Loading...
HomeMy WebLinkAboutEFR 6409 Template Cover LetterVinh Dinh 07/14/2026 21806 Poplar Way Brier, WA 98036 RE: Eligible Facilities Request to modify transmission equipment on an existing Communications tower located at: 705 BRIDGER DR. BOZEMAN, MT 59715 T-Mobile: 419657 BRIDGER VIEW MT / MT05232A Legal Description: S31, T01 S, R06 E, C.O.S. 1623, Parcel E-1 (1.919 acres) ZONING DISTRICT: M-1 Light Manufacturing District / RP - Commercial Property PARCEL SIZE: 1.919 Gross Acres (83,592 SF) Geocode: 06-0905-31-2-01-07-0000 Dear Planning, This is in reference to CONR application PLNAPP-18520 for modification to the above referenced tower facility located at 705 BRIDGER DR with the following proposed scope of work: TOWER SCOPE: • INSTALL (1) 20' TOWER EXTENSION (TO BE PERMITTED AND • INSTALLED UNDER A SEPARATE BUILDING PERMIT) • INSTALL (1) SNP8-NP PLATFORM MOUNT W/ HANDRAIL KIT • INSTALL (3) AHLOB RRHs • INSTALL (3) AHFII RRHs • INSTALL (3) FFVV-65C-R2N23 ANTENNAS • INSTALL (3) AEHC ANTENNAS • INSTALL (2) 6/24 4AWG (LENGTH: ±40m) (2.00" / 50.8mm) HYBRID TRUNKS GROUND SCOPE: • INSTALL (1) 10'-0" x 12'-0" CONCRETE PAD • INSTALL (1) ICE BRIDGE (LENGTH: ±3'-3") • INSTALL (1) 10'-0" x 14'-0" ICE CANOPY • INSTALL (1) H-FRAME WITH (1) 225A PPC, (1) 2' X 2' AAV CUBE, AND MULTI GANGE METER BASE • INSTALL (1) TIER STYLE LIGHT SWITCH AND GFCI COMBO • INSTALL (1) HPL3.1 CABINET AND (1) LB3 BATTERY CABINET • INSTALL FIBER AND POWER CONDUITS • INSTALL IN HPL3.1 CABINET: ASIM(s), (3) ABIP(s), (1) AMID(s), AND (1) CSR IXRE V2(s). Under Section 6409 of the Spectrum Act (47 U.S.C. § 1455(a), 47 C.F.R. § 1.6100), this modification qualifies as an eligible facility for streamlined review because it meets the following criteria (see the attached plans and application for details): • It is an existing wireless facility. • The proposed modification: o Does not propose a height increase of more than 20’ of the existing height (measuring from existing antenna tip height to base of proposed antenna height is 6409 eligible) o Does not propose more than 4 new equipment cabinets. o Complies with prior conditions of approval and the addition to lease area is not being expanded beyond 30-feet from the original lease area. o Does not defeat the concealment elements of the existing facility If you confirm that we submitted drawings which indicate the proposal is an EFR, as noted on the first page of the plans provided to you, the proposed scope of work qualifies as an Eligible Facilities Request (‘EFR’) under 6409. As a reminder, an eligible facilities request, like this one, must be approved because it does not constitute a substantial change to the existing design. The timeframe for review is 60 days for permits to be issued from the date this application is submitted or the site is “deemed approved” by federal law. Any questions regarding the completeness of this application must be raised within 30 days of application submittal. If you do not consider this an EFR, please consider this a formal appeal of your decision to the appropriate board, either the Board of Adjustments and Appeals or Board of Directors. We are committed to working with you to process this request in a timely and efficient manner. Please do not hesitate to contact me if you have any questions using the contact information below. Sincerely, Vinh Dinh m-(206) 295-5926 vinhd@tepgroup.net § 1.40001 Wireless Facility Modifications., 