HomeMy WebLinkAboutIntegrated Trail Lab - RFQ All trades and servicesFrom:Richard Hayes
To:Bozeman Procurement
Subject:[EXTERNAL]RFQ All trades and services
Date:Thursday, August 27, 2026 2:34:26 PM
Attachments:ITLdoc.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Greetings, To whom it may concern.
Attached is Integrated Trail LAB's submission for all trades and services Parks and Recrequest. Please feel free to reach out with any questions or clarifications.
Best,
Richard
RICHARD HAYES: PROFESSIONAL TRAIL BUILDER
P.O. BOX 24
BOZEMAN, MT 59715
P.O. BOX 7886
MISSOULA, MT 59807
(970)-333-9761
integratedtraillab@gmail.com
www.integratedtraillab.com
IG: @integratedtraillab
DOB: 06/17/1990
EDUCATION:
MONTANA STATE UNIVERSITY:
MA: ARCHITECTURE DESIGN
(2017-2019)
MONTANA STATE UNIVERSITY:
BA: ENVIROMENTAL DESIGN
(2009-2015)
UNIVERSITY OF MONTANA:
CDL CLASS A: Tandem & Air Brakes
(2023)
FEDERAL AVIATION ADMIN:
Small Unmanned Aircraft Pilot
Part 107 (2024)
INTEGRATED TRAIL LAB
PROFESSIONAL TRAIL BUILDERS
ASSOCIATION (PTBA):
MEMBER: (2022-PRESENT)
Integrated Trail LAB was formally established 2017 in Bozeman,
MT. Now members of the “Professional Trail Builders Association”
Integrated Trail LAB builds and designs bike parks, pump tracks, flow
trails and multi-use trails for city municipalities, government entities, non-
profit organizations and private land owners alike. With a passion for dirt
jumps and pump tracks Integrated Trail LAB has built the two largest city
municipality dirt jump parks in the state of Montana. Bozeman’s Westlake
Dirt Jump Park and Missoula’s Syringa Bike Park. Integrated Trail LAB also
designed and built Montana’s largest and first public asphalt pump track in
Big Sky, MT June 2024. Along with their experience building detailed dirt
jump parks and pump tracks ITL has built numerous flow trails. Ski resorts,
non-profit organizations and private landowners have capitalized on their
unique eye and creativity for building flow trails. Including Spanish Peaks
Mountain Resort, The City of Sandpoint Idaho and Big Sky Community
Organization. Our mission statement, “Building Communities Through
Trails” explicitly describes our passion and goal . To build stronger and
more robust communities through a creative and enhanced trail network.
Integrated Trail LAB will enhance your communities trail network by
surpassing industry standards with their experience, dedication, and
creativity. As the sport of mountain biking continues to progress and push
trail design, it is key that the land owners and entities that fund these trail
projects have similar mindsets along side the younger generation of trail
builders and riders.
HISTORY & APPROACH:
As a life long trails enthusiast Richard grew up working in a bike
and ski shop in his home town of Summit County, Colorado. Since the
young age of twelve he been wrenching on bikes and building dirt jumps
/ trails all over Montana, Colorado and the North West region. Now, twenty
years later he has established one of Montana’s premier trail building
companies. Fueled from the love of biking and a passion for trails, ITL has
built and enhanced numerous trail networks in many communities.
Richard’s design background fuels the build side of Integrated
Trail LAB. With a Bachelors Degree in Environmental Design and a Masters
Degree in Architecture, Richard is an expert in all aspects of trail
building. Having worked in the trades to fund his architecture education.
Richard has a wide variety of acquired skills, including carpentry, metal
work and landscaping. With the ability to conceptualize and design projects
on paper and carry them out in the field, his well rounded background
gives him the title of full-time dirt architect. Richard brings precision and
accuracy to every aspect of trail building.
PROCESS:
LOCATION: 8th Street Trail Network
Boise, ID
CLIENT: City of Boise
CONTACT: David Gordon (208)-866-2878
dgordon@cityofboise.org
DATES: Summer 2025
FINAL VALUE: $150,000.00
SCOPE: Mountain Bike Flow & Jump Trail
PROJECTS & EXPERIENCE:
LOCATION: Big Sky, MT
CLIENT: Big Sky Community Organization
CONTACT: Adam Johnson: (406)-471-5637
adam@gvlt.org (Phase 1)
Jeff MacPherson: (406)-531-5979
jeff@bsco.org (Phase II)
DATES: Phase I Summer 2021
Phase II Summer 2024
FINAL VALUE: $245,000.00
SCOPE: Phase I Dirt Pump Track
Phase II Asphalt Pump Track
LOCATION: Bozeman, MT
CLIENT: City of Bozeman
CONTACT: Addi Jadin: (406)-548-7871
ajadin@bozeman.net
DATES: Phase I Summer 2016
Phase II Summer 2021
Phase III Summer 2025
FINAL VALUE: $700,000.00+
SCOPE: Dirt Jump Park
PROFESSIONAL TRAIL BUILDER
INTEGRATED TRAIL LAB
-Chevy 3500 1 Ton (2)
-CAT 306 CR w/ Tilt Rotate
-CAT 303 CR
-CAT 301.8
-CAT 301.5
-Diamond C 25’ 25,000 lb Goose Neck Trailer
-Teton Tilt Deck Equipment Trailer 16,000 lb 20’
-Mirage 12’ Enclosed Tool Trailer & All hand tools
-Canny-Com Power Barrows (2)
-Multiquip Plate Compactors (4)
EQUIPMENT LIST:
-Owner / Manager / Operator / Office (1)
-Project Manager / Operator (1)
-Operators (1)
-Laborers (2)
PERSONNEL:
-Spring Maintenance: Flow Trail, Boise, ID
- Multi Use Trail: Livingston Bike Club / USFS (North Dry / West Pine Connector Trail)
WORK LOAD: