Loading...
HomeMy WebLinkAbout10-14-26 - Transportation Coordinating Committee - Agendas & Packet MaterialsA. Call to Order - 10:30 a.m. B. Roll Call C. Approval of Minutes C.1 Approval of the August 12, 2026 Gallatin Valley Metropolitan Planning Organization TTAC Meeting Minutes(Butts) D. Public Comments E. New Business THE GALLATIN VALLEY MPO - TRANSPORTATION TECHNICAL ADVISORY COMMITTEE OF BOZEMAN, MONTANA TTAC AGENDA Wednesday, October 14, 2026 General information about the Transportation Technical Advisory Committee can be found in our Laserfiche repository. If you are interested in commenting in writing on items on the agenda please send an email to comments@bozeman.net or by visiting the Public Comment Page prior to 12:00pm on the day before the meeting. Public comments will also be accepted through Video Conference during the appropriate agenda items. Recordings of the meeting will be available through the Commission's video page. For more information please contact Jeff Butts, jbutts@bozeman.net This meeting will be held using an online videoconferencing system. You can join this meeting: Via Video Conference: Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting. Via Phone: This is for listening only +1 719 359 4580 Access code: 950 6233 3811 This is the time to comment on any non-agenda matter falling within the scope of the Metropolitan Planning Organization. There will also be time in conjunction with each agenda item for public comment relating to that item but you may only speak once per topic. Please note, the Committee cannot take action on any item which does not appear on the agenda. All persons addressing the Committee shall speak in a civil and courteous manner and members of the audience shall be respectful of others. Please state your name and place of residence in an audible tone of voice for the record and limit your comments to three minutes. General public comments to the Committee can be found on their Laserfiche repository page. 1 E.1 First Review of the Draft Federal Fiscal Years 2027-2031 Transportation Improvement Program(Butts) E.2 First Review of the Draft Long Range Transportation Plan (Butts) F. General Discussion G. Adjournment This Committee generally meets the second Wednesday of every month from 10:30 a.m. to 12:00 p.m. All meetings are open to all members of the public. If you have a disability that requires assistance, please contact our ADA Coordinator at 406.582.3232. 2 Memorandum REPORT TO:Gallatin Valley MPO - Transportation Technical Advisory Committee FROM:Jeff Butts - MPO Manager SUBJECT:Approval of the August 12, 2026 Gallatin Valley Metropolitan Planning Organization TTAC Meeting Minutes MEETING DATE:October 14, 2026 AGENDA ITEM TYPE:Minutes RECOMMENDATION:I move to approve the August 12, 2026 Gallatin Valley Metropolitan Planning Organization TTAC Meeting Minutes STRATEGIC PLAN:1.1 Outreach: Continue to strengthen and innovate in how we deliver information to the community and our partners. BACKGROUND:Minutes from the August 12, 2026 Gallatin Valley Metropolitan Planning Organization TTAC Meeting. UNRESOLVED ISSUES:None ALTERNATIVES:As recommended by the committee. FISCAL EFFECTS:None Attachments: 081226 GVMPO TTAC Meeting Minutes Report compiled on: September 1, 2026 3 Gallatin Valley MPO Meeting Minutes, August 12, 2026 Page 1 of 2 THE GALLATIN VALLEY MPO TTAC MEETING OF BOZEMAN, MONTANA MINUTES August 12, 2026 A. 00:02:50 Call to Order -10:30 a.m. B. 00:03:39 Roll Call Present: Chris Saunders, Nicholas Ross, Katharine King, Sean O'Callaghan, Levi Ewan, Geoff Streeter (Beth Clarkson - Proxy), Sunshine Ross, Todd Wilson, John How Absent: Chad Mozol, Brandon Jones Excused: None Todd Wilson joined the meeting after the approval of minutes. Other Present at the meeting; Marcy Yeykal, Dede Frothingham, Richard Wolf, Zachary Zabel, Chris Johnson, Bethany Rorem, Jolean Hall, The Gallatin Valley Sentinel. C. 00:04:29 Approval of Minutes C.1 Approval of the July 8, 2026 Gallatin Valley Metropolitan Planning Organization TTAC Meeting Minutes (Butts) 00:04:53 Motion to approve C.1 Approval of the July 8, 2026 Gallatin Valley Metropolitan Planning Organization TTAC Meeting Minutes (Butts) Sunshine Ross: Motion Sean O'Callaghan: 2nd 00:05:33 Vote on the Motion to approve C.1 Approval of the July 8, 2026 Gallatin Valley Metropolitan Planning Organization TTAC Meeting Minutes (Butts) The Motion carried 8 - 0. Approve: 4 Gallatin Valley MPO Meeting Minutes, August 12, 2026 Page 2 of 2 Chris Saunders Nicholas Ross Katharine King Sean O'Callaghan Levi Ewan Geoff Streeter (Beth Clarkson - Proxy) Sunshine Ross John How Disapprove: None D. 00:06:11 Public Comments There was no request for public comment. E. New Business E.1 00:07:01 Initial Review of the Long-Range Transportation Plan Fiscally Constrained Project List (Butts) 00:08:21 Nelson Nygaard presented the Long-Range Transportation Plan Fiscally constrained project List to the committee. 00:18:29 Questions of Staff. 00:21:26 Continued Presentation 00:28:00 Questions of Staff. 00:31:41 Open Discussion 00:42:12 Updates to the Modeling Work 00:49:27 Questions of Staff F. 00:55:04 General Discussion 00:56:11 Public Comment There was no request for public comment G. 00:56:41 Adjournment This Committee generally meets the second Wednesday of every month from 10:30 a.m. to 12:00 p.m. 5 Memorandum REPORT TO:Gallatin Valley MPO - Transportation Technical Advisory Committee FROM:Jeff Butts, MPO Manager Emiliano Esparza, Acting Director of Transportation and Engineering Department SUBJECT:First Review of the Draft Federal Fiscal Years 2027-2031 Transportation Improvement Program MEETING DATE:October 14, 2026 AGENDA ITEM TYPE:Administration RECOMMENDATION:Review the Draft Federal Fiscal Years 2027-2031 Transportation Improvement Program and provide feedback. STRATEGIC PLAN:2.2 Infrastructure Investments: Strategically invest in infrastructure as a mechanism to encourage economic development. BACKGROUND:The Transportation Improvement Program (TIP) identifies planned federally funded transportation projects, funding sources, and implementation schedules for all projects located within the Gallatin Valley Metropolitan Planning Area. The TIP implements the Long Range Transportation Plan (LRTP) through a fiscally constrained program of near-term highway, transit, bicycle, and pedestrian investments. Projects included in the TIP must be consistent with the LRTP. As the Gallatin Valley MPO's first TIP, the draft Federal Fiscal Years 2027– 2031 TIP carries forward projects and funding already programmed in the Montana Department of Transportation’s Statewide Transportation Improvement Program. Staff is requesting review to confirm that the draft reflects expected project funding and schedules. The Gallatin Valley MPO must have an adopted TIP by December 26, 2026. Development and review of the TIP are proceeding alongside the region’s first LRTP to support adoption of both documents before that deadline. This item provides TTAC with its first opportunity to review and discuss the draft TIP. No action is requested at this meeting. Staff will refine the draft TIP based on committee feedback and continued coordination with partner agencies. The draft TIP will return to TTAC next month for a requested recommendation of approval to the Transportation Policy Coordinating Committee. 6 UNRESOLVED ISSUES:None. ALTERNATIVES:As suggested by the Committee. FISCAL EFFECTS:The draft TIP identifies anticipated surface transportation funding and programmed investments for FFY 2027-2031. Attachments: Draft FFY 2027-2031 Transportation Improvement Program Report compiled on: October 7, 2026 7 Gallatin Valley TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Federal Fiscal Years 2027 – 2031 Prepared by: Gallatin Valley Metropolitan Planning Organization in cooperation with City of Bozeman City of Belgrade County of Gallatin Gallatin Valley Urban Transportation District Montana Department of Transportation Federal Highway Administration Federal Transit Administration Approved by: TTAC: TPCC: MDT: 8 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 2 The preparation of this report has been financed in part through a grant from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the State Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. Table of Contents Acronyms ............................................................................................................................................................................................................ 4 Introduction ........................................................................................................................................................................................................ 6 FAST Act and IIJA ................................................................................................................................................................................................ 6 About the TIP ....................................................................................................................................................................................................... 6 TIP Process and Development .............................................................................................................................................................................. 8 UPDATE, AMENDMENT AND ADMINISTRATIVE PROCEDURES ........................................................................................................................ 8 TIP Updates and Major Amendments ............................................................................... 8 Minor Amendments......................................................................................................... 9 Administrative Modifications .......................................................................................... 9 Performance Measures ...................................................................................................................................................................................... 10 Safety Performance ........................................................................................................................................................................................ 11 Pavement and Bridge Condition ...................................................................................................................................................................... 11 Reliability and System Performance Targets ................................................................................................................................................... 11 Transit Performance Targets .......................................................................................................................................................................... 11 Anticipated Project Contribution .................................................................................................................................................................... 12 Energy Conservation Considerations in the TIP .................................................................................................................................................. 14 Annual Listing of Obligated Projects ................................................................................................................................................................... 14 Financial Constraint and the Financial Plan ........................................................................................................................................................ 15 Indirect Cost Recovery and the TIP .................................................................................................................................................................... 15 Understanding the TIP Funding Tables ............................................................................................................................................................... 15 Projects List ...................................................................................................................................................................................................... 17 9 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 3 Estimated Revenue ............................................................................................................................................................................................ 21 Projects by Funding Source................................................................................................................................................................................ 22 Projects with Multiple Funding Sources .......................................................................................................................................................... 22 Surface Transportation Program Urban (STPU) Bozeman ................................................................................................................................ 24 Surface Transportation Program Urban (STPU) Belgrade ................................................................................................................................ 25 Interstate Maintenance (IM)* ........................................................................................................................................................................... 26 National Highway (NH)* ................................................................................................................................................................................. 27 Surface Transportation Program Off System (STPX), Secondary (STPS), Primary (STPP), State Funded Construction ....................................... 29 Railroad Crossing (RRS) ................................................................................................................................................................................. 31 Highway Safety Improvement Program (HSIP) ................................................................................................................................................ 32 Bridge Program (BR) ....................................................................................................................................................................................... 33 Urban Pavement Preservation (UPP) ............................................................................................................................................................... 34 Montana Air and Congestion Initiative (MACI) – Discretionary Program ........................................................................................................... 35 Transportation Alternatives - MDT .................................................................................................................................................................. 36 Transportation Alternatives - MPO .................................................................................................................................................................. 38 Carbon Reduction (CR) – 50k – 200k ................................................................................................................................................................ 39 FWP Recreational Trails Program ................................................................................................................................................................... 40 Discretionary Grants ...................................................................................................................................................................................... 41 Federal Transit Administration Section 5307* ................................................................................................................................................. 42 Federal Transit Administration Section 5339 ................................................................................................................................................... 43 Federal Transit Administration Section 5339 Discretionary Funding ................................................................................................................ 44 Federal Transit Administration Section 5310 ................................................................................................................................................... 45 Transade (State Funded) ................................................................................................................................................................................. 46 Public Comment ............................................................................................................................................................................................. 46 Certification ................................................................................................................................................................................................... 47 10 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 4 Acronyms ADA Americans with Disabilities Act BIL Bipartisan Infrastructure Law CMAQ Congestion Mitigation and Air Quality CN Construction CR Carbon Reduction EPA Environmental Protection Agency FAST Act Fixing America’s Surface Transportation Act FHWA Federal Highway Administration FTA Federal Transit Administration FWP Montana Department of Fish, Wildlife, and Parks FY Fiscal Year; runs Jul 1 – Jun 30 FFY Federal Fiscal Year; runs Oct 1 – Sept 30. HSIP Highway Safety Improvement Program IC Incidental Construction IIJA Infrastructure Investment and Jobs Act IM Interstate Maintenance; National Highway Performance Program funded MACI Montana Air and Congestion Initiative MAP-21 Moving Ahead for Progress in the 21st Century Act MDT Montana Department of Transportation MPA Metropolitan Planning Area MPO Metropolitan Planning Organization NAAQS National Ambient Air Quality Standards NEVI National Electric Vehicle Infrastructure NH National Highway System; National Highway Performance Program funded PE Preliminary Engineering 11 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 5 PPP Public Participation Plan ROW Right-of-Way SFC State Funded Construction SRTS Safe Routes to School STIP State Transportation Improvement Program STPP Surface Transportation Program - Primary STPU Surface Transportation Program – Urban STPX Surface Transportation Program – Off System TA Transportation Alternatives Program TIP Transportation Improvement Program; a multi-year program of priority highway and transit projects that implement the region’s Long Range Transportation Plan. TPCC Transportation Policy Coordinating Committee. The policy body for transportation planning within the Gallatin Valley. TTAC Transportation Technical Advisory Committee. Advises TPCC on transportation planning in the Gallatin Valley and recommends actions for its review and approval. UPP Urban Pavement Preservation 12 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 6 Introduction The Transportation Improvement Program (TIP) connects the Gallatin Valley MPO’s long range transportation goals with near-term investments. It identifies planned projects, anticipated funding, and implementation schedules to help the public and partners understand how regional priorities will move forward. FAST Act and IIJA The 2021 Infrastructure Investment and Jobs Act (IIJA), commonly referred to as the Bipartisan Infrastructure Law (BIL), funds Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) programs and continues metropolitan planning requirements established under the Fixing America’s Surface Transportation (FAST) Act. About the TIP The TIP is a staged, prioritized five-year capital improvement plan for implementation of the Gallatin Valley Long Range Transportation Plan (LRTP), expenditure of Surface Transportation Federal Aid dollars, and construction of other capital projects that occur on Gallatin Valley’s Federal-Aid roadways. Developed in cooperation with local, state, and federal agencies, the TIP includes transportation facilities and projects that are the responsibility of the State, County, and Cities. The U.S. Department of Transportation (DOT) issues regulations for Transportation Planning, updating them from time to time. Regulations guiding metropolitan area planning are generally outlined in Title 23 CFR part 450, and Title 49 Section 5303. These regulations govern the development of the TIP. As specified in the regulations, this TIP: • Is a staged, multi-year, intermodal program of transportation projects; • Is consistent with the transportation plan; • Is developed and updated by the transportation policy body of the area in cooperation with state and local officials and other affected transportation and implementing agencies, including affected public transportation providers such as the Gallatin Valley Urban Transportation District (GVUTD); • Is updated at least every five years; 13 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 7 • Updated with a frequency and cycle compatible with the State Transportation Improvement Program (STIP) development and approval process; • Covers a period of not less than five years, although additional years are considered informational; • Includes a priority list of projects to be implemented during the time frame of the program; • Is fiscally constrained by year and includes a financial plan. All revenue and cost estimates for the TIP use an inflation rate to reflect “year of expenditure dollars,” based on reasonable financial principles and information, developed cooperatively by the MPO, State, and public transportation operator (GVUTD); and, • May be modified at any time. Additionally, the TIP includes: • All capital and non-capital surface transportation projects or identified phases of a project within the Gallatin Valley Metropolitan Planning Area (MPA) proposed for funding under Title 23, U.S.C. and Title 49 U.S.C., excluding (at local discretion): safety projects, emergency relief projects and planning and research activities; • Only projects that are consistent with the LRTP; • All regionally significant transportation projects for which an FHWA or FTA approval is required whether or not the projects are to be funded with Title 23 or 49, U.S.C. and, • For information purposes and air quality analysis in non-attainment and maintenance areas, all regionally significant transportation projects proposed to be funded with Federal funds not noted above or to be funded with non-Federal funds. With respect to each type of project generally described above, the TIP also includes: • Sufficient descriptive material to identify the project or phase; • Estimated total cost, reflected in year of expenditure dollars; • The amount of Federal funds proposed to be obligated during each program year; • The proposed source of Federal and non-Federal funds; • Identification of the agencies responsible for carrying out the project; • In areas with Americans with Disabilities Act (ADA) required Paratransit Plans, identification of those projects which will implement the plans. 14 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 8 As a management tool for monitoring progress in implementing the transportation plan, the TIP shall: • Identify the criteria and process for prioritizing implementation of transportation plan elements for inclusion in the TIP and any changes in priorities from previous TIPs; and, • List major projects from the previous TIP that were implemented and identify any significant delays in the planned implementation of major projects. TIP Process and Development The Gallatin Valley Metropolitan Planning Organization prepares the TIP in cooperation with the City of Bozeman, City of Belgrade, Gallatin County, Gallatin Valley Urban Transportation District, Montana Department of Transportation, Federal Highway Administration, Federal Transit Administration, and other partners in the Transportation Planning process. To help guide the preparation and adoption of updates, amendments, and modifications to the TIP, the following procedures are generally followed: UPDATE, AMENDMENT AND ADMINISTRATIVE PROCEDURES The TIP is updated at least every five years but may be revised between updates. The adopted Public Participation Plan establishes the following procedures for TIP adoption, major amendments, minor amendments and administrative approvals. TIP Updates and Major Amendments MPO staff coordinate TIP updates with partner agencies, including project nominations, cost and scope updates, funding estimates, and recommendations on project priorities. Updates may occur sooner when changes in projects, funding, or planning requirements warrant. Major amendments include: • Adding a new capital project involving capacity expansion or right-of-way acquisition. • Removing a project from the adopted TIP. • Proposing a new illustrative project for funding, as specified in the PPP. TIP updates and major amendments require TTAC review and recommendation, a public comment period of at least 14 days, and TPCC approval. Public notice will be provided through the City of Bozeman’s calendar and MPO electronic channels, including the 15 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 9 MPO website. Meeting agendas and materials will provide opportunities for public review and comment, including comment at TTAC and TPCC meetings. Minor Amendments These include the following: • Adding projects or programs without capacity expansion or right-of-way acquisition. • Increasing project or program costs above the administrative approval threshold listed below. • Converting illustrative projects to funded projects following formal funding awards when TPCC has previously reviewed or acted on them. Minor amendments require TPCC approval. Public notice and opportunities for review and comment will follow the PPP. When time constraints exist, the MPO Manager and TPCC Chair may waive TTAC review and standard notice, consistent with the PPP. Administrative Modifications These revisions are eligible for approval by the MPO Manager and TPCC Chair under the PPP. Eligible revisions include: • Text or graphic changes that do not affect project costs, scopes, or schedules. • Changes to the proposed year of an existing project phase. • Project or program cost changes within the thresholds below. • Inclusion of new capital projects designated as illustrative – unfunded, time-sensitive, or emergency related. Table 1. Administrative Approval Cost Thresholds Project Cost Maximum Cost Increase Under $100,000 30% $100,000 - $500,000 25% $500,000 - $1,000,000 20% $1,000,000 - $2,000,000 15% Over $2,000,000 10% 16 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 10 MPO staff will email TTAC and TPCC members a “Final Notice” describing the proposed revision, instructions for submitting objections, and the response deadline. TPCC voting members have five (5) days to object. TTAC members are notified but do not vote. If no objection is received, the MPO Manager and TPCC Chair may approve the revision administratively. If any TPCC voting member objects, the revision will follow the minor amendment process at the next TPCC meeting. Administrative modifications do not require TTAC review or the standard public comment period. All administrative approvals will be reported at the next TTAC and TPCC meetings. Performance Measures Planning “Performance Measures” are a tool by which the effectiveness of the transportation program can be measured and are a required element for MPO planning. Specifically, the adoption of Performance Measures and Targets is required for MPOs and States, and they must be included in the MPO’s LRTP and TIP. The Gallatin Valley MPO has adopted the measures and targets set by the Montana Department of Transportation (MDT) and has committed to meeting the targets through implementation of its LRTP. The MPO has adopted the State’s measures and targets for safety, pavement and bridge condition, system performance, freight, air quality and transit assets. The MPO will support GVUTD’s safety and security targets, as appropriate, and potentially others as they are developed. To support the targets, the MPO will plan and program projects that contribute toward meeting the targets for each Performance Measure. In general, since the MPO has opted to support the state targets, reporting on this information is completed at the state level. More detail and supporting data may be found in the Gallatin Valley LRTP, which is incorporated by reference into this TIP. The Gallatin Valley MPO continues to support current targets and affirms this commitment through inclusion of this statement of support in this document. The narratives and associated table that follow outline the currently adopted measures and targets. Finally, current projects in this TIP that support attainment of specific Performance Measure Targets are identified in the table “Projects List”, which includes a column titled “Performance Measure & Target”. While the project’s contribution to target attainment is identified, it is impossible to quantify the contribution; thus, only the measure and target description are listed. 17 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 11 Safety Performance The Gallatin Valley MPO supports the state’s targets for applicable safety performance measures. The MPO has demonstrated some progress toward reducing fatalities and serious injuries within the MPO boundary and has consistently met the state’s targets on a rate basis for the five calendar years prior to this TIP. Specific information on this performance measure can be found in the latest LRTP. Over time, projects supporting this measure will move from the LRTP into this TIP. Pavement and Bridge Condition The Gallatin Valley MPO supports MDT’s targets for NHS pavement and bridge conditions and aims to first understand, then address pavement conditions within its jurisdiction. For NHS routes, pavement conditions are collected and monitored directly by MDT. Bridge conditions are tracked and monitored by MDT. According to available bridge condition ratings, of the 55 bridges inspected by MDT within the region, ten are rated as ‘good’ and 44 ‘fair’. There is one NHS bridges in ‘poor’ condition. The MPO will continue to evaluate and include in the TIP pavement preservation projects on NHS routes and bridges. Reliability and System Performance Targets The Gallatin Valley MPO adopted MDT’s targets for system reliability, congestion, and air quality. Consistent with federal guidance, the Gallatin Valley MPO was not required to set CO2 emissions reduction targets during the current performance period. Travel time reliability in the Gallatin Valley MPA over the most recent available period was calculated by the National Performance Management Research Dataset (NPMRDS), a dataset used by states to report and monitor transportation performance measures. Interstate Travel Time Reliability within the MPA was unavailable. The MPO is committed to continued coordination with MDT and FHWA to improve reliability of the Interstate system through the Gallatin Valley MPA and will continue to improve the function and reliability of non- interstate routes in the area. Expanding mobility choices and network connectivity helps improve network efficiency, accessibility, and the movement of people and goods; therefore, the MPO will continue to include in the TIP projects that expand mobility choices and reduce emissions. Transit Performance Targets The GVUTD has not developed a Transit Asset Management Plan (TAMP), which includes transit performance measures and targets. The TAMP is updated annually and performance metrics are reported to the Federal Transit Administration (FTA) as part of the National Transit Database reporting process. 18 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 12 The GVUTD develops safety performance targets related to fixed route and paratransit services. The safety performance targets are contained in the Agency Safety Plan (ASP), which is reviewed and updated annually. The newest transit performance measures and targets included in the ASP are incorporated by reference. The Gallatin Valley MPO supports progress towards achieving these targets and is committed to working with the GVUTD to make transit services accessible, safe, and convenient for residents and visitors. Transit projects are included in the TIP and typically can be attributed to improving transit performance. Anticipated Project Contribution The tables below list the latest MDT and GVUTD Performance Measures and Targets, adopted by reference and supported by the MPO. The “Projects List” table identifies anticipated project contributions toward these targets. Table 2. Safety Performance Measures Performance Measures 2027 Targets* Number of Fatalities 199.6 Fatality Rate** 1.445 Number of Serious Injuries 750.4 Serious Injury Rate 5.371 Number of Non-Motorized Fatalities & Serious Injuries 64.6 * Based on 2024 Fatality Analysis Reporting System & MDT Serious Injury Crash Data ** per 100 Million Vehicle Miles Traveled (MVMT) Table 3. Infrastructure Condition Performance Measures Performance Measures 2-Year Target 4-Year Target Interstate Pavement – Good Condition > 35% > 35% Interstate Pavement – Poor Condition < 2% < 2% Non-Interstate NHS Pavement – Good Condition > 30% > 30% Non-Interstate NHS Pavement – Poor Condition < 3% < 3% NHS Bridge – Good Condition > 17% > 17% NHS Bridge – Poor Condition < 8% < 8% 19 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 13 Table 4. Highway Reliability Performance Measures Performance Measures 2-Year Target 4-Year Target Reliable Person-Miles Classified as in Good Condition >98% >98% Reliable Person-Miles Traveled on the non-Interstate NHS >80% >80% Truck Travel Time Reliability (TTTR) Index <1.35 <1.35 Table 5. Emissions Reductions Performance Measures Performance Measures 2-Year Target 4-Year Target CO Emissions > 0 kg/day > 0 kg/day PM10 Emissions > 0 kg/day > 0 kg/day PM2.5 Emissions > 0 kg/day > 0 kg/day Table 6. Transit Asset Performance Measures Performance Measures 4-Year Target Revenue Vehicles-% of vehicles that have met or exceeded their useful life - Bus - Revenue Vehicles-% of vehicles that have met or exceeded their useful life - Van - Equipment-% of vehicles that have met or exceeded their useful life – Other Rubber Tire Vehicles - Facilities - % of facilities with a condition rating below 3.0 – Passenger Facilities - Facilities - % of facilities with a condition rating below 3.0 – Administrative Maintenance Facilities - Table 7. Transit Fixed Route Bus Safety Performance Measures 20 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 14 Performance Measures Annual Target Fatalities (Total) 0 Fatalities (per 100 thousand VRM) 0 Injury (Total) 2 Injuries (per 100 thousand VRM) 0.0 Safety Events (Total) 1 Safety Events (per 100 thousand VRM) 0.0 System Reliability (VRM/failures) 42,800 Table 8. Transit ADA/Paratransit Safety Performance Measures Performance Measures Annual Target Fatalities (Total) 0 Fatalities (per 100 thousand VRM) 0 Injury (Total) 1 Injuries (per 100 thousand VRM) 0.0 Safety Events (Total) 1 Safety Events (per 100 thousand (VRM) 0.0 System Reliability (VRM/failures) 32,800 Energy Conservation Considerations in the TIP Many effective energy conservation techniques include reduction in the dependence upon fossil fuels Projects that encourage ridesharing, such as transit, and non-motorized projects, such as sidewalks, pathways, and bikeways, are included in both the TIP and LRTP. Annual Listing of Obligated Projects In accordance with 23 CFR §450.334 regarding the development of an annual listing of projects for which Federal funds will be obligated in the upcoming year, this annual listing is available on the MPO’s webpage, hosted as part of the City of Bozeman’s website at https://www.bozemanmt.gov/services/gvmpo 21 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 15 Financial Constraint and the Financial Plan The TIP must be financially constrained and include a financial plan that demonstrates how the projects can be implemented while the existing transportation system is being adequately operated and maintained. Only projects for which construction and operating funds can reasonably be expected to be available may be included. The funding charts on the following pages show funds currently available to finance the projects contained within the TIP and serve as the TIP’s financial plan. The federal and state revenue projections are based on best estimates provided through the MDT and local agencies. As shown in the funding charts, the TIP is financially constrained. Indirect Cost Recovery and the TIP The Montana Legislature enacted House Bill 21 (Section 17-1-105 MCA) during the 2002 Special Session as a general fund savings measure. This legislation requires all state agencies, including MDT, to fully recover indirect costs associated with Federal and third party grants. The purpose of the indirect cost recovery is to maximize the use of Federal funds for all costs associated with delivering Federal programs. The Federal Highway Administration (FHWA) directed MDT to assess accountability of both direct and indirect costs at the project level rather than the program level in order to provide full accountability of both direct and indirect costs. Indirect costs are shared administrative and support expenses that help deliver transportation projects but are not directly attributable to a single project and are applied at the project level to all applicable Federal funding categories in this TIP. Transfers to FTA for projects that FTA administers are considered pass through and are not subject to indirect cost recovery (i.e., CMAQ/STPU transfers eligible to Section 5307). Sections 5310 and 5311 are administered by MDT and are subject to indirect cost recovery. Understanding the TIP Funding Tables The TIP project funding tables consist of multiple components, designed to fully represent project information and costs, including funding sources and project phases. The image below identifies and explains each of the various components of the TIP project funding tables and can be used as a tool to understand the information being presented within the funding tables. 22 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 16 Figure 1. Components of the TIP Project Funding Tables. All construction projects included in the TIP will be completed in multiple phases (i.e., PE, RW, IC, and CN). Funding for each construction project is broken down by the costs of each specific phase. The table below provides a description of construction project phases and additional project phases the reader can expect to see within the TIP funding tables. Table 9. Project Phases and Descriptions Project Phase Description CN Construction – construction and/or reconstruction work performed by the agency or contractor. IC Incidental Construction – ‘Safety Net’ for unexpected construction expenditures OT Other – Additional programmatic expenditures including but not limited to costs for education and outreach. PE Preliminary Engineering – Analysis and design work completed prior to project construction (the abbreviation EIS will be added if the phase includes an environmental impact statement), performed by a consultant and/or MDT. Purch. Purchase – Procuring equipment, software, vehicles, or facilities. 23 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 17 Project Phase Description RW Right-of-Way – Tasks associated with acquiring and preparing the right-of-way for a project (e.g., property acquisition and utility relocation) Projects List PROJECT UPN SCOPE COMMENTS STPU Kagy Blvd 8931 Reconstruction, added capacity, added bike/ped facilities Main Street Belgrade 9926 Reconstruct with added capacity and upgraded curb, gutter, and sidewalks IM MDT-Preventative Maintenance - IM Maintenance - Striping, Durable Pave Marking, Pavement Pres. Belgrade to Bozeman 10253 Minor rehabilitation, I-90 RP 301 to RP 307 NH MDT-Preventative Maintenance - IM Maintenance - striping, durable pavement markings, pavement preservation Belgrade- Urban 9057 Intersection improvements, signal upgrades Belgrade Int Improvements 9930 Intersection improvements, signal upgrades Jackrabbit-Amsterdam Rd Int 9930001 Intersection improvements, signal upgrades Int Improvements-Four Corners 10771 Rehabilitation project to address substantial rutting issues at the Four Corners Intersection NHFP 24 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 18 STPX, STPS, SFCN Belgrade - Urban 9057 Intersection improvements, signal upgrades Belgrade Int Improvements 9930 Intersection improvements, signal upgrades South Cottonwood Road - Bozeman 10696 Resurfacing of the existing roadway includes seal and cover Extends beyond the MPA Int Improvements-Four Corners 10771 Rehabilitation project to address substantial rutting issues at the Four Corners Intersection Belgrade Southeast 10856 Pavement Preservation, mill & fill RRS HSIP Safety Projects Various locations Placeholder to allow project nominations SF179 Durston Rd Curves 9604 Reconstruct curves to address road crashes, Ajaker Creek L-16-178 RP 2.7-2.9 Signal Kagy Sourdough 9644 Install traffic signal at intersection of Kagy and Sourdough SF 198 Amsterdam Rd Intx Imprv 9718 Intersection improvements include turn lanes and traffic signals BR LMC Supply Ditch Structure 10273 Bridge replacement with added capacity, N-50 RP 81.2-81.8 Gallatin River - 3M SW Belgrade 10364 Bridge replacement to address scour issues, S347 RP 3.15-3.65 Not all locations within the MPA UPP Pavement Preservation Pavement preservation Various urban routes 25 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 19 MACI Belgrade Urban Improvements 9057 Intersection improvements, signal upgrades 2026 EQUIP PURCHASE - BELGRADE 10865 Mechanical Street Sweeper Local Match TA Path Preservation II - Bozeman 10450 Preservation work on several paths in Bozeman at various locations MDT - Statewide Bike/Ped Paths Bozeman 10453 Construct shared use paths in Bozeman at various locations MDT - Statewide Hoffman St Sidewalks-Belgrade 10737 Improve sidewalks along Hoffman Street MDT - Statewide Helen-Hoffman Walks - Belgrade 10738 Sidewalk installation on Helen Drive and Hoffman Street in Belgrade MDT - Statewide Madison Ave Sidewalk - Belgrade 10441 Improve sidewalks along Madison Ave MDT - Statewide Huffine Lane Shared Use Path 10743 Construct a shared use path on Huffine MDT - Statewide Ped Crossing Upgrades-Bozeman 10750 improve pedestrian crossing features and ADA ramps MPO Flanders Mill Sidewalk-Bozeman 10751 install sidewalk along Flanders Mill Road MPO Safe Routes to Schools-Bozeman 10752 Safe Routes to School improvements, citywide MPO CR Signal Kagy Sourdough 9644 Install traffic signal Belgrade Int Improvements 9930 Intersection improvements, signal upgrades FWP Bikefill Community Bike Park Construct 5-6 miles of bike park at Snowfill Rec Area Gallatin Valley Land Trust EARMARK GRANTS 26 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 20 Kagy Blvd 8931 Reconstruction, added capacity, added bike/ped facilities Belgrade Urban Improvements 9057 Intersection improvements, signal upgrades FTA 5307 Capital Line Operations Transit Operations FTA 5339 Purchases Buses & Bus Stop Amenities Formula/Discretionary FTA 5310 Capital purchases Purchase paratransit vehicles TRANSADE Capital transit Transit operations 27 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 21 Estimated Revenue Amounts shown in thousands of dollars. Federal FTA 5307 FTA 5339 Formula FTA 5339 Discretionary FTA 5310 GAS TAX Fiscal Year Federal Local Federal Local Federal Local Federal Local CITY COUNTY OTHER TOTAL Carryover 0.0 380.4 16,608.3 FFY 2027 1,492.2 1,268.4 96.5 0.0 0.0 0.0 207.6 36.6 2,558.8 838.3 1,623.0 41,490.4 FFY 2028 1,492.2 1,268.4 96.5 0.0 0.0 0.0 0.0 0.0 2,558.8 838.3 1,623.0 71,020.9 FFY 2029 1,492.2 1,268.4 96.5 0.0 0.0 0.0 0.0 0.0 2,558.8 838.3 1,623.0 14,067.1 FFY 2030 1,492.2 1,268.4 96.5 0.0 0.0 0.0 0.0 0.0 2,558.8 838.3 1,623.0 16,490.7 FFY 2031 1,492.2 1,268.4 96.5 0.0 0.0 0.0 0.0 0.0 2,558.8 838.3 1,623.0 11,261.2 TOTAL 7,461.2 6,342.0 862.9 0.0 0.0 0.0 207.6 36.6 12,793.8 4,191.4 8,115.1 170,938.7 Notes: These estimates are based on historical data and projections. Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional or other federal actions. Federal program funding availability may impact the scheduling of projects. Funding will be subject to the obligation limitation set by the annual appropriations process. *STPU, TA, IM, NH, STPX, STPP, STPHS, BR, Earmark, UHPIP, UPP and MACI funds include match. Operations and Maintenance funds; Average of Fiscal Years 2024-2025) and TransAde makes up OTHER. Federal STP/S/X Fiscal Year STPU* IM* NH* SFCN RRS HSIP* BR* UPP* MACI GRANTS TA TA (MPO) CR FWP SUBTOTAL Carryover 13,486.6 1,615.9 1,125.4 16,227.9 FFY 2027 368.3 250.0 8,728.2 87.5 0.0 480.6 17.8 500.0 1,992.4 17,341.4 2,494.1 404.0 579.6 125.0 33,369.0 FFY 2028 1,004.4 250.0 17,544.9 5,482.5 0.0 6,868.7 2,438.9 500.0 3,451.6 25,000.0 198.7 404.0 0.0 0.0 63,143.7 FFY 2029 1,530.0 250.0 500.0 0.0 0.0 200.0 2,617.4 500.0 0.0 0.0 188.5 404.0 0.0 0.0 6,189.9 FFY 2030 1,530.0 250.0 500.0 0.0 0.0 200.0 0.0 500.0 0.0 0.0 5,229.5 404.0 0.0 0.0 8,613.6 FFY 2031 1,530.0 250.0 500.0 0.0 0.0 200.0 0.0 500.0 0.0 0.0 0.0 404.0 0.0 0.0 3,384.0 TOTAL 19,449.5 1,250. 0 27,773.1 5,570.0 0.0 7,949.4 5,074.2 2,500.0 5,444.0 42,341.4 8,110.8 3,635.8 1,705.0 125.0 130,928.1 28 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 22 Projects by Funding Source Projects with Multiple Funding Sources Funding shown in thousands of dollars. Project: Description Phase Program Schedule Funding Source Local State Federal Total Project Costs Sponsor: Pre-2027 2027 2028 2029 2030 2031 13.42% 86.58% Kagy BLVD UPN 8931 MDT Reconstruction of the Kagy Blvd PE 1,772.6 STPU 237.9 1,534.8 1,772.6 PE 2,568.8 STPU 344.7 2,224.1 2,568.8 PE 1,000.0 Local 1,000.0 0.0 0.0 1,000.0 RW 606.0 STPU 81.3 524.7 606.0 RW 1,961.0 MPDG* 1,961.0 1,961.0 IC 1,306.0 STPU 175.3 1,130.7 1,306.0 CN 7,989.8 STPU 1,072.2 6,917.6 7,989.8 CN 3,000.0 Local 3,000.0 3,000.0 CN 22,328.6 MPDG* 22,328.6 22,328.6 Total 42,532.9 0.0 0.0 0.0 0.0 0.0 4,000.0 1,911.4 36,621.4 42,532.9 Belgrade - Urban Improvements UPN 9057 MDT Intersection Improvements, Signal Upgrades Jackrabbit Lane to Amsterdam RD PE 5,885.8 STPX 789.9 5,095.9 5,885.8 RW 3,000.0 NH 402.6 2,597.4 3,000.0 IC 1,635.5 NH 219.5 1,416.0 1,635.5 CN 3,451.6 MACI 463.2 2,988.4 3,451.6 CN 15,570.6 NH 2,089.6 13,481.0 15,570.6 CN 25,000.0 Raise Grant 0.0 0.0 0.0 Total 8,885.8 1,635.5 44,022.2 0.0 0.0 0.0 3,964.7 25,578.8 29,543.5 Belgrade Int Improvements UPN 9930 Intersection Improvements, Signal PE 2,651.7 STPX 355.9 2,295.8 2,651.7 RW 500.0 STPX 67.1 432.9 500.0 IC 87.5 STPX 11.7 75.7 87.5 29 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 23 MDT Upgrades, install roundabout Jackrabbit Corridor by I-90 CN 1,992.4 MACI 267.4 1,725.0 1,992.4 CN 6,592.7 NH 884.7 5,707.9 6,592.7 Total 3,151.7 8,672.5 0.0 0.0 0.0 0.0 1,586.8 10,237.4 11,824.2 Belgrade Int Improvements Intersection Improvements, Signal upgrades U-602 RP 6.1 to 6.2 Jackrabbit-Amsterdam RD INT CN 1,095.8 NH 147.0 948.7 1,095.8 UPN 9930001 CN 568.0 CR 76.2 491.8 568.0 MDT Total 1,663.8 0.0 0.0 0.0 0.0 0.0 223.3 1,440.5 1,663.8 Totals 56,234.2 10,308.1 44,022.2 0.0 0.0 0.0 4,000.0 7,686.3 73,878.2 85,564.5 30 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 24 Surface Transportation Program Urban (STPU) Bozeman Funding shown in thousands of dollars. Project Description Program Schedule Funding Source Total Project Costs Phase Local State Federal Sponsor Pre-2027 2027 2028 2029 2030 2031 13.42% 86.58% Carryover 8,290.0 0.0 0.0 636.1 1,797.8 2,959.5 Borrow 1,687.3 Estimated Allocation (STPU) 0.0 636.1 1,161.7 1,161.7 1,161.7 Kagy Blvd Reconstruction PE 4,341.5 582.6 3,758.8 4,341.5 UPN 8931 RW 606.0 81.3 524.7 606.0 IC 1,306.0 175.3 1,130.7 1,306.0 CN 7,989,806 1,072.2 6,917.6 7,989.8 MDT Total 14,243.3 0.0 - - - - 0.0 1,911.4 12,331.8 14,243.3 Adjustment/Closures STPU Totals 14,243.3 0.0 0.0 0.0 0.0 0.0 0.0 1,911.4 12,331.8 14,243.3 Federal 12,331.8 0.0 0.0 0.0 0.0 0.0 State 1,911.4 0.0 0.0 0.0 0.0 0.0 Balance 0.0 636.1 1,797.8 2,959.5 4,121.2 Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional and other federal actions. Federal program funding availability may impact the scheduling of projects. Funding will be subject to the obligation limitation set by the annual appropriations process. 31 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 25 Surface Transportation Program Urban (STPU) Belgrade Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre-2027 2027 2028 2029 2030 2031 13.42% 86.58% Carryover 3,509.3 3,365.9 3,671.8 3,977.7 4,346.0 Estimated Allocation (STPU) 368.3 368.3 368.3 368.3 368.3 Main Street Belgrade Reconstruction PE 612.1 511.7 150.8 973.1 1,123.9 UPN 9926 RW 62.4 8.4 54.1 62.4 IC 62.4 8.4 54.1 62.4 CN outside TIP Timeframe CN 0.0 0.0 0.0 MDT Total 612.1 511.7 62.4 62.4 0.0 0.0 0.0 167.6 1,081.2 1,248.7 Adjustment/Closures STPU Totals 612.1 511.7 62.4 62.4 0.0 0.0 0.0 167.6 1,081.2 1,248.7 Federal 530.0 443.1 54.1 54.1 0.0 0.0 State 82.1 68.7 8.4 8.4 0.0 0.0 Balance 3,365.9 3,671.8 3,977.7 4,346.0 4,714.4 Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional and other federal actions. Federal program funding availability may impact the scheduling of projects. Funding will be subject to the obligation limitation set by the annual appropriations process. 32 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 26 Interstate Maintenance (IM)* Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 8.76% 91.24% MDT-PREVENTATIVE MAINTENANCE - IM Maintenance - Striping, Durable All 250.0 250.0 250.0 250.0 250.0 109.5 1,140.5 1,250.0 MDT Pave Marking, Pavement Pres. Total 0.0 250.0 250.0 250.0 250.0 250.0 0.0 109.5 1,140.5 1,250.0 BELGRADE TO BOZEMAN Minor rehabilitation PE 129.2 11.3 117.9 129.2 UPN 10253 I-90 RP 301 to RP 307 CN 11,437.2 1,001.9 10,435.3 11,437.2 MDT Total 11,566.3 0.0 0.0 0.0 0.0 0.0 0.0 1,013.2 10,553.1 11,566.3 IM TOTAL 11,566.3 250.0 250.0 250.0 250.0 250.0 0.0 1,122.7 11,693.6 12,816.3 Federal program funding availability may impact the scheduling of projects. Funding will be subject to the obligation limitation set by the annual appropriations process. *IM is a state sub-allocated program by the federal National Highway Performance Program. 33 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 27 National Highway (NH)* Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 13.42% 86.58% MDT-PREVENTATIVE MAINTENANCE - NH Maintenance - Striping, Durable ALL 500.0 500.0 500.0 500.0 500.0 335.5 2,164.5 2,500.0 MDT Pave Marking, Pavement Pres. Total 0.0 500.0 500.0 500.0 500.0 500.0 0.0 335.5 2,164.5 2,500.0 Belgrade Urban Improvements Intersection Improvements, Signal 0.0 0.0 0.0 Upgrades IC 1,635.5 219.5 1,416.0 1,635.5 RW 3,000.0 402.6 2,597.4 3,000.0 UPN 9057 CN 15,570.6 2,089.6 13,481.0 15,570.6 MDT Jackrabbit Lane to Amsterdam RD Total 3,000.0 1,635.5 15,570.6 0.0 0.0 0.0 0.0 2,711.7 17,494.5 20,206.1 Belgrade Int Improvements Intersection Improvements, Signal PE 0.0 0.0 0.0 UPN 9930 Upgrades CN 6,592.7 884.7 5,707.9 6,592.7 MDT Jackrabbit Corridor by I- 90 Total 0.0 6,592.7 0.0 0.0 0.0 0.0 0.0 884.7 5,707.9 6,592.7 Belgrade Int Improvements Intersection Improvements, Signal Jackrabbit- Amsterdam RD INT upgrades UPN 9930001 CN 1,095.8 147.0 948.7 1,095.8 MDT U-602 RP 6.1 to 6.2 Total 1,095.8 0.0 0.0 0.0 0.0 0.0 0.0 147.0 948.7 1,095.8 34 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 28 INT IMPROVEMENTS- FOUR CORNERS Rehabilitation project to address substantial rutting issues at the Four Corners Intersection 0.0 0.0 0.0 UPN 10771 0.0 0.0 0.0 CN 1,474.2 197.8 1,276.4 1,474.2 MDT Total 0.0 0.0 1,474.2 0.0 0.0 0.0 0.0 197.8 1,276.4 1,474.2 NH TOTAL 4,095.8 8,728.2 17,544.9 500.0 500.0 500.0 0.0 4,276.8 27,592.0 31,868.8 Federal program funding availability may impact the scheduling of projects. Funding will be subject to the obligation limitation set by the annual appropriations process. Funding projections are based on best available information and are subject to change given current funding uncertainties and unknown impacts of future congressional and other federal actions. *NH is a state sub-allocated program by the federal National Highway Performance Program. 35 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 29 Surface Transportation Program Off System (STPX), Secondary (STPS), Primary (STPP), State Funded Construction Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 13.42% 86.58% Belgrade - Urban Improvements Intersection Improvements, Signal PE 5,885.8 789.9 5,095.9 5,885.8 UPN 9057 Upgrades, install roundabout MDT Total 5,885.8 0.0 0.0 0.0 0.0 0.0 0.0 789.9 5,095.9 5,885.8 Belgrade Int Improvements Intersection Improvements, Signal PE 2,651.7 355.9 2,295.8 2,651.7 UPN 9930 Upgrades RW 500.0 67.1 432.9 500.0 IC 87.5 11.7 75.7 87.5 MDT Jackrabbit Corridor by I- 90 Total 3,151.7 87.5 0.0 0.0 0.0 0.0 0.0 434.7 2,804.5 3,239.2 SOUTH COTTONWOOD ROAD- BOZEMAN resurfacing of the existing roadway includes PE 18.9 2.5 16.4 18.9 UPN 10696 seal & cover. Not all locations inside MPO boundary Using 30% for costs CN 190.6 25.6 165.0 190.6 MDT Total 209.5 0.0 0.0 0.0 0.0 0.0 0.0 28.1 181.4 209.5 INT IMPROVEMENTS- FOUR CORNERS Rehabilitation project to address substantial PE 124.7 16.7 108.0 124.7 UPN 10771 CN 493.9 66.3 427.6 493.9 36 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 30 rutting issues at the Four Corners Intersection MDT Total 124.7 0.0 493.9 0.0 0.0 0.0 0.0 83.0 535.5 618.6 BELGRADE - SOUTHEAST Pavement Preservation, mill & fill PE 161.8 21.7 140.1 161.8 UPN 10856 Frontage Road CN 4,988.7 669.5 4,319.2 4,988.7 MDT P-205 RP 21.1 to RP 26.8 Total 161.8 0.0 4,988.7 0.0 0.0 0.0 0.0 691.2 4,459.3 5,150.4 TOTALS 9,533.5 87.5 5,482.5 0.0 0.0 0.0 0.0 2,026.9 13,076.6 15,103.5 37 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 31 Railroad Crossing (RRS) Funding shown in thousands of dollars Project Description Program Schedule Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 10.00% 90.00% PE 0.0 0.0 0.0 RW 0.0 0.0 0.0 IC 0.0 0.0 0.0 CN 0.0 0.0 0.0 MDT Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTALS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 38 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 32 Highway Safety Improvement Program (HSIP) Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre-2027 2027 2028 2029 2030 2031 10.00% 90.00% SAFETY PROJECTS Various Locations ALL 200.0 200.0 200.0 200.0 200.0 100.0 900.0 1,000.0 MDT Total 200.0 200.0 200.0 200.0 200.0 100.0 900.0 1,000.0 SF179 Durston RD Curves Reconstruct curves to address road crashes Ajaker Creek L- 16-178 RP 2.7- 2.9 PE 681.3 68.1 613.2 681.3 UPN 9604 RW 178.2 17.8 160.3 178.2 IC 89.1 8.9 80.2 89.1 CN 3,679.4 367.9 3,311.5 3,679.4 MDT Total 681.3 178.2 3,768.5 0.0 0.0 0.0 0.0 462.8 4,165.2 4,628.0 Signal Kagy Sourdough Install a traffic signal intersection of Kagy and Sourdough PE 811.7 81.2 730.5 811.7 UPN 9644 0.0 0.0 0.0 CN 90.7 84.9 0.6 5.2 90.7 MDT Total 811.7 90.7 0.0 0.0 0.0 0.0 84.9 81.8 735.8 902.4 SF 189 AMSTERDAM RD INTX IMPRV Intersection improvements includes turn lanes and PE 1,286.5 128.6 1,157.8 1,286.5 traffic signals. RW 615.0 61.5 553.5 615.0 IC 11.8 1.2 10.6 11.8 UPN 9718 CN 2,900.2 290.0 2,610.2 2,900.2 MDT S-347 RP 4.3 - 4.7 Amsterdam and River Rock Total 1,901.5 11.8 2,900.2 0.0 0.0 0.0 0.0 481.3 4,332.1 4,813.5 HSIP Totals 3,394.5 480.6 6,868.7 200.0 200.0 200.0 84.9 1,125.9 10,133.1 11,343.9 39 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 33 Bridge Program (BR) Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 13.42% 86.58% LMC SUPPLY DITCH STRUCTURE Bridge Replacement PE 1,005.1 134.9 870.2 1,005.1 UPN 10273 with added capacity RW 5.8 0.8 5.1 5.8 IC 35.0 4.7 30.3 35.0 CN 2,391.8 321.0 2,070.8 2,391.8 MDT N-50 RP 81.2 to 81.8 Total 1,005.1 5.8 2,426.9 0.0 0.0 0.0 0.0 461.4 2,976.5 3,437.9 Gallatin River- 3M SW Belgrade Bridge Replacement to address PE 231.2 31.0 200.2 231.2 UPN 10364 scour issues RW 12.0 1.6 10.4 12.0 IC 12.0 1.6 10.4 12.0 Not all locations inside MPO boundary CN 2,617.4 351.3 2,266.2 2,617.4 MDT S-347 RP 3.15 to 3.65 Total 231.2 12.0 12.0 2,617.4 0.0 0.0 0.0 385.5 2,487.1 2,872.6 BR TOTAL 1,236.3 17.8 2,438.9 2,617.4 0.0 0.0 0.0 846.9 5,463.6 6,310.5 40 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 34 Urban Pavement Preservation (UPP) Funding shown in thousands of dollars Project Description Program Schedule Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 13.42% 86.58% URBAN PAVEMENT PRESERVATION ALL 500.0 500.0 500.0 500.0 500.0 335.5 2,164.5 2,500.0 MDT Various Locations Total 500.0 500.0 500.0 500.0 500.0 335.5 2,164.5 2,500.0 PE 0.0 0.0 0.0 IC 0.0 0.0 0.0 CN 0.0 0.0 0.0 Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 UPP TOTAL 0.0 500.0 500.0 500.0 500.0 500.0 0.0 335.5 2,164.5 2,500.0 41 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 35 Montana Air and Congestion Initiative (MACI) – Discretionary Program Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre-2027 2027 2028 2029 2030 2031 13.42% 86.58% Belgrade - Urban Improvements Intersection Improvements, Signal 0.0 0.0 0.0 UPN 9057 Upgrades CN 3,451.6 463.2 2,988.4 3,451.6 MDT Jackrabbit Lane to Amsterdam RD Total 0.0 0.0 3,451.6 0.0 0.0 0.0 0.0 463.2 2,988.4 3,451.6 Belgrade Int Improvements Intersection Improvements, Signal 0.0 0.0 0.0 UPN 9930 Upgrades CN 1,992.4 267.4 1,725.0 1,992.4 MDT Jackrabbit Corridor by I- 90 Total 0.0 1,992.4 0.0 0.0 0.0 0.0 0.0 267.4 1,725.0 1,992.4 2026 EQUIP PURCHASE - BELGRADE Street Sweeper for City 0.0 0.0 0.0 UPN 10865 OT 500.0 67.1 0.0 432.9 500.0 MDT Total 500.0 0.0 0.0 0.0 0.0 0.0 67.1 0.0 432.9 500.0 Total 500.0 1,992.4 3,451.6 0.0 0.0 0.0 67.1 730.6 5,146.3 5,944.0 42 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 36 Transportation Alternatives - MDT Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 13.42% 13.42% 86.58% Madison Ave Sidewalk - Belgrade Improve sidewalks along Madison ave PE 350.6 47.1 0.0 303.6 350.6 UPN 10441 IC 10.3 1.4 0.0 8.9 10.3 CN 997.3 133.8 0.0 863.4 997.3 MDT Madison Ave in Belgrade Total 350.6 1,007.6 0.0 0.0 0.0 0.0 182.3 0.0 1,176.0 1,358.3 Path Preservation II - Bozeman Preservation work on several paths in PE 43.5 5.8 0.0 37.6 43.5 UPN 10450 Bozeman at various locations CN 349.0 46.8 0.0 302.2 349.0 MDT Total 392.5 0.0 0.0 0.0 0.0 0.0 52.7 0.0 339.8 392.5 Bike/Ped Paths Bozeman Construct shared use paths in PE 202.5 27.2 0.0 175.4 202.5 UPN 10453 Bozeman at various locations CN 539.7 72.4 0.0 467.2 539.7 MDT Total 742.2 0.0 0.0 0.0 0.0 0.0 99.6 0.0 642.6 742.2 HOFFMAN ST SIDEWALKS-BELGRADE improve sidewalks along Hoffman Street PE 769.5 103.3 0.0 666.2 769.5 UPN 10737 RW 12.3 12.3 0.0 0.0 12.3 IC 56.8 56.8 0.0 0.0 56.8 more local funds than normal split CN 2,775.2 1,488.7 76.3 1,210.2 2,775.2 City of Belgrade Hoffman Street in Belgrade Total 0.0 769.5 12.3 56.8 2,775.2 0.0 1,661.0 76.3 1,876.5 3,613.7 43 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 37 HELEN-HOFFMAN WALKS - BELGRADE Sidewalk installation PE 458.2 61.5 0.0 396.8 458.2 UPN 10738 RW 7.8 1.1 0.0 6.8 7.8 IC 56.7 7.6 0.0 49.1 56.7 CN 1,419.4 190.5 0.0 1,228.9 1,419.4 City of Belgrade Helen Drive and Hoffman Street in Belgrade Total 0.0 458.2 7.8 56.7 1,419.4 0.0 260.6 0.0 1,681.6 1,942.2 HUFFINE LANE SHARED USE PATH Construct a shared use path on Huffine PE 258.7 34.7 0.0 224.0 258.7 UPN 10743 RW 178.6 24.0 0.0 154.6 178.6 IC 75.0 10.1 0.0 64.9 75.0 CN 1,035.0 138.9 0.0 896.1 1,035.0 Gallatin County LAG Huffine Lane near Bozeman Total 0.0 258.7 178.6 75.0 1,035.0 0.0 207.6 0.0 1,339.7 1,547.3 TA TOTALS 1,485.3 2,494.1 198.7 188.5 5,229.5 0.0 2,463.8 76.3 7,056.1 9,596.1 Federal 1,286.0 2,159.4 172.0 163.2 4,527.7 0.0 Local/State 199.3 334.7 26.7 25.3 701.8 0.0 44 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 38 Transportation Alternatives - MPO Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre-2027 2027 2028 2029 2030 2031 13.42% 13.42% 86.58% Carryover 1,615.9 1,825.8 821.0 1,224.9 1,628.9 Estimated Allocation (TA) 404.0 404.0 404.0 404.0 404.0 Ped Crossing Upgrades-Bozeman improve pedestrian crossing features and ADA ramps PE 57.6 7.7 0.0 49.9 57.6 UPN 10750 CN 727.7 97.7 0.0 630.0 727.7 City of Bozeman LAG Total 0.0 57.6 727.7 0.0 0.0 0.0 105.4 0.0 680.0 785.3 FLANDERS MILL SIDEWALK-BOZEMAN install sidewalk along Flanders Mill Road PE 66.8 9.0 0.0 57.8 66.8 UPN 10751 CN 681.0 91.4 0.0 589.6 681.0 City of Bozeman LAG Flanders Road in Bozeman Total 0.0 66.8 681.0 0.0 0.0 0.0 100.4 0.0 647.5 747.8 SAFE ROUTES TO SCHOOLS-BOZEMAN Safe Routes to School improvements OT 69.7 9.4 0.0 60.4 69.7 UPN 10752 0.0 0.0 0.0 0.0 City of Bozeman LAG Citywide Total 0.0 69.7 0.0 0.0 0.0 0.0 9.4 0.0 60.4 69.7 TA TOTALS 0.0 194.1 1,408.8 0.0 0.0 0.0 215.1 0.0 1,387.8 1,602.9 Federal 0.0 168.1 1,219.7 0.0 0.0 0.0 Local/State 0.0 26.1 189.1 0.0 0.0 0.0 Balance 0.0 1,825.8 821.0 1,224.9 1,628.9 2,032.9 45 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 39 Carbon Reduction (CR) – 50k – 200k Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 13.42% 13.42% 86.58% Carryover 1,125.4 557.3 119.3 Estimated allocation 579.6 Signal Kagy Sourdough Install traffic signal IC 5.8 0.8 5.1 5.8 UPN 9644 CN 1,011.8 135.8 876.0 1,011.8 MDT intersection of Kagy and Sourdough Total 1,017.7 136.6 881.1 1,017.7 Belgrade Int Improvements Intersection Improvements, Signal Jackrabbit- Amsterdam RD INT upgrades UPN 9930001 MDT U-602 RP 6.1 to 6.2 CN 568.0 76.2 491.8 568.0 Total 568.0 1,017.7 0.0 0.0 0.0 0.0 0.0 212.8 1,372.9 1,585.7 Federal 491.8 881.1 0.0 0.0 0.0 0.0 Local/State 76.2 136.6 0.0 0.0 0.0 0.0 46 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 40 FWP Recreational Trails Program Funding shown in thousands of dollars Project Description Funding Source Total Project Costs Phase Local State Federal Sponsor Pre-2027 2027 2028 2029 2030 2031 20.00% 0% 80.00% Bikefill Community Bike Park Construct 5-6 miles of bike park. PE 25.0 5.0 20.0 25.0 IC CN 100.0 20.0 80.0 100.0 Gallatin Valley Land Trust Snowfill Recreation Area Total 0.0 125.0 0.0 0 0 0 25.0 0.0 100.0 125.0 47 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 41 Discretionary Grants Funding shown in thousands of dollars Project Description Funding Source* Total Estimated Obligation Phase Local State Federal Sponsor Pre-2027 2027 2028 2029 2030 2031 Kagy BLVD Reconstruction of the Kagy Blvd RW 1,961.0 1,961.0 1,961.0 UPN 8931 CN 22,328.6 22,328.6 22,328.6 MDT Total 24,289.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 24,289.6 24,289.6 Belgrade Urban Improvements Intersection Improvements, Signal UPN 9057 Upgrades CN 25,000.0 25,000.0 25,000.0 MDT Total 0.0 0.0 25,000.0 0.0 0.0 0.0 0.0 0.0 25,000.0 25,000.0 Connecting Communities Install Roundabout, build shared use path. Gallatin County Rural- Urban All 17,341.4 3,468.3 13,873.1 17,341.4 County SS4A Alaska RD and Cameron Bridge RD Total 0.0 17,341.4 0.0 0.0 0.0 0.0 3,468.3 0.0 13,873.1 17,341.4 TOTAL 24,289.6 17,341.4 25,000.0 0.0 0.0 0.0 3,468.3 0.0 63,162.7 66,631.0 *local and federal match vary by grant opportunity and phasing. 48 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 42 Federal Transit Administration Section 5307* Funding shown in thousands of dollars Project Description Funding Source Total Estimated Obligation Phase Local** State Federal Sponsor 2027 2028 2029 2030 2031 Carryover 0.0 0.0 0.0 0.0 0.0 Allocation (Estimated)(Fed Share) 1,492.2 1,492.2 1,492.2 1,492.2 1,492.2 Transit Operations Operating costs 2,760.6 2,760.6 2,760.6 2,760.6 2,760.6 6,342.0 7,461.2 13,803.2 Capital Transit Total 2,760.6 2,760.6 2,760.6 2,760.6 2,760.6 6,342.0 7,461.2 13,803.2 SECTION 5307 TOTALS* 2,760.6 2,760.6 2,760.6 2,760.6 2,760.6 6,342.0 0.0 7,461.2 13,803.2 Federal 1,492.2 1,492.2 1,492.2 1,492.2 1,492.2 Local 1,268.4 1,268.4 1,268.4 1,268.4 1,268.4 Ending Balance (Federal) 0.0 0.0 0.0 0.0 0.0 *FTA administered funds are not subject to indirect cost recovery. ** Local match rates vary by project. Full 5307 apportionment $1,492,234 Project 1 - Operating Assistance FTA Amount Local Total FTA Share Local Share ALI 30.09.01 - Up to 50% share Operating Assistance $ 1,178,865 $ 1,178,865 $ 2,357,730 50.00% 50.00% ALI 30.09.01 - Up to 50% share Operating Assistance (1% for Security)* $ 14,922 $ 14,922 $ 29,845 50.00% 50.00% ALI 11.7C.00 - Non Fixed Route ADA Paratransit Service** $ 298,447 $ 74,612 $ 373,059 80.00% 20.00% Total P2 $ 1,492,234 $ 1,268,399 $ 2,760,633 * at least 1% of allocation amount. **up to 20% of total allocation if 3 criteria are met. 49 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 43 Federal Transit Administration Section 5339 Funding shown in thousands of dollars Project Description Funding Source* Total Estimated Obligation Phase Local State Federal Sponsor 2027 2028 2029 2030 2031 20% 80% Carryover 380.4 476.9 573.4 669.9 766.4 Allocation (Estimated Federal Share) 96.5 96.5 96.5 96.5 96.5 Buses & Bus Stop Facilities Program, Rural Funds 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Capital Transit Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 SECTION 5339 TOTALS 0.0 0.0 0.0 0.0 0.0 Federal 0.0 0.0 0.0 0.0 0.0 Local 0.0 0.0 0.0 0.0 0.0 Ending Balance (Federal) 476.9 573.4 669.9 766.4 862.9 50 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 44 Federal Transit Administration Section 5339 Discretionary Funding Funding shown in thousands of dollars Project Description Funding Source Total Estimated Obligation Phase Local State Federal Sponsor Pre- 2027 2027 2028 2029 2030 2031 Carryover FTA Grant Award 0.0 0.0 Total 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 SECTION 5339 TOTALS 0.0 0.0 0.0 0.0 0.0 0.0 Federal 0.0 0.0 0.0 0.0 0.0 0.0 ` Local 0.0 0.0 0.0 0.0 0.0 0.0 Balance 0.0 0.0 0.0 0.0 0.0 0.0 51 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 45 Federal Transit Administration Section 5310 Funding shown in thousands of dollars Project Description Funding Source Total Estimated Obligation Phase Local State Federal Sponsor 2027 2028 2029 2030 2031 15%** TransAde 85%* Carryover 0.0 0.0 0.0 0.0 0.0 Allocation (Estimated) 244.3 244.3 244.3 244.3 244.3 Paratransit Vehicles Purchase ADA accessible vehicles Purch. GVUTD 9 Pass Van 102.7 15.4 87.3 102.7 Reach 7 Pass Van 50.0 10.0 40.0 50.0 Reach 12 Pass Extended Van 91.5 18.3 73.2 91.5 Gallatin Valley UTD - Lead Agency 244.3 0.0 0.0 0.0 0.0 43.7 0.0 200.6 244.3 SECTION 5310 TOTALS 244.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Federal 207.6 0.0 0.0 0.0 0.0 State 0.0 0.0 0.0 0.0 0.0 Local 36.6 0.0 0.0 0.0 0.0 Ending Balance 0.0 244.3 244.3 244.3 244.3 *Funding dependent on the outcome of a competitive process and funding availability ** Match for ADA accessible 15% and Non-ADA accessible 20% 52 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 46 Transade (State Funded) Funding shown in thousands of dollars Project Description State Total Estimated Obligation Phase Funded Sponsor 2027 2028 2029 2030 2031 100% Carryover 0.0 0.0 0.0 0.0 0.0 Allocation (Estimated) 115.7 115.7 115.7 115.7 115.7 578.3 578.3 Transit Operations Operating 115.7 115.7 115.7 115.7 115.7 578.3 Capital Transit 115.7 115.7 115.7 115.7 115.7 578.3 578.3 STATE TOTALS 115.7 115.7 115.7 115.7 115.7 578.3 578.3 Public Comment FFY 2027-2031 Transportation Improvement Program The draft TIP and notice of availability for review and comment were posted on the MPO’s webpage. Direct public comment was also called for at the TTAC and TPCC meetings where action for approval of the TIP was considered. 53 Gallatin Valley FFY 2027-2031 Transportation Improvement Program 47 Certification The Gallatin Valley Metropolitan Planning Organization for the Bozeman, Montana, urbanized area hereby certifies that its transportation planning process is in compliance with applicable provisions for transportation planning included in the following sections: (1) 23 U.S.C. 134, 49 U.S.C. 5303, and this subpart; (2) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d-1) and 49 CFR part 21; (3) 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity; (4) Section 1101(b) of the FAST Act (Pub. L. 114-357) and 49 CFR part 26 regarding the involvement of disadvantaged business enterprises in DOT funded projects; (5) 23 CFR part 230, regarding the implementation of an equal employment opportunity program on Federal and Federal-aid highway construction contracts; (6) The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and 49 CFR part 27, 37, and 38; (7) The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age in programs or activities receiving Federal financial assistance; (8) Section 324 of title 23 U.S.C. regarding the prohibition of discrimination based on gender; and (9) Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities. Gallatin Valley Metropolitan Planning Organization _______________________________________________________________ Joey Morrison, TPCC Chair Date: 54 Memorandum REPORT TO:Gallatin Valley MPO - Transportation Technical Advisory Committee FROM:Jeff Butts, MPO Manager Emiliano Esparza, Acting Director of Transportation and Engineering Department SUBJECT:First Review of the Draft Long Range Transportation Plan MEETING DATE:October 14, 2026 AGENDA ITEM TYPE:Plan/Report/Study RECOMMENDATION:Review and discuss the draft Long Range Transportation Plan and provide initial feedback. STRATEGIC PLAN:4.3 Strategic Infrastructure Choices: Prioritize long-term investment and maintenance for existing and new infrastructure. BACKGROUND:The Gallatin Valley Metropolitan Planning Organization's (MPO) first Long Range Transportation Plan (LRTP) establishes shared transportation goals, policies, programs, and investment priorities through 2050. The plan covers the Metropolitan Planning Area, which includes Bozeman, Belgrade, Four Corners, and surrounding portions of Gallatin County. The plan must meet federal requirements for evaluating current and future needs, addressing safety and system performance, involving the public, and aligning proposed investments with reasonably anticipated funding. This work requires coordination among the MPO, member jurisdictions, Montana Department of Transportation (MDT), transit providers, and federal partners. The first review provides an opportunity for the Transportation Technical Advisory Committee (TTAC) to consider the draft as a complete regional plan, identify refinements, and prepare for subsequent committee review. How the plan was developed LRTP development began in 2025 and builds on existing local, regional, and state plans, studies, and capital priorities. The process has combined technical analysis and partner coordination, which have been informed by surveys, online engagement, pop-up events, and community workshops. TTAC and the Transportation Policy Coordinating Committee (TPCC) helped shape the goals and objectives, which were formally adopted by TPCC. They address safety, maintenance, mobility choices, quality of life, regional character, transportation and land use coordination, and resilience. Project 55 concepts originated with member jurisdictions and the public, drawing on existing plans and submissions through the call for projects and engagement activities. Projects were evaluated against the adopted goals, regional needs, funding eligibility, feasibility, and partner input. This bottom-up approach established the foundation for the regional project lists. Coordination with MDT on travel demand modeling helped compare broad approaches to improving the regional transportation system. The Community Advisory Panel included members from each jurisdiction with varied backgrounds and perspectives. Its input, together with internal discussions, helped inform the draft Policies, Programs, and Practices. As this chapter comes before TTAC for its first review, staff would welcome members' perspectives on the proposed guidance. An advance draft was provided to members on October 2, 2026. What is included in the draft LRTP appendices are attached as supporting reference materials for members to consult as helpful during their review. The document progresses through the following: Introduction, planning process, and community input: The MPO’s role, how the plan was developed, and how public and partner input shaped it. Goals, performance, and conditions: The adopted vision, goals, and objectives; the performance framework; and existing and future transportation conditions. Project evaluation and recommendations: Project identification and prioritization, network alternatives, and recommended projects, including committed and illustrative projects. Policies, Programs, and Practices: Guidance linked to the adopted goals and objectives, with proposed priority levels, partners, and next steps. Funding, measuring success, and implementation : Project costs and anticipated revenues, assessing progress, and advancing the plan through continued partnership. Appendices: Supporting information and technical detail for members to consult as helpful during their review. The policies and programs are an important part of this review. They describe how the MPO and its partners can advance regional goals through on-going coordination, planning, and future investments. Review and Next Steps Staff would particularly welcome feedback on two areas: Projects and funding: Confirm that upcoming projects are accurately represented with appropriate funding sources, assumptions, and anticipated timing. Policies, Programs, and Practices: Review the proposed guidance, priority levels, partners, and next steps for alignment with adopted 56 goals, community input, and partner responsibilities. Comments on all sections are welcome during the TTAC meeting and as technical and regulatory refinements continue. Written comments received by noon October 20, 2026, will inform TPCC’s review later this month. Adoption remains on track this year, with TTAC’s recommendation scheduled for November 5, 2026, replacing the Veterans Day meeting. This item is presented for review and feedback; no formal action is requested. UNRESOLVED ISSUES:None. ALTERNATIVES:As suggested by the Committee. FISCAL EFFECTS:None. Attachments: Draft Long Range Transportation Plan.pdf Appendix F GVMPO Projected Revenue.xlsx Appendix A Project Lists.pdf Appendix C Existing and Projected Conditions.docx Appendix D Transit Strategic Plan.docx Appendix F GVMPO Projected Revenue.pdf Appendix B Community Involvement Summary.docx Appendix E Project Evaluation Framework.docx Report compiled on: October 7, 2026 57 58 i Table of Contents Page 1 Introduction ......................................................................................... 1-1 2 Plan Process .......................................................................................... 2-1 3 Community Input ................................................................................ 3-1 4 Vision, Goals, Objectives ..................................................................... 4-1 5 Performance Framework .................................................................... 5-1 6 Existing and Future Conditions.......................................................... 6-1 7 Project Identification and Prioritization ........................................... 7-1 8 Alternatives Analysis ........................................................................... 8-1 9 Recommended Projects ...................................................................... 9-1 10 Policies, Programs, and Practices ................................................... 10-1 11 Funding the Plan ............................................................................... 11-1 12 Measuring Success............................................................................ 12-1 13 Conclusion ......................................................................................... 13-1 59 ii Acknowledgements AGENCY AND ORGANIZATION City of Belgrade City of Bozeman Gallatin County Gallatin Valley Urban Transportation District / Streamline Montana Department of Transportation GALLATIN VALLEY MPO Transportation Policy Coordinating Committee Joey Morrison, Mayor – City of Bozeman (Chair) Neil Cardwell, City Manager – City of Belgrade (Vice-Chair) Emma Bode, Commissioner – City of Bozeman Zach Brown, Commissioner – Gallatin County Mark Egge, Chair – Gallatin Valley Urban Transportation District James Hanson, Member at Large Geno Liva, District Administrator – Montana Department of Transportation Former Members Terry Cunningham, Mayor – City of Bozeman Douglas Fischer, Commissioner – City of Bozeman Scott Macfarlane, Commissioner – Gallatin County Transportation Technical Advisory Committee Nicholas Ross, City of Bozeman (Chair) Chad Mozol, City of Belgrade (Vice-Chair) Beth Clarkson, Montana Department of Transportation Levi Ewan, Gallatin County John How, Montana State University 60 iii Brandon Jones, Montana Department of Transportation Katharine King, City of Belgrade Sunshine Ross, Gallatin Valley Urban Transportation District Chris Saunders, City of Bozeman Chris Scott, Gallatin County Todd Wilson, Gallatin Valley Urban Transportation District Non-Voting Members Chris Pomeroy, Bozeman/Yellowstone International Airport Manager of Operations Richard Wolff, County Planning Board Former Members Jason Karp, City of Belgrade Sean O’Callaghan, Gallatin County Camaree Ulijua, City of Belgrade Community Advisory Panel Kristin Blackler, Briger Bowl Marilee Brown, Galla10 Alliance for Pathways; Safer Bozeman Ricky Burns II, Ability Montana Elizabeth D’Imperio, Montana State University Agricultural Extension Lila Fleishman, Human Resources Development Council Sandy Lee, Belgrade Planning Board Matt Parsons, Gallatin Valley Land Trust Andy Rowse, Monforton Moves Captain Doug Samuelson, Montana Highway Patrol Hayden Savage, Bozeman Transportation Advisory Board Ellie Staley, Downtown Bozeman Partnership MPO Staff Jeff Butts, MPO Manager; Project Manger 61 iv Joelean Hall, Transportation Planner Special Thanks Emma Belmont, Federal Transit Administration Mitch Buthod, Montana Department of Transportation Kevin Larsen, Gallatin County Emergency Management Katie Potts, Federal Highways Administration Brad Stein, City of Belgrade Geoff Streeter, Montana Department of Transportation CONSULTING TEAM Zachary Zabel, Project Manager Bethany Rorem, Deputy Project Manager Chris Johnson, Principal-in-Charge Kristine Fife, Big Sky Communications Bill Delo, DJ&A Disclaimer: This report was funded in part through grants from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation. The views and opinions of the agency expressed herein do not necessarily state or reflect those of the U.S. Department of Transportation, Federal Highway Administration, or Montana Department of Transportation. 62 v Glossary of Terms Acronym Definition Acronym Definition ADA Americans with Disabilities Act NHPP National Highway Performance Program CAP Community Advisory Panel NHS National Highway System CFR Code of Federal Regulations STIP Statewide Transportation Improvement Program CMAQ Congestion Mitigation and Air Quality Improvement Program STP Surface Transportation Program FHWA Federal Highway Administration STPU Surface Transportation Program-Urban FSI Fatal and Severe Injury TA Transportation Alternatives FTA Federal Transit Administration TAMP Transit Asset Management Plan GVMPO Gallatin Valley Metropolitan Planning Organization TIP Transportation Improvement Program HSIP Highway Safety Improvement Program TPCC Transportation Policy Coordinating Committee LRTP Long Range Transportation Plan TTAC Transportation Technical Advisory Committee MACI Montana Air and Congestion Initiative ULB Useful Life Benchmark MDT Montana Department of Transportation UPP Urban Pavement Preservation MPA Metropolitan Planning Area UTD Urban Transportation District 63 vi Acronym Definition Acronym Definition MPO Metropolitan Planning Organization VMT Vehicle Miles Traveled MSU Montana State University 64 vii TABLE OF FIGURES Figure 1-1. Gallatin Valley Metropolitan Planning Area ........................................................ 1-2 Figure 3-1. LRTP Public Participation Continuum .................................................................. 3-1 Figure 3-2. Timeline of Engagement Touchpoints ................................................................. 3-3 Figure 6-1. Population Growth ................................................................................................. 6-2 Figure 6-2. Employment Growth .............................................................................................. 6-3 Figure 6-3. Major Employment Sectors ................................................................................... 6-4 Figure 6-4. Transit Propensity Index ........................................................................................ 6-5 Figure 6-5. Percent of Commute Modes 2019 vs. 2023 ........................................................ 6-6 Figure 6-6. Streamline Fixed-Route Service ............................................................................ 6-7 Figure 6-7. Historical Transit Ridership ................................................................................... 6-8 Figure 6-8. Goods Movement Network ................................................................................ 6-10 Figure 6-9. Crash History, 2015-2024 ................................................................................... 6-12 Figure 6-10. Fatal and Serious Injury Crash Locations 2015-2024 ................................... 6-13 Figure 6-11. Motorized Vehicle Only Crashes vs. Pedestrian and Bicycle Crashes by Injury Level, 2015-2024 ............................................................................................... 6-14 Figure 6-12. 2050 Volume-to-Capacity Ratios ...................................................................... 6-16 Figure 6-13. Median Home Listing Price in Gallatin Valley, 2027-2024 ............................ 6-17 Figure 6-14. Renter-Occupied vs. Owner-Occupied Housing Units.................................. 6-18 Figure 7-1. Project Prioritization Determination Criteria ...................................................... 7-7 Figure 8-1. Alternative 1 Projects ............................................................................................. 8-2 Figure 8-2. Alternative 2 Projects ............................................................................................. 8-3 Figure 8-3. Alternative 3 Projects ............................................................................................. 8-4 Figure 8-4. 2050 Existing/Committed Volume/Capacity Ratios............................................ 8-6 Figure 8-5. Alternative 3 Volume/Capacity Ratios .................................................................. 8-7 Figure 8-6. VMT by Functional Classification by Alternative ................................................. 8-8 Figure 9-1. Committed Projects ................................................................................................ 9-4 Figure 9-2. Recommended Mid- and Long-Term Projects .................................................... 9-5 Figure 11-1. Recommended Project Costs by Timeline ..................................................... 11-2 Figure 11-2. Forecasted GVMPO Funding by Source .......................................................... 11-3 65 i 66 Connecting Gallatin Valley LRTP 1-1 1 Introduction Transportation connects Gallatin Valley residents to jobs, education, services, recreation, and one another. It supports the movement of goods and the regional economy. Daily travel crosses jurisdictional boundaries, making the valley one interconnected transportation system. Rapid growth over the past decade has increased pressure on existing infrastructure. Safety concerns, gaps in walking, bicycling, and transit networks, changing development patterns, rising costs, and limited funding call for coordinated investment. This Long Range Transportation Plan (LRTP) establishes shared priorities through 2050. Community outreach and partner participation shaped the plan’s development. Regional stakeholders contributed data and helped develop the Vision, Goals, and Objectives adopted by the MPO board. Project concepts came from partner plans, partner submissions, and members of the public. Travel demand modeling and performance analysis informed the plan’s recommendations. This inaugural LRTP is a step toward a more coordinated future. What is the Gallatin Valley MPO? A Metropolitan Planning Organization (MPO) is the policy board of an organization created and designated to carry out the metropolitan transportation planning process. MPOs are required for urbanized areas with populations exceeding 50,000, as determined by the U.S. Census. After the 2020 Census counted 59,080 residents in the Bozeman Urbanized Area, Montana’s Governor designated the Gallatin Valley MPO (GVMPO) on December 21, 2023. The partnership includes Bozeman, Belgrade, Gallatin County, the Montana Department of Transportation (MDT), and the Gallatin Valley Urban Transportation District (UTD). The Transportation Policy Coordinating Committee (TPCC) governs the MPO and sets regional policy and investment priorities, with recommendations from the Transportation Technical Advisory Committee (TTAC), staff support, and agency and partner input. The MPO coordinates regional planning, maintains federally required plans and programs, and provides a public forum for investment decisions. Member agencies retain their authority; the MPO does not own facilities, operate transit, or make land-use decisions. 67 Connecting Gallatin Valley LRTP 1-2 The Metropolitan Planning Area The Metropolitan Planning Area (MPA) is the geographic area determined by agreement between the GVMPO and the Governor, in which the metropolitan transportation planning process is carried out. The Gallatin Valley MPA includes Bozeman, Belgrade, Four Corners, and developing portions of Gallatin County. Its boundary encompasses the Census-designated urban area, adjacent areas expected to urbanize within the planning horizon, and areas added through voluntary boundary expansion (Figure 1-1). Figure 1-1. Gallatin Valley Metropolitan Planning Area 68 Connecting Gallatin Valley LRTP 1-3 What is the LRTP? Connecting Gallatin Valley is the GVMPO’s LRTP, a multi-decade development strategy designed to guide long-term policy, investments, and multimodal system integration. It establishes a shared vision among local, regional, state, and federal jurisdictions and addresses current conditions and future needs for roadways, transit, walking, bicycling, freight, operations, connections, and infrastructure preservation. The LRTP is developed through a continuing, cooperative, and comprehensive planning process involving public agencies, transportation providers, and interested parties. It uses data and public input to assess current conditions, forecast future demand, and identify transportation needs. The plan guides investments and strategies for an integrated multimodal transportation system that safely and efficiently moves people and goods, supports the economy, and serves communities through 2050. The plan links long-range priorities to near-term investment. Projects seeking federal surface transportation funding must be consistent with the LRTP before entering the Transportation Improvement Program (TIP) and Statewide Transportation Improvement Program (STIP). Federal Requirements Under Title 23 of the Code of Federal Regulations, Part 450 (23 CFR Part 450), the LRTP must address no less than a 20-year planning horizon. This plan spans 24 years through 2050 with short-term (Committed), mid-term (Recommended), and long-term (Recommended) strategies and projects identified in Chapter 9. See Appendix I for details. 69 Connecting Gallatin Valley LRTP 1-1 70 Connecting Gallatin Valley LRTP 2-1 2 Plan Process Connecting Our Planning Efforts Although Connecting Gallatin Valley is the first LRTP for the region, the GVMPO’s local jurisdictions and partner agencies have developed a wide array of previous plans, policies, and studies which have informed and shaped this effort. The purpose of the LRTP is not to replace previous planning efforts, but rather to build upon them, by establishing a shared regional vision for the transportation system and enhancing collaboration between those responsible for delivering projects across the planning area. Local, regional, and state plans from the last decade were reviewed in the initial discovery phase of the LRTP and are summarized in Appendix A. Recurring themes and priorities memorialized in previous efforts include: • Provide a safe, efficient, and reliable network for the movement of both people and freight. • Preserve and maintain existing transportation infrastructure. • Support walking and bicycling as important transportation modes for access to destinations, economic vitality, and health. • Expand reliable public transit and paratransit services, while improving first/last-mile access to existing stops. • Address growth through collaborative cohesion of land use and transportation decision- making. 71 Connecting Gallatin Valley LRTP 2-2 Our Approach Connecting Gallatin Valley was an iterative multi-year effort guided by federal transportation planning factors and using a performance-based transportation planning process. This approach links a community-driven vision and goals to analysis, programming, and implementation by using data, analytical and mapping tools, performance measures, public involvement, and interagency collaboration. The federal planning factors informed each step, from identifying needs to evaluating projects and strategies, and are discussed more in Chapter 5. 72 Connecting Gallatin Valley LRTP 2-3 Creating the LRTP The project team, made up of GVMPO staff, partner agencies, and consultants, collected and analyzed qualitative and quantitative input at key milestones throughout the LRTP process to capture the region’s values and priorities to develop recommendations that are implementable and technically sound. EXISTING CONDITIONS August to November 2025 The project kicked off in Summer 2025 by reviewing previous planning documents and the latest available datasets to understand existing transportation network conditions and opportunities to better meet current and future needs. TRANSIT STRATEGIC PLAN August to November 2025 Consultants and MPO staff worked closely with Streamline to identify current system challenges and establish best practices of a successful transit system in the context of the Gallatin Valley. We then developed a set of recommended long-range transit service changes and the needed capital infrastructure to support growth, along with implementation steps and potential sources of funding. Those findings can be found in the companion Transit Strategic Plan. PUBLIC ENGAGEMENT August to December 2025 The planning team held several pop-up events, created a website, and launched a survey to understand community values and needs for the regional transportation system. This values outreach concluded with an online open house and informed the draft goals and objectives. PUBLIC ENGAGEMENT January to April 2026 Developed with TTAC and public input in November-December, the Vision, Goals, and Objectives were adopted by TPCC. The technical team and agency partners hosted workshops to gather community input on desired project types, network gaps, and priorities for investing finite public funds in the regional transportation system. This included a multi-station public meeting in each of the GVMPO’s three jurisdictions. 73 Connecting Gallatin Valley LRTP 2-4 PROJECT COLLECTION, EVALUATION, AND PRIORITIZATION April to July 2026 The MPO and its partners created a vast inventory of potential projects from previous plans, formal entries by GVMPO partners, and community comments to assess through a multi-step evaluation framework to understand alignment with LRTP goals and objectives to begin prioritizing investments. ALTERNATIVES, FUNDING PLAN, AND REFINEMENT June to August 2026 Roadway projects were collaboratively assessed in a regional travel demand model with MDT to better understand how different alternative futures of potential investments can help to relieve potential delays and respond to future growth. Revenue forecasts were developed in step with the Statewide Transportation Improvement Program (STIP) for the MPO to establish realistic funding constraints and fundable projects. Final prioritization of projects was refined based on TTAC input which included consideration of construction feasibility, synergy with existing efforts, and funding needs for annual operations, maintenance, and preservation. LONG RANGE TRANSPORTATION PLAN September to December 2026 Connecting Gallatin Valley includes a final list of fiscally constrained and illustrative projects, programs, and policies along with measures to monitor performance. The plan will be adopted by the GVMPO and will serve as a framework for future funding needs. Guiding the GVMPO In addition to robust community engagement covered in the next chapter, the formation of the plan was guided throughout with frequent updates to standing committees and collaboration meetings with the GVMPO’s jurisdictional partners the City of Belgrade, City of Bozeman, and Gallatin County. Coordination with the Federal Transit Administration (FTA) and Gallatin Valley UTD informed the plan’s transit elements and companion Transit Strategic Plan. Representatives from MDT and Federal Highway Administration (FHWA) provided guidance in bi-weekly working meetings to ensure the plan was developed in compliance with state and federal requirements and leverages best practice for fiscally constrained long range plan development. 74 Connecting Gallatin Valley LRTP 2-5 Transportation Policy Coordinating Committee The Transportation Policy Coordinating Committee is the official policy and governing board of the GVMPO, responsible for carrying out the continuing, comprehensive, and cooperative (3-C) transportation planning process in the Gallatin Valley MPA. The TPCC has final local approval for GVMPO plans and programs related to public participation, transportation planning, the scope of services, and the work program. The TPCC includes positions for the Belgrade City Manager, Mayor of Bozeman and an appointed City Commissioner, Gallatin County Commission Chair, MDT District Administrator, Gallatin Valley UTD Chair, and an at-large member with education or experience in transportation engineering or planning. The TPCC provided overall policy direction to the project team, responded to recommendations from TTAC and input from the community, and informed refinement of the final LRTP recommendations. Transportation Technical Advisory Committee The Transportation Technical Advisory Committee is a standing committee of the GVMPO and conducts technical reviews and makes recommendations to the TPCC to support the continuing, comprehensive, and cooperative transportation planning process while providing technical guidance to GVMPO staff. TTAC includes planning, community development, engineering, and transit staff from across the City of Belgrade, City of Bozeman, Gallatin County, Gallatin Valley UTD, MDT, and MSU. Non-voting members include representatives of Bozeman Yellowstone International Airport, Gallatin City-County Health Department, Belgrade School District 44, and Bozeman School District 7 in a non-voting capacity. LRTP progress updates were provided to TTAC during regularly scheduled meetings, with members providing feedback through all phases of the plan development. 75 Connecting Gallatin Valley LRTP 2-1 76 Connecting Gallatin Valley LRTP 3-1 3 Community Input Public Participation Approach Community input shaped the LRTP’s vision and priorities, projects, and recommendations. In- person and online engagement at key milestones offered several ways for the public to participate in the plan development and review. The GVMPO’s Public Participation Plan, informed by the International Association for Public Participation (IAP2) spectrum, guided engagement. Activities matched the decision and anticipated public interest, from sharing information and consulting to involving the public and collaborating with the Community Advisory Panel (CAP). Figure 3-1. LRTP Public Participation Continuum 77 Connecting Gallatin Valley LRTP 3-2 Engagement Methods Outreach throughout the MPA included: • Information shared through the GVMPO website, postcards, press releases, notices, and partner networks. • Paper and online surveys on regional values, transportation needs, travel choices, and funding priorities. • A virtual open house, webinar, and online activities. • Pop-ups at community events and public locations in Bozeman and Belgrade. • An interactive map for identifying needs, proposing projects, commenting, and responding to others’ ideas. • Drop-in workshops in Belgrade, Bozeman, and Four Corners with polling, mapping, project-selection, and budgeting exercises. • CAP meetings at major milestones. • An online feedback forum, written comments, and a 30-day public review of the plan. 78 Connecting Gallatin Valley LRTP 3-3 Engagement informed decisions at key milestones throughout the LRTP process. Figure 3-2. Timeline of Engagement Touchpoints 79 Connecting Gallatin Valley LRTP 3-4 Community Advisory Panel (CAP) The CAP met four times, advising GVMPO staff and committees. Members represented communities, interests, and perspectives across the Gallatin Valley. Early meetings refined the vision, goals, and objectives later adopted by TPCC. Members also identified needs and projects, tested spring engagement activities, discussed public input, project evaluation, fiscal constraints, and recommended policies, programs, and practices. Final discussions reviewed key recommendations and how community input shaped the plan. Spring Engagement Workshops Drop-in workshops held April 14-16, 2026, in Belgrade, Bozeman, and Four Corners anchored the project and alternatives engagement phase. Each offered the same activities and welcomed input on need throughout the planning area. Concurrent online mapping expanded participation. The workshops included five interactive activities: • This or That: Weigh trade-offs, including transit coverage versus frequency, on-street lanes versus separated pathways, and improving existing infrastructure versus adding new connections. • Pick a Project: Use dots to identify priorities among projects in existing local plans. • Build a Project: Allocate a limited budget among roadway, pedestrian, bicycle, transit, landscaping, accessibility, and safety elements for a hypothetical project. • Add to the Map: Identify needs, barriers, connections, and project ideas on a map. • GVMPO Programming: Use interactive polling to gather input on broader values, outcomes, and types of programs the GVMPO should support. 80 Connecting Gallatin Valley LRTP 3-5 Pop-Ups, Surveys, and Online Engagement The GVMPO also joined partner-led events, including a downtown disability-access workshop and a university walk audit for firsthand insights into network conditions. Early pop-ups and surveys identified regional values and needs. Later mapping and feedback gathered location- specific ideas and comments on potential recommendations. 81 Connecting Gallatin Valley LRTP 3-6 What We Heard The following summarizes recurring and notable comments from engagement activities. They reflect participant perspectives and are not statistically representative of the region. Early Surveys and Interactive Polling Participants envisioned a safe, affordable, sustainable, accessible, connected, and well- maintained transportation system supported by transit. Leading considerations included affordability, safety, infrastructure conditions, sustainability, and access to jobs and services. Walking and bicycling input emphasized connected trails, bikeways, sidewalks, and separated facilities, safer crossings, and accessibility and comfort for people of all ages and abilities. Transit comments emphasized more frequent, reliable service, longer service hours, and connections among Bozeman, Belgrade, Four Corners, Bozeman Yellowstone International Airport, schools, employment centers, services, and recreational areas. Driving-related comments focused on signal timing, congestion, street connectivity, roadway maintenance, safer intersections, and separation of users. Pop-up Events Regional connections were a recurring theme. Transit comments emphasized service between Bozeman and Belgrade; direct connections to MSU and Gallatin College; and access to the airport, Four Corners, shopping, employment, schools, the Warming Center, and other daily destinations. Some participants expressed willingness to pay for convenient airport service. Comments on walking and bicycling emphasized continuous routes between communities, including safer travel along Frontage Road and bicycle connections between Bozeman and Belgrade. Participants also identified wider shoulders or separated facilities, sidewalk gaps, school bicycle programs, and access in developing areas. Roadway comments included speeding along Huffine Lane and Jackrabbit Lane, red-light running, turning movements along Jackrabbit Lane, downtown truck traffic in Belgrade and Bozeman, parking and enforcement, and student traffic on surrounding streets. One comment suggested a diagonal roadway running parallel to I-90 along its south side. 82 Connecting Gallatin Valley LRTP 3-7 Spring Workshops Budgeting and mapping activities highlighted interest in connected multimodal networks and context sensitive improvements. Participants emphasized shared-use paths, trail connections, pedestrian crossings, bicycle lanes, and safer intersections. Other interests included roadway maintenance, targeted road reconfiguration, landscaping, parking, transit connections, and capacity improvements where warranted. Participants also emphasized extending the connected street-grid pattern into growing areas. Mapping emphasized connections between facilities, neighborhoods, schools, parks, commercial areas, and neighboring communities. Comments addressed roadway-design, truck routes, zoning and development standards near a potential future interchange. Project voting focused on a small group of planned investments. Results informed the plan but did not establish a regional project ranking. Interactive Mapping and Online Comments The spring interactive map received 102 comments. Approximate theme counts overlap because individual comments may address several issues. 83 Connecting Gallatin Valley LRTP 3-8 Theme Approximate Comments Common Requests Walking and bicycling connectivity 59 Shared-use paths, bike lanes, sidewalks, trail connections, and closing network gaps Crossing, intersection, and speed safety 46 Signals, RRFBs, refuge islands, roundabouts, lower speeds, and pedestrian timing Roadway design and operations 34 Lane design, widening concerns, two-way streets, parking, and truck routing Transit service and investment 11 Streamline funding, school service, and connections to Four Corners and the airport Regional policy and land use 11 Complete Streets, parking reform, development standards, and coordination among jurisdictions Maintenance and accessibility 10 Snow removal, bicycle-lane debris, sidewalk condition, and accessibility Wildlife infrastructure 1 Potential wildlife crossing near Bozeman Pass and Bear Canyon Agreement on problems did not always mean agreement on solutions. For example, crossing proposals ranged from signals and Rectangular Rapid-Flashing Beacons (RRFBs) to refuge islands, roundabouts, and speed management. Some proposals favored roadway widening for bicycle lanes, whereas others preferred lowering speeds and not widening roads. 84 Connecting Gallatin Valley LRTP 3-1 85 Connecting Gallatin Valley LRTP 4-1 4 Vision, Goals, Objectives Developing a Regional Vision The vision, goals, and objectives adopted by TPCC establish the LRTP’s policy foundation and are used in conjunction with the federal performance-based planning and programming framework. The goals establish broad regional direction and the objectives translate that direction into guidance for planning, investment, and decision-making. Performance measures complement this framework by providing a consistent basis for tracking system conditions, evaluating outcomes, and assessing changes over time. This chapter presents the LRTP vision, goals, and objectives, and Chapter 12 describes the performance measures and targets in greater detail. Together, they shaped project evaluation, program and policy development, comparison of alternatives, and regional transportation investment decisions. Vision Statement In 2050, Gallatin Valley’s transportation system provides safe, reliable, and multimodal connectivity that supports people, goods, and communities as the region grows. The system is well maintained, fiscally sustainable, and designed to strengthen human-centered connections. 86 Connecting Gallatin Valley LRTP 4-2 Goals The LRTP includes six goals representing the region’s desired transportation outcomes: The goals are interconnected and should be considered together. A project, program, policy, or practice may support several goals even when organized under one primary goal for purposes of evaluation or presentation. 87 Connecting Gallatin Valley LRTP 4-3 Objectives The objectives provide each goal with more specific planning direction. They help the GVMPO and its partners evaluate transportation needs, compare potential investments, and develop recommendations. They are intended to guide decisions rather than prescribe a single project or solution. Goal 1: Support Safe Travel Across All Modes 1. Eliminate all traffic-related fatalities and serious injuries across all transportation modes. 2. Improve safety outcomes and reduce barriers for nonmotorized travel. 3. Improve safety performance on high-injury corridors and intersections. 4. Improve accessibility and safety by reducing existing facility gaps and Americans with Disabilities Act (ADA) deficiencies. 5. Reduce conflicts and barriers that undermine safety, comfort, and personal security. 6. Maintain safe and secure connections for transit riders and operators. 7. Strengthen partnerships to support reaching Vision Zero goals. Goal 2: Ensure a Well-Maintained Transportation System 1. Maintain a state of good repair for roadway, bridge, and transit assets. 2. Maintain reliable travel times across the transportation system. 3. Improve pedestrian conditions to and within pre-1980s neighborhoods, activity centers, and transit stops. 4. Improve long-term system performance through preservation-focused investments. 88 Connecting Gallatin Valley LRTP 4-4 Goal 3: Expand Mobility Choices Throughout the Region 1. Improve access between schools, jobs, services, and key destinations. 2. Improve street and pathway connectivity to support more direct multimodal travel. 3. Expand transportation infrastructure to support trips made by not driving alone. 4. Improve access, comfort, and safety to and at transit stops and transfer locations. 5. Expand access to everyday non-driving travel options that lower household costs. 6. Improve continuity and comfort by filling missing gaps in the pedestrian network. 7. Establish a regional bicycle network connecting key destinations for all ages and abilities. Goal 4: Enhance Health, Quality of Life, and Preserve Regional Character 1. Improve access to nonmotorized facilities that support active travel options. 2. Improve transportation access to parks, trails, and recreation areas. 3. Reduce wildlife-vehicle conflicts and improve safe wildlife movement across corridors. 4. Reduce transportation-related impacts on environmentally sensitive areas. 5. Reduce per capita air emissions from the transportation system. 89 Connecting Gallatin Valley LRTP 4-5 Goal 5: Enhance Transportation and Land-Use Planning Coordination 1. Align transportation system and network decisions with adopted growth plans. 2. Encourage land use decisions consistent with transportation investments and policies. 3. Align system design to support walkable, human-centered, and well-connected places. 4. Support placemaking, economic vitality, and access in centers. 5. Prioritize year-round needs to avoid overbuilding driven by seasonal travel demand. 6. Reduce speed-related conflicts through context-sensitive design. Goal 6: Improve Transportation System Resilience 1. Improve the adaptability and flexibility of transportation network design. 2. Maintain and enhance system design for the reliable movement of people and goods. 3. Maintain a transportation system that can accommodate emerging technologies. 4. Strengthen coordination, cooperation, and preparedness among transportation partners to support mobility, access, and logistics during emergency response and recovery. 90 Connecting Gallatin Valley LRTP 4-1 91 Connecting Gallatin Valley LRTP 5-1 5 Performance Framework Performance-Based Planning The LRTP links the region’s adopted vision, goals, and objectives to federal performance measures and applicable targets. These measures track system conditions over time, helping evaluate progress toward adopted goals and inform future planning and investment decisions. Defining and establishing measurable outcomes helps the GVMPO and its partners track progress, identify performance needs, make informed planning and investment decisions, and improve transparency to the public. Federal and State Coordination To maintain federal compliance with 23 CFR 450.306(d), MPOs must use a performance-based approach to transportation decision-making that supports the following national performance goals established in 23 U.S.C. § 150(b): Safety: To achieve a significant reduction in traffic fatalities and serious injuries on all public roads. Infrastructure Condition: To maintain the highway infrastructure asset system in a state of good repair. Congestion reduction: To achieve a significant reduction in congestion on the National Highway System (NHS). 92 Connecting Gallatin Valley LRTP 5-2 System reliability: To improve the efficiency of the surface transportation system. Freight Movement and Economic Vitality: To improve the National Highway Freight Network, strengthen the ability of rural communities to access national and international trade markets, and support regional economic development. Environmental Sustainability: To enhance the performance of the transportation system while protecting and enhancing the natural environment. Reduced project delivery delays: To reduce project costs, promote jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices. These national goals are translated into specific measures and targets. MDT sets statewide targets using prescribed methods and statewide data in coordination with Montana’s five MPOs. Transit providers may establish transit-asset and safety targets through federal planning process. The GVMPO acts within federal timeframes to support statewide targets or establish separate targets for the MPA. TPCC voted to support MDT’s statewide targets for the applicable performance periods. The GVMPO’s Performance-Based Planning Agreement defines responsibilities for target setting, data sharing, reporting, and LRTP integration. These targets are near-term benchmarks, not 2050 forecasts and are updated with MDT. Streamline previously participated in the State’s Transit Asset Management Plan but is no longer included in the updated plan. Streamline is now developing its own plan. The MPO continues to use Streamline’s targets for transit safety. 93 Connecting Gallatin Valley LRTP 5-3 National Planning Factors The GVMPO also aligned the Connecting Gallatin Valley goals and objectives with the required ten National Planning Factors in 23 CFR 450.306(b): • Economic Vitality • Safety • Security • Accessibility • Project Environment and Align with Planned Growth • Connectivity Across Modes • System Management and Operation • System Preservation • Resiliency and Reliability • Travel and Tourism These factors informed the assessment of conditions, identification of transportation needs, and discussions around the goals and objectives. They provide the broader framework for the LRTP’s performance-based approach, with performance measures and targets helping assess system conditions and track progress. 94 Connecting Gallatin Valley LRTP 5-4 Performance Measures and Targets Federally required target setting and reporting help evaluate progress and inform transportation investment decisions. Measures describe system conditions and outcomes. Targets define anticipated level of performance for a defined reporting period. Measures apply at the system level with applicability varying by roadway, facility, and project. They complement local needs, public input, fiscal constraints, and adopted goals. Statewide Safety Targets Highway safety measures track fatalities and serious injuries for both motorized and nonmotorized travel using five-year rolling averages. Performance Measure Annual Reduction per Year 2027 Targets Fatalities 8 199.6 Fatality Rate 0.056 1.445 Serious Injuries 29 750.4 Serious Injury Rate (per 100 million VMT) 0.210 5.371 Combined Nonmotorized Fatalities and Serious Injuries 2 64.6 The 2027 targets reflect a trajectory toward continued reductions in fatalities, fatality rates, serious injuries, and serious injury rates. 95 Connecting Gallatin Valley LRTP 5-5 Pavement and Bridge Condition Targets These measures track Interstate and non-Interstate NHS pavement and bridge condition. MDT may revise four-year targets at mid-period. The lower pavement targets reflect measurement changes, not an observed decline in condition. Performance Measure 2-Year Targets (2028) 4-Year Targets (2030) Interstate Pavement: Good >35% >35% Interstate Pavement: Poor <2% <2% Non-Interstate Pavement: Good >30% >30% Non-Interstate Pavement: Poor <3% <3% NHS Bridge Deck Area: Good >17% >17% NHS Bridge Deck Area: Poor <8% <8% Pavement targets reflect lower rates in good condition due to changes in data collection equipment, whereas poor-condition thresholds are generally steady. Bridge targets have increased from 16 to 17 percent while targets for poor deck area have declined from nine to eight percent. 96 Connecting Gallatin Valley LRTP 5-6 System Performance and Freight Targets These measures track passenger and freight travel reliability on the NHS. The table presents MDT’s statewide targets for the 2026-2029 performance period. The MPO coordinates with MDT to support these targets through its planning and programming. Performance Measure 2-Year Targets (2028) 4-Year Targets (2030) Reliable person-miles traveled on the Interstate >98% >98% Reliable person-miles traveled on the non-Interstate NHS >80% >80% Interstate Truck Travel Time Reliability Index <1.35 <1.35 Interstate and non-Interstate NHS reliability targets remain unchanged, and the Interstate Truck Travel Time Reliability Index is maintained at 1.30. Emissions-Reduction Targets Federal emissions measures apply where required under the Congestion Mitigation and Air Quality Improvement Program (CMAQ). Statewide targets are shown for context. The GVMPO meets air quality standards and receives no direct CMAQ suballocation; local partners may seek eligible funding through MDT. Performance Measure 2-Year Targets (2028) 4-Year Targets (2030) Total Emission Reductions: PM2.5 N/A N/A Total Emission Reductions: NOx N/A N/A Total Emission Reductions: VOC N/A N/A Total Emission Reductions: PM10 >0 kg/day >0 kg/day Total Emission Reductions: CO >0 kg/day >0 kg/day The PM10 and CO targets remain greater than zero kilograms per day, and PM2.5, Nox, and VOC targets are not applicable. 97 Connecting Gallatin Valley LRTP 5-7 Transit Asset Management Targets Below are Streamline’s targets under the State’s Transit Asset Management Plan (TAMP). The MPO will incorporate targets from Streamline’s forthcoming plan into its planning process. Asset Category Asset Class 2024 2025 2026 2027 2028 Revenue Vehicles Bus 0% 16% 12% 8% 4% Revenue Vehicles Cutaway Bus 7% 20% 7% 20% 7% Equipment Age: % at or beyond Useful Life Benchmark 2024 2025 2026 2027 2028 Non-revenue/service automobile 25% 25% 25% 0% 0% Trucks and other rubber-tired vehicles 100% 100% 100% 50% 50% Facility-maintenance vehicle 43% 29% 29% 29% 29% Facilities Condition: % below 3.0 on FTA Transit Economic Requirements Model scale 2024 2025 2026 2027 2028 Passenger facilities 0% 0% 0% 0% 0% Administrative and maintenance 0% 0% 0% 0% 0% Streamline previously used the statewide targets for their plans. The targets vary by vehicle class but generally anticipate fewer vehicles operating beyond their Useful Life Benchmark (ULB) by 2028, and facility targets remain at zero percent below the 3.0 condition rating. Low annual bus mileage locally may justify use beyond the age-based ULB. Streamline will develop its own TAMP and the MPO will incorporate the resulting targets. 98 Connecting Gallatin Valley LRTP 5-8 Transit Safety Targets Streamline establishes transit safety targets through its Public Transportation Agency Safety Plan. The targets are shown below. Mode of Transit Service Fatalities (total) Fatalities (per 100 thousand VRM) Injury (total) Injuries (per 100 thousand VRM) Fixed-Route Bus 0 0 2 0.0 ADA / Paratransit 0 0 1 0.0 Mode of Transit Service Safety Events (total) Safety Events (per 100 thousand VRM) System Reliability (VRM/ failures) Fixed-Route Bus 1 0.0 42,800 ADA / Paratransit 1 0.0 32,000 The targets maintain zero fatalities for both fixed-route and ADA/paratransit service, with limited injuries or safety incidents. System reliability targets are 42,800 vehicle revenue miles per failure for fixed-route service and 32,000 for ADA/paratransit services. 99 Connecting Gallatin Valley LRTP 5-9 Applying the Framework The framework informs project evaluation, recommended policies and programs, and regional investment decisions in support of adopted goals and objectives. Future Regional and Local Measures This LRTP establishes no independent GVMPO-specific measures nor numerical targets. Future regional measures would require reliable data, sufficient staff capacity, coordination with MDT and local partners, and TPCC consideration. Staff may develop informal indicators for local planning without establishing formal measures or targets. 100 Connecting Gallatin Valley LRTP 5-1 101 Connecting Gallatin Valley LRTP 6-1 6 Existing and Future Conditions Guiding Plans With robust local and regional planning work conducted in the last 10 years, reviewing current planning and policy documents, and understanding what has been successful in the past, helps set the framework to build on previous momentum. The LRTP integrates existing plans and projects while identifying new opportunities to create an integrated transportation system that meets the needs of our community and partner agencies. The 2017 Bozeman Transportation Master Plan, 2018 Belgrade Transportation Master Plan, 2022 Gallatin County Greater Triangle Area Transportation Plan, and 2023 Gallatin Valley Sensitively Lands Protection Plan were the foundation for the LRTP. The recommendations from these plans have been integrated into the LRTP so that we have a single list of projects that can advance with our region’s limited transportation funding. These recent plans share common values that informed our work on the Gallatin Valley LRTP. 102 Connecting Gallatin Valley LRTP 6-2 Demographics Our region has experienced rapid growth over the past decade. The population within the MPA increased by 38% from 2013 (65,044) to 2023 (89,855) (Figure 6-1). Growth has slowed in recent years, but the area has continued to add residents year over year. Projected growth estimates show that Belgrade, Bozeman, and Four Corners will grow to a combined population of 114,300 in 2045 (Appendix C). Figure 6-1. Population Growth Source: American Community Survey (ACS) 5-Year Estimates, 2023 103 Connecting Gallatin Valley LRTP 6-3 The Gallatin Valley economy has become increasingly diversified. Retail, educational services, and accommodation/food services account for over one-third of all jobs in the region. Jobs in the MPA increased by 47% in the past decade, with a total of 56,759 jobs in 2022 (Figure 6-2), and an additional 44,500 jobs are projected to be added in the Gallatin Valley by 2045 (Appendix C). Montana State University and the vibrant tourist economy support the regional economic hub, with many people traveling into the urbanized areas to access jobs, services, and other major destinations. As the region continues to grow, transportation options and connectivity need to be considered to link people from where they live to where they work. Figure 6-2. Employment Growth Source: Longitudinal Employer-Household Dynamics (LEHD), 2022 104 Connecting Gallatin Valley LRTP 6-4 Figure 6-3. Major Employment Sectors Source: Longitudinal Employer-House Dynamics (LEHD), 2022 Using select demographic, socioeconomic, and employment data can help determine the overall transit need for a given area. Areas with higher transit propensity are more likely to generate ridership and support transit services. The following groups were examined due to their statistically higher likelihood of using transit based on Census journey to work data: • Minority populations1 • Low-income households • People with limited English proficiency • Zero-vehicle households • Young people ages 15-24 • Older adults age 65+ • People with a disability A composite transit propensity score was computed for each block group in the MPA by summing up the individual percentages of population or households in each block group that met the given criteria. A higher composite score indicates a greater relative transit propensity. 1 “Title VI Circular to 4702.1B.” Title VI Requirements and Guidelines for Federal Transit Administration Recipients, Federal Transit Administration, 1 Oct. 2012, www.transit.dot.gov/sites/fta.dot.gov/files/docs/FTA_Title_VI_FINAL.pdf. 105 Connecting Gallatin Valley LRTP 6-5 Downtown and northwest Bozeman have areas with the highest propensity to use transit, as well as northeast Bozeman along I-90. Central Belgrade also has high transit propensity adjacent to the airport and in the River Rock community west of I-90. Bozeman has four local bus routes and one commuter route that connects Belgrade and Bozeman. Improving service in Bozeman and expanding service in Belgrade will help meet mobility needs as the region grows. Figure 6-4. Transit Propensity Index Source: American Community Survey (ACS) 5-Year Estimates, 2023. The transit propensity index is based on combined densities of the following socioeconomic and demographic groups: people ages 15-24, people ages 65+, people with a disability, low-income individuals, households without a vehicle, minority groups, and people with limited English proficiency. 106 Connecting Gallatin Valley LRTP 6-6 Multimodal Travel Conditions A reliable transportation system is essential for the livelihood of our residents, connecting them to neighborhoods, commercial and recreational areas, and job centers. Understanding how we travel will provide insight into opportunities to create a better traveling experience for our region. Mode Share Driving alone is the primary mode of transportation for 68% of area residents who commute to work. Although the overall number of residents who drive alone to work has increased since 2019, the overall drive-alone share decreased by five percentage points. A small percentage of residents take transit, although the share increased by 0.1% in 2023. Residents are more likely to carpool, walk, or ride a bike, although the shares for these modes declined by 0.3 to 1.6 percentage points since 2019. Remote work more than doubled in 2023, likely due to the COVID-19 pandemic causing changes to commute patterns. Figure 6-5. Percent of Commute Modes 2019 vs. 2023 Source: American Community Survey (ACS) 5-Year Estimates, 2019 and 2023 107 Connecting Gallatin Valley LRTP 6-7 Transit in the Gallatin Valley Providing high-quality public transit is essential to connect residents, employees, and visitors throughout the area. The Gallatin Valley Urban Transportation District manages Streamline, a fare-free fixed-route transit service with four local routes in Bozeman and one commuter route from Bozeman to Belgrade. The four local routes operate every 60 minutes on weekdays, with 30-minute service at peak hours while MSU is in session. The Pinkline operates as a commuter route with four trips in each direction on the weekdays, and it does not operate on weekends. Figure 6-6. Streamline Fixed-Route Service Source: Streamline; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade 108 Connecting Gallatin Valley LRTP 6-8 Streamline currently contracts with the Human Resources Development Council (HRDC) to provide Galavan, a door-to-door paratransit service for senior citizens and riders who are unable to use fixed-route services due to a disability. The service operates within two miles of regular Streamline fixed-route service, which is beyond the legal minimum of ¾-mile as set by ADA requirements. Streamline experienced a significant drop in ridership during the COVID-19 pandemic (Figure 6- 7) and has been slow to recover, with current ridership at 59% of pre-pandemic levels. Ridership is also heavily influenced by the academic calendar at MSU, with levels dropping during summer and winter breaks and rising again when classes resume. Galavan ridership has trended similarly to the fixed-route service with slow recovery after the drop in ridership that occurred during the COVID-19 pandemic, and ridership has not yet returned to pre-pandemic levels. Figure 6-7. Historical Transit Ridership Source: Streamline; Ridership is shown through fiscal year 2026, which ended in June 2026 109 Connecting Gallatin Valley LRTP 6-9 Biking, Walking, and Rolling Providing high quality and connected bicycle lanes, shared use pathways and sidewalk networks is essential for supporting safe, healthy, and more affordable living in the Gallatin Valley. Active transportation facilities expand opportunities for physical activity and provide more reliable options for trips made without driving alone. An accessible and complete sidewalk network is also essential for people to walk or use mobility devices to safely reach their destinations. As the region continues to grow, a complete bicycle and pedestrian network will need to be a priority to meet community mobility needs. Available bicycle and pedestrian facilities data are incomplete across the MPA, and developing a complete inventory will require additional data collection beyond this LRTP. 110 Connecting Gallatin Valley LRTP 6-10 Freight and Goods Movement Moving goods efficiently and safely through the Gallatin Valley is essential to the region’s economy and the success of local businesses. The freight network in the MPA includes highways, railroads, and Bozeman Yellowstone International Airport (BZN). Figure 6-8. Goods Movement Network Source: MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade 111 Connecting Gallatin Valley LRTP 6-11 Roadway-based goods movement through and within the MPA primarily occurs along key portions of the MDT system. These include major freight flows along I-90, US-191/Gallatin Road, and MT-85/Jackrabbit Lane. Local jurisdictions, including Gallatin County and the cities of Belgrade and Bozeman, do not currently designate any roadways as truck routes, though they have the authority to do so. As the region continues to grow, greater planning considerations should be given to areas where local and freight traffic share the network. 112 Connecting Gallatin Valley LRTP 6-12 Transportation Safety One of our priorities is keeping people safe on our streets as they move through the region. According to MDT crash data, there were 13,070 transportation-related crashes in the MPA between 2015 and 2024 (Figure 6-9). Of those, 23.1% were reported as injury crashes, 2.5% of which were fatal or serious injury (FSI) crashes. Certain corridors in the MPA have a concentration of FSI crashes, including Huffine Lane, 19th Avenue, West Oak Street, Main Street, and Jackrabbit Lane. See Figure 6-10 for details. Figure 6-9. Crash History, 2015-2024 Source: MDT 113 Connecting Gallatin Valley LRTP 6-13 Figure 6-10. Fatal and Serious Injury Crash Locations 2015-2024 Source: MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade Over 88% of crashes involving people biking, walking, using mobility aids, or riding other small- wheeled devices result in some level of injury or fatality (Figure 6-11). This highlights the importance of having safe infrastructure that reduces vehicle conflicts with people biking, walking, or using mobility aids or other small-wheeled devices. Although these crashes account for a small share of all crashes, they are more likely to result in fatal or serious injuries. 114 Connecting Gallatin Valley LRTP 6-14 Figure 6-11. Motorized Vehicle Only Crashes vs. Pedestrian and Bicycle Crashes by Injury Level, 2015-2024 Source: MDT Most crash reports include information on factors that contributed to the crash. Crash factors can be environmental factors, such as road conditions, or human factors, such as reckless driving. The most common human factor for crashes within the MPA is driving in a distracted, inattentive, or careless manner, whereas driving under the influence of alcohol, drugs, or other substances is the most common contributing factor in FSI crashes specifically. The top five human crash factors are: 115 Connecting Gallatin Valley LRTP 6-15 Growth and Land Use Integrating land use with our transportation planning is an essential part of how we plan for growth in our region. The projected conditions and growth estimates in this plan were developed in collaboration with the Gallatin Valley Land Use Committee and built off the Gallatin County Growth Policy and Future Land Use Map. Using the projected growth in households and jobs (detailed in Appendix C), traffic volumes were modeled throughout the MPA and show projected growth in vehicle volumes between 2022 and 2050. Volumes are expected to grow significantly in locations where future households and job growth are concentrated or where alternative travel routes are limited. Chapter 8 provides a more detailed analysis of projected growth in vehicle volumes. Some roadways may experience traffic volumes that approach or exceed capacity by 2050. As shown in Figure 6-12, the blue segments on the map show where future projected traffic volumes exceed current roadway capacities and congestion is expected to be most acute. The green segments show roadways where future needs may emerge. The 2050 projections reflect conditions before the projects and policies in this plan are implemented. As such, it helps inform the plan’s policies, programs, and practices. 116 Connecting Gallatin Valley LRTP 6-16 Figure 6-12. 2050 Volume-to-Capacity Ratios Source: Travel Demand Model 117 Connecting Gallatin Valley LRTP 6-17 Housing and Affordability Housing costs in our region have risen faster than wages, creating challenges for residents seeking housing they can afford. Transportation is often one of the largest household expenses, so affordable transportation options are essential to connect residents with jobs, schools, services, and recreational opportunities. Figure 6-13. Median Home Listing Price in Gallatin Valley, 2027-2024 Source: Realtor.com, 2024 118 Connecting Gallatin Valley LRTP 6-18 Of residents in the study area, 55% own their home and 45% rent (Figure 6-14). This percentage may change over time as housing prices shift and influence whether households choose to rent or purchase. Vacant and part-time residential housing units are also an area of focus for local elected officials due to Bozeman being an amenity destination during both the summer and winter months. This may impact housing availability and affordability for full-time residents in an already constrained market. Figure 6-14. Renter-Occupied vs. Owner-Occupied Housing Units Source: American Community Survey (ACS) 5-Year Estimates, 2023 119 120 Connecting Gallatin Valley LRTP 7-1 7 Project Identification and Prioritization Evaluation Process This chapter describes how the evaluation framework was developed to help collect, screen, assess, and prioritize for LRTP recommendations through the horizon year 2050. This process builds off community input from public engagement and consensus building from GVMPO Committee working sessions. Collection Projects were collected in two phases. First, the project team created an inventory of projects recommended or identified in existing local and state plans to collaboratively review with partner agencies to confirm which projects have been built, are in progress, or may no longer be relevant. Next, an agency call for projects was held for GVMPO partners to submit any new project concepts to be considered for inclusion in the LRTP, as well as provide technical and project description refinements to already identified projects. 121 Connecting Gallatin Valley LRTP 7-2 Screening Altogether, over 900 projects were identified or submitted for evaluation. The projects were then screened and updated accordingly for completeness of project descriptions, accuracy of geographic extents to map, and removal of duplicates or those outside the MPA boundary. Projects were advanced for further evaluation if they were potentially eligible for anticipated LRTP funding sources or were identified as regionally significant. Projects generally involve facilities functionally classified as Collector or higher to align with typical federal surface transportation funding eligibility. However, other projects or facilities not on the federal-aid system may qualify for certain funding programs, such as Transportation Alternatives (TA) or other applicable funding sources. At this point, concepts not specifically tied to a transportation network capital project and more closely aligned with a program, policy, study, or equipment acquisition were set aside for consideration in Chapter 10. Eligible projects were then filtered into one of four project types: SAFETY Projects aimed at reducing or eliminating conflicts at intersections and key corridors and improving safety for people using active transportation modes. Types of projects include: • Traffic signals and roundabouts • New or upgraded pedestrian crossings • Curb extensions and lane configurations • Signal phasing improvements ACTIVE TRANSPORTATION Projects aimed at providing dedicated space for people to walk, bike, or use mobility aids to reach destinations throughout the region. Types of projects include: • Constructing new sidewalks or filling in sidewalk gaps • Pedestrian/bicycle tunnels and overpasses • Dedicated bike lanes and shared-use paths/trails ROADWAYS Projects designed to increase vehicle capacity and enhance the roadway system through creation, redesign, and reconstruction of streets and bridges. Types of projects include: • Reconstructing or widening to upgrade road classification 122 Connecting Gallatin Valley LRTP 7-3 • Restriping and reconfiguring lanes • New extensions for network connectivity • Realignment of segments to accommodate infrastructure projects MAINTENANCE Projects designed to preserve the roadway system through maintenance efforts. Types of projects include: • Bridge maintenance or replacement • Pavement seal, mill, and overlay • Streetscape improvements Assessing With a screened list of LRTP funding eligible and regionally significant projects complied, a multi-step quantitative geospatial analysis was conducted to “score” projects to estimate their potential to advance GVMPO goals and objectives based on design elements and location within the transportation network. In total, 21 specific scoring metrics directly tied towards meeting performance measures were developed and refined with input from the TTAC. Scored projects were then assigned within four tiers based on natural breaks out of a possible total of 29 points, to be used to inform but not dictate the prioritization of projects. The full evaluation criteria, assignment of scores, and aggregate scores are provided in Appendix E. GOAL 1: SUPPORT SAFE TRAVEL ACROSS ALL MODES Scoring Metric Projects Receive Points if They Crash Reduction Address corridors which average two or more serious injury or fatal collisions per year Bicycle and Pedestrian Safety Improve active transportation safety near corridors which average two or more bicycle/pedestrian involved collisions per year Accessibility Improve or close a gap in the ADA network 123 Connecting Gallatin Valley LRTP 7-4 GOAL 2: ENSURE A WELL-MAINTAINED TRANSPORTATION SYSTEM Scoring Metric Projects Receive Points if They Facility Preservation Improve pavement, bridge, or transit facilities rated in “fair” or “poor” condition Pedestrian Conditions Repair, restore, or improve pedestrian conditions in pre-1980s neighborhoods GOAL 3: EXPAND MOBILITY CHOICES THROUGHOUT THE REGION Scoring Metric Projects Receive Points if They Access to Essential Services Improve or expand multimodal access to schools or hospitals Access to Jobs Improve access to key commercial and employment centers Route Choice Improve network access and connectivity by increasing intersection density Transit Access Close a gap, remove a barrier, or improve transit operations near Streamline bus routes and stops Active Transportation Network Improve or close a gap in pedestrian or bicycle network; Add low-stress facilities for walking or bicycling separated from motor vehicles 124 Connecting Gallatin Valley LRTP 7-5 GOAL 4: ENHANCE HEALTH, QUALITY OF LIFE, AND PRESERVE REGIONAL CHARACTER Scoring Metric Projects Receive Points if They Access to Recreational and Active Facilities Improve or expand access to public recreation facilities, parks, or trails Wildlife Do not impact moderate or high wildlife sensitivity and use corridors Natural Preservation Do not encroach on environmentally sensitive areas Emissions Reduce VMT, single-occupancy vehicle trips, or carbon emissions GOAL 5: ENHANCE TRANSPORTATION AND LAND USE PLANNING COORDINATION Scoring Metric Projects Receive Points if They Connectivity to Destinations Add connections near multiple key destinations or provide connections between neighborhoods and/or urban renewal districts Growth Plans Located within a Moderately or Most Suitable area as defined by the Gallatin Valley Future Land Use Map Walkable Place Support Improve pedestrian access or contribute to a more comfortable walking environment Complete Streets Design Include Complete Street elements that better align the street or road with surrounding land use, access needs, and multimodal activity 125 Connecting Gallatin Valley LRTP 7-6 GOAL 6: IMPROVE TRANSPORTATION SYSTEM RESILIENCE Scoring Metric Projects Receive Points if They Freight Reliability and Access Located on a corridor where freight traffic is common or within ½ mile of an industrial zone used for trucking Network Redundancy Improve route options, parallel circulation, emergency access, or system redundancy Transit Reliability and Access Advance Transit Strategic Plan recommendations or improve reliable transit operations Prioritizing and Recommending Project scoring results were presented to TTAC for feedback and discussed in working sessions with GVMPO partners to memorialize specific project benefits and project-specific features or context that may not be elevated through the spatially focused assessment, determine tradeoffs, and identify potential challenges with implementation. This iterative process was used to collaboratively prioritize projects to help select final recommendations contingent on the forecasted availability of applicable funding sources by project types, which is detailed in Chapter 11. Final decisions were informed based on work sessions held with GVMPO staff and TTAC partners to determine tradeoffs and feasibility challenges with projects to develop a fiscally constrained list with the greatest potential return on investment based on the GVMPO goals and objectives. Scored projects not in alignment with the prioritization criteria were allocated to the Illustrative List for further evaluation in subsequent LRTP updates and consideration as conditions may evolve in the future. 126 Connecting Gallatin Valley LRTP 7-7 Figure 7-1. Project Prioritization Determination Criteria Advance for Funding Consideration Assign to Illustrative List  The project has committed or partial funding  The project is a key priority for implementation based on GVMPO Committees and partner feedback  The project is in an advanced state of shovel readiness (e.g., preliminary design or engineering)  The project received strong support in LRTP workshop voting or online comments  The project is a strong candidate for grant funding  The project will advance regional collaboration  The project will improve system resilience or replace deficient assets • The project has major design or feasibility constraints • The project has significant right-of-way acquisition needs or complications • The project is primarily dependent on future private development • The project warrants an increase in traffic volumes • The project will significantly increase future costs for roadway preservation, maintenance, or snow removal • The project has limited funding source or grant opportunities 127 128 Connecting Gallatin Valley LRTP 8-1 8 Alternatives Analysis Approach A total of three future transportation network alternatives were analyzed with the travel demand model to help understand which projects (or packages of projects) would best address future needs. Projects modeled consisted solely of those that would affect the capacity of the network (e.g., widenings or intersection turn lane modifications). The three alternatives are described below: 1. Adding Capacity to Existing/Committed Corridors 2. Adding Capacity through New Connections 3. Hybrid Combination of Alternatives 1 & 2 Additional summary of the travel demand model analysis which informed the LRTP is provided as Appendix G. 129 Connecting Gallatin Valley LRTP 8-2 Alternative 1 ADDING CAPACITY TO EXISTING/COMMITTED CORRIDORS Figure 8-1. Alternative 1 Projects 130 Connecting Gallatin Valley LRTP 8-3 Alternative 2 ADDING CAPACITY THROUGH NEW CONNECTIONS Figure 8-2. Alternative 2 Projects 131 Connecting Gallatin Valley LRTP 8-4 Alternative 3 HYBRID COMBINATION OF ALTERNATIVES 1 & 2 Figure 8-3. Alternative 3 Projects 132 Connecting Gallatin Valley LRTP 8-5 Using the projected growth in households and jobs through 2050, future traffic volumes were estimated for the roadway network within the MPA and then compared to underlying roadway capacities to identify roadway segments by generalized level of need. Roadways with a volume- to-capacity (v/c) ratio within the range .75 to 1.00 are indicative of an emerging capacity constraint, and those exceeding a v/c ratio of 1.00 may indicate more pronounced capacity constraints. Volumes are expected to grow significantly in locations where future households and job growth are concentrated or where alternative travel routes are limited. The model does not quantify the extent to which congestion could be mitigated through changes to land-use mix, trip lengths, mode choice, development form, or local-street connectivity. The projected growth in households and jobs were developed in collaboration with the Gallatin Valley Land Use Committee and built off the Gallatin County Growth Policy and Future Land Use Map. Future housing and job growth was assigned to transportation analysis zones throughout the MPA based on adopted growth plans, environmental constraints, infrastructure availability, and vacant developable land. Evaluation The Gallatin Valley Travel Demand Model was the primary tool used to evaluate the roadway network alternatives described above. A travel demand model is used to simulate existing travel patterns, forecast future travel patterns and conditions, and evaluate the relative effects of transportation improvement alternatives. Knowledge of how transportation systems perform, and the magnitude of their impacts, provides local decision-makers with valuable information needed to evaluate various transportation improvements. This travel demand model was developed by staff at MDT’s Rail, Transit, and Planning Division using Caliper Corporation’s TransCAD modeling software (Version 9.0). The traditional modeling process of trip generation, trip distribution, and traffic assignment were used to develop the Gallatin Valley Travel Demand Model. For the purposes of this model only part of Gallatin County was included. Areas south of Gallatin Gateway were excluded. Results were measured both model-wide and within the Bozeman Urbanized Area boundary. Overall, the model achieves results well within target validation guidelines as set forth by FHWA’s Travel Model Improvement Program Travel Model Validation and Reasonableness Checking Manual Second Edition. The model reasonably reflects observed traffic data for the 2022 base year. 133 Connecting Gallatin Valley LRTP 8-6 The maps below show the 2050 Volume/Capacity ratios on the Existing/Committed and Alternative 3 networks. Figure 8-4. 2050 Existing/Committed Volume/Capacity Ratios 134 Connecting Gallatin Valley LRTP 8-7 Figure 8-5. Alternative 3 Volume/Capacity Ratios 135 Connecting Gallatin Valley LRTP 8-8 Key Findings When comparing the model results of the Alternative 1 to Alternative 2, and when focusing on 2050 projected VMT (e.g., modeled volumes weighted by distance) for the “worst of the worst” (i.e., those network segments with volume/capacity ratios exceeding 1.00), Alternative 2 resulted in less future travel being exposed to highly congested conditions, particularly at the system level. This outcome reinforced additional exploration of the effects of the remaining “new connections” projects and led to the creation of a final alternative for modeling (Alternative 3) and could be supportive of a recommended policy direction that emphasizes “new connections” projects. Figure 8-6. VMT by Functional Classification by Alternative Functional Class 2050 Existing/ Committed 2050 Alt 1 2050 Alt 2 2050 Alt 3 Interstate 0 0 0 0 Principal Arterial - Other 254,559 248,560 223,555 182,774 Minor Arterial 114,095 75,754 94,808 74,150 Major Collector 101,123 108,798 86,425 72,954 Minor Collector 4,415 5,252 3,554 6,128 Local 113,733 93,928 98,702 76,525 Ramp 18,181 11,493 17,994 11,225 All 606,106 543,786 525,038 423,756 All (Excluding Local Roads) 492,373 449,858 426,336 347,231 All VMT shown is for V/C>1.00 136 Connecting Gallatin Valley LRTP 8-9 Functional Class Alt 1 vs. Existing/ Committed Alt 2 vs. Existing/ Committed Alt 3 vs. Existing/ Committed Interstate 0% 0% 0% Principal Arterial - Other 98% 88% 72% Minor Arterial 66% 83% 65% Major Collector 108% 85% 72% Minor Collector 119% 80% 139% Local 83% 87% 67% Ramp 63% 99% 62% All 90% 87% 70% All (Excluding Local Roads) 91% 87% 71% All VMT shown is for V/C>1.00 Although none of the alternatives modeled was shown to completely address the “worst of the worst” congestion, Figure 8-6 above provides a clear indication that the package of projects included in Alternative 3 would make the most progress. Except for Minor Collector roadways, Alternative 3 would result in significantly reduced exposure of future travelers to highly congested conditions when compared to the Existing/Committed condition and to Alternatives 1 and 2. Although the modeling results do not directly inform project selection, they do provide confirmation that the collection of projects included in Alternative 3 address future needs and, as such, these projects were advanced to the illustrative list for further evaluation and pending funding availability, were included in the final list of recommended projects. 137 138 Connecting Gallatin Valley LRTP 9-1 9 Recommended Projects Our Transportation Future Formed through community input, collaboration with GVMPO partners, and technical analysis focused on achieving our goals and performance targets, the Recommended Project List includes 46 projects that address immediate needs within the Gallatin Valley MPA and identifies future investments that support the LRTP goals, objectives, and performance targets. Committed projects have funding allocated or are currently underway within MDT’s current five-year STIP with federal funds. Many of these projects are in progress or construction is anticipated within the next five years. STIP committed projects are included in the near-term funding projections, though in some cases the funding needs extend beyond the current timeframe of the STIP. 139 Connecting Gallatin Valley LRTP 9-2 Committed projects also include locally funded projects from the City of Bozeman’s Capital Improvements Plan (CIP) and a locally funded project from the City of Belgrade’s Safety Action Plan. Committed local projects are not federally funded and are included in this plan for illustrative purposes because they represent important transportation investments in the region in the next five years. Committed projects include important maintenance on roads, trails, and sidewalks, including South Cottonwood Road, South 27th Avenue, and Oak Street. They also include major capital projects on Main Street and Jackrabbit Lane in Belgrade, as well as Kagy Boulevard and Fowler Lane in Bozeman. Recommended projects are divided into mid-term and long-term phases and are recommended to be implemented as funding allows. Mid-term projects focus on building off or enhancing projects committed in the near-term, as well as improving connections and expanding mobility options along key priority corridors. This includes projects such as adding new multimodal facilities along Amsterdam Road, I-90 Frontage Road, and Gallatin Gateway, and improving capacity and traffic operations on 3rd Avenue, Oak Street, and at the 19th Avenue/I-90 interchange in Bozeman. Long-term projects invest in critical infrastructure upgrades across the MPA to improve safety and prioritize regional connectivity between Bozeman and Belgrade and within Four Corners. Illustrative projects are used to supplement the recommended project list as community needs evolve and funding opportunities arise. Construction costs and right-of-way acquisition may not be feasible for these projects within the timeframe of the plan, but they are important to consider for future implementation. Some illustrative projects reflect local commitments and expectations for projects, but their implementation is dependent on traffic warrants being met or development occurring near the project site. Funding is not yet programmed for these projects, and they are outside the fiscally constrained project list. There are 85 illustrative projects in total, 72 of which are roadway projects, seven are safety projects, three are active transportation projects, and three are maintenance projects. The complete list of projects can be found in Appendix A. 140 Connecting Gallatin Valley LRTP 9-3 Prioritizing Projects Projects are recommended for implementation based on the Evaluation Framework described in Chapter 7 and the availability of funding sources described in Chapter 11. The following sections display the projects by their phases and describe the projects in more detail, including cost estimates and potential funding sources. Costs in the mid- and long-terms have been adjusted for inflation using MDT’s standard three percent annual increase to the midpoint of each phase. Listing a source does not constitute a commitment. 141 Connecting Gallatin Valley LRTP 9-4 Committed Projects Figure 9-1. Committed Projects 142 Connecting Gallatin Valley LRTP 9-5 Recommended Mid- and Long-Term Projects Figure 9-2. Recommended Mid- and Long-Term Projects 143 Connecting Gallatin Valley LRTP 9-6 Project Lists Committed STIP Projects LRTP Project ID MDT Project Code LRTP Project Name MDT STIP Project Name (If Different From LRTP) Project Category Cost (2026 Dollars) Funding Source(s) Local/Regional/ State Plan Source S-1 UPN 9930 Jackrabbit Lane and Amsterdam Road Intersection Improvements Belgrade - Int Improvements Safety $12,915,725 NH; STP (STPX, STPS, SFCN) 2018 Belgrade Long Range Transportation Plan R-29 UPN 9926 Main Street (Bolinger Road to Jackrabbit Lane) Main Street - Belgrade Roadway $11,000,000 STPU 2018 Belgrade Long Range Transportation Plan S-52 UPN 9718 Amsterdam Road/River Rock Road and Green Belt Drive Intersections SF 189 Amsterdam Rd Intx Imprv Safety $3,786,387 HSIP 2018 Belgrade Long Range Transportation Plan S-68 UPN 9644 SF 179 Signal Kagy Sourdough Safety $902,393 HSIP; CR MDT Statewide Transportation Improvement Plan (STIP) 144 Connecting Gallatin Valley LRTP 9-7 LRTP Project ID MDT Project Code LRTP Project Name MDT STIP Project Name (If Different From LRTP) Project Category Cost (2026 Dollars) Funding Source(s) Local/Regional/ State Plan Source R-10 UPN 9057 Jackrabbit Lane (Main Street to Madison Avenue) Belgrade - Urban Improvements Roadway $61,893,776 NH; STP (STPX, STPS, SFCN); MACI; Grants (RAISE) 2018 Belgrade Long Range Transportation Plan R-39 UPN 8931 Kagy Boulevard (Willson Avenue to S 19th Avenue) Kagy Blvd - S 19th To Willson Roadway $42,491,447 STPU; Grants 2017 Bozeman Transportation Master Plan A-121 UPN 10751 Flanders Mill Sidewalk- Bozeman Active Transportation $747,815 TA-MPO MDT Statewide Transportation Improvement Plan (STIP) S-69 UPN 10750 Ped Crossing Upgrades-Bozeman Safety $785,346 TA-MPO MDT Statewide Transportation Improvement Plan (STIP) A-86 UPN 10743 Connecting Communities in Gallatin County Huffine Lane Shared Use Path / Connecting Communities Active Transportation $18,888,704 TA-Statewide; GRANTS (SS4A) 2025 Gallatin County Safe Streets for All A-120 UPN 10738 Helen-Hoffman Walks - Belgrade Active Transportation $1,942,195 TA-Statewide MDT Statewide Transportation Improvement Plan (STIP) 145 Connecting Gallatin Valley LRTP 9-8 LRTP Project ID MDT Project Code LRTP Project Name MDT STIP Project Name (If Different From LRTP) Project Category Cost (2026 Dollars) Funding Source(s) Local/Regional/ State Plan Source A-119 UPN 10737 Hoffman St Sidewalks-Belgrade Active Transportation $3,613,736 TA-Statewide MDT Statewide Transportation Improvement Plan (STIP) M-15 UPN 10696 South Cottonwood Road- Bozeman Maintenance $262,615 STP (STPX, STPS, SFCN) MDT Statewide Transportation Improvement Plan (STIP) A-118 UPN 10453 Bike/Ped Paths-Bozeman Active Transportation $891,573 TA-Statewide MDT Statewide Transportation Improvement Plan (STIP) M-14 UPN 10450 Path Preservation II-Bozeman Maintenance $392,466 TA-Statewide MDT Statewide Transportation Improvement Plan (STIP) A-117 UPN 10441 Madison Ave Sidewalk-Belgrade Active Transportation $1,358,250 TA-Statewide MDT Statewide Transportation Improvement Plan (STIP) 146 Connecting Gallatin Valley LRTP 9-9 Committed Local Projects LRTP Project ID Local Project Code LRTP Project Name Project Category Cost (2026 Dollars) Funding Source(s) Local/Regional/ State Plan Source R-129 SIF191 in FY27-31 CIP Stucky Road (S 19th Avenue to Fowler Lane) Roadway $9,409,900 Local Funding 2017 Bozeman Transportation Master Plan R-100 SIF159 in FY27-31 CIP Oak Street (27th Avenue to 19th Avenue) Roadway $4,250,000 Local Funding 2017 Bozeman Transportation Master Plan R-17 SIF157 in FY26-30 CIP W College Street (8th Avenue to 11th Avenue) Roadway $1,500,000 Local Funding 2017 Bozeman Transportation Master Plan R-123 SIF114 in FY26-30 CIP Fowler Connection (Huffine Lane to Oak Street) Roadway $22,596,000 Local Funding 2017 Bozeman Transportation Master Plan A-49 A&C016 in FY26-30 CIP S 19th Avenue Shared Use Path Active Transportation $432,600 Local Funding 2017 Bozeman Transportation Master Plan R-51 WO 22-03 Dry Creek Road, Cruiser Lane, and Spooner Road Intersection Safety Project Roadway $8,500,000 Local Funding, Private Developer Funding 2025 Belgrade Safety Action Plan 147 Connecting Gallatin Valley LRTP 9-10 Mid-Term Project Recommendations LRTP Project ID Name Description Cost (2036 Dollars) Potential Funding Source(s) Project Source Jurisdiction R-130 Mendenhall & Babcock Streetscape Complete streetscape improvements along Mendenhall Street and Babcock Street to include curb bulb-outs, landscaping and crossing enhancements. $3,297,000 TA-Statewide; HSIP 2017 Bozeman Transportation Master Plan Bozeman A-137 Peach St Complete Street Improvements This project will improve sidewalks, crosswalks, and bicycle facility on Peach Street between N 7th Avenue and N Rouse Avenue in the city of Bozeman. $6,500,000 STP (STPU); TA-Statewide; TA-MPO; Grants City of Bozeman Call for Projects Bozeman R-90 Oak St: 7th To 19th Safety Improvement This project will redesign Oak Street from 7th Avenue to 19th Avenue in the city of Bozeman to improve safety and access control. The project would adjust curb location to remove the existing bike lanes and narrow travel lanes to minimum arterial standards, install a landscaped median to provide traffic calming and access management, and construct missing sections of shared use path. $6,500,000 STP (UPP); HSIP; MACI (CMAQ); Grants City of Bozeman Call for Projects Bozeman 148 Connecting Gallatin Valley LRTP 9-11 LRTP Project ID Name Description Cost (2036 Dollars) Potential Funding Source(s) Project Source Jurisdiction A-133 Madison Ave/Broadway St - Jackrabbit Lane to Main Street Bike lane; bike-ped route and connector; Reconstruct to urban minor arterial standards to include on-street parking, curb, gutter, sidewalks, bike lanes $2,600,000 STP (STPU) 2026 Belgrade Draft TMP Belgrade R-22 Main Street (North Quaw Boulevard to Gallatin Field Road) Reconstruct to urban principal arterial standards to include 8-foot shoulder/parking, center turn lane/turn bays, curb and gutter $6,930,000 NHPP 2018 Belgrade Long Range Transportation Plan MDT, Belgrade R-125 Bozeman Trail/Haggerty Lane (Main Street to Kagy Boulevard) Bozeman Trail should be reconstructed to a three-lane urban "minor arterial" roadway from the intersection with Kagy Boulevard north to the intersection with Haggerty Lane. Haggerty Lane should also be upgraded to a three-lane urban "minor arterial" roadway. Bike lanes, sidewalks, curb, and gutter improvements. $8,635,000 STP (STPX/STPS/SFCN); TA-Statewide; TA- MPO 2017 Bozeman Transportation Master Plan Bozeman A-123 Airway Blvd - Gallatin Field Road to E Frank Road Bike lane or shared use path; partial commuter $993,700 STP (STPU); TA-MPO; Grants 2026 Belgrade Draft TMP Belgrade, County 149 Connecting Gallatin Valley LRTP 9-12 LRTP Project ID Name Description Cost (2036 Dollars) Potential Funding Source(s) Project Source Jurisdiction A-134 Jackrabbit Lane - Frontage Road to Amsterdam Road/Alaska Frontage Road Bike lane; bike-ped route and connector $1,232,792 Grants 2026 Belgrade Draft TMP MDT, Belgrade A-131 Amsterdam Road - Clovehitch Road to Jackrabbit Lane Shared use path; commuter $1,105,000 STP (STPU) 2026 Belgrade Draft TMP Belgrade, County A-84 Bozeman To Belgrade Frontage Road Shared Use Path Construct shared use path along Frontage Road from Cherry River Fishing Access to Valley Center Spur. Further extension to Belgrade to be completed in future projects. $600,000 Committed Dollars: $700,000 TA-Statewide; Local Funding 2017 Bozeman Transportation Master Plan Bozeman, MDT M-16 Lamme Street Bridge Rehabilitation This project will rehabilitate or replace the existing structure on Lamme Street between N Bozeman Avenue and N Rouse Avenue in the City of Bozeman to improve structure condition and hydraulic capacity. $5,900,000 BR City of Bozeman Call for Projects Bozeman 150 Connecting Gallatin Valley LRTP 9-13 LRTP Project ID Name Description Cost (2036 Dollars) Potential Funding Source(s) Project Source Jurisdiction R-102 N 19th Avenue (Interstate 90 To Springhill Road) This project consists of widening N 19th Avenue from Interstate 90 to the intersection with Springhill Road to a 5-lane urban arterial standard. This project includes widening the I-90 overpass along N 19th Avenue. $7,379,000 NHPP 2017 Bozeman Transportation Master Plan Bozeman, MDT R-20 S 3rd Avenue (Graf Street to Kagy Boulevard) Reconstruct S 3rd Avenue from Graf Street to Kagy Boulevard to an urban "collector" roadway standard. $3,297,000 STP (STPU) 2017 Bozeman Transportation Master Plan Bozeman S-73 Jackrabbit Lane Pedestrian Tunnel Tunnel under Jackrabbit Lane at Driveway $4,472,000 Grants 2026 Belgrade Draft TMP MDT, Belgrade R-165 N 19th Avenue Interchange Modifications This project would construct modifications to the N 19th Avenue Interchange with I-90 (westbound exit ramp) to support street infrastructure for the North Park development $13,000,000 NHPP City of Bozeman Call for Projects Bozeman, MDT A-136 Valley Center Spur Multimodal Connection This project will construct a multimodal connection along Valley Center Spur between the existing Frontage Road shared use path and E Valley Center. Signal modifications at each existing intersection are anticipated. $1,300,000 STP (STPU) City of Bozeman Call for Projects Bozeman 151 Connecting Gallatin Valley LRTP 9-14 LRTP Project ID Name Description Cost (2036 Dollars) Potential Funding Source(s) Project Source Jurisdiction A-79 Gallatin Road (Four Corners to Gallatin Gateway) Extend existing shared use path $5,396,000 Grants 2022 Greater Triangle Area Transportation Plan MDT, County A-59 Amsterdam Road (Royal Road to Fishing Access) Extend the existing shared use path from Royal Road to Erwin Bridge Fishing Access Site $852,000 TA-Statewide; FWP 2022 Greater Triangle Area Transportation Plan Belgrade, County S-48 S 3rd Avenue and Graf Street Installation of a traffic signal or roundabout at the intersection of South 3rd Avenue, W Graf St, and Wagonwheel Dr $1,570,000 Grants 2017 Bozeman Transportation Master Plan Bozeman M-17 E Griffin Bridge Replacement This project will replace the existing Bozeman Creek bridge on E Griffin Drive between N Rouse Avenue and Story Mill Road $1,150,000 BR City of Bozeman Call for Projects Bozeman 152 Connecting Gallatin Valley LRTP 9-15 Long-Term Project Recommendations LRTP Project ID Name Description Cost (2036 Dollars) Potential Funding Source(s) Project Source Jurisdiction S-85 Streamline Downtown Transfer Station Improvements The Downtown Transfer Station needs major repairs to the bus pull through lane and improved ADA compliance. The asphalt in the bus pull through lane is significantly deteriorated. The asphalt should be replaced with concrete to better withstand the load of heavy-duty transit buses. The passenger loading island does not meet ADA requirements, a walk audit demonstrated inability of a power chair to access the bus. The sidewalk south of the island should be moved to widen the bus pull through lane and comply with ADA. $7,850,000 STP (UPP); MACI (CMAQ); Grants City of Bozeman Call for Projects Bozeman M-19 Downtown Bozeman Creek Structure Rehabilitation Bozeman Creek traverses downtown Bozeman through a series of three tunnels under Olive Street, Rouse Ave, Babcock Street, and Main Street for a total length of approximately 700 LF. This infrastructure is critical for the function of urban, primary, and NHS routes. The tunnel system is approaching the end of its useful life and requires rehabilitation, replacement, and hydraulic capacity improvements to manage flooding. $22,125,000 NHPP; BR; Grants City of Bozeman Call for Projects Bozeman 153 Connecting Gallatin Valley LRTP 9-16 LRTP Project ID Name Description Cost (2036 Dollars) Potential Funding Source(s) Project Source Jurisdiction S-60 US 191 Improvements Complete the following recommendations from MDT’s 2020 US 191 Corridor Study at 3 locations: Modify business access; install second westbound left-turn lane; add pedestrian crossing treatments at Four Corners intersection; Install curve warning signs for substandard roadway elements; Replace or widen bridge based on future needs of the highway Consolidate approaches and realign intersection; improve intersection/roadway lighting $20,496,000 NHPP; BR; HSIP; Grants 2025 Gallatin County Safe Streets for All MDT, County R-121 Cottonwood Road (Baxter Lane to Cattail Street) Complete the construction of Cottonwood Road, from Baxter Lane to Cattail Street, to a five-lane urban "principal arterial" standard. This includes two travel lanes in each direction, bike lanes on each side, curb and gutter throughout. $9,200,000 STP (STPX/STPS/SFCN); TA-MPO; Grants 2017 Bozeman Transportation Master Plan Bozeman S-63 Belgrade To Bozeman Frontage Road Improvements Includes roadway reconstruction, passing zone modifications, installation of centerline rumble strips, and development of a separated shared use path. $37,104,000 NHPP; STP (STPU); TA- Statewide; TA-MPO; HSIP; FWP 2025 Gallatin County Safe Streets for All County, Bozeman 154 Connecting Gallatin Valley LRTP 9-17 Project Spotlights Streetscape Improvements Downtown Bozeman is a major activity center in the Gallatin Valley MPA and has the highest concentration of people walking, biking, and rolling. It also has some of the highest numbers of crashes involving pedestrians, and safety has emerged as a top priority for the city and the region. Three projects collected during the screening phase of the LRTP propose safety improvements along key roads in and near Downtown Bozeman: Project ID Project Name Cost R-130 Mendenhall & Babcock Streetscape $3.3 million A-137 Peach Street Complete Street Improvements $6.5 million R-90 Oak Street: 7th Avenue to 19th Avenue Safety Improvement $6.5 million The following improvements are planned on one or more of the corridors: • Curb bulb-outs • Pedestrian crossing enhancements • Sidewalk upgrades • Landscaping • Bike lanes and/or shared use paths 155 Connecting Gallatin Valley LRTP 9-18 Downtown Belgrade Belgrade has experienced high population growth in the past decade, and the existing road infrastructure needs upgrades to meet the increased demand. The City is currently working with MDT on two projects that will widen key sections of Jackrabbit Lane and Main Street in Downtown Belgrade. The LRTP has also identified four additional projects that could complement the committed improvements to provide travel alternatives throughout the city. Project ID Project Name Cost Phase R-29 (UPN 9926) Main Street - Belgrade $11 million Near-Term R-10 (UPN 9057) Belgrade Urban $61.9 million Near-Term R-22 Main Street (North Quaw Boulevard to Gallatin Field Road) $6.9 million Mid-Term A-133 Madison Avenue/Broadway Street - Jackrabbit Lane to Main Street $2.6 million Mid-Term A-134 Jackrabbit Lane - Frontage Road to Amsterdam Road/Alaska Frontage Road $1.2 million Mid-Term S-73 Jackrabbit Lane Pedestrian Tunnel $4.5 million Mid-Term R-29 (UPN 9926) Main Street - Belgrade $11 million Near-Term 156 Connecting Gallatin Valley LRTP 9-19 Frontage Road Corridor The I-90 corridor is one of the most important in the region for the movement of people and goods, with Frontage Road providing a parallel connection between Bozeman and Belgrade. There are potential safety concerns for vehicles traveling along the road, including no safe active transportation infrastructure along the corridor. To improve safety and connectivity between Bozeman and Belgrade, two phases of projects are recommended to add a shared use path between the two urban centers and reconstruct the frontage road with enhanced safety features as travel demand associated with new developments continues to increase along the corridor. Project ID Project Name Cost Phase A-84 Bozeman To Belgrade Frontage Road Shared Use Path $1.3 million Mid-Term S-63 Belgrade To Bozeman Frontage Road Improvements $20.5 million Long-Term 157 158 Connecting Gallatin Valley LRTP 10-1 10 Policies, Programs, and Practices This chapter identifies the non-capital programs, policies, and planning practices that support the implementation of the LRTP. The project list identifies future infrastructure investments, and the programs and policies in this section describe how the GVMPO and its partners can guide transportation decisions, coordinate regional priorities, and advance the LRTP goals over time. How To Use This Chapter For ease of navigation, each item is placed under the LRTP goal it most directly supports. Many items advance multiple goals, and their placement does not limit their purpose, application, or relationship to other goals. Each item is presented in a consistent profile describing what it is, why it matters, where we are now, partners, next steps, and priority. Priority designations identify ongoing work or a high, medium, or low level of emphasis for the efforts. The GVMPO's role will vary. It may include regional planning or data efforts, convene partners, provide technical assistance, review funding eligibility, support grants, incorporate eligible projects into the TIP, or provide a forum for regional coordination. MDT, local governments, transit providers, and community partners may lead other efforts. Identified partners indicate potential roles rather than commitments. MDT participation and project decisions remain subject to its authority, applicable practices, funding eligibility and formulas, and project-specific conditions. Taken together, these programs, policies, and practices provide a flexible framework for future work programs, corridor and project planning, funding decisions, interagency coordination, and LRTP updates. Implementation may occur through ongoing activities, additional study, partner coordination, pilots, or new funding. 159 Connecting Gallatin Valley LRTP 10-2 Goal 1: Support Safe Travel Across All Modes Manage speeds, reduce severe-crash risk, improve visibility and crossings, and focus attention on the locations and users facing the greatest safety risks. VISION ZERO POLICY Priority: Ongoing WHAT IT IS A commitment to eliminate traffic deaths and serious injuries through a Safe System approach that anticipates human error and reduces crash severity. WHY IT MATTERS It reinforces preventing fatal and serious injury crashes the region’s highest safety priority. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, UTD, MSU, and Community Partners WHERE ARE WE NOW? Regional partners prioritize severe crash reduction, but no regional Vision Zero policy has been adopted. NEXT STEPS Use the LRTP to establish Vision Zero as a regional direction and explore a coordinated regional effort 160 Connecting Gallatin Valley LRTP 10-3 CONTEXT-APPROPRIATE SPEEDS AND TARGET SPEEDS Priority: Ongoing WHAT IT IS Identifying target speeds and speed limits based on roadway context, crash history, land use, and all users, then using design to support the intended speed. WHY IT MATTERS Speed is a primary determinant of crash severity; lower, context-appropriate speeds reduce risk for all users. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, and MDT WHERE ARE WE NOW? Authority and speed-setting practices vary among MDT and local jurisdictions. NEXT STEPS Coordinate with roadway owners on target speeds, supporting designs, and speed limits reflecting current conditions. TRAFFIC CALMING AND SPEED MANAGEMENT Priority: Ongoing WHAT IT IS Supporting street designs that make the intended speed intuitive through physical and visual cues, such as narrower travel lanes, tighter turning radii, pavement textures, and raised crossings, which reduces reliance on signs to communicate appropriate speeds. WHY IT MATTERS Lower speeds reduce crash severity and improve comfort for people walking, bicycling, and crossing. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, UTD, and MSU WHERE ARE WE NOW? Partners address speeding through local programs and projects, with varying approaches. 161 Connecting Gallatin Valley LRTP 10-4 NEXT STEPS Support partner-led traffic calming through planning, project development, and grant applications; encourage context sensitive design as highways enter communities. ENHANCED CROSSINGS AND INTERSECTION DESIGN Priority: Ongoing WHAT IT IS Context-sensitive designs–proven or emerging–that improve visibility, manage speed, shorten crossing distances, clarify priority, and reduce conflicts. WHY IT MATTERS Predictable crossings help everyone navigate busy or wide streets and complex intersections safely and comfortably. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, UTD, MSU, and school districts WHERE ARE WE NOW? High-demand or high-risk locations may need additional or redesigned crossings and intersections. NEXT STEPS Use the LRTP to support improvements where roadway, land-use, network, or safety conditions warrant. HIGH-CRASH CORRIDOR PROGRAM Priority: Ongoing WHAT IT IS Identifying regional corridors with concentrated fatal and serious injury crashes or elevated safety risk for proactive analysis and improvement. WHY IT MATTERS Prioritizes addressing the region’s greatest safety risks, including higher-speed and heavily traveled commuter corridors. 162 Connecting Gallatin Valley LRTP 10-5 PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, law enforcement, and first responders WHERE ARE WE NOW? Crash concentrations are evident, but funding and jurisdiction complicate regional prioritization. Speed and impairment may also warrant attention. NEXT STEPS Use data-based criteria to identify corridors and risks independent of ownership. CONTEXT-SENSITIVE STREET LIGHTING Priority: Ongoing WHAT IT IS Encouraging attractive, context-sensitive lighting that improves visibility, particularly for people walking or biking, while fitting the scale, character, and environmental setting of each location. WHY IT MATTERS Thoughtful lighting improves visibility, safety, and nighttime comfort, especially where travel modes interact, while preserving community character and limiting impacts on night skies, residents, and wildlife. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, UTD, and Northwestern Energy WHERE ARE WE NOW? Coverage and standards vary regionally, with gaps. Some past installations have caused light to trespass into nearby residences. NEXT STEPS Use safety-based criteria to prioritize multimodal areas, pedestrian routes, and crossings, then key intersections and corridors. Encourage lower-mounted, shielded, pedestrian-scale fixtures with decorative designs where appropriate. Encourage evaluation of glare, residential light trespass, and wildlife impacts before installation. Consider National Park Service lighting standards for inspiration. 163 Connecting Gallatin Valley LRTP 10-6 TRAIL AND SIDEPATH VISUAL CONTINUITY Priority: Ongoing WHAT IT IS Supporting MUTCD-compatible visual cues that reinforce route continuity, including wayfinding signs, markings, and muted earth-tone surfacing. WHY IT MATTERS Aesthetic treatments clarify complex routes for unfamiliar users while building regional identity. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, and MDT WHERE ARE WE NOW? Treatments vary by location and must remain distinct from regulatory colors and markings. NEXT STEPS Support appropriate continuity treatments with future projects and grants. SAFER ROUTES TO SCHOOL Priority: Ongoing WHAT IT IS A regional effort combining education, family engagement, skill progression, and infrastructure to make walking, bicycling, and transit routine while building confidence and independence. WHY IT MATTERS Making active travel routine builds confidence, independence, and traffic awareness as culture, infrastructure, and instruction reinforce one another. PARTNERS UTD, City of Bozeman, City of Belgrade, Gallatin County, MDT, MSU, and school districts WHERE ARE WE NOW? Safe Routes to School efforts and low-stress networks still lack consistent programs, resources, expectations, and skill progression across schools and jurisdictions. 164 Connecting Gallatin Valley LRTP 10-7 NEXT STEPS Use TA funds for school cohorts; prioritize participation, skill progression, independence, supportive culture, travel behavior, and infrastructure. TRANSPORTATION EDUCATION AND PUBLIC AWARENESS Priority: Ongoing WHAT IT IS Providing clear, accessible information to build understanding of regional transportation issues, plans, responsibilities, decisions, and activities. WHY IT MATTERS Education strengthens public input, clarifies safety decisions, and supports safer travel but cannot replace safer street design and infrastructure. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, UTD, MSU, schools, public health, law enforcement, nonprofits, and topic-specific partners WHERE ARE WE NOW? Partners conduct project-specific outreach and safety education, but regional public-awareness efforts remain limited. NEXT STEPS As resources allow, develop materials, share relevant partner information, and expand GVMPO communication channels. TRAFFIC SAFETY PARTNERSHIPS Priority: Ongoing WHAT IT IS Supporting safety partnerships and leading selected efforts on prevention, education, roadway improvements, and enforcement, including impaired driving. 165 Connecting Gallatin Valley LRTP 10-8 WHY IT MATTERS Transportation safety is a shared responsibility requiring coordinated action to reduce everyday risk while preventing fatal and serious-injury crashes. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, UTD, MSU, law enforcement, nonprofits, and topic-specific partners WHERE ARE WE NOW? Partners conduct project-specific outreach and safety education, but regional public-awareness efforts remain limited. NEXT STEPS Strengthen coordination with safety partners, including law enforcement, on regional planning, field observations, prevention, and enforcement. 166 Connecting Gallatin Valley LRTP 10-9 Goal 2: Ensure A Well-Maintained Transportation System Extend asset life and system value through preservation, maintenance innovation, targeted operations, and responsible funding choices. FIX IT FIRST Priority: Ongoing WHAT IT IS Applying a preservation-first preference when choosing among eligible uses of flexible funds. WHY IT MATTERS Maintaining existing assets protects past investment, extends service life, and reduces long-term costs. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, and MDT WHERE ARE WE NOW? Community outreach and technical staff input showed strong support for a well-maintained system. Funding eligibility and formulas shape many investments; flexible funds may involve choices between preservation and capacity. NEXT STEPS Update partner needs and funding assumptions. 167 Connecting Gallatin Valley LRTP 10-10 MAINTENANCE INNOVATION AND TECHNOLOGY Priority: Ongoing WHAT IT IS Monitoring materials, equipment, and practices that reduce lifecycle costs and simplify upkeep of roads, asphalt trails, sidewalks, shared-use paths, and transit stops, including snow and ice removal at bus stops and accessible boarding areas. WHY IT MATTERS Innovation can extend asset life, reduce disruptions, improve quality of life, and stretch limited maintenance funding. Low annual mileage and effective maintenance may allow transit buses to remain reliable beyond their ULB. PARTNERS MDT, City of Bozeman, City of Belgrade, and Gallatin County, UTD WHERE ARE WE NOW? Partners evaluate products and practices independently. NEXT STEPS Use the GVMPO as a resource to research best practices, convene partners, and share effective maintenance and asset-management approaches. OPTIMIZATION BEFORE EXPANSION Priority: Ongoing WHAT IT IS Using coordinated operations, technology, data, demand management, and targeted improvements before major expansion. WHY IT MATTERS Better management of the existing transportation system can reduce delays, improve safety, and extend infrastructure value at lower cost and with fewer impacts than expansion. PARTNERS MDT, City of Bozeman, City of Belgrade, and Gallatin County 168 Connecting Gallatin Valley LRTP 10-11 WHERE ARE WE NOW? Agencies use operational strategies and performance monitoring; while regional coordination and shared priorities are still developing. NEXT STEPS Monitor travel time reliability, identify priorities, and support studies, pilots, and investments through regional planning. STREET SWEEPING EQUIPMENT AND MACI FUNDING Priority: Ongoing WHAT IT IS Recognizing MDT’s Montana Air and Congestion Initiative (MACI) funding for eligible street- sweeping equipment. WHY IT MATTERS Sweepers reduce road dust and debris while helping keep streets, bicycle lanes, and drainage systems clean. PARTNERS MDT, City of Bozeman, City of Belgrade, and Gallatin County WHERE ARE WE NOW? Partners have identified equipment needs; MACI awards are competitive and depend on eligibility, air-quality benefits, available funding, and match. NEXT STEPS Coordinate applications as needed; include awarded projects in the TIP. 169 Connecting Gallatin Valley LRTP 10-12 Goal 3: Expand Mobility Choices in the Region Expand safe, practical options for walking, bicycling, taking transit, using mobility devices, and connected multimodal trips. COMPLETE STREETS Priority Ongoing WHAT IT IS Complete streets are roadways designed, built, and maintained to provide safe, comfortable, and convenient travel for all modes of travel. This can work alongside a complete network approach where some corridors serve a primary modal purpose. WHY IT MATTERS Designing the network for all modes makes travel safer, healthier, and more affordable while boosting local business. PARTNERS MDT, City of Bozeman, City of Belgrade, and Gallatin County WHERE ARE WE NOW? Complete Streets and multimodal practices vary across the region. Developing a complete network is challenging and will take time. NEXT STEPS Establish a regional expectation that multiple modes will be considered throughout project development and, over time, explore priority corridor roles and connections to them. 170 Connecting Gallatin Valley LRTP 10-13 LOW STRESS BIKEWAYS FOR ALL AGES AND ABILITIES Priority: High WHAT IT IS A connected, intuitive bikeway network that minimizes traffic stress through separation, low speeds and volumes, safer crossings, clear wayfinding, and a consistent visual identity. WHY IT MATTERS Low-stress routes make bicycling practical and comfortable for more people, including children, older adults, and less-confident riders. PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, MDT, UTD, and nonprofits WHERE ARE WE NOW? The region has the beginnings of a low-stress network, but expanding it will require better connectivity, a wider range of facility types, and innovative intersection treatments. NEXT STEPS Prioritize projects and encourage designs that make everyday bicycle trips safe, intuitive, and comfortable for people of all ages and abilities. TRANSIT PRIORITY CORRIDORS Priority: Ongoing WHAT IT IS Identifying corridors where transit reliability and travel times can be improved through treatments such as signal priority, queue jumps, stop improvements, and targeted roadway or operational changes. WHY IT MATTERS Faster, more reliable transit makes everyday trips easier and less stressful, encourages people to choose transit, and helps existing resources serve more riders. PARTNERS UTD, MDT, City of Bozeman, City of Belgrade, Gallatin County, MSU, and business districts 171 Connecting Gallatin Valley LRTP 10-14 WHERE ARE WE NOW? Transit operates on many of the busiest corridors, but delays, congestion, stop access, and design can affect reliability and passenger experience. NEXT STEPS Build upon the companion Transit Strategic Plan priority corridors and consider supporting phased pilots beginning with increased service. Explore regional corridor planning with partners to assess bus delays, ridership, and roadway improvements. REGIONAL TRANSIT CONNECTIONS Priority: Ongoing WHAT IT IS Expanding convenient transit connections among communities, employment centers, the airport, recreational areas, and other regional activity centers. WHY IT MATTERS Reliable regional transit improves access to jobs, education, services, and daily needs for people who cannot or prefer not to drive. PARTNERS UTD, Regional transit providers, MDT, City of Bozeman, City of Belgrade, and Gallatin County WHERE ARE WE NOW? Existing routes provide some regional connections, though service gaps and limited frequency reduce their usefulness for daily needs. NEXT STEPS Support transit partners as they evaluate regional connections, service needs, community interest in one-seat rides, and opportunities for phased improvements. 172 Connecting Gallatin Valley LRTP 10-15 ACCESSIBILITY AND ADA TRANSITION NEEDS Priority: Ongoing WHAT IT IS Improving regional understanding of sidewalk gaps, inaccessible curb ramps and crossings, and barriers to transit access. WHY IT MATTERS Accessible routes support safe, independent travel and participation while advancing ADA compliance. PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, UTD, advocates, and nonprofits WHERE ARE WE NOW? Accessibility planning and inventories vary across the region, with gaps and barriers remaining. NEXT STEPS Use future regional planning to better document accessibility needs, identify priority barriers, and support partner-led improvements as opportunities arise. STRATEGIC NETWORK CONNECTIONS BEFORE CORRIDOR EXPANSION Priority: Ongoing WHAT IT IS Prioritizing street, pathway and strategic connections to improve access and distribute trips across parallel routes to relieve bottlenecks before adding general-purpose lanes to existing corridors. WHY IT MATTERS Connections distribute trips, provide alternate routes, improve access, and relieve pressure across multiple corridors. PARTNERS MDT, City of Bozeman, City of Belgrade, and Gallatin County 173 Connecting Gallatin Valley LRTP 10-16 WHERE ARE WE NOW? LRTP modeling found new connections outperformed widening, especially on east-west corridors. NEXT STEPS Support strategic new connections over widening existing corridors where appropriate. SUPPORT EXPANDED TRANSIT FUNDING FOR FREQUENT SERVICE Priority: Ongoing WHAT IT IS Increased transit funding to support higher-frequency service proven to attract riders of choice. WHY IT MATTERS Frequent service lets people show up and go without planning around a schedule, which removes a major barrier to choosing transit. PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, UTD, and nonprofits WHERE ARE WE NOW? UTD serves many destinations, but limited operating funds require tradeoffs between frequent core service and broader lower frequency coverage. NEXT STEPS Support expanded operating funding and prioritize frequency and service span on high-demand corridors. 174 Connecting Gallatin Valley LRTP 10-17 Goal 4: Enhance Health, Quality of Life, and Preserve Regional Character Integrate transportation with community life, rural character, environmental stewardship, and wildlife connectivity. REGIONAL HABITAT CONNECTIVITY AND WILDLIFE PASSAGE Priority: Ongoing WHAT IT IS Reducing wildlife-vehicle collisions and improving habitat and riparian connectivity through planning and wildlife-responsive bridge and culvert work. WHY IT MATTERS Roads, bridges, and culverts intersect natural movement corridors; preserving passage sustains wildlife populations and ecological health. PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, UTD, MSU, and nonprofits WHERE ARE WE NOW? The GVMPO has a wildlife-safety objective and supports the 2023 Gallatin Valley Sensitive Lands Protection Plan habitat and connectivity findings; connectivity planning and mitigation remain project-specific. NEXT STEPS Use the Gallatin Valley Sensitive Lands findings and hotspot analysis early in facility siting and design to avoid fragmentation, preserve linkages, identify passage opportunities, and guide feasible mitigation; encourage best practices for safe wildlife passage for bridges and culverts. 175 Connecting Gallatin Valley LRTP 10-18 OPEN STREETS AND CICLOVÍA-STYLE EVENTS Priority: Low WHAT IT IS A Ciclovía, or Open Streets event, temporarily closes selected streets to through motor-vehicle traffic and opens a connected route of streets for people to walk, bicycle, roll, play, visit local businesses, and gather as a community. The concept originated in Bogota, Colombia, and has been adopted in communities throughout the United States, creating a lively, festival-like way to experience streets as public space. WHY IT MATTERS Open Streets brings people together while offering a fun, low-risk way to experience what a healthier and less car-dependent future could feel like. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, MDT, MSU, businesses, neighborhood groups, nonprofits, and event organizers WHERE ARE WE NOW? Partners close streets for individual events, but none has developed connected open-streets routes. NEXT STEPS Gauge interest and support a partner-led pilot that connects destinations, reflects local character, maintains access, and could grow into a recurring tradition. ROAD ECOLOGY AND URBAN FOREST MANAGEMENT Priority: Ongoing WHAT IT IS Avoiding, minimizing, and mitigating ecological impacts while enhancing the urban forest by supporting street trees, native plantings, maintaining connections among streams and wetlands as part of healthy landscapes. WHY IT MATTERS Roads affect habitat, runoff, heat, and community character; thoughtful design and landscaping can reduce impacts, support ecological function, and improve walking comfort. 176 Connecting Gallatin Valley LRTP 10-19 PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, utility providers, development community, property owners, and forestry and conservation organizations. WHERE ARE WE NOW? Road-ecology practices vary among partners and projects; practices depend upon roadway context, ownership, and maintenance. responsibility. NEXT STEPS Encourage early consideration of ecological impacts, conservation of healthy landscapes, native plants, and street trees in appropriate plans and projects while avoiding visibility conflicts. PUBLIC REALM AND PLACEMAKING Priority: Ongoing WHAT IT IS Supporting partner-led improvements and activation of streets and public spaces through trees, furnishings, plazas, parklets, wayfinding, and other accessible, human-scale features. WHY IT MATTERS Welcoming public spaces encourage walking, bicycling, transit use, gathering, and longer visits while strengthening community identity, social connection, quality of life, and local businesses. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, UTD, MDT, MSU, downtown and business organizations, development community, and community groups WHERE ARE WE NOW? Partners advance placemaking through downtown and community plans, design standards, parks and trails, and individual projects; approaches vary by jurisdiction and setting. NEXT STEPS Use the GVMPO as a forum to share practices and identify locally supported placemaking opportunities through corridor planning and transportation projects. 177 Connecting Gallatin Valley LRTP 10-20 RAILROAD QUIET ZONES AND TRANSPORTATION NOISE MITIGATION Priority: Ongoing WHAT IT IS Supporting efforts to reduce railroad and airport noise through railroad quiet zones, voluntary aviation noise-abatement measures, compatible land use, and other measures where appropriate. WHY IT MATTERS Reducing transportation noise can improve health and quality of life, make nearby neighborhoods and commercial areas more attractive for investment, and support economic development. PARTNERS City of Bozeman, City of Belgrade, UTD, MSU, MDT, BNSF, and Bozeman-Yellowstone International Airport. WHERE ARE WE NOW? The region remains relatively quiet, but growing traffic volumes, noise from train horns and aircraft may dampen that in some areas. Responsibility is divided among local governments, operators, and federal agencies. NEXT STEPS Encourage partner coordination, targeted planning, and investment to reduce transportation noise; explore feasible mitigation measures and support voluntary aviation noise abatement. 178 Connecting Gallatin Valley LRTP 10-21 Goal 5: Enhance Transportation and Land Use Planning Coordination Improve coordination of transportation, development, land use, and the public realm to support connected, transit-ready, and walkable growth. TRANSIT-ORIENTED DEVELOPMENT Priority: Ongoing WHAT IT IS Encouraging land use zoning, investment, and design that support walkable, mixed-use centers and corridors designed around frequent transit, whether mixed within buildings or across nearby sites. WHY IT MATTERS Bringing housing, businesses, services, and transit closer together improves access, including for people with disabilities, supports local businesses, strengthens transit, and may lower household transportation costs. PARTNERS City of Bozeman, City of Belgrade, UTD, MSU, MDT, and development community WHERE ARE WE NOW? Transit-oriented development remains exploratory, and some higher-density residential areas lack nearby commercial destinations for frequent transit. NEXT STEPS Encourage planning, zoning, transit, and investment around potential transit-oriented centers and corridors, including commercial uses near higher-density housing as horizontal mixed use. 179 Connecting Gallatin Valley LRTP 10-22 TRANSIT SUPPORTIVE DENSITIES Priority: Ongoing WHAT IT IS Exploring how residential, employment, and activity densities near existing or planned transit corridors can support useful, frequent service. WHY IT MATTERS Concentrations of people, jobs, and destinations can strengthen ridership and service feasibility, expand access, and support efficient infrastructure. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, UTD, MSU, MDT, and development community WHERE ARE WE NOW? Partners approach density differently; alignment with current and future transit remains an emerging regional opportunity. NEXT STEPS Encourage partners to consider transit-supportive densities in appropriate locations, with land- use decisions and implementation remaining local. WALKABLE AND TRANSIT SUPPORTIVE NEIGHBORHOOD DESIGN Priority: Ongoing WHAT IT IS Encouraging new neighborhoods to coordinate land use, connected local streets, alleys, walking access, and future transit operations from the outset while extending connections across phases. WHY IT MATTERS Public input supports transit, but density alone is insufficient. Connected streets, well-placed destinations, and direct stop access determine whether service can operate efficiently; disconnected layouts are difficult to retrofit while increasing pressure on major roads. 180 Connecting Gallatin Valley LRTP 10-23 PARTNERS City of Bozeman, City of Belgrade, Gallatin County, UTD, MDT, school districts, emergency services, and development community WHERE ARE WE NOW? Neighborhood plans address transit and connectivity differently; shared regional understanding could help inform network evaluation, land-use placement, walking access, and future transit operations. NEXT STEPS Continue regional discussion and coordination on a shared approach to walkable and transit- supportive neighborhood design; including early review of connected street and block connectivity across development phases, land-use mix and placement, direct transit routing, transit-operable streets, and accessible future stops. TRANSIT STOPS, HUBS, AND STATION AREAS Priority: Medium WHAT IT IS Supporting coordinated stop and hub siting, design, amenities, surroundings, and safe walking, bicycling, and micromobility access. WHY IT MATTERS Visible, accessible, well-integrated stops make transit easier to reach and use, strengthen first- and final-mile connections, and support coordinated investment and walkable development. PARTNERS UTD, MDT, City of Bozeman, City of Belgrade, Gallatin County, MSU, property owners, and development community WHERE ARE WE NOW? Transit serves many destinations, but stop visibility, accessibility, amenities, and connections vary; a shared approach could better coordinate investment. NEXT STEPS Explore with transit and local partners opportunities for shared guidance on stop siting, access, amenities, development integration, maintenance, and investment. 181 Connecting Gallatin Valley LRTP 10-24 REGIONAL LAND USE AND MULTIMODAL ACCESS DATA Priority: Ongoing WHAT IT IS Developing consistent regional GIS data and measures for density, land-use mix, street connectivity, destination accessibility, and transit proximity. WHY IT MATTERS Comparable data help partners track change, identify gaps, evaluate growth patterns, and understand how land use and network design influence travel. PARTNERS City of Bozeman, City of Belgrade, Gallatin County, UTD, MDT, and MSU WHERE ARE WE NOW? Partners use related data in local planning; a documented regional baseline would support consistent measures, comparisons, and updates. NEXT STEPS As resources allow, explore a regional GIS baseline that could include activity density, land-use mix, intersection density, four-way intersection share, and destination and transit access. REGIONAL FREIGHT UNDERSTANDING AND PLANNING Priority: Ongoing WHAT IT IS Building a practical understanding of regional freight movement, generators, commercial truck parking and other needs, and data limitations to better incorporate freight into planning. WHY IT MATTERS Better understanding helps partners consider goods movement, safety, access, reliability, land use, and infrastructure needs in plans and projects. PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, Bozeman-Yellowstone International Airport, Burlington Northern Santa Fe Railway, freight carriers, and major freight generators 182 Connecting Gallatin Valley LRTP 10-25 WHERE ARE WE NOW? FHWA and MDT provide broad information, but regional freight routes, truck counts, generators, and local patterns are not yet well understood. NEXT STEPS As resources allow, use available FHWA, MDT, local, and industry information to improve regional understanding, identify data gaps, and continue to gradually integrate freight into planning. Utilize local land use planning as a key resource for understanding where truck generators will be located. 183 Connecting Gallatin Valley LRTP 10-26 Goal 6: Improve Transportation System Resilience Prepare the regional system for hazards, emergencies, freight needs, infrastructure dependencies, and long-term challenges. TRANSPORTATION VULNERABILITY SCREENING Priority: Medium WHAT IT IS Using available hazard and asset information to screen transportation facilities for potential exposure to flooding, wildfire, severe weather, and other disruptions. WHY IT MATTERS Early screening can direct practical upgrades where disruptions could threaten safety, access, and system continuity. PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, UTD, and Ready Gallatin WHERE ARE WE NOW? Partners maintain relevant plans and data, but transportation vulnerabilities have not been screened consistently across the region by the GVMPO. NEXT STEPS In coordination with partners, identify locations for further study, and apply findings to improve infrastructure responsiveness to flooding, wildfire, and other hazards. 184 Connecting Gallatin Valley LRTP 10-27 WATER-AWARE STREETSCAPES AND GREEN INFRASTRUCTURE Priority: Ongoing WHAT IT IS Encouraging context-appropriate trees, water-wise landscaping, permeable pavers, native plants, and green stormwater features, such as rain gardens, instead of high-water turf, while keeping pedestrian clear-vision areas. WHY IT MATTERS These treatments conserve water, reduce polluted runoff, and add shade, habitat, visual character, and resilience in a drought-prone region. PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, UTD, improvement districts, and watershed organizations WHERE ARE WE NOW? Partners use water-wise landscaping and stormwater practices to varying degrees; approaches depend on setting, ownership, and maintenance capacity. NEXT STEPS Use GVMPO coordination to share practices and support partner-led opportunities where site conditions, geometries, ADA and code requirements, and long-term maintenance allow. EMERGENCY TRANSPORTATION COORDINATION Priority: Ongoing WHAT IT IS Supporting coordination among transportation, transit, emergency-management, and response agencies before, during, and after emergencies. WHY IT MATTERS Preparation and coordination can save lives by enabling faster response, clear decisions, dependable access, and improved effectiveness during emergencies. 185 Connecting Gallatin Valley LRTP 10-28 PARTNERS MDT, City of Bozeman, City of Belgrade, Gallatin County, UTD, Ready Gallatin, law enforcement, and first responders WHERE ARE WE NOW? Partners maintain emergency plans and protocols; the GVMPO’s role in supporting regional transportation coordination is still developing. NEXT STEPS Support partner planning, exercises, transportation information sharing, and coordination. 186 187 Connecting Gallatin Valley LRTP 11-1 11 Funding the Plan Achieving our long-range transportation vision by 2050 will require substantial investment. Our funding plan includes formula-based federal and state/local funds, as well as potential funding sources, such as competitive grants that may fill critical funding gaps. The combination of these funding sources will allow us to meet our goals and performance targets for transportation in the Gallatin Valley MPA. The total cost for the 46 recommended capital projects in the LRTP, including committed projects in the STIP, is estimated at $341.4 million. The recommended projects are fiscally constrained, meaning the expected costs do not exceed projected revenues for transportation investments throughout the LRTP horizon. 188 Connecting Gallatin Valley LRTP 11-2 Cost by Phase We developed project costs using existing estimates from MDT’s STIP, the City of Bozeman’s Capital Improvement Plan (CIP), the City of Belgrade’s Draft Transportation Management Plan (TMP), and other local and regional plans. We also used custom estimates based on recently completed multimodal projects in the region. Project costs are planning-level estimates and represent the amount of funding needed for planning, designing, and constructing the project. Although most of the recommended projects can be implemented within existing right-of-way, additional right-of-way acquisition costs are not included in these estimates. All project costs in the LRTP are estimated using inflated year-of-execution dollars per MDT requirements. Construction and material costs continue to rise each year, and accounting for inflation helps determine what projects can be accomplished with the estimated revenues. We used MDT’s recommended annual inflation factor of three percent per year to the midpoint of each timeframe to determine our list of fiscally constrained projects. Figure 11-1. Recommended Project Costs by Timeline Category Near Term (2027-2031) Mid Term (2032-2040) Long Term (2041-2050) LRTP Total (2027-2050) Roadway $115.4M $49.0M $9.2M $173.6M Active Transportation $27.4M $20.6M $0.0* $48.0M Safety $18.4M $6.0M $65.5M $89.9M Maintenance $655K $7.1M $22.1M $29.8M Total $161.9M $82.7M $96.8M $341.4M *Although there are no dedicated active transportation projects recommended in the long-term phase, several long-term projects have multimodal elements that will support safe and comfortable active transportation. 189 Connecting Gallatin Valley LRTP 11-3 Revenue Projections Building our projects and implementing our programs will require federal, state, and local funding sources. An estimated $470.9 million is projected to be available to fund projects and programs from 2027 to 2050. Projected revenues from federal, state, and local sources were estimated based on historic averages for Bozeman, Belgrade, and Gallatin County. The following table summarizes the various funding programs available for the GVMPO: Figure 11-2. Forecasted GVMPO Funding by Source Category Near Term (2027-2031) Mid Term (2032-2040) Long Term (2041-2050) LRTP Total (2027-2050) Federal Programmed $72.4M $73.9M $82.1M $228.3M Federal Grants $42.3M $14.4M $16.M $72.7M Transit $14.5M $16.5M $18.3M $49.4M State/Local Operations & Maintenance $25.1M $45.2M $50.2M $120.5M TOTAL $154.4M $149.9M $166.6M $470.9M For a more detailed breakdown of each funding source, please refer to Appendix F. Federal Transportation Funding Sources With its creation, the GVMPO can now have a role in helping strategically program federal funds to projects identified in the LRTP recommendations. Federal transportation funding is primarily through formula funds from FHWA and FTA apportioned to Montana and administered by MDT. Federal funding is the primary source for capital projects in the recommended list. These sources include: • NHPP (National Highway Performance Program) 190 Connecting Gallatin Valley LRTP 11-4 − Interstate Maintenance (IM), National Highway Performance (NH) • Surface Transportation Block Grant Program (STBG) − Urban (STPU); Off-System/Secondary/State Funded Construction (STPX, STPS, SFCN); Urban Pavement Preservation (UPP); Transportation Alternatives (TA - Statewide and TA - MPO) • Highway Safety Improvement Program (HSIP) • Bridge Formula Program (BR) • Montana Air and Congestion Initiative (MACI) • Carbon Reduction Program (CRP) • Recreational Trails Program (FWP) FTA formula funds are apportioned to states and urbanized areas and made available through designated or direct recipients. These funds are programmed in the TIP or STIP in cooperation among the MPO, MDT, and the transit operator. The Gallatin Valley UTD, which operates Streamline within the Gallatin Valley MPA, uses eligible FTA funds for planning, operations and capital need, including equipment: • Urbanized Area Formula Grants (FTA Section 5307) • Enhanced Mobility for Seniors and Individuals with a Disability (FTA Section 5310) • Formula Grants for Rural Areas (FTA Section 5311) • Grants for Buses and Bus Facilities (FTA Section 5339) State and Local Funding Sources Although federal funds are critical, rising costs and transportation needs mean local jurisdictions will also need to contribute funding. The GVMPO’s revenue projections include state and local funding sources to provide a more complete picture of the region’s available transportation resources. These funding sources are primarily used for operations and maintenance of the transportation system rather than capital projects. 191 Connecting Gallatin Valley LRTP 11-5 Additional Funding Opportunities To advance projects and programs beyond the fiscally constrained recommendations, the GVMPO may work with local jurisdictions and MDT to pursue additional funding. Potential sources include competitive grants and locally authorized revenue options, such as fees or taxes. The options described below are currently permitted for use under Montana law. The United States Department of Transportation and FHWA administer competitive grant programs for transportation projects and activities. Depending on the program rules, GVMPO or its partners may be eligible to apply for programs including: • Better Utilizing Investments to Leverage Development (BUILD) Grant Program: For surface transportation infrastructure projects with significant local or regional impact. • Safe Streets and Roads for All (SS4A): For local initiatives to prevent transportation- related deaths and serious injuries on roads and streets Gallatin County was recently awarded an SS4A grant to improve safety at three key intersections in the MPA. Connecting Gallatin County is reflected in the near- term funding phase. • Bridge Investment Program: For bridge or culvert replacement, rehabilitation, and protection 192 Connecting Gallatin Valley LRTP 11-6 Local jurisdictions within the MPA may also consider implementing revenue-generating programs through additional fees or taxes. Bozeman and Belgrade currently assess impact fees for new or expanding development to increase capacity for transportation, water, sewer, and emergency services in the area. Other types of fees and taxes could include: • Local Lodging Tax: A local lodging tax to support transportation would require authorization by the Montana Legislature and subsequent local approval. • Local-Option Resort Tax: Bozeman and Belgrade exceed the statutory population limit, and unincorporated areas must meet narrow population and tourism criteria. • Parking Fees: Using parking meter revenue to invest in specific projects or programs, while also encouraging alternative modes of transportation. • Special Improvement Districts (SIDs) / Business Improvement Districts (BIDs): Levying assessments within a defined area, such as a business district, to fund projects that benefit the area’s businesses and neighborhood, such as sidewalks, streetscapes, or wayfinding. • Additional public-private partnerships: Partnering with local and regional businesses, organizations, or foundations to fund projects, such as new transit services, street maintenance, or active transportation infrastructure. 193 194 Connecting Gallatin Valley LRTP 12-1 12 Measuring Success Success means safer travel, more useful connections, and a well-maintained transportation system. The GVMPO and its partners can use performance results to guide investments and assess progress toward the LRTP’s goals. Performance Measures Chapter 5 identifies the applicable performance measures and targets. TPCC voted to support MDT's statewide targets for the current performance period. The table below connects performance information to LRTP investment priorities. Performance Areas HIGHWAY SAFETY Information to Review Connection to LRTP Investments Number of Recommended Projects Types of Projects Dollars Invested Fatal and serious injury counts and rates; nonmotorized fatalities and serious injuries. Address severe crash risks through roadway, intersection, crossing, and speed management investments. 31 High-crash corridor and intersection modifications, separated nonmotorized facilities, grade-separated crossings $280 million 195 Connecting Gallatin Valley LRTP 12-2 ROAD AND BRIDGE CONDITION Information to Review Connection to LRTP Investments Number of Recommended Projects Types of Projects Dollars Invested Interstate and non- Interstate NHS pavement condition; NHS bridge condition. Preserve existing infrastructure; address rehabilitation and replacement needs. 10 Bridge rehabilitation and replacement, roadway preservation and maintenance $108.2 million TRAVEL TIME RELIABILITY AND FREIGHT Information to Review Connection to LRTP Investments Number of Recommended Projects Types of Projects Dollars Invested Percent of person-miles on the NHS that are reliable; Interstate truck travel time reliability. Improve operations and connections for people and goods. 11 Highway interchange modifications, roadway widening and reconstruction $188.5 million 196 Connecting Gallatin Valley LRTP 12-3 TRANSIT ASSETS AND SAFETY Information to Review Connection to LRTP Investments Number of Recommended Projects Types of Projects Dollars Invested Applicable asset condition measures, safety measures, and coordinated targets. Extend the useful life of transit assets and support facilities needed for safe, reliable travel. 