47 C.F.R. § 1.40001 © 2016 Thomson Reuters. No claim to original U.S. Government Works.1 Code of Federal Regulations Title 47. Telecommunication Chapter I. Federal Communications Commission (Refs & Annos) Subchapter A. General Part 1. Practice and Procedure (Refs & Annos) Subpart CC. State and Local Review of Applications for Wireless Service Facility Modification (Refs & Annos) 47 C.F.R. § 1.40001 § 1.40001 Wireless Facility Modifications. Effective: May 18, 2015 Currentness (a) Purpose. These rules implement section 6409 of the Spectrum Act (codified at 47 U.S.C. 1455), which requires a State or local government to approve any eligible facilities request for a modification of an existing tower or base station that does not substantially change the physical dimensions of such tower or base station. (b) Definitions. Terms used in this section have the following meanings. (1) Base station. A structure or equipment at a fixed location that enables Commission-licensed or authorized wireless communications between user equipment and a communications network. The term does not encompass a tower as defined in this subpart or any equipment associated with a tower. (i) The term includes, but is not limited to, equipment associated with wireless communications services such as private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul. (ii) The term includes, but is not limited to, radio transceivers, antennas, coaxial or fiber-optic cable, regular and backup power supplies, and comparable equipment, regardless of technological configuration (including Distributed Antenna Systems and small-cell networks). (iii) The term includes any structure other than a tower that, at the time the relevant application is filed with the State or local government under this section, supports or houses equipment described in paragraphs (b)(1)(i) through (ii) of this section that has been reviewed and approved under the applicable zoning or siting process, or under another State or local regulatory review process, even if the structure was not built for the sole or primary purpose of providing such support. (iv) The term does not include any structure that, at the time the relevant application is filed with the State or local government under this section, does not support or house equipment described in paragraphs (b)(1)(i)-(ii) of this section. § 1.40001 Wireless Facility Modifications., 47 C.F.R. § 1.40001 © 2016 Thomson Reuters. No claim to original U.S. Government Works.2 (2) Collocation. The mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting and/or receiving radio frequency signals for communications purposes. (3) Eligible facilities request. Any request for modification of an existing tower or base station that does not substantially change the physical dimensions of such tower or base station, involving: (i) Collocation of new transmission equipment; (ii) Removal of transmission equipment; or (iii) Replacement of transmission equipment. (4) Eligible support structure. Any tower or base station as defined in this section, provided that it is existing at the time the relevant application is filed with the State or local government under this section. (5) Existing. A constructed tower or base station is existing for purposes of this section if it has been reviewed and approved under the applicable zoning or siting process, or under another State or local regulatory review