Loading...
HomeMy WebLinkAboutIntegrated Trail Lab - RFQ All trades and servicesFrom:Richard Hayes To:Bozeman Procurement Subject:[EXTERNAL]RFQ All trades and services Date:Thursday, August 27, 2026 2:34:26 PM Attachments:ITLdoc.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Greetings, To whom it may concern. Attached is Integrated Trail LAB's submission for all trades and services Parks and Recrequest. Please feel free to reach out with any questions or clarifications. Best, Richard RICHARD HAYES: PROFESSIONAL TRAIL BUILDER P.O. BOX 24 BOZEMAN, MT 59715 P.O. BOX 7886 MISSOULA, MT 59807 (970)-333-9761 integratedtraillab@gmail.com www.integratedtraillab.com IG: @integratedtraillab DOB: 06/17/1990 EDUCATION: MONTANA STATE UNIVERSITY: MA: ARCHITECTURE DESIGN (2017-2019) MONTANA STATE UNIVERSITY: BA: ENVIROMENTAL DESIGN (2009-2015) UNIVERSITY OF MONTANA: CDL CLASS A: Tandem & Air Brakes (2023) FEDERAL AVIATION ADMIN: Small Unmanned Aircraft Pilot Part 107 (2024) INTEGRATED TRAIL LAB PROFESSIONAL TRAIL BUILDERS ASSOCIATION (PTBA): MEMBER: (2022-PRESENT) Integrated Trail LAB was formally established 2017 in Bozeman, MT. Now members of the “Professional Trail Builders Association” Integrated Trail LAB builds and designs bike parks, pump tracks, flow trails and multi-use trails for city municipalities, government entities, non- profit organizations and private land owners alike. With a passion for dirt jumps and pump tracks Integrated Trail LAB has built the two largest city municipality dirt jump parks in the state of Montana. Bozeman’s Westlake Dirt Jump Park and Missoula’s Syringa Bike Park. Integrated Trail LAB also designed and built Montana’s largest and first public asphalt pump track in Big Sky, MT June 2024. Along with their experience building detailed dirt jump parks and pump tracks ITL has built numerous flow trails. Ski resorts, non-profit organizations and private landowners have capitalized on their unique eye and creativity for building flow trails. Including Spanish Peaks Mountain Resort, The City of Sandpoint Idaho and Big Sky Community Organization. Our mission statement, “Building Communities Through Trails” explicitly describes our passion and goal . To build stronger and more robust communities through a creative and enhanced trail network. Integrated Trail LAB will enhance your communities trail network by surpassing industry standards with their experience, dedication, and creativity. As the sport of mountain biking continues to progress and push trail design, it is key that the land owners and entities that fund these trail projects have similar mindsets along side the younger generation of trail builders and riders. HISTORY & APPROACH: As a life long trails enthusiast Richard grew up working in a bike and ski shop in his home town of Summit County, Colorado. Since the young age of twelve he been wrenching on bikes and building dirt jumps / trails all over Montana, Colorado and the North West region. Now, twenty years later he has established one of Montana’s premier trail building companies. Fueled from the love of biking and a passion for trails, ITL has built and enhanced numerous trail networks in many communities. Richard’s design background fuels the build side of Integrated Trail LAB. With a Bachelors Degree in Environmental Design and a Masters Degree in Architecture, Richard is an expert in all aspects of trail building. Having worked in the trades to fund his architecture education. Richard has a wide variety of acquired skills, including carpentry, metal work and landscaping. With the ability to conceptualize and design projects on paper and carry them out in the field, his well rounded background gives him the title of full-time dirt architect. Richard brings precision and accuracy to every aspect of trail building. PROCESS: LOCATION: 8th Street Trail Network Boise, ID CLIENT: City of Boise CONTACT: David Gordon (208)-866-2878 dgordon@cityofboise.org DATES: Summer 2025 FINAL VALUE: $150,000.00 SCOPE: Mountain Bike Flow & Jump Trail PROJECTS & EXPERIENCE: LOCATION: Big Sky, MT CLIENT: Big Sky Community Organization CONTACT: Adam Johnson: (406)-471-5637 adam@gvlt.org (Phase 1) Jeff MacPherson: (406)-531-5979 jeff@bsco.org (Phase II) DATES: Phase I Summer 2021 Phase II Summer 2024 FINAL VALUE: $245,000.00 SCOPE: Phase I Dirt Pump Track Phase II Asphalt Pump Track LOCATION: Bozeman, MT CLIENT: City of Bozeman CONTACT: Addi Jadin: (406)-548-7871 ajadin@bozeman.net DATES: Phase I Summer 2016 Phase II Summer 2021 Phase III Summer 2025 FINAL VALUE: $700,000.00+ SCOPE: Dirt Jump Park PROFESSIONAL TRAIL BUILDER INTEGRATED TRAIL LAB -Chevy 3500 1 Ton (2) -CAT 306 CR w/ Tilt Rotate -CAT 303 CR -CAT 301.8 -CAT 301.5 -Diamond C 25’ 25,000 lb Goose Neck Trailer -Teton Tilt Deck Equipment Trailer 16,000 lb 20’ -Mirage 12’ Enclosed Tool Trailer & All hand tools -Canny-Com Power Barrows (2) -Multiquip Plate Compactors (4) EQUIPMENT LIST: -Owner / Manager / Operator / Office (1) -Project Manager / Operator (1) -Operators (1) -Laborers (2) PERSONNEL: -Spring Maintenance: Flow Trail, Boise, ID - Multi Use Trail: Livingston Bike Club / USFS (North Dry / West Pine Connector Trail) WORK LOAD: