Loading...
HomeMy WebLinkAbout26 - Evaluations - Stucky Road RFQ (3)Stucky Road Reconstruction Name of Reviewer: Date of Review: Prime Consultant Sanbell Allied Engineering (w/ RPA & Morrison Maierle) HDR Engineering Selection Criteria Experience with Projects of Similar Size & Design Max 40 pts 34 28 32 28 is base Firm's Qualifications and Project Approach Max 30 pts 26 21 27 21 is base Ability to Meet Schedule and Budget Max 10 pts 5 7 8 7 is base Present and Projected Workload Max 10 pts 6 7 8 7 is base Past Projects/Experience working with the City of Bozeman Max 5 pts 5 4 4 Office Location Max 5 pts 5 5 5 Total Points Awarded 0 81 72 84 0 0 0 0 0 /100 /100 /100 /100 /100 /100 /100 /100 /100 Notes concern with workload and ability to deliver project on timeline, by far the most direct transportation project experience, recent designs showed weakness in QA/QC and thoroughness, less experience on water, wastewater, storm aspects, experience with city projects lies mostly as a sub rather than prime role, HDR appears to have put a good deal of thought into the project challenges and potential solutions, while HDR has no direct transportation project experience with the city, they have a long and proven history in water and wastewater, project approach was detailed, tying in experience on other projects for context, broad range of transportation projects of similar size and context with other cities in MT and with MDT, range of staff to meet project needs, clearly identified role and reason for subcontractors,