process, provided that a tower that has not been reviewed and approved because it was not in a zoned area when it was built, but was lawfully constructed, is existing for purposes of this definition. (6) Site. For towers other than towers in the public rights-of-way, the current boundaries of the leased or owned property surrounding the tower and any access or utility easements currently related to the site, and, for other eligible support structures, further restricted to that area in proximity to the structure and to other transmission equipment already deployed on the ground. (7) Substantial change. A modification substantially changes the physical dimensions of an eligible support structure if it meets any of the following criteria: (i) For towers other than towers in the public rights-of-way, it increases the height of the tower by more than 10% or by the height of one additional antenna array with separation from the nearest existing antenna not to exceed twenty feet, whichever is greater; for other eligible support structures, it increases the height of the structure by more than 10% or more than ten feet, whichever is greater; (A) Changes in height should be measured from the original support structure in cases where deployments are or will be separated horizontally, such as on buildings' rooftops; in other circumstances, changes in height should be measured from the dimensions of the tower or base station, inclusive of originally approved appurtenances and any modifications that were approved prior to the passage of the Spectrum Act. (ii) For towers other than towers in the public rights-of-way, it involves adding an appurtenance to the body of the tower that would protrude from the edge of the tower more than twenty feet, or more than the width of the tower structure at the level of the appurtenance, whichever is greater; for other eligible support structures, it involves § 1.40001 Wireless Facility Modifications., 47 C.F.R. § 1.40001 © 2016 Thomson Reuters. No claim to original U.S. Government Works.3 adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six feet; (iii) For any eligible support structure, it involves installation of more than the standard number of new equipment cabinets for the technology involved, but not to exceed four cabinets; or, for towers in the public rights-of-way and base stations, it involves installation of any new equipment cabinets on the ground if there are no pre-existing ground cabinets associated with the structure, or else involves installation of ground cabinets that are more than 10% larger in height or overall volume than any other ground cabinets associated with the structure; (iv) It entails any excavation or deployment outside the current site; (v) It would defeat the concealment elements of the eligible support structure; or (vi) It does not comply with conditions associated with the siting approval of the construction or modification of the eligible support structure or base station equipment, provided however that this limitation does not apply to any modification that is non-compliant only in a manner that would not exceed the thresholds identified in § 1.40001(b) (7)(i) through (iv). (8) Transmission equipment. Equipment that facilitates transmission for any Commission-licensed or authorized wireless communication service, including, but not limited to, radio transceivers, antennas, coaxial or fiber-optic cable, and