500 9,175
9 SUD PH 1B Tai Lane 252,977 5.81 -2800 16,261
10 SUD PH 1 Tai Lane 557,933 12.81 -2800 35,863
11 R4 Willow Way 225,119 5.17 -2800 14,470
12 SUD PH 2 Willow Way 843,741 19.37 887.00 -57,123
13 SUD PH 3 - Block 4 Willow Way 612,385 14.06 655.00 -42,182
14 REMU Willow Way - - --0 204,133
15 SUD PH 3 - Block 1 Willow Way 458,500 10.53 273.00 -39,138
16 SUD PH 3 - Block 2 Willow Way 495,062 11.37 162.00 -22,631
17 SUD PH 3 - Block 1A Willow Way 556,700 10.88 128.00 -17,882
Totals 402,863 167.67 17.47 25,150.92 428,014
18 SUD PH 3 - Block 1B 19th Sewer 372,865 8.56 128.00 -17,882 17,882 8.56 0.89 1,284.00 19,166
193,426 71.38 7.44 10,706.65
Area/ Population
146,273 73.74 7.68 11,060.49
63,164 22.56 2.35 3,383.78
Average Daily
Water Usage Rates2 Infiltration3 Total
Sewer Mains 9 8/5/2026
Construction specifications will be Montana Public Works Standards and
Specifications (MPWSS), and the City of Bozeman Modifications to
MPWSS.
11.17 Site Information
The SUD Phase 3 Block 3 site is typical of Bozeman with fine-grained soils
overlying gravel deposits. Geotechnical borings have determined the depth
to gravel ranges from 2.5 to 6.5 feet. Estimated depth to groundwater
obtained from the geotechnical borings is variable from 4 to 9 feet. If mains
are installed during periods of high groundwater, dewatering may be
required.
11.18 Alternative Selection/ Analysis
Due to the project’s location within the City of Bozeman, extension of public
mains was the only sewer collection alternative.
11.19 Environmental Impacts
Continued use and new extensions of City of Bozeman municipal sewer
mains has the least environmental impact. No new environmental impacts
will be caused by these sewer main extensions.
R4
SUD PH 2FUTUREREMU
PARK
SUD
PH 1
SUD
PH1b
RD
B1
RC
B-2M MSU
STADIUMCOUNTY AWILLOW WAYRCCOUNTY BBLOCK 3
LOT 1A
PH 3
BLOCK 2
PH 3
BLOCK 1
PH 3
BLOCK 4
PH 3
1 4
2
3
5
6
7 8
13
14
9 1016
17
15 11
12
ARNOLD ST17TH AVESTUCKY RD
KAGY BLVD
19TH AVELINCOLN STREET
18
BLOCK 3
LOT 1B
PH 3
PROFESSIONALENGINEERS &SURVEYORS3SEWER STAHLYENGINEERING& ASSOCIATESPHASE 3SOUTH UNIVERSITYDISTRICTRTR HOLDING II, LLC.CAPACITYANALYSISIN FEET
LEGEND
MANDEVILLE SUBBASIN
TAI LANE SUBBASIN
WILLOW WAY SUBBASIN
19TH SEWER SUBBASIN
EXISTING SEWER
PROPOSED SEWER
SSSSSSSSSSSSSSW W W WSSSS SS SS
WSDSDSDSDSDSD
SDSDSDWWWWWSOUTH 14TH AVESS
HC HC
HC HC
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHESSSSSSSS
SSSSSSSSW WSSSSSSSSSSSSSSOHEOHEOHESDSDSDWWWY3
Y3
Y3
Y3
Y3
P3
P3
P3
P3
SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSTUCKY RD
SOUTH 14TH AVESTUCKY RD(48' WIDTH - 90' ROW)W W W W W W W W W W W WOHEOHEOHE (48' WIDTH - 90' ROW)WWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWSSSSSSSSSTATE ST(35' WIDTH - 60' ROW)SD(47' WIDTH - 70' ROW)SSSS SOUTH 17TH AVE(EXISTING 70'
ROW)
STUCKY RD(48' WIDTH - 90' ROW)
ARNOLD ST(36' WIDTH - 105' ROW)
SD
IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR
SOUTH 14TH AVESOUTH 17TH AVE(47' WIDTH - 70' ROW)S 19TH AVE(ROW WIDTH VARIES)S 19TH AVE(ROW WIDTH VARIES)OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEEXISTINGTRAILS (TYP)SSSSSSSSSSSSSSSSSSWWWWWWWWWWSTORM BASINS
T
O
RM
BA
S
IN (47' WIDTH - 70' ROW)STUDENT DRIVES 19TH AVE(ROW WIDTH VARIES)IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRREXISTINGSTORM BASIN CITY PARK 14.41 ACRESPLAT J-605Tract 3ACOS 2661B
CITY PARK 2
9.64 ACRES
PLAT J-605
CITY PARK 41.83 ACRESPLAT J-695COMMON OPEN SPACELOT 2, BLOCK 1, 0.07 ACPLAT J-695COMMON OPEN SPACELOT 1, BLOCK 2, 0.07 ACPLAT J-695 COMMON OPEN SPACELOT 2, BLOCK 2, 0.07 ACPLAT J-695
BLOCK 3 , LOT 1A8.840 ACRES(385,071 SF)CITY PARK 3
13.36 ACRES
PLAT J-695
LOT 2 "PHASE 1"6.41 ACRESPLAT J-518
BLOCK 3 SUBDIVISIONINFRASTRUCTURE EXTENTSBLOCK 3 SUBDIVISIONINFRASTRUCTUREEXTENTSARNOLD ST
STUDENT DRIVE
SOUTH 17TH AVES 19TH AVESTUCKY RD
YELLOWSTONE THEOLOGICAL
INSTITUTE MINOR SUBDIVISION
RESTRICTED LOT 4
10.519 ACRES
YELLOWSTONE THEOLOGICAL
INSTITUTE MINOR SUBDIVISION
COMMON OPEN SPACE LOT 2
1.826 ACRES
YELLOWSTONE THEOLOGICAL
INSTITUTE MINOR SUBDIVISION
LOT 3
7.644 ACRES
YELLOWSTONE THEOLOGICAL
INSTITUTE MINOR SUBDIVISION
LOT 1
15.069 ACRES
ALLISON
SUBDIVISION, PH 4A
BLOCK 1, LOT 1
W WWW
SDBLOCK 3, LOT 1B8.636 ACRES(376,169 SF)WWWWW(36' WIDTH - 62' ROW)SSWWWWWW W SSSSSSSSSSSS SSWW SSSSW WSSSSSDSDSDSDSDSDSDSDSDSDSD SDSDSD SDSDSD SDWW WSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDWWWWW WWWWWSDSDSDSDSSSS
EXISTING
TRAILS (TYP)
EXISTING
TRAILS (TYP)SSSSSSSSLOT 1, BLOCK 2"PHASE 3"8.60 ACRESPLAT J-695
WWSDSDSDSDSDSDSDSSWWWWSSSSSSSS(27' WIDTH - 70' ROW+29.5' EASE)ARNOLD ST
SCALE IN FEETC3.0SEWER PLAN1 12/15/2025 PRELIMINARY PLAT ZWL CDP
2 5/26/2026 PRELIMINARY PLAT RC1 JWF CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESSUD PH. 3 BLOCK 3SUBDIVISION
RTR HOLDINGS II, LLC HELENA Phone:(406)442-8594CODY Phone:(307)509-5541851 BRIDGER DR. STE 1BOZEMAN, MT 59715 Phone:(406)522-9526BILLINGS Phone:(406)601-4055GREAT FALLS Phone:(406)604-4644