1 Transit center pavement condition and accessibility $7.8 million TPCC has expressed interest in more ambitious local safety targets. Future targets would be developed in coordination with MDT and local partners. The LRTP does not establish GVMPO- specific measures or targets. Looking Beyond Federal Measures Local indicators can show whether daily travel is becoming safer and more convenient, particularly for walking and bicycling. The following could complement federal measures, subject to data availability and staff capacity: Focus Area Potential Indicator How the Information Helps Pedestrian and Bicycle Safety Active transportation fatal and serious injuries; crash locations and patterns Address severe crash risks through roadway, intersection, crossing, and speed management investments Connected Networks Intersection density, share of four-way intersections, route directness, and street, walking, and bicycling connections. Build understanding of how network patterns affect local access, travel options, and demand on major roads 197 Connecting Gallatin Valley LRTP 12-4 Focus Area Potential Indicator How the Information Helps Land Use Mix and Walkable Access Share of households within a 10-minute walk of daily destinations Show whether homes and everyday destinations are close enough to support routine trips on foot Walking and Bicycling Activity Walking and bicycling counts at consistent locations Track changes in use over time Before the next LRTP update, the GVMPO may explore these indicators through internal tracking to assess their usefulness and feasibility. Indicators that provide reliable, relevant information could inform future planning and consideration of local targets. Looking Toward the Future Growth will continue to reshape Gallatin Valley’s transportation needs. The pace, location, and design of development–including street connectivity and the mix of nearby uses–will influence travel, demand, and infrastructure needs. Connected neighborhoods with convenient access to daily destinations and transit can better support walking, bicycling, and transit use while reducing reliance on major roads for local trips. The GVMPO can supplement local planning with regional data and analysis to help partners coordinate investments and connections across jurisdictional boundaries. This work can build on shared priorities and community input while respecting local authority over land use, development review, and local street planning. Rising construction costs and inflation may reduce the purchasing power of transportation revenues and place additional demands on available funds. Broader fiscal pressures and uncertainty about future transportation funding may also affect the pace and scope of improvements. As conditions change, the GVMPO and its partners should review cost and revenue assumptions. 198 Connecting Gallatin Valley LRTP 12-5 Future work should build on the LRTP’s analysis of bicycle and pedestrian safety, network gaps, and access to daily destinations and transit. More detailed analysis of crash patterns and access needs can guide GVMPO planning and project development, refine investment priorities, and inform TPCC’s consideration of more ambitious safety targets. Partner plans and records can help track the status of projects, programs, and policies. This plan will inform the TIP, future studies, and LRTP updates. The GVMPO will update the plan at least every five years to reflect changing needs and funding. 199 200 Connecting Gallatin Valley LRTP 13-1 13 Conclusion Our Pathway Forward Connecting Gallatin Valley establishes a comprehensive community vision and performance- based framework for funding and delivering transportation projects and programs to meet existing and future needs of the region through 2050. Reflecting Community Values and Priorities The LRTP is grounded in community engagement that reflects varying transportation needs of residents, workers, and visitors across the Gallatin Valley. Implementing the LRTP can help improve safety for all modes, maintain a state of good repair, expand mobility choices and access to opportunity, enhance health outcomes and quality of life, preserve regional character, better integrate transportation into land use planning, and strengthen resilience to natural disasters, and support adaptation to emerging technologies. Data-Driven Project Recommendations within Fiscal Constraint The recommended list of projects reflects an assessment of existing and future conditions, evaluation using quantitative and qualitative criteria, and the forecasts of reasonably expected federal, state, and local revenue sources through 2050. Regional growth, transportation conditions, available data, and funding may change over the plan's horizon. Connecting Gallatin Valley is the region’s first LRTP and provides a foundation for updates. The GVMPO may amend it as transportation needs and funding change. If additional funding becomes available, illustrative projects may be considered through a future LRTP and TIP amendment. Implementation Through Partnership and Collaboration Development of the LRTP was a cooperative process with the GVMPOs partner agencies and will require ongoing collaboration to make the recommendations in this plan come to life. As projects advance, those proposed for federal funding will be considered for inclusion in the GVMPO’s TIP and MDT’s STIP, in coordination with the City of Belgrade, City of Bozeman, Gallatin County, and Gallatin Valley UTD. The GVMPO will continue to build consensus and 201 Connecting Gallatin Valley LRTP 13-2 technical capacity with these partners to deliver LRTP projects in a manner that reflects efficient use of public funds, community needs, and regional priorities. Monitoring Success and Reporting Performance The GVMPO supports MDT’s statewide targets for the federally required performance measures included in the LRTP and will use those targets as a baseline for monitoring regional performance. Ongoing data collection, analysis, and reporting, including use of MDT’s travel demand model as appropriate, will help the GVMPO track regional performance, inform future priorities, and community progress to TTAC, TPCC, and the community. The GVMPO will provide progress updates on performance measures and statewide targets. As described in Chapter 12, the GVMPO may also test local indicators related to pedestrian and bicycle safety, walkability, connectivity, and access, subject to staff capacity and data availability. Planning Requirements and Partner Input Connecting Gallatin Valley was developed under the metropolitan planning requirements in 23 CFR §450.324 with a performance-based approach, fiscally constrained recommendations, and transparent public process. Implementation partners and FHWA representatives provided input throughout the process to ensure recommendations are aligned with local priorities and ongoing partner-led plans and initiatives. This collaborative foundation will support coordinated implementation and future updates as regional needs and priorities evolve. 202 203 2027 2028 2029 2030 2031 NHPP (3)-$8,978,186 $17,794,865 $750,000 $750,000 $750,000 $29,023,051 $3,318,570 $63,052,830 $92,075,881 $29,867,130 $33,185,700 IM -$250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000 $1,510,197 $28,693,743 $29,943,743 $13,591,773 $15,101,970 NH -$8,728,186 $17,544,865 $500,000 $500,000 $500,000 $27,773,051 $1,808,373 $34,359,087 $62,132,138 $16,275,357 $18,083,730 NHFP ------------ STP (3)$24,594,567 $3,853,906 $7,631,092 $2,622,504 $7,663,569 $2,434,020 $24,205,091 $3,165,696 $60,148,224 $108,947,882 $28,491,264 $31,656,960 STPU $13,445,204 $368,335 $1,045,888 $1,530,046 $1,530,046 $1,530,046 $6,004,361 $1,530,046 $29,070,874 $48,520,439 $13,770,414 $15,300,460 STPX, STPS, SFCN $9,533,466 $87,485 $5,482,531 ---$5,570,016 $579,596 $11,012,324 $26,115,806 $5,216,364 $5,795,960 UPP -$500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 $191,135 $3,631,565 $6,131,565 $1,720,215 $1,911,350 TA (Statewide) (4)-$2,494,112 $198,699 $188,484 $5,229,549 -$8,110,844 $460,945 $8,757,955 $16,868,799 $4,148,505 $4,609,450 TA (MPO) (5)$1,615,897 $403,974 $403,974 $403,974 $403,974 $403,974 $2,019,870 $403,974 $7,675,506 $11,311,273 $3,635,766 $4,039,740 BR -$17,845 $2,438,885 $2,617,434 --$5,074,164 $878,931 $16,699,685 $21,773,849 $7,910,377 $8,789,308 HSIP -$480,629 $6,868,744 $200,000 $200,000 $200,000 $7,949,373 $420,854 $7,996,226 $15,945,599 $3,787,686 $4,208,540 MACI (CMAQ) (11)-$1,992,388 $3,451,600 ---$5,443,988 $347,528 $6,603,030 $12,047,018 $3,127,751 $3,475,279 CR (6)$1,125,353 $579,613 ----$579,613 --$1,704,966 -- FTA (3)$380,421 $3,101,410 $2,857,133 $2,857,133 $2,857,133 $2,857,133 $14,529,942 $1,833,011 $34,827,209 $49,737,572 $16,497,099 $18,330,110 FTA 5307 -$2,760,633 $2,760,633 $2,760,633 $2,760,633 $2,760,633 $13,803,165 $1,492,234 $28,352,446 $42,155,611 $13,430,106 $14,922,340 FTA 5339 - Formula (7)$380,421 $96,500 $96,500 $96,500 $96,500 $96,500 $482,500 $96,500 $1,833,500 $2,696,421 $868,500 $965,000 FTA 5339 - Discretionary (8)------------ FTA 5310 -$244,277 ----$244,277 $244,277 $4,641,263 $4,885,540 $2,198,493 $2,442,770 Grants (9)-$17,341,405 $25,000,000 ---$42,341,405 $1,600,000 $30,400,000 $72,741,405 $14,400,000 $16,000,000 FWP -$125,000 ----$125,000 $25,000 $475,000 $600,000 $225,000 $250,000 RRS -------$50,000 $950,000 $950,000 $450,000 $500,000 TransADE -$115,658 $115,658 $115,658 $115,658 $115,658 $578,290 $115,658 $2,197,502 $2,775,792 $1,040,922 $1,156,580 Operations and Maintenance -$1,507,353 $1,507,353 $1,507,353 $1,507,353 $1,507,353 $7,536,765 $1,507,353 $28,639,706 $36,176,471 $13,566,176 $15,073,529 Fuel Tax (3)-$3,397,031 $3,397,031 $3,397,031 $3,397,031 $3,397,031 $16,985,154 $3,397,031 $64,543,584 $81,528,738 $30,573,277 $33,970,307 Fuel Tax - City of Belgrade (10)-$495,383 $495,383 $495,383 $495,383 $495,383 $2,476,916 $495,383 $9,412,282 $11,889,199 $4,458,450 $4,953,833 Fuel Tax - City of Bozeman (10)-$2,063,369 $2,063,369 $2,063,369 $2,063,369 $2,063,369 $10,316,847 $2,063,369 $39,204,020 $49,520,868 $18,570,325 $20,633,695 Fuel Tax - County (10)-$838,278 $838,278 $838,278 $838,278 $838,278 $4,191,390 $838,278 $15,927,281 $20,118,671 $7,544,502 $8,382,780 TOTAL $26,100,341 $41,490,424 $71,062,361 $14,067,113 $16,490,744 $11,261,195 $154,371,835 $16,659,631 $316,532,996 $497,005,172 $149,936,682 $166,596,314 Projected Funding by Funding Source (Estimated) – Gallatin Valley MPO Source: Montana Department of Transportation, GVMPO Financial Plan and Draft FFY2027-2031 GVMPO TIP Funding Source FFY 2027 Beginning Balance Committed Funding (1)2027-2031 Committed Funding 2032-2050 Annual Projected Funding Average (2) 2032-2050 Total Projected Funding Total Funding (2027-2050) (1) Based on funding information provided by the Montana Department of Transportation regarding the DRAFT FFY2027-2031 GVMPO TIP. Mid-Term Funding (2032-2040) Long-Term Funding (2041-2050) FEDERAL STATE AND LOCAL (6) Carbon Reduction Program (CR) shows $0 for the 2032-2050 horizon projection. MDT does not anticipate any further CR funding following the expiration of the Continuing Resolution. (5) TA (MPO) reflects the Gallatin Valley MPO's direct population-based sub-allocation of Transportation Alternatives funding under STP, separate from the statewide competitive TA pool but still part of the same STP set-aside. (4) TA (Statewide) and TA (MPO) are both components of the STP roll-up above, since Transportation Alternatives is a federally-mandated set-aside of the Surface Transportation Block Grant Program (STP) that splits into a statewide competitive pool and a direct MPO suballocation. TA (Statewide) funding is competitive and not guaranteed. (3) NHPP, STP, FTA, and Fuel Tax are roll-up totals computed as the sum of their component rows directly below them. (2) Projected Funding for 2032-2050 is estimated using the GVMPO Financial Plan (per-project/per-year annualized averages prepared by MDT) and is the best information available at this time. There is no guarantee that funding will be available in the future. Note: NEVI (National Electric Vehicle Infrastructure) funding is not included because the GVMPO Financial Plan notes NEVI funding does not apply to newly-designated MPOs. Note: NHFP (National Highway Freight Program) appears only as a category heading in the draft TIP's Projects sheet with no projects or dollar figures programmed for GVMPO in this TIP cycle. All values are shown as zero pending future project identification. Note: The draft TIP and GVMPO Financial Plan report CMAQ funding for this MPO under a single MACI line with no further split into "Guaranteed" vs. "Discretionary" portions. (7) FTA 5339 - Formula 2032-2050 annual projected funding reflects the GVMPO Financial Plan estimate. The draft TIP has only programmed this funding in FFY2027 pending future project identification. Note: FTA 5307 and FTA 5310 figures combine the federal share and required local match into a single total funding amount for each year, consistent with how other federal programs (STPU, IM, NH, SFCN, HSIP, BR, UPP, MACI) already report combined federal-plus-match totals per the source TIP. (11) Pure CMAQ funds that come to Montana based on the federal formula and are directed to Missoula, Montana's only moderate CO non-attainment area. Projects are prioritized through the MPO process. Montana Air & Congestion Initiative (MACI) Discretionary Program: Projects using MACI discretionary funds are selected through a proposal process administered by the Transportation Planning Division of MDT. Projects are prioritized and selected amongst all eligible areas based on air quality benefits. Montana Air & Congestion Initiative (MACI) Guaranteed Program: MACI guaranteed funds are distributed to Billings and Great Falls at a level equivalent to what Missoula receives each year in CMAQ funds. Projects are prioritized through the MPO planning process. (10) Fuel Tax revenues are received by the City of Belgrade, City of Bozeman, and Gallatin County and are primarily used for routine operations and maintenance. Excess funds are prioritized for capital expenditures based on need and priority. The draft TIP's REVENUE sheet and GVMPO Financial Plan both label this revenue "Gas Tax" internally; it is shown here as "Fuel Tax", since the tax applies to both gasoline and diesel. The draft TIP's REVENUE sheet reports only a combined City total (Belgrade + Bozeman) for FFY2027-2031; the Belgrade/Bozeman figures above prorate that combined total using each city's share of the GVMPO Financial Plan's individual city estimates. 2032-2050 annual averages use the Financial Plan's city-specific and county estimates directly. (9) Grants reflects competitively awarded federal discretionary grants (e.g., BUILD, RAISE, SS4A) rather than a recurring formula funding source, currently consisting of the Belgrade Urban Improvements grant ($25,000,000, FFY2027) and Gallatin County SS4A grant ($13.9 million). The 2032-2050 annual amount is a simplified projection equal to the FFY2027-2031 total divided evenly across 5 years and held constant for the outyears; this is a modeling assumption only and is not a guaranteed or expected revenue stream. The annual projected average for grants was initially set at $5 million per year, but after direction from MDT, it has been adjusted to $1.6 million per year. (8) FTA 5339 - Discretionary is a competitive federal program; no recurring annual amount is assumed for 2032-2050 given its non-formula, competitive nature. 204 Near-Term (Committed) Projects 205 LRTP Project ID Project Code LRTP Project Name MDT TIP Project Name Description Project Category Cost (2026 Dollars)Federal Committed Dollars State Committed Dollars Local Committed Dollars Funding Source(s)Local/Regional/State Plan Source S-1 UPN 9930 Jackrabbit Lane and Amsterdam Road Intersection Improvements BELGRADE - INT IMPROVEMENTS This project will improve signal operations in Belgrade along the Jackrabbit Lane corridor (from Amsterdam Road to I-90 West-Bound Off Ramp) and on Amsterdam Road (from Jackrabbit Lane to Thorpe Road). The signal improvements will include upgrading the existing signals by adding flashing yellow lights, improving bike/ped features (including ADA), and adding retro-reflective backplates to signals. Additionally, the project will add a new roundabout at the intersection of Broadway and Main Street in Belgrade.Safety $12,915,725 $11,182,435 $1,733,290 NH; STP (STPX, STPS, SFCN)2018 Belgrade Long Range Transportation Plan R-29 UPN 9926 Main Street (Bolinger Road to Jackrabbit Lane)MAIN STREET - BELGRADE Reconstruction project on Main Street in Belgrade between Jackrabbit Lane and Bolinger Road. The project scope will include added capacity (expansion to three lanes) with new curb and gutter, sidewalks, ADA improvements and street lighting.Roadway $11,000,000 $1,081,167 $167,582 STPU 2018 Belgrade Long Range Transportation Plan S-52 UPN 9718 Amsterdam Road/River Rock Road and Green Belt Dr Intersections SF 189 AMSTERDAM RD INTX IMPRV Improvements to address intersection-related crashes at 2 sites along Amsterdam Rd near Belgrade. Amsterdam & River Rock Blvd: Installation of a 2-phase traffic signal with detection on all legs. Install a dedicated left-turn lane on S-347. Amsterdam & Green Belt Dr: Install a left-turn lane on Amsterdam and reconstruct the right turn lane to meet current design standards. (Amsterdam is maintained by Gallatin County, and will require coordination throughout the design process.)Safety $3,786,387 $3,407,748 $378,639 HSIP 2018 Belgrade Long Range Transportation Plan S-68 UPN 9644 SF 179 Signal Kagy Sourdough SF 179 SIGNAL KAGY SOURDOUGH Install a traffic signal at the intersection of Kagy and Sourdough to address intersection- related crashes.Safety $902,393 $735,768 $81,752 $84,873 HSIP; CR MDT Transportation Improvement Plan (TIP) R-10 UPN 9057 Jackrabbit Lane (Main Street to Madison Avenue)BELGRADE - URBAN IMPROVEMENTS Reconstruct to 5-lane urban principal arterial standards to include shoulders, curb, gutter, and sidewalks; Grade separated rail crossing (underpass), accommodate two lanes in each direction Roadway $61,893,776 $56,942,631 $4,951,145 NH; STP (STPX, STPS, SFCN); MACI; Grants (RAISE)2018 Belgrade Long Range Transportation Plan R-39 UPN 8931 Kagy Boulevard (Willson Avenue to S. 19th Avenue)KAGY BLVD - S 19TH TO WILLSON This project consists of widening Kagy Boulevard, from the intersection of S. 19th Avenue to Willson Avenue, to a four-lane urban principal arterial standard. This includes two travel lanes in each direction, shared use paths on each side, curb and gutters, and intersection improvements including two pedestrian tunnels.Roadway $42,491,447 $36,585,562 $1,905,885 $4,000,000 STPU; Grants 2017 Bozeman Transportation Master Plan A-121 UPN 10751 Flanders Mill Sidewalk-Bozeman FLANDERS MILL SIDEWALK-BOZEMAN Transportation Alternatives (TA) Program project to install sidewalk along Flanders Mill Road in Bozeman.Active Transportation $747,815 $647,458 $100,357 TA-MPO MDT Transportation Improvement Plan (TIP) S-69 UPN 10750 Ped Crossing Upgrades-Bozeman PED CROSSING UPGRADES-BOZEMAN Transportation Alternatives (TA) Program project to improve pedestrian crossing features and ADA ramps in Bozeman.Safety $785,346 $679,953 $105,393 TA-MPO MDT Transportation Improvement Plan (TIP) A-86 UPN 10743 Connecting Communities in Gallatin County HUFFINE LANE SHARED USE PATH / Connecting Communities Complete the shared use path on Huffine between Circle F Trail and Bozeman City Limits to create a continuous non-motorized route between Four Corners and Bozeman. Reconfigure Alaska/Cameron Bridge intersection as a roundabout. Enhance visibility and reduce conflicts on Gooch Hill from Huffine to Durston through low-cost intersection safety countermeasures and eventual long-term reconstruction.Active Transportation $18,888,704 $15,212,775 $3,675,929 TA-Statewide; GRANTS (SS4A)2025 Gallatin County Safe Streets For All A-120 UPN 10738 Helen-Hoffman Walks - Belgrade HELEN-HOFFMAN WALKS - BELGRADE Transportation Alternatives (TA) Program project to install sidewalk along portions of Helen Drive and Hoffman Street in Belgrade.Active Transportation $1,942,195 $1,681,552 $260,643 TA-Statewide MDT Transportation Improvement Plan (TIP) A-119 UPN 10737 Hoffman St Sidewalks-Belgrade HOFFMAN ST SIDEWALKS-BELGRADE Transportation Alternatives (TA) Program project to improve sidewalks along Hoffman Street in Belgrade.Active Transportation $3,613,736 $1,876,488 $1,660,991 TA-Statewide MDT Transportation Improvement Plan (TIP) M-15 UPN 10696 South Cottonwood Road- Bozeman SOUTH COTTONWOOD ROAD- BOZEMAN Butte District Project on Secondary 345 (S-345 ) from RP 0.51 to RP 5.5 near Bozeman. Seal & Cover. Gallatin County has agreed to blade patch and crack seal this segment of S-345 in 2025. MDT has committed to delivering a chip seal treatment in 2026. This project is a short-term solution that is intended to help repair the roadway until the County can advance a long-term solution (major rehab, etc.) in the future.Maintenance $262,615 $181,390 $28,116 STP (STPX, STPS, SFCN)MDT Transportation Improvement Plan (TIP) A-118 UPN 10453 Bike/Ped Paths-Bozeman BIKE/PED PATHS-BOZEMAN Transportation Alternatives (TA) Program project to construct shared use paths at several locations in Bozeman. Active Transportation $891,573 $642,598 $99,604 TA-Statewide MDT Transportation Improvement Plan (TIP) M-14 UPN 10450 Path Preservation II-Bozeman PATH PRESERVATION II-BOZEMAN Transportation Alternatives (TA) Program project for preservation work on a number of paths within the City of Bozeman.Maintenance $392,466 $339,797 $52,669 TA-Statewide MDT Transportation Improvement Plan (TIP) A-117 UPN 10441 Madison Ave Sidewalk-Belgrade MADISON AVE SIDEWALK-BELGRADE Transportation Alternatives (TA) Program project to improve sidewalks along Madison Avenue in Belgrade.Active Transportation $1,358,250 $1,175,973 $182,277 TA-Statewide MDT Transportation Improvement Plan (TIP) R-129 SIF191 in FY27-31 CIP Stucky Rd (S 19th Ave to Fowler Ln) This project consists of upgrading Stucky road from the intersection with S. 19th Avenue west to the intersection with Fowler Lane to an urban "collector" standard. Project includes intersection improvement at Fowler and S 19th as well as addition of southbound lane on S 19th.Roadway $9,409,900 $9,409,900 Local Funding 2017 Bozeman Transportation Master Plan R-100 SIF159 in FY27-31 CIP Oak (27th to 19th) Description from CIP: This project will widen Oak St to a five-lane configuration that better aligns with the adjacent sections of Oak St. It includes an eastbound lane reconfiguration and signal upgrade at N 19th. These improvements will increase the intersection's capacity by matching the lane configuration established in the 2016 Oak St 15th to 19th project. The project will also address multimodal considerations by adding a shared-use path to this corner of the intersection. It is identified in the 2017 Transportation Master Plan as TSM-16 and MSN-9. Reconstruct Oak, from 27th to 19th, to a five-lane urban "principal arterial" standard.Roadway $4,250,000 $4,250,000 Local Funding 2017 Bozeman Transportation Master Plan R-17 SIF157 in FY26-30 CIP W College (8th to 11th) This project consists of reconstructing College Street, from the intersection of S. 11th Avenue to S. 8th Avenue, to a two-lane urban "minor arterial" standard.Roadway $1,500,000 $1,500,000 Local Funding 2017 Bozeman Transportation Master Plan R-123 SIF114 in FY26-30 CIP Fowler Connection (Huffine to Oak) This project consists of upgrading Fowler Road from the intersection with Huffin Lane to the intersection with Oak Street to a five-lane urban "minor arterial" standard.Roadway $22,596,000 $22,596,000 Local Funding 2017 Bozeman Transportation Master Plan A-49 A&C016 in FY26-30 CIP S 19th Shared Use Path This project will widen the existing sidewalk on the east and west sides of S 19th Ave between Lincoln St and Kagy Blvd to 10’ wide shared use paths.Active Transportation $432,600 $432,600 Local Funding 2017 Bozeman Transportation Master Plan R-51 WO 22-03 Dry Creek Road, Cruiser Lane, and Spooner Road Intersection Safety Project Roundabout. Filling in sidewalk gaps (or creating shared use paths). High visibility crosswalks. Lighting upgrades.Roadway $8,500,000 $8,500,000 Local Funding, Private Developer Funding 2025 Belgrade Safety Action Plan 206 Mid-Term Projects 207 Project ID Name Description Cost (2036 Dollars) Committed Dollars Potential Funding Source(s) Project Source Jurisdiction Notes R-130 Mendenhall & Babcock Streetscape Complete streetscape improvements along Mendenhall Street and Babcock Street to include curb bulb-outs, landscaping and crossing enhancements. $3,297,000 $0 TA-Statewide; HSIP 2017 Bozeman Transportation Master Plan Bozeman A-137 Peach St Complete Street Improvements This project will improve sidewalks, crosswalks, and bicycle facility on Peach St between N 7th and N Rouse in the city of Bozeman. Redesign of the street within existing right of way would be accomplished with the next mill and overlay of this segment. $6,500,000 $0 STP (STPU); TA-Statewide; TA- MPO; Grants City of Bozeman Call for Projects Bozeman R-90 Oak St: 7th To 19th Safety Improvement This project will redesign Oak St from 7th to 19th in the city of Bozeman to improve safety and access control. The project would adjust curb location to remove the existing bike lanes and narrow travel lanes to minimum arterial standards, install a landscaped median to provide traffic calming and access management, and construct missing sections of shared use path. This project would be implemented with the next mill and overlay of the segment, which was last chip sealed in 2009. $6,500,000 $0 STP (UPP); HSIP; MACI (CMAQ); Grants City of Bozeman Call for Projects Bozeman A-133 Madison Ave/Broadway St - Jackrabbit Ln To Main St Bike lane; bike-ped route and connector; Reconstruct to urban minor arterial standards to include on- street parking, curb, gutter, sidewalks, bike lanes $2,600,000 $0 STP (STPU) 2026 Belgrade Draft TMP Belgrade Project originated in 2018 TMP R-22 Main Street (North Quaw Boulevard To Gallatin Field Road) Reconstruct to urban principal arterial standards to include 8-foot shoulder/parking, center turn lane/turn bays, curb and gutter $6,930,000 $0 NHPP 2018 Belgrade Long Range Transportation Plan MDT, Belgrade R-125 Bozeman Trail/Haggerty Ln (Main St To Kagy Blvd) Bozeman Trail should be reconstructed to a three-lane urban "minor arteral" roadway from the intersection with Kagy Boulevard north to the intersection with Haggerty Lane. Haggerty Lane should also be upgraded to a three-lane urban "minor arterial" roadway. Bike lanes, sidewalks, curb, and gutter improvements. $8,635,000 $0 STP (STPX/STPS/SFCN); TA- Statewide; TA-MPO 2017 Bozeman Transportation Master Plan Bozeman A-123 Airway Blvd - Gallatin Field Rd To E Frank Rd Bike lane or shared use path; partial commuter. $993,700 $0 STP (STPU); TA-MPO; Grants 2026 Belgrade Draft TMP Belgrade, County A-134 Jackrabbit Ln - Frontage Rd To Amsterdam Rd/Alaska Frontage Rd Bike lane; bike-ped route and connector. $1,232,792 $0 Grants 2026 Belgrade Draft TMP MDT, Belgrade A-131 Amsterdam Rd - Clovehitch Rd To Jackrabbit Ln Shared use path; commuter. $1,105,000 $0 STP (STPU) 2026 Belgrade Draft TMP Belgrade, County Project originated in 2018 TMP. This project is along a priority corridor identified in public outreach. A-84 Bozeman To Belgrade Frontage Road Shared Use Path Construct shared use path along Frontage Road from Cherry River Fishing Access to Valley Center Spur. Further extension to Belgrade to be completed in future projects. $600,000 $700,000 TA-Statewide; Local Funding 2017 Bozeman Transportation Master Plan Bozeman, MDT This project received support during public outreach. Has partial committed funding. M-16 Lamme St Bridge Rehabilitation This project will rehabilitate or replace the existing structure on Lamme St between N Bozeman and N Rouse in the city of Bozeman to improve structure condition and hydraulic capacity. $5,900,000 $0 BR City of Bozeman Call for Projects Bozeman R-102 N 19th Ave (Interstate 90 To Springhill Rd) This project consists of widening N. 19th Avenue from Interstate 90 to the intersection with Springhill Road to a 5-lane urban arterial standard. This project includes widening the I-90 overpass along N. 19th Avenue. This roadway is currently a principal. $7,379,000 $0 NHPP 2017 Bozeman Transportation Master Plan Bozeman, MDT R-20 S 3rd Ave (Graf St To Kagy Blvd) Reconstruct S. 3rd Avenue from Graf Street to Kagy Boulevard to an urban "collector" roadway standard. $3,297,000 $0 STP (STPU) 2017 Bozeman Transportation Master Plan Bozeman This project is along a priority corridor identified in public outreach S-73 Jackrabbit Ln Pedestrian Tunnel Tunnel under Jackrabbit Ln at Driveway $4,472,000 $0 Grants 2026 Belgrade Draft TMP MDT, Belgrade This project is along a priority corridor identified in public outreach R-165 N 19th Interchange Modifications This project would construct modifications to the N 19th Interchange with I-90 (westbound exit ramp) to support street infrastructure for the North Park development currently under MDT Systems Impact review. $13,000,000 $0 NHPP City of Bozeman Call for Projects Bozeman, MDT A-136 Valley Center Spur Multimodal Connection This project will construct a multimodal connection along Valley Center Spur between the existing Frontage Rd shared use path and E Valley Center. Detailed planning and design will determine facility type. Signal modifications at each existing intersection are anticipated. $1,300,000 $0 STP (STPU) City of Bozeman Call for Projects Bozeman A-79 Gallatin Road (Four Corners To Gallatin Gateway)Extend existing shared use path $5,396,000 $0 Grants 2022 Greater Triangle Area Transportation Plan MDT, County A-59 Amsterdam Road (Royal Road To Fishing Access)Extend the existing shared use path from Royal Road to Erwin Bridge Fishing Access Site $852,000 $0 TA-Statewide; FWP 2022 Greater Triangle Area Transportation Plan Belgrade, County S-48 S 3rd Ave And Graf St Installation of a traffic signal or roundabout at the intersection of South 3rd Ave, W Graf St, and Wagonwheel Dr. $1,570,000 $0 Grants 2017 Bozeman Transportation Master Plan Bozeman M-17 E Griffin Bridge Replacement This project will replace the existing Bozeman Creek bridge on E Griffin Dr between N Rouse and Story Mill Rd. $1,150,000 $0 BR City of Bozeman Call for Projects Bozeman 208 Long-Term Projects 209 Project ID Name Description Cost (2045 Dollars) Potential Funding Source(s) Project Source Jurisdiction Notes S-85 Streamline Downtown Transfer Station Improvements The Downtown Transfer Station needs major repairs to the bus pull through lane and improved ADA compliance. The asphalt in the bus pull through lane is significantly deteriorated. The asphalt should be replaced with concrete to better withstand the load of heavy duty transit buses. The passenger loading island does not meet ADA requirements, a walk audit demonstrated inability of a power chair to access the bus. The sidewalk south of the island should be moved to widen the bus pull through lane and comply with ADA.$7,850,000 STP (UPP); MACI (CMAQ); Grants City of Bozeman Call for Projects Bozeman This project is also eligible for FTA funding. M-19 Downtown Bozeman Creek Structure Rehabilitation Bozeman Creek traverses downtown Bozeman through a series of three tunnels under Olive St, Rouse Ave, Babcock St, and Main St. for a total length of approximately 700 LF. This infrastructure is critical for the function of urban, primary, and NHS routes. The tunnel system is approaching the end of its useful life and requires rehabilitation, replacement, and hydraulic capacity improvements to manage flooding.$22,125,000 NHPP; BR; Grants City of Bozeman Call for Projects Bozeman S-60 US 191 Improvements Complete the following recommendations from MDT’s 2020 US 191 Corridor Study (Four Corners to Beaver Creek Road): Modify business access; install second westbound left-turn lane; add pedestrian crossing treatments at Four Corners intersection; Install curve warning signs for substandard roadway elements; 3rd Street to 2nd Street (S2) - Replace or widen bridge based on future needs of the highway; Bozeman Hot Springs/Cobb Hill/Lower Rainbow Road (S3) - Consolidate approaches and realign intersection; improve intersection/roadway lighting $20,496,000 NHPP; BR; HSIP; Grants 2025 Gallatin County Safe Streets For All MDT, County R-121 Cottonwood (Baxter Ln to Cattail St) Complete the construction of Cottonwood Road, from Baxter Lane to Cattail Street, to a five lane urban "prinicpal arterial" standard. This includes two travel lanes in each direction, bike lanes on each side, curb and gutter throughout.$9,200,000 STP (STPX/STPS/SFCN); TA- MPO; Grants 2017 Bozeman Transportation Master Plan Bozeman S-63 Belgrade To Bozeman Frontage Road Improvements 8: Passing Zone ModificaƟons 9: Install Centerline Rumble Strips 10: Develop Separated Shared Use Path 11: Roadway Reconstruction $37,104,000 NHPP; STP (STPU); TA- Statewide; TA-MPO; HSIP; FWP 2025 Gallatin County Safe Streets For All County, Bozeman Will complete the shared use path into Belgrade funded in the mid- term. This project received support during public outreach. 210 Illustrative Projects 211 Project ID Name Description Project Category Project Source Jurisdiction Long-Term Cost (2045 Dollars)Committed Dollars Potential Funding Source(s)Notes S-90 Huffine and Fowler Intersection Improvement This project will modify the intersection of Huffine Lane and Fowler Avenue in the city of Bozeman as the last phase of the city's planned Fowler Avenue Connection project. City and MDT coordination on final scope of improvements and design review is ongoing.Safety City of Bozeman Call for Projects Bozeman $7,850,000 $0 NH; HSIP; Grants (SS4A); MACI (CMAQ) S-86 S 19th and Blackwood Rd Traffic Signal This project will construct a traffic signal at S 19th and Blackwood Rd in the city of Bozeman once volumes develop to a level that warrants signalization.Safety City of Bozeman Call for Projects Bozeman $7,850,000 $0 MACI (CMAQ); Grants (SS4A) S-77 Jackrabbit Ln/I-90 Grade-separated crossing. Safety 2026 Belgrade Draft TMP MDT, Belgrade $16,715,790 $0 HSIP; TA; NHPP; Grants (SS4A); Grants (RAISE) S-76 Madison Ave/I-90 Underpass. Safety 2026 Belgrade Draft TMP MDT, Belgrade $14,327,820 $0 HSIP; TA; NHPP; Grants (SS4A); Grants (RAISE) S-43 Davis & Valley Center Geometric improvements with traffic signalization when warrants are met. Potential lane configuration include northbound left and right-turn bays, a westbound leturn bay, and an eastbound right-turn lane.Safety 2017 Bozeman Transportation Master Plan Bozeman $3,680,000 $0 MACI (CMAQ); Grants (SS4A)Privately funded as a condition of new Turnrow subdivision S-124 Improve Paratransit Visibility & Accessibility Streamline's brand is recognizable and trusted in the community as reliable, safe, and convenient. Aligning paratransit to Streamline's brand with vehicle wraps improves the visibility and enhances accessibility to transit. Good branding for paratransit helps reduce the stigma of specialized transportation - improving mobility, connectivity, and sustainability. Fostering independence by better serving seniors and people with disabilities. Integrated branding encourages usage and limits barriers to mobility options.Safety City of Bozeman Call for Projects Streamline $1,570,000 $0 FTA 5310 S-123 Bus Stop Parklet Pop-Up MDT guidelines dictate parklets located on MDT maintained streets must be constructed out of steel to protect from vehicle conflicts. These structures will improve the visibility and accessibility of this parklet. The space is currently occupied by two free parking spaces that block bus riders (especially seniors and those with disabilities) from boarding in an accessible manner. Additional benefits are safety, traffic calming through inclusion of local art, seating and landscaping, and multimodal mobility.Safety City of Bozeman Call for Projects Bozeman, Streamline $1,570,000 $0 FTA 5310 R-99 Oak (7th to Rouse) This project consists of reconstructing Oak Street, from the intersection of N. 7th Avenue to Rouse Avenue, to a three--lane urban "principal arterial" standard. This includes one travel lane in each direction, bike lanes on each side, curb and gutter throughout Roadway 2017 Bozeman Transportation Master Plan Bozeman $3,588,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE)This project is committed with adjacent development R-98 Durston (Gooch Hill Rd To Study Area Boundary) - Minor Arterial Recommended Extension - Minor Arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan County, Bozeman $2,760,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-97 Garfield (Fowler To Ferguson) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $2,944,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-96 S 11th Ave (Blackwood To Goldenstein) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $4,195,200 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-95 Blackwood Road (Fowler To S 31st Ave) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $1,030,400 $0 STP (STPX/STPS/SFCN) R-91 Fowler Lane: Garfield To Stucky This project will construct Fowler Lane from Garfield to Stucky as a 2-lane minor arterial in the city of Bozeman to provide an alternate N/S route to S 19th. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway City of Bozeman Call for Projects; 2017 Bozeman TMP Bozeman $23,550,000 $0 STP (STPU) [tentative - not yet built, system designation pending per MDT]; Grants (RAISE); Grants (INFRA) R-77 W Frank Rd - Thorpe Rd To Jackrabbit Ln Reconstruct to collector standards. Roadway 2026 Belgrade Draft TMP Belgrade, County $25,627,110 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-76 Bolinger Rd - Weaver Rd To Cruiser Ln Reconstruct to minor collector standards. Roadway 2026 Belgrade Draft TMP Belgrade $34,792,770 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-74 New Roadway (Future) - Happy Ln To Dry Creek Rd New roadway. Roadway 2026 Belgrade Draft TMP Belgrade $21,994,130 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-73 Weaver Rd - West Of Thorpe Rd To Dry Creek Rd Upgrade to 4-lane arterial with center median. Roadway 2026 Belgrade Draft TMP Belgrade, County $151,274,210 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-72 E Valley Center Rd - Alaska Rd To Love Ln Upgrade to minor arterial; maintain shared use path. Roadway 2026 Belgrade Draft TMP MDT, County $11,068,500 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE) R-71 Tarmac Trail (New Airport Rd) - Jetway Dr To Frontage Rd New roadway; Airport Rd relocation; minor collector standards. Jetway Dr to Frontage Rd; Intersection improvements to include traffic signal Roadway 2026 Belgrade Draft TMP Belgrade, County $24,948,870 $0 STP (STPX/STPS/SFCN); NHFP; Grants (RAISE)New airport road will be a high-interest project for the region R-67 Kingston Rd (Future) - Collins Rd To Dry Creek Rd New collector roadway. Roadway 2026 Belgrade Draft TMP Belgrade $30,120,450 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-66 Harper Puckett Rd - E Cameron Bridge Rd To E Valley Center Rd Roadway improvements. Roadway 2026 Belgrade Draft TMP County $4,394,430 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-65 E Cameron Bridge Rd - Alaska Rd To Harper Puckett Rd Upgrade from minor collector to major collector.Roadway 2026 Belgrade Draft TMP County $8,121,610 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-64 Spooner Rd - Weaver Rd To Cruiser Ln Roadway improvements. Roadway 2026 Belgrade Draft TMP Belgrade, County $8,072,940 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-63 Thorpe Rd - Planning Area Boundary To Royal Rd Roadway improvements if western interchange occurs. Roadway 2026 Belgrade Draft TMP Belgrade, County $25,537,620 $0 NHPP; STP (STPX/STPS/SFCN); Grants (RAISE) R-59 Frontage Rd - Airway Blvd To City Limits Reconstruct to urban street standards. Roadway 2026 Belgrade Draft TMP MDT, Belgrade $22,546,770 $0 STP (Primary); Grants (RAISE) R-58 Amsterdam Rd - Countryside Ln/Royal Rd To Thorpe Rd Reconstruct to 5-lane urban minor arterial standards with appropriate non-motorized accomodations. Roadway 2026 Belgrade Draft TMP Belgrade, County $43,635,010 $0 STP (STPU); TA; CRP; Grants (RAISE); Grants (INFRA) R-57 Jackrabbit Ln Overpass (Amsterdam Rd To Colorado St) Widen/replace overpass to accommodate additional lanes and non-motorized accomodations; reconstruct off-ramp to increase capacity. Roadway 2026 Belgrade Draft TMP MDT, Belgrade $44,997,770 $0 NHPP; BR; TA; Grants (Bridge Investment Program); Grants (RAISE); CRP; Grants (INFRA) R-56 Jackrabbit Ln - Mayfair Dr To Frontage Rd Reconstruct to urban minor arterial standards to be consistent with souther portion of the corridor; realign side streets. Roadway 2026 Belgrade Draft TMP MDT, Belgrade $14,883,600 $0 STP (STPU); Grants (RAISE) R-54 Amsterdam Rd - Thorpe Rd To Jackrabbit Ln Reconstruct to 5-lane urban minor arterial standards with appropriate non-motorized accomodations like paralell multi-use path. Roadway 2026 Belgrade Draft TMP Belgrade, County $54,571,630 $0 STP (STPU); TA; CRP; Grants (RAISE); Grants (INFRA) R-53 Frontage Rd - Thorpe Rd To Bolinger Rd Reconstruct to urban typical standard. Roadway 2026 Belgrade Draft TMP MDT, Belgrade $12,247,570 $0 STP (STPU); Grants (RAISE) R-46 S. 19th Avenue (Kagy Blvd To Hyalite Canyon Road) Reconstruct roadway to urban principal standards from Kagy Blvd to Goldenstein Road, rural principal arterial standards from Goldenstein Road to Johnson Road, and minor arterial standards to Hyalite Canyon Road. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan Bozeman, County $67,971,800 $0 STP (STPU); STP (STPX/STPS/SFCN); TA; Grants (RAISE); CRP R-38 Church (Main St To Kagy Blvd) This project consists of reconstructing Church Street from the intersection with Main Street south to the intersection with Kagy Boulevard to a two-lane urban "collector" standard. This would include one travel lane in each direction, curb and gutter.Roadway 2017 Bozeman Transportation Master Plan Bozeman $6,476,800 $0 STP (STPU); Grants (RAISE)Project has significant right-of-way challenges 212 Project ID Name Description Project Category Project Source Jurisdiction Long-Term Cost (2045 Dollars)Committed Dollars Potential Funding Source(s)Notes R-37 Valley Center (Valley Center Spur To 27th Ave) This project consists of upgrading Valley Center Drive from the intersection with the Valley Center Underpass to the intersection with N. 27th Avenue to a three-lane urban arterial standard complete with one travel lane in each direction, bike lanes on each side, curb and gutter.Roadway 2017 Bozeman Transportation Master Plan Bozeman, MDT $6,458,400 $0 STP (STPU); TA; CRP; Grants (RAISE)This project is committed with adjacent development R-36 Cottonwood Rd (Loyal Drive To Graf St) This project consists of reconstructing Cottonwood Road, from the intersection of Loyal Drive to Graf Street, to a three-lane urban "principal arterial" standard. This includes one travel lanes in each direction, bike lanes on each side, curb and gutter.Roadway 2017 Bozeman Transportation Master Plan Bozeman $10,120,000 $0 STP (STPU); STP (STPX/STPS/SFCN); TA; Grants (RAISE); CRP; Grants (INFRA) R-33 Kagy Blvd (Highland To Bozeman Trail) This project consists of widening Kagy Boulevard from the intersection with Highland Boulevard to the intersection with Bozeman Trail to a three-lane urban "principal arterial" standard complete with one travel lane in each direction, bike lanes on each side, curb and gutter.Roadway 2017 Bozeman Transportation Master Plan Bozeman $9,200,000 $0 STP (STPU); TA; Grants (RAISE); CRP; Grants (INFRA) R-23 Frontage Road (Weaver Road To Bolinger Road) Reconstruct to rural minor arterial standards to include widended shoulders, recoverable side slopes, center turn lane/turn bays Roadway 2018 Belgrade Long Range Transportation Plan MDT, Belgrade $15,385,000 $0 STP (STPU); Grants (RAISE); Grants (INFRA) R-19 College St (11th to 19th) This project consists of reconstructing College Street, from the intersection of S. 19th Avenue to S. 11th Avenue, to a two-lane urban "minor arterial" standard.Roadway 2017 Bozeman Transportation Master Plan Bozeman $6,752,800 $3,670,000 STP (STPU); TA; Local Funding College St from 8th-11th is committed in the near-term; some local funding for the remainder of the project is programmed as SIF158 in Bozeman CIP FY27-31 R-169 Belgrade Rail Quiet Zone Implement rail quiet zone in the city of Belgrade to reduce noise pollution.Roadway Belgrade City Council Belgrade --- R-162 Gooch Hill Road (Huffine Lane To Stucky Road)Reconstruct roadway to urban minor arterial standards Roadway 2022 Greater Triangle Area Transportation Plan County, Bozeman $18,252,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-161 Alaska Road South (Frank Road To E Valley Center Road) Reconstruct roadway to rural minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $32,617,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-160 Elk Lane (Red Mountain Drive To Gooch Hill Road)Minor Arterial. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $15,210,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-159 Oak Street (Forest Glen Road To Love Lane)Principal Arterial. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $25,519,000 $0 STP (STPX/STPS/SFCN); TA; Grants (RAISE); CRP; Grants (INFRA) R-158 Gooch Hill Road (Durston Road To Hulbert Road)Minor Arterial. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $31,603,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-156 Durston Road (Parklands Trail To Monforton Drive)Minor Arterial Roadway 2022 Greater Triangle Area Transportation Plan County $15,717,000 $0 STP (STPX/STPS/SFCN); FWP; Grants (RAISE); Grants (INFRA) R-155 Stucky Road (S 19Th Avenue To Gooch Hill Road) Reconstruct roadway to urban collector standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $50,700,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-154 Stucky Road (Gooch Hill Road To Elk Lane) Extend Stucky Road between Gooch Hill Road and Elk Lane / Red Mountain Drive intersection as rural minor arterial Roadway 2022 Greater Triangle Area Transportation Plan County $15,717,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-153 Cobb Hill Road / Elk Lane (Gallatin Road To Red Mountain Drive) Reconstruct roadway to rural minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $33,293,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-152 Cottonwood Road (Oak Street To Hulbert Road) Reconstruct roadway to urban principal arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County, Bozeman $18,421,000 $0 STP (STPX/STPS/SFCN); TA; Grants (RAISE); CRP; Grants (INFRA) R-151 Gooch Hill Road (Durston Road To Huffine Lane) Reconstruct roadway to urban minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $14,027,000 $0 STP (STPX/STPS/SFCN); TA; HSIP; Grants (SS4A); CRP; Grants (RAISE); Grants (INFRA) R-150 Harper Puckett Road / Gooch Hill Road (Cameron Bridge Road To Durston Road) Reconstruct roadway to urban minor arterial standards, complete connection between Durston Road and Harper Puckett Road. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $55,263,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-15 Cruiser Lane (Dry Creek Road To Jackrabbit)Reconstruct to Urban major collector standard Roadway 2018 Belgrade Long Range Transportation Plan Belgrade $4,525,000 $0 STP (STPU); Grants (RAISE) R-149 Cameron Bridge Road (Harper Puckett Road To Alaska Road South) Reconstruct roadway to urban minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $35,659,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-148 Cameron Bridge Road (Alaska Road South To Jackrabbit Lane) Reconstruct roadway to urban minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County, Belgrade $17,069,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-147 Hulbert Road (Harper Puckett Road To Love Lane) Construct roadway to urban minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $31,434,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-146 Hulbert Road (Love Lane To Jackrabbit Lane) Reconstruct roadway to rural minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $30,589,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-145 Oak Street (Cottonwood Road To Love Lane) Reconstruct roadway to urban principal arterial standards, complete connection between Forest Glen Drive and Love Lane. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County, Bozeman $3,718,000 $0 STP (STPX/STPS/SFCN); TA; Grants (RAISE); CRP R-144 Durston Road (Gooch Hill Road To Jackrabbit Lane) Reconstruct roadway to urban minor arterial standards (Gooch Hill Road to Love Lane) and rural minor arterial standards (Love Lane to Jackrabbit Lane), complete connection between Parklands Trail and Jackrabbit Lane. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $45,292,000 $0 STP (STPX/STPS/SFCN); TA; FWP; CRP; Grants (RAISE); Grants (INFRA) R-143 Baxter Lane (Harper Puckett Road To Jackrabbit Lane) Reconstruct roadway to rural minor arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $27,378,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-142 Love Lane (Huffine Lane To E Valley Center Road) Reconstruct roadway to rural principal arterial standards. Parallel shared use path recommended.Roadway 2022 Greater Triangle Area Transportation Plan County $6,084,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE) R-137 Frank Road (Jackrabbit Lane To Alaska Road South)Reconstruct and extend to urban minor arterial standards Roadway 2018 Belgrade Long Range Transportation Plan County, Belgrade $5,430,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-135 Story Mill N / Mcllhattan Rd (Boyland Rd To Landfill) This project consists of reconstructing Story Mill Road north to Mcllhattan, and Mcllhattan northwest to the Landfill, to a two-lane urban "collector" road standard. This would include one travel lane in each direction, bike lanes on each side, curb and gutter.Roadway 2017 Bozeman Transportation Master Plan Bozeman $5,667,200 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE) R-133 Valley Center (Valley Center Spur to 27th Ave) This project consists of upgrading Valley Center Drive from the intersection with the Valley Center Underpass to the intersection with N. 27th Avenue to a three-lane urban arterial standard complete with one travel lane in each direction, bike lanes on each side, curb and gutter throughout.Roadway 2017 Bozeman Transportation Master Plan Bozeman $6,458,400 $0 STP (STPU); TA; R-128 Highland (Main To Kagy)This project consists of mill and overlay on Highland Boulevard Maintenance 2017 Bozeman Transportation Master Plan Bozeman $18,400,000 $0 Grants (RAISE); Grants (INFRA) R-126 Cattail St (Ferguson To Cottonwood Rd) This project consists of upgrading Cattail Street from the intersection with Davis west of its current termini point to a three-lane urban "collector" roadway; Bike lanes, sidewalks, curb, and gutter improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $5,520,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE) R-122 Davis (Baxter To Valley Center) This project consists of upgrading Davis from the intersection with Baxter to the intersection with Valley Center Road to a five-lane urban "minor arterial" standard. This includes two travel lanes in each direction, bike lanes on each side, curb and gutter.Roadway 2017 Bozeman Transportation Master Plan Bozeman $15,640,000 $0 STP (STPX/STPS/SFCN); TA; CRP; Grants (RAISE); Grants (INFRA) R-120 Kagy Boulevard (Willson Avenue To Highland Boulevard) This project consists of widening Kagy Boulevard, from the intersection of S. 19th Avenue to Willson Avenue, to a four-lane urban principal arterial standard. This includes two travel lanes in each direction, curb, and gutter.Roadway 2017 Bozeman Transportation Master Plan Bozeman $11,040,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-119 Babcock (El Dorado To Love Ln) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $4,931,200 $0 STP (STPX/STPS/SFCN); Grants (RAISE) 213 Project ID Name Description Project Category Project Source Jurisdiction Long-Term Cost (2045 Dollars)Committed Dollars Potential Funding Source(s)Notes R-118 Laurel Parkway (Valley Center To Oak) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $13,873,600 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-117 Baxter (US 191 to MPA Boundary) - Minor Arterial Recommended Extension - Minor Arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $8,372,000 $0 STP (STPX/STPS/SFCN) R-116 Deadman's Gulch/Cattail St (Cottonwood To Study Area Boundary) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $8,335,200 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-115 Graf St (Cottonwood To S 31st) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $3,588,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-114 S 27th Ave (Blackwood To Patterson) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $4,103,200 $0 STP (STPX/STPS/SFCN); Grants (RAISE) R-113 Ferguson (Huffine To Johnson) - Collector Recommended Extension - Collector. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman, County $22,172,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-112 Gooch Hill (Durston To Harper Puckett) - Minor Arterial Recommended Extension - Minor Arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $23,220,800 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-110 Catamount St (Davis Ln To Love Lane) - Minor Arterial Recommended Extension - Minor Arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $16,615,200 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-109 Kagy Blvd (Cottonwood To S 27th Ave) - Principal Arterial Recommended Extension - Principal Arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $16,320,800 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-108 Harper Puckett (Deadman's Gulch / Cattail St To Valley Center) - Principal Arterial Recommended Extension - Principal Arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan Bozeman $13,781,600 $0 STP (STPX/STPS/SFCN); Grants (RAISE); Grants (INFRA) R-106 I-90 Overpass/Underpass New overpass/underpass across I-90 to connect Maxter and Mandeville (between N 19th and N 7th)Roadway 2017 Bozeman Transportation Master Plan Bozeman, MDT $13,800,000 $0 NHPP; BR; STP (STPX/STPS/SFCN); Grants (Bridge Investment Program); Grants (RAISE); Grants (INFRA); R-105 "L" Street (Tamarack to Bridger Canyon Dr) This project consists of reconstructing "L" Street and Story Mill Road from the intersection with Tamarack Street to Bridger Canyon Drive to a two-lane urban "collector" standard. This would include one travel lane in each direction, bike lanes on each side, and curb and gutter throughout Roadway 2017 Bozeman Transportation Master Plan Bozeman $3,937,600 $0 STP (STPX/STPS/SFCN); TA This project is committed with adjacent development R-103 Harper Puckett (Gooch Hill Rd To E Valley Center Road) Reconstruct to a 3-lane urban minor arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Roadway 2017 Bozeman Transportation Master Plan County $4,600,000 $0 STP (STPX/STPS/SFCN); Grants (RAISE) M-19 Streep Sweeper Purchase - Bozeman The City of Bozeman has two street sweeper replacements scheduled for FY29 and FY30 in their local capital plan.Maintenance City of Bozeman Call for Projects Bozeman $1,256,000 $800,000 Local Funding; MACI (CMAQ) M-18 Story Mill Bridge Replacement This project will replace the existing Bridger Creek bridge on Story Mill Rd in the city of Bozeman with improved structural capacity and shared use path on or adjacent to the bridge Maintenance City of Bozeman Call for Projects Bozeman $6,710,000 $0 BR; TA; Grants (Bridge Investment Program); Grants (RAISE); Grants (INFRA) A-91 Cottonwood Rd Shared Use Path (Northbound)Proposed Shared Use Path on Cottonwood between Farmers Canal and Stucky Active Transportation 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT)County, Bozeman $519,747 $0 TA; STP (STPU); Grants (SS4A); CRP; Grants (RAISE) A-14 W. Valley Center Road (Jackrabbit Lane To Path) Construct approximately 100 feet of shared use path to connect existing facilities at the intersection Active Transportation 2022 Greater Triangle Area Transportation Plan County, Belgrade $16,900 $0 TA; STP (STPU); Grants (SS4A); CRP A-112 E Valley Center/Cattail Creek Anchor Route Proposed Anchor Route on E Valley Center Rd and Cattail Creek Active Transportation 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT)Bozeman $1,793,000 $600,000 Local Funding; TA 214 Local Projects 215 Project ID Name Description On/Off System Project Category Sub-Category Local/Regional Plan Source A-10 Bike/Ped Overpass Visionary project, but would provide more direct access for valley west resdients to Bridger Drive trails.On Active Transportation Pedestrian Tunnel/Bridge 2017 Bozeman Transportation Master Plan A-11 Grade separated crossing Could be over or underpass connecting Fowler trails and the college to Huffine trail. Engineering study needed.On Active Transportation Pedestrian Tunnel/Bridge 2017 Bozeman Transportation Master Plan A-12 Signal or grade separation Conceptual project depends on ability to create east-west bicycle boulevard.On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-15 Baxter Lane Sidewalk Sidewalk Improvements on Baxter and N 11th On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-16 Baxter Lane Sidewalk Sidewalk Improvements on Baxter to N 7th On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-2 Grade Separation Over or underpass for future central bicycle and pedestrian route as proposed in the Long Range Campus Development Plan On Active Transportation Pedestrian Tunnel/Bridge 2017 Bozeman Transportation Master Plan A-25 S 19th Sidewalk (west side)Sidewalk Improvements on S 19th from W Kagy to W Graf On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-26 Highland Blvd Sidewalk Sidewalk Improvements on Highland from Holly Dr to E Kagy On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-27 Baxter Ln Sidewalk Sidewalk Improvements on Baxter between Commerce Way and Simmental Wy On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-29 Bridger Dr Sidewalk Sidewalk Improvements on Bridger Dr from Story Mill Rd to Creekwood Dr On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-31 E Main/Haggerty Ln Sidewalk Sidewalk Improvements on E Main and Haggerty Ln On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-32 S 3rd Ave Sidewalk (east side)Sidewalk Improvements on S 3rd Ave from W Graf to Hill St On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-33 S 3rd Ave Sidewalk (east side)Sidewalk Improvements on S 3rd from Staudaher St to W Kagy On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-34 W Graf Sidewalk (north side)Sidewalk Improvements on W Graf between S 3rd and Wagonwheel Rd On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-35 W Graf Sidewalk (south side)Sidewalk Improvements on W Graf between S 3rd and Wagonwheel Rd On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-36 Sidewalk Sidewalk Improvements on W College between S 13th and McIntosh Ct On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-39 Highland Blvd Bike Lane Bike lane from E Kagy to Holly Dr when road is reconstructed / development occurs On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-4 Grade Separation As part of the W Kagy improvements a pedestrian tunnel will be constructed providing benefitial pedestrian and bicycle improvements to the Kagy/Wilson/S 3rd intersection as well as serving the existing and future Gallagator trail.On Active Transportation Pedestrian Tunnel/Bridge 2017 Bozeman Transportation Master Plan A-40 S 11th Bike Lane For the section of bike lane between the roundabout and the southern parking access just south of Harrison Street, South 11th is approximately 45 feet wide. The bike lanes could be significantly wider here and be buffered to provide a more comfortable On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-41 S 11th Bike Lane 2 Add bike lane signs and stencils every 200 feet, or after ped crossings and at far side of intersections. Add 6" lane stripe.On Active Transportation Road Markings 2017 Bozeman Transportation Master Plan A-43 W College Bike Lanes 1 This is the last part of College west of 11th that will not have been reconstructed. The roadway has no curb and gutter and has sub-standard shoulders. There is approximately 32 feet of asphalt. Short Term: The shoulders should be restriped as designat On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-46 N 7th Ave Bike Lane Convert parking lanes to buffered bike lanes. Parking is underutilized.Coordination may be neccessary near Oak St and the hotel/Santa Fe Reds.On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-47 S 11th Ave Bike Lane S 11th Ave is proportioned as a local street, however it is classified as a minor arterial. This is a popular biking and walking route to reach MSU and it carries considerable traffic volumes. This project prohibits parking along S 11th Ave and establish On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-48 E Babcock St Bike Lane Short term, provide shared lane markings in both travel lanes mid-term, remove northern parking lane and provide a separated two-way bike lane (cycle track) on the north side of the street. This side generally has less existing parking and better aligns On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-5 Intersection Improvements Add a bike box on Babcock in the EB direction in front of the combination lane. This will help bicyclists position to use 23rd to reach College Ave. Perform traffic study on WB approach on S 23rd Ave to verify right turn queuing requirements. If possib On Active Transportation Road Markings 2017 Bozeman Transportation Master Plan A-50 S 11 th Shared Use Path Widen sidewalk to 10'-12' shared use path standard; provide bike lane transitions at Lincoln and Kagy.On Active Transportation Shared Use Path 2017 Bozeman Transportation Master Plan A-55 W Main St (North) Sidewalk 12 foot wide sidewalk to facilitate connections between bikeways that provide alternatives to Main Street and N 19th Ave.On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-56 W Main St (South) Sidewalk 12 foot wide sidewalk to facilitiate connections between bikeways that provide alternatives to W Main St and N 19th Ave.On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan 216 Project ID Name Description On/Off System Project Category Sub-Category Local/Regional Plan Source A-58 W Babcock St Requires sharrows to provide eastbound bicycle treatment to match Mendenhall Street On Active Transportation Road Markings 2017 Bozeman Transportation Master Plan A-60 S 19th Ave Sidewalk (east side)Sidewalk improvements on S 19th from W Graf to W Kagy On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-63 S Churchill Sidewalk (east side)Sidewalk improvements on S Churchill Ave from E Kagy to E Story On Active Transportation Sidewalks 2017 Bozeman Transportation Master Plan A-66 Highland Blvd Bike Lane Bike lane from Bozeman Deaconess Hospital to E Main St when road is reconstructed / development occurs On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-67 N 7th Ave I-90 overpass was designed for bike lanes, but never had them marked or signed. This project completes the thought, adds dotted lane line extensions across the I-90 ramps and signs/marks bike lane on N 7th north of the interchange.On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-68 N 19th Ave 8 foot minimum shoulders already exist. This project involves adding bicycle lane stencils and signage. Future additions include adding through bike lanes where right only lanes exist at intersections. This project is similar to other MDT highways of sim On Active Transportation Road Markings 2017 Bozeman Transportation Master Plan A-71 Springhill Rd Path linking Frontage Road with Sypes Canyon Rd. Could also connect to conceptual path to Story Mill/Bridger Dr.On Active Transportation Shared Use Path 2017 Bozeman Transportation Master Plan A-73 S 19th Ave As Proposed in the BozemanArea Alternative Transportation Study and PROST Plan On Active Transportation Shared Use Path 2017 Bozeman Transportation Master Plan A-78 Koch St Sharrows and bike route signs are present. The signal at 19th makes this an important connection for bicyclists and pedestrians. Volumes have been recorded higher than desired just east of 19th at 3700 vehicles per day.On Active Transportation Bike Lane 2017 Bozeman Transportation Master Plan A-8 Trail Underpass Replace at-grade crossing with underpass where grading is favorable.On Active Transportation Crosswalk 2017 Bozeman Transportation Master Plan A-9 Trail Underpass Replace at-grade crossing with underpass where grading is favorable.On Active Transportation Crosswalk 2017 Bozeman Transportation Master Plan M-2 S 19th Ave (Kagy to Stucky)Mill/fill, seal and cover, pavement markings On Maintenance Road Preservation 2017 Bozeman Transportation Master Plan R-104 W Lincoln St (N 19Th Ave To S 11Th Ave) This project consists of reconstructing W Lincoln Street from S. 11th Ave to S 19th Ave to Willson Avenue, to a two-lane urban collector roadway. This includes one travel lane in each direction, bike lanes on each side, curb and gutter throughout, and Off Roadway Road Construction 2017 Bozeman Transportation Master Plan R-111 Goldenstein (Cottonwood To S 19Th Ave) - Minor Arterial Recommended Extension - Minor Arterial. All street maintenance projects are evaluated for Complete Streets compliance and multimodal improvements.Off Roadway Road Construction 2017 Bozeman Transportation Master Plan R-127 Kagy/Bozeman Trail (Bozeman Trail To I-90)Upgrade to 2-lane rural arterial & realign Off Roadway Road Construction 2017 Bozeman Transportation Master Plan R-35 Springhill Rd (Frontage Rd To Sypes Canyon Rd) Springhill Road from the intersection with the Frontage Road to the intersection with Sypes Canyon Road should be widened to a three-lane rural "minor arterial" arterial roadway. This includes one travel lane in each direction and a two-way center turn l On Roadway Road Construction 2017 Bozeman Transportation Master Plan R-5 Durston & N 15Th Avenue Restripe/reconfigure to address peak hour traffic queueing On Roadway Lane Geometry 2017 Bozeman Transportation Master Plan R-8 7Th & Mendenhall Restripe approach to include designated right-turn lane On Roadway Lane Geometry 2017 Bozeman Transportation Master Plan S-10 Intersection Improvements Improvements associated with Kagy Blvd project. Recommend roundabout with grade separation across Kagy. If signal is to remain, include leading pedestrian interval, bike lane to path transitions On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-11 W College St Midblock Rectangular Rapid Flashing Beacon School crossing for students living in family housing to go to Irving School. W College at S 13th On Safety Crosswalk 2017 Bozeman Transportation Master Plan S-12 W College/S 15th Ave Rectangular Rapid Flashing Beacon Provide crosswalk and RRFB based crossing for trail/sidewalk connection at W College and S 15th On Safety Crosswalk 2017 Bozeman Transportation Master Plan S-13 Pedestrian Hybrid Beacon Lamme is an existing high bicycle and pedestrian use street. This crossing point at 7th is currently difficult and limits the east-west poential of the route. With the 4-lane cross section with no median a rapid flashing beacon would not be visible enoug On Safety Crosswalk 2017 Bozeman Transportation Master Plan S-14 Curb Extensions Install curb extensions at Galligator trail crossing. This crossing will become more heavily used when Kagy Blvd project is complete. RRFB could be a value added option, however yielding compliance on Wilson Ave is usually good.On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-16 Realign Path Crossing re route path crossing from current location to a location approximately 20 feet south. Utilize median for single lane crossing at a time. Vehicles can then interact with pathway users in a different decision process than merging into/out of traffic.On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-19 Intersection Improvements Provide leading pedestrian interval to get peds in crosswalks before vehicles are given green lights. Add shared lane markings in left and right turn lanes in the northbound direction. Add a gore sepearator between left and right only lanes. Main street On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-20 Pedestrian Hybrid Beacon Pedestrian activated 3-lens beacon. Only activates when pedestrian calls it. Could be coordinated with existing signal progression along Main St.On Safety Crosswalk 2017 Bozeman Transportation Master Plan 217 Project ID Name Description On/Off System Project Category Sub-Category Local/Regional Plan Source S-21 Trail Underpass Need improved pedestrian crossing in conjunction with new development at Curtiss St or in association with trails. Crossing should be underpass, which should be somewhat straght forward with existing grading on west side, on east side the City of Bozeman On Safety Crosswalk 2017 Bozeman Transportation Master Plan S-22 S 3rd Ave Rectangular Rapid Flashing Beacon Add pedestrian crossing and RRFB on S 3rd Ave and Westridge Dr On Safety Crosswalk 2017 Bozeman Transportation Master Plan S-23 S 3rd Ave Rectangular Rapid Flashing Beacon Upgrade crossing to include RRFB on S 3rd Ave and W Arnold St On Safety Crosswalk 2017 Bozeman Transportation Master Plan S-24 Remove crosswalk Existing pedestrian crossing has no control and is on the hill into downtown where traffic is decelerating from 40 mph. New signal at Broadway offers nearby controlled crossing. Warrants would not likely support a signalized crossing at this location.On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-29 Main Street & Cypress Make Cypress right in, right out On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-30 Willson & Grant Intersection control On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-31 Willson & Peach Intersection control On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-32 Huffine & Fowler Update signal to include left-turn phase On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-33 Huffine & Ferguson Update signal to include left-turn phase On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-35 Highland & Kagy Intersection control On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-37 Babcock & Wilson Upgrade signal at Babcock and Wilson On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-40 Oak & 11Th Intersection control - Signal On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-44 Grant & S 11Th Avenue Install single-lane roundabout at the intersection of Grant Street and S. 11th Avenue.On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-45 Lincoln & S 11Th Ave Install single lane roundabout at the intersection Lincoln Street & South 11th Avenue.On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-8 Install full signal Recommend installing a full signal to protect pedestrian and bike crossings on W Lincoln Street. This could allow the current right turn out restrictiosn to remain and just activeate for lefts and for pedestrian signal calls.On Safety Intersection Improvements 2017 Bozeman Transportation Master Plan S-2 Amsterdam Rd/Royal Rd Intersection Intersection improvements; traffic signal or roundabout On Safety Intersection Improvements 2018 Belgrade Long Range Transportation Plan S-4 Madison Avenue/Broadway Street/Colorado Street Intersection Intersection improvements; roundabout or realignment; further evaluation needed On Safety Intersection Improvements 2018 Belgrade Long Range Transportation Plan S-5 Oregon Street/Main Street Intersection Intersection improvements; traffic signal or roundabout with intersection realignment On Safety Intersection Improvements 2018 Belgrade Long Range Transportation Plan A-82 S. 19th Avenue (Nash Road to Kagy Boulevard) Construct a shared use path from Nash Road to Kagy Boulevard On Active Transportation Shared Use Path 2022 Greater Triangle Area Transportation Plan M-1 Amsterdam Road Preservation and/or minor rehabilitation On Maintenance Road Preservation 2022 Greater Triangle Area Transportation Plan S-55 Cottonwood Road/ Pasha Lane Intersection Reconstruct the Cottonwood Road and Pasha Lane intersection to accommodate turning movements of a fire truck. Pedestrian facilities with ADA accommodations should also be included, primarily on the western side of the of the intersection.On Safety Lane Geometry 2022 Greater Triangle Area Transportation Plan S-56 Cottonwood Road/ S. 19th Avenue Intersection Minor intersection reconstruction to address geometrics and pedestrian accommodations. The intersection should be modified to accommodate bus turning movements at a minimum. Appropriate ADA treatments should also be included at the crosswalk.On Safety Lane Geometry 2022 Greater Triangle Area Transportation Plan A-100 Kagy/Bozeman Trail Rd Shared Use Path (south side) Proposed Shared Use Path on Kagy/Bozeman Trail Rd between Highland and Academy On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-102 Springhill Rd Shared Use Path Proposed Shared Use Path on Springhill Rd between Sypes Canyon and I-90 Frontage Rd On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-103 S 19th Ave Shared Use Path (east side)Proposed Shared Use Path on S 19th between W Kagy and Nash Rd On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-104 W Kagy Blvd Shared Use Path Proposed Shared Use Path on W Kagy between S 19th and S Wilson On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-106 E Valley Center Shared Use Path (southwest side) Proposed Shared Use Path on E Valley Center to Honor Lane On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-107 Tamarack/Durston/W Main St Shared Use Path Proposed Shared Use Path on W Tamarack/Durston/W Main St On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-109 S 19th Shared Use Path Proposed Shared Use Path on S 19th between Durston and W College On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-110 N 7th Ave Shared Use Path Proposed Shared Use Path on N 7th between W Main and I-90 Frontage Rd On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-111 Durston Rd Shared Use Path Proposed Shared Use Path on Durston between N 15th and Greenway On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-113 W Main/Bridger Canyon Anchor Route Proposed Anchor Route on W Main/Bridger Canyon On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-115 Cottonwood Rd Shared Use Path (southbound) Proposed Shared Use Path on Cottonwood between Farmers Canal and Johnson On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-87 N 19th Ave Shared Use Path Proposed Shared Use Path on N 19th Ave between Durston and W Oak On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-88 S 3rd Shared Use Path Proposed Shared Use Path on S 3fd between Graf and S Montana Ave On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) 218 Project ID Name Description On/Off System Project Category Sub-Category Local/Regional Plan Source A-89 W Graf Shared Use Path Proposed Shared Use Path on W Graf between S 3rd and Wagonwheel Rd On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-90 Baxter Lane Shared Use Path Proposed Shared Use Path on Baxter between N 19th and N 11th On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-92 S 19th Ave Shared Use Path Proposed Shared Use Path on S 19th between W Garfield and W Kagy On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-93 S 11th Shared Use Path Proposed Shared Use Path on S 11th between W Grant and W Kagy On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-94 E Valley Center Shared Use Path (southwest side) Proposed Shared Use Path on E Valley Center between Catamount and Catron On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-95 E Valley Center Shared Use Path (northeast side) Proposed Shared Use Path on E Valley Center between Catron and N 19th On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-96 E Valley Center Shared Use Path (southwest side) Proposed Shared Use Path on E Valley Center between Catron and N 19th On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-98 W Koch St Shared Use Path Proposed Shared Use Path on W Koch between S 19th and S 20th On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) A-99 N Rouse/Bridger Drive Shared Use Path Proposed Shared Use Path on N Rouse/Bridger Drive between E Oak and Birdie Dr On Active Transportation Shared Use Path 2023 Bozeman Parks, Recreation, and Active Transporation Plan (PRAT) S-62 Central Valley Fire Roadway Alert System Install an emergency signal at the driveway and a messaging system.On Safety Intersection Improvements 2025 Belgrade Safety Action Plan A-122 Jackrabbit Ln - Cruiser Ln to Main St Bike lane. On Active Transportation Bike Lane 2026 Belgrade Draft TMP A-124 Spooner Rd - Cruiser Ln to Mayfair Dr Bike lane. On Active Transportation Bike Lane 2026 Belgrade Draft TMP A-125 Cruiser Ln - Westwood Cir to Dry Creek Rd Bike lane. On Active Transportation Bike Lane 2026 Belgrade Draft TMP A-127 Main St - Quaw's Blvd to Weaver St; N Kennedy St to Voegeles Trailer Park Tpke Sidewalk. On Active Transportation Sidewalks 2026 Belgrade Draft TMP A-128 Broadway St - Central Ave to Southview Ave; Allison Ave to Cameron Ave Sidewalk. On Active Transportation Sidewalks 2026 Belgrade Draft TMP A-130 Frontage Rd - 13th St to 8th St Sidewalk. On Active Transportation Sidewalks 2026 Belgrade Draft TMP A-132 Dry Creek Rd/Airway Blvd - Penwell Bridge Rd to Madison Ave Shared use path. On Active Transportation Shared Use Path 2026 Belgrade Draft TMP A-135 Madison Ave - Jackrabbit Ln to Nevada St Sidewalk. On Active Transportation Sidewalks 2026 Belgrade Draft TMP R-52 E Cameron Bridge Rd - Jackrabbit Ln to Alaska Rd Build to urban collector standards with paralell multi-use path. Off Roadway Intersection Improvements 2026 Belgrade Draft TMP R-62 Alaska Rd - E Frank Rd to E Valley Center Reconstruct to urban typical standards. Off Roadway Road Construction 2026 Belgrade Draft TMP R-68 New Roadway (future) - Penwell Bridge Rd to Wes Davis Rd New roadway. Off Roadway Road Construction 2026 Belgrade Draft TMP R-70 Spain Bridge Rd - Penwell Bridge Rd to Airport Rd Roadway improvements. Off Roadway Road Construction 2026 Belgrade Draft TMP R-75 New Roadway (future) - Bolinger Rd to Hawken Ln New roadway. Off Roadway Road Construction 2026 Belgrade Draft TMP R-79 Jackrabbit Ln/I-90 Interchange Intersection improvements; Widen/replace overpass to accommodate additional lanes and non-motorized accommodations; reconstruct off-ramp to increase capacity; Amsterdam Rd to Colorado St On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-80 Alaska Rd/E Valley Center Rd Intersection improvements. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-81 E Valley Center Rd/Love Ln Intersection improvements. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-82 Penwell Bridge Rd/Dry Creek Rd Proposed roundabout. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-83 Frontage Rd/Bolinger Rd Intersection improvements. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-84 West Belgrade Interchange (future; near Thorpe Rd) Potential interchange. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-85 West Belgrade Interchange (future; near Coulee Dr) Potential interchange. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-86 13th St/Frontage Rd Intersection improvements; traffic signal or roundabout. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-87 Jackrabbit Ln/Frank Rd Intersection improvements. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-88 Jackrabbit Ln/Cameron Bridge Rd Intersection improvements. On Roadway Intersection Improvements 2026 Belgrade Draft TMP R-89 Collins Rd/Frontage Rd Intersection improvements; traffic signal or roundabout. On Roadway Intersection Improvements 2026 Belgrade Draft TMP S-74 Main St/Oregon St Crosswalk improvements. On Safety Crosswalk 2026 Belgrade Draft TMP S-75 Madison Ave/Broadway St Tie to intersection improvements. On Safety Crosswalk 2026 Belgrade Draft TMP S-78 Jackrabbit Ln/Missoula Ave Crosswalk improvements. On Safety Crosswalk 2026 Belgrade Draft TMP S-80 Airway Blvd/Service Sr Crosswalk improvements; Consider HAWK, PHB, or Roundabout On Safety Crosswalk 2026 Belgrade Draft TMP S-83 Jackrabbit Ln/Central Ave Crosswalk improvements. On Safety Crosswalk 2026 Belgrade Draft TMP S-89 Huffine Lane Street Lighting This project will construct street lighting on Huffine Lane from College St west to city limits for improved safety.On Safety City of Bozeman Call for Projects A-138 Stucky Bike Lane Bike lane on Stucky between Gooch Hill and S 19th Off Active Transportation Bike Lane Public Workshop A-139 Baxter Bike Lane Bike lane on Baxter between Flanders Mill Rd and Shandalyn Ln Off Active Transportation Bike Lane Public Workshop A-140 Gooch Hill Trail/Shared Use Path/BikeBlvd Trail/shared use path from Huffine to N Laurel Pkwy via Westmorland Dr, providing access to the Lakes at Valley West/Bronken Natual Space Off Active Transportation Shared Use Path Public Workshop A-142 S Alaska Trail/Shared Use Path Trail/shared use path between Airway Blvd and end of S Alaska Off Active Transportation Shared Use Path Public Workshop 219 Project ID Name Description On/Off System Project Category Sub-Category Local/Regional Plan Source A-143 Thorpe/Frontage Rd Trail/Shared Use Path Trail/shared used path connecting west Belgrade to downtown Belgrade On Active Transportation Shared Use Path Public Workshop A-144 Blackwood Rd Trail/Shared Use Path Trail/shared use path connecting Four Corners to south Bozeman along the Gallatin River and Blackwood Off Active Transportation Shared Use Path Public Workshop A-145 Bike Lane Bikelane on Main Street in Belgrade from west of Gallatin Field Rd to West of Astor Ave On Active Transportation Bike Lane Public Workshop A-146 Trail Pathway linking L St. to Frontage Rd at Osterman Dr.Off Active Transportation Shared Use Path Public Workshop A-147 Frontage Road Bike Lane Bike lane along Frontage Road connecting Belgrade and Bozeman On Active Transportation Bike Lane Public Workshop A-148 Bike Lane Need more road space, specifically connecting from River Rock Dr On Active Transportation Bike Lane Public Workshop A-149 Amsterdam Rd Bike Lane Need more road space, specifically connecting from River Rock On Active Transportation Bike Lane Public Workshop A-150 Bike Lane To connect to Valley Center Path from North Bozeman On Active Transportation Bike Lane Public Workshop A-151 Bridger Dr Trail Trail on Rouse/Bridger Dr from W Peach to Story Mill, along Story Mill to McIlhattan Rd.Off Active Transportation Shared Use Path Public Workshop A-152 19th Ave Trail Shared use path on east side of 19th Ave from W College St to existing trail at Oak.On Active Transportation Shared Use Path Public Workshop A-153 Durston Trail Shared use path or enhanced bikeway (cycletrack) from Cottonwood Rd to N 7th On Active Transportation Shared Use Path Public Workshop A-154 Trail Trail to nature conservancy Off Active Transportation Shared Use Path Public Workshop A-155 Kagy Bike Lane Bike lane from 11th Ave to terminus east of S 22nd Ave.On Active Transportation Bike Lane Public Workshop A-156 Kagy Bike Lane Bike lane on E Kagy from Highland Blvd to Fort Ellis Rd.On Active Transportation Bike Lane Public Workshop A-157 Huffine Trail Trail on north side of Huffine (US-191) from Gooch Hill Rd to College.On Active Transportation Shared Use Path Public Workshop A-158 Amsterdam Trail Trail on Amsterdam Rd from Buckskin Rd to Jackrabbit Ln On Active Transportation Shared Use Path Public Workshop A-159 Frank Rd Trail Shared use path from Thorpe Rd to Jackrabbit Off Active Transportation Shared Use Path Public Workshop A-160 3rd Ave Trail Trail on Wagonwheel Rd - south of Sundance Dr - north on S 3rd Ave to W Kagy Blvd.On Active Transportation Shared Use Path Public Workshop A-161 Safety Enhancement Underpass for bikes On Active Transportation Pedestrian Tunnel/Bridge Public Workshop R-166 Road Better design urban route. Get land use design done first On Roadway Road Construction Public Workshop R-167 Redesign I-90 Redesign I-90 / US-191 interchange On Roadway Road Construction Public Workshop R-168 Road Truck route on MT-84 and north to MT-85, avoiding US-191 into Bozeman On Roadway Road Preservation Public Workshop S-100 Lighting W Garfield St and S Tracy Ave On Safety Lighting Public Workshop S-101 Ped Crossing Ped bridge crossing over or under I-90 between N7th Ave and Rouse On Safety Crosswalk Public Workshop S-102 Ped Crossing Enhanced pedestrian crossing on Bridger Drive, mid-block, to help people get to trail on south side of road On Safety Crosswalk Public Workshop S-103 Ped Crossing Enhanced pedestrian crossing at Frank Rd and Jackrabbit. On Safety Crosswalk Public Workshop S-108 Signal Improvement Signal improvements on W Main at S19th Ave and W Babcock On Safety Intersection Improvements Public Workshop S-109 Huffine Lighting Lighting project on Huffine from College to east of Gooch Hill Rd.On Safety Lighting Public Workshop S-114 Ped Crossing Improved pedestrian crossing at Burke St. and N 19th Ave On Safety Crosswalk Public Workshop S-117 Safety Enhancement Intersection improvements at Blackwood Rd and Gooch Hill Rd.Off Safety Intersection Improvements Public Workshop S-118 Safety Enhancement Intersection improvements at Blackwood Rd and Kimber Ct Off Safety Intersection Improvements Public Workshop S-119 Signal Improvement Signal at Blackwood Rd and Cottonwood Rd On Safety Intersection Improvements Public Workshop S-120 Ped Crossing Improved pedestrian crossing at Blackwood Rd and Cottonwood Rd On Safety Crosswalk Public Workshop S-121 Lighting Lighting in Langhor Gardens near Gallagator trail On Safety Lighting Public Workshop S-91 Lighting Lighting project at W Cameron Bridge Rd and Thorpe Rd Off Safety Lighting Public Workshop S-92 Ped Crossing Enhanced pedestrian crossing at Bolinger Rd and Windjammer.Off Safety Crosswalk Public Workshop S-93 Safety Enhancement Intersection improvements at Huffine Ln and S. Cottonwood Rd. On Safety Intersection Improvements Public Workshop S-94 Ped Crossing Bike/ped bridge corssing over I-90 On Safety Pedestrian Tunnel/Bridge Public Workshop S-95 Ped Crossing Ped crossing at Harmon Stream Blvd on south side of Huffine Lane.On Safety Crosswalk Public Workshop S-96 Signal Improvement E Babcock to W Babcock Bike Lane & Ped Crossing On Safety Intersection Improvements Public Workshop S-97 Ped Crossing Enhanced pedestrian crossing at Alaska Frontage Rd and Jackrabbit. On Safety Crosswalk Public Workshop S-98 Lighting Lighting near Langohr Gardens at @ W Mason St. On Safety Lighting Public Workshop A-162 Trail Trail on Bolinger Rd from Cruiser Lane to Gunslinger Ln Off Active Transportation Shared Use Path Public Workshop A-163 Trail Trail connecting Baxter Ln to Max Ave Off Active Transportation Shared Use Path Public Workshop M-2 Maintainence Entryway beautification at I-90 and 7th Ave N On Maintainence Beautification Public Workshop 220 Gallatin Valley MPO Long- Range Transportation Plan Existing and Projected Conditions Report May 2026 221 Gallatin Valley MPO LRTP Existing Conditions Report i Table of Contents Page 1 Introduction .................................................................................................................. 