regular and backup power supply. The term includes equipment associated with wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul. (9) Tower. Any structure built for the sole or primary purpose of supporting any Commission-licensed or authorized antennas and their associated facilities, including structures that are constructed for wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul, and the associated site. (c) Review of applications. A State or local government may not deny and shall approve any eligible facilities request for modification of an eligible support structure that does not substantially change the physical dimensions of such structure. (1) Documentation requirement for review. When an applicant asserts in writing that a request for modification is covered by this section, a State or local government may require the applicant to provide documentation or information only to the extent reasonably related to determining whether the request meets the requirements of this section. A State or local government may not require an applicant to submit any other documentation, including but not limited to documentation intended to illustrate the need for such wireless facilities or to justify the business decision to modify such wireless facilities. (2) Timeframe for review. Within 60 days of the date on which an applicant submits a request seeking approval under this section, the State or local government shall approve the application unless it determines that the application is not covered by this section. § 1.40001 Wireless Facility Modifications., 47 C.F.R. § 1.40001 © 2016 Thomson Reuters. No claim to original U.S. Government Works.4 (3) Tolling of the timeframe for review. The 60–day period begins to run when the application is filed, and may be tolled only by mutual agreement or in cases where the reviewing State or local government determines that the application is incomplete. The timeframe for review is not tolled by a moratorium on the review of applications. (i) To toll the timeframe for incompleteness, the reviewing State or local government must provide written notice to the applicant within 30 days of receipt of the application, clearly and specifically delineating all missing documents or information. Such delineated information is limited to documents or information meeting the standard under paragraph (c)(1) of this section. (ii) The timeframe for review begins running again when the applicant makes a supplemental submission in response to the State or local government's notice of incompleteness. (iii) Following a supplemental submission, the State or local government will have 10 days to notify the applicant that the supplemental submission did not provide the information identified in the original notice delineating missing information. The timeframe is tolled in the case of second or subsequent notices pursuant to the procedures identified in this paragraph (c)(3). Second or subsequent notices of incompleteness may not specify missing documents or information that were not delineated in the original notice of incompleteness. (4) Failure to act. In the event the reviewing State or local government fails to approve or deny a request seeking approval under this section within the timeframe for review (accounting for any tolling), the request shall be deemed granted. The deemed grant does not become effective until the applicant notifies the applicable reviewing authority in writing after the review period has expired (accounting for any tolling) that the application has been deemed granted. (5) Remedies. Applicants and reviewing authorities may bring claims related to Section 6409(a) to any court of competent jurisdiction. Credits [80 FR 28203, May 18, 2015] SOURCE: 56 FR 57598, Nov. 13, 1991; 57 FR 187, Jan. 3, 1992; 58 FR 27473, May 10, 1993; 59 FR 22985, May 4, 1994; 61 FR 45618, Aug. 29, 1996; 61 FR 46561, Sept. 4, 1996; 61 FR 52899, Oct. 9, 1996; 62 FR 37422, July 11, 1997; 63 FR 67429, Dec. 7, 1998; 63 FR 71036, Dec. 23, 1998; 64 FR 63251, Nov. 19, 1999; 65 FR 10720, Feb. 29, 2000; 65 FR 19684, April 12, 2000; 65 FR 31281, May 17, 2000; 69 FR 77938, Dec. 29, 2004; 71 FR 26251, May 4, 2006; 74 FR 39227, Aug. 6, 2009; 75 FR 9797, March 4, 2010; 76 FR 43203, July 20, 2011; 77 FR 71137, Nov. 29, 2012; 78 FR 10100, Feb. 13, 2013; 78 FR 15622, March 12, 2013; 78 FR 41321, July 10, 2013; 78 FR 50254, Aug. 16, 2013; 79 FR 48528, Aug. 15, 2014; 80 FR 1268, Jan. 8, 2015; 80 FR 1269, Jan. 8, 2015; 81 FR 40821, June 23, 2016; 81 FR 52362, Aug. 8, 2016; 81 FR 79930, Nov. 14, 2016; 81 FR 86601, Dec. 1, 2016, unless otherwise noted. AUTHORITY: 15 U.S.C. 79, et seq.; 47 U.S.C. 151, 154(i), 154(j), 155, 157, 160, 201, 225, 227, 303, 309, 310, 332, 1403, 1404, 1451, 1452, and 1455. § 1.40001 Wireless Facility Modifications., 47 C.F.R. § 1.40001 © 2016 Thomson Reuters. No claim to original U.S. Government Works.5 Notes of Decisions (1) Current through December 22, 2016; 81 FR 94210. End of Document © 2016 Thomson Reuters. No claim to original U.S. Government Works. XSHEET NUMBER:REVISION:C-001 DESCRIPTIONREV.DATEBY Copyright © 2026 ATC IP LLC, All Rights Reserved.326 TRYON ROADRALEIGH, NC 27603-3530OFFICE: (919) 661-6351www.tepgroup.net TEP IS A FAMILY OF COMPANIES LICENSED TO PROVIDE DIFFERENT SERVICES INDIFFERENT JURISDICTIONS. DEPENDING ON THE JURISDICTION, PROFESSIONALENGINEERING AND LAND SURVEYING SERVICES ARE PROVIDED BY TEP OPCOLLC, A DELAWARE LIMITED LIABILITY COMPANY, TEP ENGINEERING, LLC, A NORTHCAROLINA PROFESSIONAL LIMITED LIABILITY COMPANY, OR M&H ENGINEERING,LLC, A NEW YORK PROFESSIONAL LIMITED LIABILITY COMPANY. GENERALCONTRACTOR SERVICES ARE PROVIDED BY TEP OPCO LLC, A DELAWARELIMITED LIABILITY COMPANY. WE ACQUIRE THE REQUISITE LICENSES IN EACHSTATE. ADDITIONAL INFORMATION CAN BE OBTAINED FROM THE COMPANY. 419657 ATC SITE NUMBER: SITE ADDRESS: T-MOBILE SITE NAME: BRIDGER VIEW MT BRIDGER RD_ATC (419657) ATC SITE NAME: 705 BRIDGER DR BOZEMAN, MT 59715 BRIDGER RD_ATC (419657) 15314363 MT05232A 02/18/26DATE DRAWN: ATC JOB NO: CUSTOMER ID: CUSTOMER NAME: SEAL: 100% CONSTRUCTION0 07/25/25SRZ 02/18/26 100% CONSTRUCTION1 09/24/25SRZ 100% CONSTRUCTION2 02/18/26RMJ A PRELIMINARY PRB 06/10/25 2 OVERALL SITE PLAN LEGEND 00 70'140' SCALE: 1"=70' (11X17) 1"=35' (22X34) 1 OVERALL SITE PLAN SCALE: 1" = 70' PROPOSED 20' TOWER EXTENSION(TO BE PERMITTED AND INSTALLEDUNDER A SEPARATE PERMIT) NOTES: 1. BOUNDARY LINES OBTAINED FROM CITY OF BOZEMAN ONLINE GIS. 2. ZONING INFORMATION OBTAINED FROM CITY OF BOZEMAN. 3. THE TOWER IS LOCATED WITHIN SHADED ZONE "X," AREASDETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCEFLOODPLAIN ACCORDING TO FEMA COMMUNITY PANEL#30031C0809E, DATED APRIL 21, 2021. XXXXXX X X XXXXXXXXXXXXXXXUTUEUE UEUEUEUEUEUEUEUEUE UEUEUEUEUEUEUEUEUEUEUEUEUE UTUTUTUTUTUTUTUTUTUTUTUTUT SHEET NUMBER:REVISION:C-101 DESCRIPTIONREV.DATEBY Copyright © 2026 ATC IP LLC, All Rights Reserved.326 TRYON ROADRALEIGH, NC 27603-3530OFFICE: (919) 661-6351www.tepgroup.net TEP IS A FAMILY OF COMPANIES LICENSED TO PROVIDE DIFFERENT SERVICES INDIFFERENT JURISDICTIONS. DEPENDING ON THE JURISDICTION, PROFESSIONALENGINEERING AND LAND SURVEYING SERVICES ARE PROVIDED BY TEP OPCOLLC, A DELAWARE LIMITED LIABILITY COMPANY, TEP ENGINEERING, LLC, A NORTHCAROLINA PROFESSIONAL LIMITED LIABILITY COMPANY, OR M&H ENGINEERING,LLC, A NEW YORK PROFESSIONAL LIMITED LIABILITY COMPANY. GENERALCONTRACTOR SERVICES ARE PROVIDED BY TEP OPCO LLC, A DELAWARELIMITED LIABILITY COMPANY. WE ACQUIRE THE REQUISITE LICENSES IN EACHSTATE. ADDITIONAL INFORMATION CAN BE OBTAINED FROM THE COMPANY. 419657 ATC SITE NUMBER: SITE ADDRESS: T-MOBILE SITE NAME: BRIDGER VIEW MT BRIDGER RD_ATC (419657) ATC SITE NAME: 705 BRIDGER DR BOZEMAN, MT 59715 BRIDGER RD_ATC (419657) 15314363 MT05232A 02/18/26DATE DRAWN: ATC JOB NO: CUSTOMER ID: CUSTOMER NAME: SEAL: 100% CONSTRUCTION0 07/25/25SRZ 02/18/26 100% CONSTRUCTION1 09/24/25SRZ 100% CONSTRUCTION2 02/18/26RMJ A PRELIMINARY PRB 06/10/25 2 DETAILED SITE PLAN 0 10'20' SCALE: 1"=10' (11X17) 1"=5' (22X34) 1 DETAILED SITE PLAN SCALE: 1" = 10' PROPOSED CABLE NOTES: 1. ESTIMATED LENGTH OF PROPOSED CABLE IS 40m.ESTIMATED LENGTH OF CABLE WAS PROVIDED BYCUSTOMER OR CALCULATED BY ADDING THE RADCENTER AND THE DISTANCE FROM THE SHELTERENTRY PLATE TO THE TOWER (ALONG THE ICEBRIDGE) AND A SAFETY FACTOR MEASUREMENT OF15% (OF THE TWO PREVIOUS VALUES), CDS DEFERTO GREATEST CABLE LENGTH. 2. ROUTE PROPOSED CABLES ALONG SAME PATH ASEXISTING CABLES AND IN ACCORDANCE WITHSTRUCTURAL ANALYSIS. IF ADEQUATE SPACEEXISTS, ROUTE CABLES THROUGH ENTRY PORTHOLE, UP INSIDE OF MONOPOLE, AND THROUGH EXITPORT HOLE. IF ROUTING OUTSIDE THE MONOPOLE,ATTACH CABLES USING STAND-OFF ADAPTERS MOUNTED TO TOWER USING STAINLESS STEELBANDING. ADEQUATELY SECURE CABLES USINGEITHER APPROPRIATELY SIZED STAINLESS STEELSNAP-INS OR MOUNTING HARDWARE AND BRACKETSAS SPECIFIED BY CABLE MANUFACTURER. SITE PLAN NOTES: 1. THIS SITE PLAN REPRESENTS THE BEST PRESENTKNOWLEDGE AVAILABLE TO THE ENGINEER AT THETIME OF THIS DESIGN. THE CONTRACTOR SHALLVISIT THE SITE PRIOR TO CONSTRUCTION ANDVERIFY ALL EXISTING CONDITIONS RELATED TO THESCOPE OF WORK FOR THIS PROJECT. 2. ICE BRIDGE, CABLE LADDER, COAX PORT, AND COAXCABLE ARE SHOWN FOR REFERENCE ONLY.CONTRACTOR SHALL CONFIRM THE EXACTLOCATION OF ALL PROPOSED AND EXISTINGEQUIPMENT AND STRUCTURES DEPICTED ON THISPLAN. BEFORE UTILIZING EXISTING CABLESUPPORTS, COAX PORTS, INSTALLING NEW PORTS OR ANY OTHER EQUIPMENT, CONTRACTOR SHALLVERIFY ALL ASPECTS OF THE COMPONENTS MEETTHE ATC SPECIFICATIONS. 3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TOCOORDINATE WITH THE T-MOBILE REPRESENTATIVEAND LOCAL UTILITY COMPANY FOR THEINSTALLATION OF CONDUITS, CONDUCTORS,BREAKERS, DISCONNECTS, OR ANY OTHEREQUIPMENT REQUIRED FOR ELECTRICAL SERVICE.ALL ELECTRICAL WORK SHALL BE PERFORMED INACCORDANCE WITH LATEST EDITION OF THE STATEAND NATIONAL CODES, ORDINANCES ANDREGULATIONS APPLICABLE TO THIS PROJECT. LEGEND AUTOMATIC TRANSFER SWITCHATS DISCONNECTD ELECTRICALE FIBERF BOLLARDB GENERATOR RECEPTACLEG HAND HOLE, VAULTHH, V ICE BRIDGEIB KENTROX BOXK GENERATORGEN METERM LIGHTING CONTROLLC PULL BOXPB POWER POLEPP TELCOT TRANSFORMERTRN XCHAINLINK FENCE GROUNDING TEST WELL CELL SITE CABINETCSC PROPOSED 20' TOWER EXTENSION(TO BE PERMITTED AND INSTALLED UNDER A SEPARATE PERMIT) PROPOSED T-MOBILEICE BRIDGE (LENGTH 3'-3"±) 1 C-502 PROPOSED GPS ANTENNA 3 C-502 PROPOSED T-MOBILE CABLE COUNT:(2) 6/24 4AWG (LENGTH: ±40m)(2.00" / 50.8mm) HYBRID TRUNKS(ROUTED PER TOWER NOTE 2)(REFER TO PROPOSED CABLELENGTH NOTE ON THIS PAGE) 4 C-501 PROPOSED T-MOBILE10'-0" X 12'-0" EQUIPMENT PAD 1 C-503 PROPOSED T-MOBILE10' X 15' LEASE AREA 1 C-102 PROPOSED T-MOBILE EQUIPMENTWITHIN PROPOSED EQUIPMENT PAD:(1) HPL3.1 600A SITE SUPPORT CABINET(1) PURCELL LB3 BATTERY CABINET(1) 2' x 2' AVV CUBE (1) 225A PPC(1) 200A METER AND DISCONNECT(2) ASIMs(3) ABIPs(1) AMID(1) CSR IXRE V2(2) LED LUMINARE 1 C-102 PROPOSED 10'-0" X 14'-0" WEATHERCANOPY (4 POSTS) BY PERFECTVISION (P/N: PV-EQ1014-B) ORAPPROVED EQUIVALENT 1 R-611 PROPOSED UNDERGROUNDPOWER AND TELCO CONDUITROUTED IN TRENCH 2 C-502 3'-3" PROPOSED 2-GANG METER BASETO BE MOUNTED ON PROPOSEDH-FRAME-UNISTRUT. METERS MUSTBE LABELED VERIZON & T-MOBILECONTRACTOR TO CONFIRM METER SPECS PRIOR TO CONSTRUCTIONWITH NORTH WESTERN ENERGY 1'-0"1'-0" PROPOSED NORTH WESTERNENERGY TO INTERCEPT EXISTINGVERIZON SERVICE RUN ENTERINGCOMPOUND TO BE SPLICED INTOPROPOSED 2-GANG METER BASEFOR T-MOBILE AND VERIZON PROPOSED T-MOBILE FIBERGOING THROUGH EXISTINGFIBER HANDHOLE. XXXXXXXXXXXXXXXXXXXXXXXXXUTUEUE SHEET NUMBER:REVISION:C-102 DESCRIPTIONREV.DATEBY Copyright © 2026 ATC IP LLC, All Rights Reserved.326 TRYON ROADRALEIGH, NC 27603-3530OFFICE: (919) 661-6351www.tepgroup.net TEP IS A FAMILY OF COMPANIES LICENSED TO PROVIDE DIFFERENT SERVICES INDIFFERENT JURISDICTIONS. DEPENDING ON THE JURISDICTION, PROFESSIONALENGINEERING AND LAND SURVEYING SERVICES ARE PROVIDED BY TEP OPCOLLC, A DELAWARE LIMITED LIABILITY COMPANY, TEP ENGINEERING, LLC, A NORTHCAROLINA PROFESSIONAL LIMITED LIABILITY COMPANY, OR M&H ENGINEERING,LLC, A NEW YORK PROFESSIONAL LIMITED LIABILITY COMPANY. GENERALCONTRACTOR SERVICES ARE PROVIDED BY TEP OPCO LLC, A DELAWARELIMITED LIABILITY COMPANY. WE ACQUIRE THE REQUISITE LICENSES IN EACHSTATE. ADDITIONAL INFORMATION CAN BE OBTAINED FROM THE COMPANY. 419657 ATC SITE NUMBER: SITE ADDRESS: T-MOBILE SITE NAME: BRIDGER VIEW MT BRIDGER RD_ATC (419657) ATC SITE NAME: 705 BRIDGER DR BOZEMAN, MT 59715 BRIDGER RD_ATC (419657) 15314363 MT05232A 02/18/26DATE DRAWN: ATC JOB NO: CUSTOMER ID: CUSTOMER NAME: SEAL: 100% CONSTRUCTION0 07/25/25SRZ 02/18/26 100% CONSTRUCTION1 09/24/25SRZ 100% CONSTRUCTION2 02/18/26RMJ A PRELIMINARY PRB 06/10/25 2 DETAILED EQUIPMENT LAYOUT1PROPOSED GROUND EQUIPMENT LAYOUT SCALE: 1" = 3' 0 3'6' SCALE: 1"=3' (11X17) 1"=1.5' (22X34) 3 R-608 2 R-608 1 R-608 1 R-609 PROPOSED T-MOBILE EQUIPMENTTO BE INSTALLED IN PURCELL HPL3.1600A SITE SUPPORT CABINET:(2) ASIMs(3) ABIPs(1) AMID(1) CSR IXRE V2 PROPOSED PURCELL HPL3.1600A SITE SUPPORT CABINET 5 C-501 1 R-603 PROPOSED LED LUMINARE(TYP. 2) PROPOSED T-MOBILEICE BRIDGE (LENGTH: 3'-3"±) 1 C-502 PROPOSED GPS ANTENNA 3 C-502 PROPOSED T-MOBILE10'-0" X 12'-0" CONCRETE PAD 1 C-503 PROPOSED 10'-0" X 14'-0" WEATHERCANOPY (4 POSTS) BY PERFECTVISION (P/N: PV-EQ1014-B) ORAPPROVED EQUIVALENT 1 R-611 PROPOSED 2' X 2' AAV CUBE PROPOSED T-MOBILE 225A POWERPROTECTION CABINET BY DELTA(P/N: 4910163600)(CONTRACTOR TO SUPPLY) 1 R-610 PROPOSED 36" NEC (TYP.) 1 R-604 1 R-605 1 R-606 PROPOSED T-MOBILE10' X 15' LEASE AREA PROPOSED PURCELL LB3BATTERY CABINET 5 C-501 1 R-607 PROPOSED T-MOBILE CABLE COUNT:(2) 6/24 4AWG (LENGTH: ±40m)(2.00" / 50.8mm) HYBRID TRUNKS 4 C-501 2'-0"1'-6"PROPOSED TIER STYLE LIGHT SWITCHAND GFCI COMBO MOUNTED TO THEBACK OF THE H-FRAME 1'-0"1'-0" PROPOSED 2-GANG METER BASETO BE MOUNTED ON PROPOSEDH-FRAME-UNISTRUT. METERS MUSTBE LABELED VERIZON & T-MOBILECONTRACTOR TO CONFIRM METERSPECS PRIOR TO CONSTRUCTIONWITH NORTH WESTERN ENERGY PROPOSED UNDERGROUNDPOWER AND TELCO CONDUITROUTED IN TRENCH 2 C-502 SHEET NUMBER:REVISION:C-201 DESCRIPTIONREV.DATEBY Copyright © 1980 ATC IP LLC, All Rights Reserved.326 TRYON ROADRALEIGH, NC 27603-3530OFFICE: (919) 661-6351www.tepgroup.net TEP IS A FAMILY OF COMPANIES LICENSED TO PROVIDE DIFFERENT SERVICES INDIFFERENT JURISDICTIONS. DEPENDING ON THE JURISDICTION, PROFESSIONALENGINEERING AND LAND SURVEYING SERVICES ARE PROVIDED BY TEP OPCOLLC, A DELAWARE LIMITED LIABILITY COMPANY, TEP ENGINEERING, LLC, A NORTHCAROLINA PROFESSIONAL LIMITED LIABILITY COMPANY, OR M&H ENGINEERING,LLC, A NEW YORK PROFESSIONAL LIMITED LIABILITY COMPANY. GENERALCONTRACTOR SERVICES ARE PROVIDED BY TEP OPCO LLC, A DELAWARELIMITED LIABILITY COMPANY. WE ACQUIRE THE REQUISITE LICENSES IN EACHSTATE. ADDITIONAL INFORMATION CAN BE OBTAINED FROM THE COMPANY. 419657 ATC SITE NUMBER: SITE ADDRESS: T-MOBILE SITE NAME: BRIDGER VIEW MT BRIDGER RD_ATC (419657) ATC SITE NAME: 705 BRIDGER DR BOZEMAN, MT 59715 BRIDGER RD_ATC (419657) 15314363 MT05232A 09/24/25DATE DRAWN: ATC JOB NO: CUSTOMER ID: CUSTOMER NAME: SEAL: 100% CONSTRUCTION0 07/25/25SRZ 09/24/25 100% CONSTRUCTION1 09/24/25SRZ A PRELIMINARY PRB 06/10/25 1 TOWER ELEVATION PER MOUNT ANALYSIS COMPLETED BY POWER OFDESIGN, DATED MAY 19, 2025. THE PROPOSEDMOUNT CAN ADEQUATELY SUPPORT THEPROPOSED LOADING. 2 PROPOSED TOWER ELEVATION SCALE: N.T.S.1 EXISTING TOWER ELEVATION SCALE: N.T.S. PROPOSED T-MOBILEEQUIPMENT 1 C-401 PROPOSED T-MOBILERAD CENTER @ 73' PROPOSED T-MOBILERAD CENTER @ 75' PROPOSED T-MOBILECABLE COUNT:(2) 6/24 4AWG (LENGTH: ± 40m)(2.00" / 50.8mm) HYBRID TRUNKS 4 C-501 PROPOSED T-MOBILET/ANTENNA @ 77' PROPOSED T-MOBILEB/ANTENNA @ 69'PROPOSED PLATFORM MOUNTBY SITE PRO 1 (P/N: SNP8-NP) WITHHANDRAIL KIT BY SITE PRO 1 (P/N: HRA8) OR APPROVEDEQUIVALENT1 R-613 1 R-612 PROPOSED CABLING SUMMARY COAX HYBRID LENGTH STATUS -(2) 6/24 4AWG(2.00" / 50.8mm)40m ADD TOWER NOTES:1. IT IS THE CONTRACTOR'S RESPONSIBILITY TOCONFIRM WITH THE PROJECT MANAGER THATTHEY HAVE THE MOST RECENT VERSION OF THESTRUCTURAL ANALYSIS BEFORE COMMENCINGWORK. EXISTING AND PROPOSED TOWERAPPURTENANCES, MOUNTS, AND ANTENNAS ARESHOWN BASED ON THE STRUCTURAL ANALYSIS.2. WHERE APPLICABLE, ALL NEW ANTENNAS,EQUIPMENT, MOUNTS, CABLING, ETC. SHALL BE PAINTED/SOCKED TO MATCH EXISTING EQUIPMENTIN ACCORDANCE WITH FAA, JURISDICTION, AND/OROTHER LOCAL REQUIREMENTS.3. ROUTE PROPOSED CABLES ALONG SAME PATH ASEXISTING CABLES AND IN ACCORDANCE WITHSTRUCTURAL ANALYSIS. IF ADEQUATE SPACEEXISTS, ROUTE CABLES THROUGH ENTRY PORTHOLE, UP INSIDE OF MONOPOLE, AND THROUGHEXIT PORT HOLE. IF ROUTING OUTSIDE THEMONOPOLE, ATTACH CABLES USING STAND-OFFADAPTERS MOUNTED TO TOWER USING STAINLESSSTEEL BANDING. ADEQUATELY SECURE CABLESUSING EITHER APPROPRIATELY SIZED STAINLESSSTEEL SNAP-INS OR MOUNTING HARDWARE ANDBRACKETS AS SPECIFIED BY CABLEMANUFACTURER.4. TOWER ELEVATION DEPICTION MAY NOT REFLECTALL EQUIPMENT INCLUDED IN STRUCTURALANALYSIS. REFER TO STRUCTURAL ANALYSIS FOR FULL TOWER LOADING. (TO BE RELOCATED) PROPOSED 20' TOWER EXTENSION(TO BE PERMITTED AND INSTALLEDUNDER A SEPARATE PERMIT) TOP OF PROPOSED EXTENSIONELEV. 80'-0"8'-0"