1-1 Introducing the Organization ................................................................................................................. 1-1 Introducing the Plan ................................................................................................................................... 1-4 How is the Report Organized? ............................................................................................................... 1-4 2 Regional Context .......................................................................................................... 2-1 Overview of Completed and Ongoing Plans .................................................................................... 2-1 Population and Employment Growth and Trends .......................................................................... 2-4 Key Findings ................................................................................................................................................ 2-21 3 Transit Conditions ........................................................................................................ 3-1 Transit Service Overview ........................................................................................................................... 3-1 Other Regional Providers ......................................................................................................................... 3-6 Key Findings ................................................................................................................................................... 3-8 4 Multimodal Transportation Conditions ..................................................................... 4-1 Functional Class System ............................................................................................................................ 4-1 Transportation Asset Conditions ........................................................................................................... 4-4 Goods Movement ........................................................................................................................................ 4-6 How People Get Around ........................................................................................................................... 4-9 Driving in the Gallatin Valley ................................................................................................................ 4-10 Walking ......................................................................................................................................................... 4-16 Biking and Rolling .................................................................................................................................... 4-18 Transportation Safety .............................................................................................................................. 4-20 Key Findings ................................................................................................................................................ 4-28 5 Projected Conditions .................................................................................................... 5-1 6 Conclusion ..................................................................................................................... 6-1 Appendix A – Plan Document Review ................................................................................ 6-2 222 Gallatin Valley MPO LRTP Existing Conditions Report ii Table of Figures Page Figure 1 MPO Boundaries ........................................................................................................................ 1-2 Figure 2 Montana Statewide Routes .................................................................................................... 1-3 Figure 3 Population Growth .................................................................................................................... 2-4 Figure 4 Population Density .................................................................................................................... 2-5 Figure 5 Employment Growth ................................................................................................................ 2-6 Figure 6 Employment Density ................................................................................................................ 2-7 Figure 7 Major Employment Sectors ................................................................................................... 2-8 Figure 8 Population and Employment Density ................................................................................ 2-9 Figure 11 Minority Population ............................................................................................................... 2-13 Figure 12 Low-Income Households ..................................................................................................... 2-14 Figure 13 Limited English Proficiency ................................................................................................. 2-15 Figure 14 Zero-Vehicle Households .................................................................................................... 2-16 Figure 15 Young People ........................................................................................................................... 2-17 Figure 16 Older Adults .............................................................................................................................. 2-18 Figure 17 People Living with a Disability ........................................................................................... 2-19 Figure 18 Median Home Listing Price in Gallatin County, 2017-2024 ................................... 2-20 Figure 19 Renter-Occupied vs. Owner-Occupied Housing Units ............................................. 2-21 Figure 20 Streamline Fixed-Route Service ........................................................................................... 3-2 Figure 21 Streamline Paratransit Service Area .................................................................................... 3-3 Figure 22 Transit Route Information ...................................................................................................... 3-4 Figure 23 Bus Stop Amenities ................................................................................................................... 3-5 Figure 24 Functional Classification Roadway Miles .......................................................................... 4-1 Figure 25 Highway Functional Classification...................................................................................... 4-2 Figure 26 Proposed New Road Classifications ................................................................................... 4-3 Figure 27 Transportation Asset Conditions ......................................................................................... 4-5 Figure 28 Goods Movement Network ................................................................................................... 4-6 Figure 29 Percent of Commute Modes 2019 vs. 2023 .................................................................... 4-9 Figure 30 Annual Average Daily Trips (AADT) ................................................................................. 4-10 Figure 31 Roadway Volume Capacity Ratios, 2022........................................................................ 4-11 Figure 32 GVMPO Origin-Destination Travel, Spring 2025 ........................................................ 4-12 Figure 33 GVMPO Origin-Destination Trips, Spring 2025 .......................................................... 4-13 Figure 34 Intra-GVMPO Origin-Destination Travel, Spring 2025 ............................................. 4-14 Figure 35 Intra-GVMPO Origin-Destination Trips, Spring 2025 ............................................... 4-14 Figure 36 Intra-GVMPO Trips by Time of Day, Spring 2025 ...................................................... 4-15 Figure 37 Bozeman Pedestrian Network Gaps ................................................................................ 4-17 Figure 38 Existing Bicycle Facilities ...................................................................................................... 4-19 223 Gallatin Valley MPO LRTP Existing Conditions Report iii Figure 39 All Crashes, 2015-2024 ......................................................................................................... 4-20 Figure 40 Fatal and Serious Injury (FSI) Crashes, 2015-2024 ..................................................... 4-20 Figure 41 Fatal and Serious Injury Crash Locations 2015-2024 ................................................ 4-22 Figure 42 Bicycle and Pedestrian Involved Crash Locations 2015-2024 ............................... 4-23 Figure 43 Motorized Vehicle Only Crashes vs. Pedestrian and Bicycle Crashes by Injury Level, 2015-2024 ..................................................................................................................... 4-24 Figure 44 Crashes by Time of Day, 2015-2024............................................................................... 4-25 Figure 45 Fatal and Serious Injury (FSI) Crashes by Time of Day, 2015-2024 ..................... 4-25 Figure 46 Crash Factors, 2015-2024 .................................................................................................... 4-26 Figure 47 Fatal and Serious Injury (FSI) Crash Factors, 2015-2024 .......................................... 4-27 Figure 48 Committed Projects .................................................................................................................. 5-1 Figure 49 2022-2050 New Households ................................................................................................. 5-2 Figure 50 2022-2050 New Jobs ................................................................................................................ 5-3 Figure 51 2022-2050 Growth in Vehicle Volumes ............................................................................. 5-4 Figure 52 2050 Volume-to-Capacity Ratios......................................................................................... 5-5 Figure 53 Documents Reviewed with Key Projects Identified ...................................................... 6-3 224 Gallatin Valley MPO LRTP Existing Conditions Report 1-1 1 INTRODUCTION INTRODUCING THE ORGANIZATION Who is the Gallatin Valley MPO? The 2020 Census marked an important milestone for the Bozeman area, with the population surpassing 50,000 and launching the formation of the Gallatin Valley Metropolitan Planning Organization (MPO). Federal regulations require MPOs to develop a Long-Range Transportation plan (LRTP), providing the opportunity for the City of Bozeman, City of Belgrade, and urbanized areas in Gallatin County within the MPO boundaries to create a multi-decade vision for transportation infrastructure and mobility programming. This process brings together agency partners and the community to establish priorities and shared values for the region. The MPO’s boundaries are shown in Figure 1 and Figure 2 show Montana statewide routes. 225 Gallatin Valley MPO LRTP Existing Conditions Report 1-2 Figure 1 MPO Boundaries Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 226 Gallatin Valley MPO LRTP Existing Conditions Report 1-3 Figure 2 Montana Statewide Routes Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 227 Gallatin Valley MPO LRTP Existing Conditions Report 1-4 INTRODUCING THE PLAN Gallatin Valley’s Long-Range Transportation Plan The Gallatin Valley LRTP is a multi-decade plan that looks at all modes of transportation and identifies future priorities for projects and funding. In accordance with the federal requirements set in the Infrastructure Investment and Jobs Act (IIJA), this plan will help steer the community toward a healthier, safer, and more efficient future while preserving and expanding mobility for all residents, workers, and visitors. This plan also supports MDT’s statewide performance-based approach and aligns with the State’s performance targets. The LRTP will build upon existing plans and projects while identifying new opportunities to create an integrated transportation system that meets the needs of the community and partner agencies. A strong transportation plan is critical to keep the Gallatin Valley a prosperous and healthy place to live, learn, and visit. HOW IS THE REPORT ORGANIZED? This existing and projected conditions report serves as a foundation for the development of LRTP goals, objectives, and prioritization of projects, policies, and plans. The existing conditions report synthesizes key aspects of the Gallatin Valley’s regional planning context, including population and employment patterns, and evaluates the existing transportation network.  Chapter 2 examines planning and policy documents to understand previous planning work done in the Gallatin Valley. It also includes key demographic and employment information.  Chapter 3 summarizes the transit system, including fixed-route transit and paratransit services, ridership trends, and other regional transit providers.  Chapter 4 provides a multimodal snapshot of transportation conditions in the region, which includes the roadway, bicycle, and pedestrian networks.  Chapter 5 analyzes housing and employment growth estimates in the region to project future travel demand using the MDT Travel Demand Model.  Chapter 6 lays the foundation for how the existing and projected conditions will inform the Long Range Transportation Plan. 228 Gallatin Valley MPO LRTP Existing Conditions Report 2-1 2 REGIONAL CONTEXT OVERVIEW OF COMPLETED AND ONGOING PLANS Reviewing current planning and policy documents, and understanding what has been successful in the past, helps set the framework to build on previous momentum. This section summarizes key local plans and improvements identified in them, which can be considered as part of the LRTP. A review of additional local, state, and regional plans documents is included in the appendix. Belgrade Long Range Transportation Plan (2018) The Belgrade Long Range Transportation Plan serves as a guide for development and investment of the community’s transportation system to meet the needs of a growing population. The LRTP identifies community goals, outlines infrastructure and service improvements, and recommends projects to enhance connectivity and safety, foster economic vitality, and improve quality of life. As Belgrade grows, traffic congestion is projected to worsen along Jackrabbit Lane, Frontage Road, and Amsterdam Road. The goals of the LRTP include providing a safe, efficient, and connected transportation system; supporting economic vitality of the community; and promoting financially sustainable transportation while coordinating between land use and environmental sustainability. The City of Belgrade is currently updating their Comprehensive Plan, which also includes the transportation component. Bozeman Transportation Master Plan (2017) The Bozeman Transportation Master Plan (TMP) guides transportation investments to accommodate projected city growth. The City of Bozeman has reached its jurisdictional growth update and may annex some land in Gallatin County in the next two to three decades. The plan also outlines community goals, infrastructure and service improvements, and projects to meet community needs. While most traffic operations are expected to remain the same by horizon year 2040, major arterials – including 19th Avenue, Oak Street, Main Street, and Kagy Boulevard – are projected to experience increased congestion and 229 Gallatin Valley MPO LRTP Existing Conditions Report 2-2 delays. The goals of the plan include improving the efficiency, connectivity, safety, and financial sustainability of the transportation system; coordinate land use and transportation; and protect environmental sustainability and natural and cultural resources. The City of Bozeman anticipates updating their TMP in 2027. Bozeman Bicycle and Pedestrian Gap Analysis (2025) The Bozeman Bicycle and Pedestrian Gap Analysis identifies two types of gaps in the bicycle and pedestrian networks. Spot gaps are key focal points, such as crossings or intersections, that lack appropriate infrastructure for comfortable pedestrian or bicycle travel. Linear gaps are sections of missing segments of sidewalk, trail, bicycle lane, or shared-use paths that create gaps between existing facilities. Four criteria were used to prioritize projects: safety and comfort, connections to activity centers, equity, and public support. Gallatin County Greater Triangle Area Transportation Plan (2022) The Gallatin County Greater Triangle Transportation Plan provides recommendations to improve traffic safety, sustainability, and multimodal connections between Bozeman, Belgrade, Four Corners, and Gallatin Gateway. The county has consistently outpaced the population growth of other Montana counties, and this growth can be attributed to the evolving economies of Bozeman and Belgrade, the continued expansion of Montana State University, and migration patterns to the area. The plan incorporates land use trends, projected development, and documented transportation needs to guide near-term and long- range roadway, bicycle, pedestrian, and transit improvements that address anticipated growth through 2040. Gallatin County Triangle Trails Plan (2021) The Gallatin County Triangle Trails Plan aims to connect the trail system throughout Bozeman, Belgrade, Four Corners, and Gallatin County while establishing design standards for different trail types. The vision of the trail system is to be connected, safe and welcoming, and inclusive for all. Community members and stakeholders consider the trail network as a highly valued community asset that should serve travelers of all ages and abilities. Recommended projects improve connectivity between neighborhoods, schools, parks, and employment centers, address documented gaps, and support access to active transportation within the growing suburban area. 230 Gallatin Valley MPO LRTP Existing Conditions Report 2-3 Gallatin Valley Sensitive Lands Plan (2023) The Gallatin Valley Sensitive Lands Plan highlights sensitive lands throughout the Gallatin Valley and identifies recommendations to improve sensitive lands conservation and management. Project goals include securing the long-term ecological health of the region; creating a regional model that identifies sensitive lands; recommendations for protecting resources; identifying best practices; and facilitating dialogue between local and regional stakeholders. The plan also identifies regional transportation infrastructure planning as a priority recommendation that could mitigate impact to sensitive lands. Additional Local, State, and Regional Plans Additional plans were reviewed. Common themes emphasize multimodal connectivity, traffic safety, coordinated land use, improved transit access, and long-term system preservation. Multimodal investment and coordinated growth are broadly reinforced across plans. A complete inventory and summary of all reviewed documents is provided in the Appendix. 231 Gallatin Valley MPO LRTP Existing Conditions Report 2-4 POPULATION AND EMPLOYMENT GROWTH AND TRENDS The data in this section represents trends within the Gallatin Valley Metropolitan Planning Area (referred to going forward as the MPA) based on Census data from 2023. The region has experienced rapid growth over the past decade, with a compound annual growth rate of 3.3%.1 As population and employment opportunities continue to grow in the region, high- quality transportation infrastructure and services should be a priority. Population Over the past decade, the population within the MPA area increased by 38% from 65,044 residents in 2013 to 89,855 residents in 2023 (Figure 3). Growth has slowed in recent years, but the area has continued to add residents year over year. The 2025-2045 Bozeman Population and Housing Forecast report projects that Belgrade, Bozeman, and Four Corners will grow to a combined population of 114,300 in 2045.2 Figure 3 Population Growth Source: American Community Survey (ACS) 5-Year Estimates, 2023 1 American Community Survey, 2023 2 “2025-2045 Bozeman Population and Housing Forecast.” Engage Bozeman, Economic & Planning Systems, Inc., 5 Sept. 2025.” 50,000 55,000 60,000 65,000 70,000 75,000 80,000 85,000 90,000 95,000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 232 Gallatin Valley MPO LRTP Existing Conditions Report 2-5 Areas of the highest population density are clustered in downtown Bozeman, neighborhoods surrounding Montana State University, and the River Rock Subdivision just to the west of I-90 and the Belgrade city limits (Figure 4). Figure 4 Population Density Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 233 Gallatin Valley MPO LRTP Existing Conditions Report 2-6 Employment Jobs in the study area increased by 47% in the past decade, with a total of 56,759 jobs in 2022. The number of jobs decreased slightly in 2020, likely due to the COVID-19 pandemic, but have since surpassed pre-pandemic numbers (Figure 5). The 2025-2045 Bozeman Population and Housing Forecast report projects that Gallatin County will add 44,500 additional jobs by 2045.3 Figure 5 Employment Growth Source: Longitudinal Employer-Household Dynamics (LEHD), 2022 Employment density reveals that major employment hubs are concentrated in the Bozeman and Belgrade urbanized areas (Figure 6). The industries with the most jobs are retail trade and educational services, which account for about one-quarter of all jobs in the region (Figure 7). Other jobs (26.9%) include other services, waste management, wholesale trade, finance and insurance, public administration, transportation, and arts/entertainment, among others. As the region continues to grow, transportation options and connectivity need to be considered to link people from where they live to where they work. 3 “2025-2045 Bozeman Population and Housing Forecast.” Engage Bozeman, Economic & Planning Systems, Inc., 5 Sept. 2025.” 30,000 35,000 40,000 45,000 50,000 55,000 60,000 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 234 Gallatin Valley MPO LRTP Existing Conditions Report 2-7 Figure 6 Employment Density Source: Longitudinal Employer-House Dynamics (LEHD), 2022; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 235 Gallatin Valley MPO LRTP Existing Conditions Report 2-8 Figure 7 Major Employment Sectors Sector % Of Total Employment Share Retail Trade 13.9% Educational Services 11.8% Accommodation and Food Services 11.6% Health Care and Social Assistance 10.6% Construction 10.1% Professional, Scientific, and Technical Services 9.2% Manufacturing 5.8% Other 26.9% Source: Longitudinal Employer-House Dynamics (LEHD), 2022 Population and Employment Combining population and employment data can better highlight areas that are anticipated to be more supportive of transit service. Locations with higher densities of population and employment can benefit the most from transportation investments, and transit service is more productive in these areas. As shown in Figure 8, the areas with the highest combined population and employment density are concentrated in downtown Bozeman and surrounding the university. 236 Gallatin Valley MPO LRTP Existing Conditions Report 2-9 Figure 8 Population and Employment Density Source: American Community Survey (ACS) 5-Year Estimates, 2023; Longitudinal Employer-House Dynamics (LEHD), 2022; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 237 Gallatin Valley MPO LRTP Existing Conditions Report 2-10 Marriage and Birth Rates Vital statistics such as marriage and birth rates are not published at the MPO geographic scale, so this analysis uses county-level administrative records and proportional allocation based on population share. Figure 9 and Figure 10 show historical birth and marriage rates for Gallatin County for the past five years. Births have fluctuated over the five-year period but have ultimately increased since 2020. Gallatin County has a slightly higher birth rate than the rest of the state but slightly lower than the national rate. Marriage license issuance has steadily increased since 2020, and despite a slight decrease from 2024 to 2025 YTD, Gallatin County has a higher marriage rate than both the state and national rates. Figure 9 Births Among Gallatin County Residents, 2020-2025 Year Births 2020 1,148 2021 1,256 2022 1,146 2023 1,218 2024 1,271 2025 1,202 5-Year Average 1,207.8 County Rate (per 1,000) 10.2 Montana Birth Rate (2023) 9.8 US Birth Rate (2023) 10.7 Source: Montana Office of Vital Statistics 238 Gallatin Valley MPO LRTP Existing Conditions Report 2-11 Figure 10 Marriage Licenses Issued to Gallatin County Residents, 2020-2025 Year Licenses Issued 2020 949 2021 1,169 2022 1,249 2023 1,264 2024 1,451 2025 (YTD) 1,435 5-Year Average 1,216.4 MPO Rate (per 1,000) 10.2 Montana Marriage Rate (2023) 9.2 US Marriage Rate (2023) 6.1 Source: Gallatin County Clerk of Court 239 Gallatin Valley MPO LRTP Existing Conditions Report 2-12 Demographic and Socioeconomic Characteristics Using select demographic, socioeconomic, and employment data can help determine the overall transit need for a given area. Areas of higher propensity, or demand, are more likely to generate ridership and support transit service that is provided. The following groups were examined due to their higher likelihood to use transit based on Census journey to work data:  Minority populations  Low-income households  Limited English proficiency  Zero-vehicle households  Young people ages 15-24  Older adults age 65+  People with a disability 240 Gallatin Valley MPO LRTP Existing Conditions Report 2-13 The Federal Transit Administration define a minority person as one who self-identifies as American Indian and Alaska Native, Asian, Black or African American, Hispanic or Latino, or Native Hawaiian or Other Pacific Islander.4 The highest concentration of minority individuals are located in downtown Bozeman around MSU and in areas of Belgrade adjacent to the airport and west of I-90. This information supports impact analysis and Title VI compliance. Figure 11 Minority Population Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 4 “Title VI Circular to 4702.1B.” Title VI Requirements and Guidelines for Federal Transit Administration Recipients, Federal Transit Administration, 1 Oct. 2012, www.transit.dot.gov/sites/fta.dot.gov/files/docs/FTA_Title_VI_FINAL.pdf. 241 Gallatin Valley MPO LRTP Existing Conditions Report 2-14 For the purpose of this study, low-income households are defined as earning less than 150% of the federal poverty level. Low-income households are more financially burdened by transportation options and are likely to use transit due to the high costs of vehicle ownership. Low-income households within the MPA are primarily located surrounding MSU and in Belgrade west of I-90. This information supports evaluating mobility access and affordability implications of transportation investments. Figure 12 Low-Income Households Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 242 Gallatin Valley MPO LRTP Existing Conditions Report 2-15 Limited English proficiency (LEP) is often an indicator of immigrant communities, who are more likely to take transit.5 While the MPA has an overall low density of limited English speaking individuals, areas of the MPA with more LEP communities are located in south Bozeman and the greater Belgrade area. This information helps inform mobility access and language considerations in transportation planning. Figure 13 Limited English Proficiency Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 5 “Movement after Migration: Immigrants’ Disproportionate Reliance on Public Transportation.” Migration Policy Institute, 21 Mar. 2021, https://www.migrationpolicy.org/article/movement-migration-immigrants-public-transportation. 243 Gallatin Valley MPO LRTP Existing Conditions Report 2-16 People without access to a vehicle are more reliant on transit to meet their travel needs that cannot be completed by walking, biking, or rolling. Most zero-vehicle households are located in northern Bozeman and downtown Bozeman around MSU, which are areas currently served by fixed-route transit. Figure 14 Zero-Vehicle Households Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 244 Gallatin Valley MPO LRTP Existing Conditions Report 2-17 Young people are less likely to have a driver’s license or access to a vehicle and therefore have greater reliance on transit or other multimodal services to access their destinations. Additionally, students at Montana State University are an important ridership base for public transit services. The highest concentrations of young people are located surrounding MSU and in northwest Bozeman. Figure 15 Young People Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 245 Gallatin Valley MPO LRTP Existing Conditions Report 2-18 People who are older than 65 years old may no longer be able to drive due to aging-related changes in sight, hearing, and mobility. Older adults are less able to utilize other active modal options and may rely solely on others driving them places or public transportation. Older adult care facilities are often located along bus routes to provide access for older adults. While the MPA has an overall low density of older adults, the highest concentration of older adults are located south of downtown Bozeman and in northwest Bozeman. Figure 16 Older Adults Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 246 Gallatin Valley MPO LRTP Existing Conditions Report 2-19 People who are unable to drive alone or may require additional assistance rely more heavily on public transportation, whether that be fixed-route service or paratransit services. Areas with the highest density of people living with disabilities are located northwest of MSU, in downtown Bozeman, and near I-90 in Belgrade. Figure 17 People Living with a Disability Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 247 Gallatin Valley MPO LRTP Existing Conditions Report 2-20 Changes in Affordability Housing costs in the MPA are rising faster than wages, creating challenges for residents seeking housing they can afford. Therefore, affordable transportation options are essential to connect residents with jobs, schools, various services, and recreational opportunities. Based on ACS 5-Year estimates for 2023, about 21% of households in the MPA have an annual income of less than $40,000. As of 2025, the official poverty rate, as defined by the Bureau of Labor Statistics, is $15,650 for an individual and $21,150 for a household with two people. In 2023, 8.8% of Gallatin County residents were living below the poverty line, while within the MPA area, 11.2% residents live below the poverty line. Additionally, the median home listing price in Gallatin County doubled between 2017 and 2023, posing challenges for residents to live comfortably in the area (Figure 18). Home prices decreased in 2024 but are still well above pre-pandemic prices and have overall increased by 68% since 2017. 55% of the study area residents own their home and 45% rent. This percentage may change in the future if housing prices begin to rise and more people choose to rent due to the high price to purchase a home (Figure 19). Vacant and part-time residential housing units are also an area of focus due to Bozeman being an amenity destination during both the summer and winter months. This impacts housing supply for full-time residents in an already constrained market.6 Figure 18 Median Home Listing Price in Gallatin County, 2017-2024 6 “2025-2045 Bozeman Population and Housing Forecast.” Engage Bozeman, Economic & Planning Systems, Inc., 5 Sept. 2025.” $400,000 $500,000 $600,000 $700,000 $800,000 $900,000 $1,000,000 $1,100,000 $1,200,000 2017 2018 2019 2020 2021 2022 2023 2024 248 Gallatin Valley MPO LRTP Existing Conditions Report 2-21 Source: Realtor.com, 2024 Figure 19 Renter-Occupied vs. Owner-Occupied Housing Units Source: American Community Survey (ACS) 5-Year Estimates, 2023 KEY FINDINGS  Population in the MPA area has risen steadily over the past decade, increasing by 38% since 2013. The largest increase was from 2020 to 2021, most likely due to the rise of remote work during the COVID-19 pandemic and new arrivals or second home buyers from other states.  Population density is concentrated in downtown Bozeman and neighborhoods surrounding Montana State University. Belgrade has a growing population.  Jobs increased by 47% in the past decade except for a slight decrease in 2020, likely due to the COVID-19 pandemic. Employment is concentrated in downtown Bozeman and surrounding MSU.  The median home listing price in Gallatin County doubled between 2017 and 2023. While listing prices have since decreased, they are still well above pre-pandemic levels. Owner Occupied 55% Renter Occupied 45% 249 Gallatin Valley MPO LRTP Existing Conditions Report 3-1 3 TRANSIT CONDITIONS TRANSIT SERVICE OVERVIEW Streamline Transit serves Bozeman with fare-free connections in and around the city and to Belgrade, as illustrated in Figure 20 below. Streamline operates five fixed routes, including one commuter route that connects Bozeman to Belgrade, and seasonal transit service to Livingston from October through April. Streamline connects to the Skyline Bus System for travel to and from Big Sky and Jefferson Lines Intercity Bus Service. Streamline also operates Galavan, a complementary paratransit service for seniors and people with disabilities, in accordance with the Americans with Disability Act (ADA). Galavan operates within a two-mile radius of Streamline routes (Figure 21). Streamline serves several top destinations in Bozeman such as the MSU campus, Gallatin Crossing Mall, and downtown Bozeman. The Blueline and Goldline are the highest ridership routes, and each serves two of the three top destinations. As discussed in Chapter 2, the MPA has experienced significant growth beyond the downtown areas of Bozeman and Belgrade, and current transit service does not operate outside of the downtown areas. Primary gaps in service coverage include south of MSU to the Museum of the Rockies, west of Bozeman to Four Corners, greater Belgrade, and the airport. While the Pinkline does serve Belgrade, it operates only on weekdays with four trips in each direction, and it does not directly connect to the airport. During public outreach activities, members of the public also identified a gap in service to Gallatin College. Like many transit agencies, Streamline experienced a significant drop in ridership due to the COVID-19 pandemic, and current ridership is at 59% of pre-pandemic levels. Galavan ridership has trended similarly and is operating at 67% of pre-pandemic levels. Additionally, ridership is heavily influenced by the academic calendar at MSU, with levels dropping during summer and winter breaks and rising again when classes resume. The Transit Strategic Report provides a comprehensive overview of the transit system in the MPA, including current span of service and frequency times, historical ridership, bus stop inventory, paratransit service, and fleet and facilities. 250 Gallatin Valley MPO LRTP Existing Conditions Report 3-2 Figure 20 Streamline Fixed-Route Service Source: Streamline; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 251 Gallatin Valley MPO LRTP Existing Conditions Report 3-3 Figure 21 Streamline Paratransit Service Area Source: Streamline; MDT; MPA; Gallatin County; City of Bozeman; City of Belgrade 252 Gallatin Valley MPO LRTP Existing Conditions Report 3-4 Transit Routes and Facilities On weekdays, Streamline operates four routes locally within Bozeman and one commuter route between Bozeman and Belgrade. On weekends, four hourly local routes are available. The Northeast Bozeman shuttle operates to provide direct service to social services, such as the food bank and warming shelter, trails and local parks. Figure 22 provides an overview of all Streamline routes. Figure 22 Transit Route Information Route Service Span Frequency Ridership (2024) Weekday Blueline 6:45 am - 9:45 pm 60 minutes, with 30- minute service at peak hours while MSU is in session 110,390 Weekday Goldline 6:45 am - 10:09 pm 60 minutes, with 30- minute service at peak hours while MSU is in session 56,099 Weekday Purpleline 6:45 am - 7:36 pm 60 minutes, with 30- minute service at peak hours 25,601 Weekday Brownline 6:45 am - 6:47 pm 60 minutes 2,822 Pinkline (Belgrade) 7:04 am -7:01 pm Four trips in each direction 13,584 Livingston 5:50 am -6:45 pm One trip in the morning and evening - Late-night (not currently operating) 7:55 pm -2:25 am 30 minutes - Weekend Blueline 9:13 am - 6:13 pm 60 minutes 15,468 Weekend Goldline 9:32 am - 5:54 pm 60 minutes 2,879 Weekend Purpleline 9:15 am - 6:15 pm 60 minutes 4,359 Weekend Brownline 9:16 am - 6:16 pm 60 minutes 2,928 Shuttle to Northeast Bozeman 9:35 am -7:00 pm Six daily trips - Streamline has one major transfer station, located at the Bridger Park garage in downtown Bozeman, where riders can transfer between the Blueline, Purpleline, and Brownline. The transfer station has capacity for two buses without independent pull-in/pull-out. Streamline currently has 162 active stops in its system (Figure 23). Based on a September 2025 review of existing bus stops using Google Street View imagery, 113 stops are marked 253 Gallatin Valley MPO LRTP Existing Conditions Report 3-5 with a pole, sign face, and route indicator. Ten of these stops have a shelter and bench, and one has a standalone bench. The 49 stops without signage are primarily located along the following corridors, several of which being federal-aid, MDT-maintained roadways: 7th Ave, Huffine Ln, Main St, Oak St, and Rouse Ave. Figure 23 Bus Stop Amenities Amenity Number of Stops Percent Signage 102 63% No Signage 49 30% Signage + Shelter + Bench 10 6% Signage + Bench 1 1% Total Bus Stops 162 100% Source: Streamline, Google Street View 254 Gallatin Valley MPO LRTP Existing Conditions Report 3-6 OTHER REGIONAL PROVIDERS CatTracks Campus Shuttle CatTracks is a pilot program that provides Montana State University’s campus with a parking shuttle service. The shuttles connect MSU’s perimeter parking lots to key locations on the main campus. The service is available on weekdays from 7am to 6pm, and shuttles run every 30 minutes. During the academic year, two routes operate one-way loop service: the Blue line operates on a westbound loop, and the Gold line operates on an eastbound loop. From May to August, the Summer line replaces the Blue and Gold line service with one route that combines key destinations from both. Skyline Skyline is the public transportation service that operates Big Sky Connect within Big Sky as fare-free on-demand microtransit services. Skyline also operates fixed-route Link buses between Big Sky and Bozeman seven days a week. The Link route serves Bozeman with a stop at Walmart and MSU before continuing to Four Corners and then south to Big Sky. Fares are required on Link buses, and schedules differ between the summer and fall seasons. HRDC Community Commons The Human Resource Development Council (HRDC) is the founding organization of Streamline. In addition to Streamline’s fixed routes, HRDC implemented a shuttle service to northeast Bozeman for riders to access the new Community Commons campus. Shuttles operate six trips on weekdays excluding holidays. Bridger Bowl Streamline operates weekend seasonal bus service in partnership with Bridger Bowl to connect visitors to the ski area. Bridger Bowl is committed to operating their ski areas in the most socially responsible manner possible, and partnering with Streamline to provide transportation service significantly reduces the impact on Bridger Canyon Road during peak ski access times. Reach Reach is a non-profit organization that supports adults with developmental disabilities. Reach has a fleet of 20 vehicles to provide transportation services to clients to get to work, appointments, recreational activities, and other transportation needs. To receive services, 255 Gallatin Valley MPO LRTP Existing Conditions Report 3-7 riders must be eligible for Medicaid and qualify for the state’s Developmental Disability Program (DDP). Karst Stage Karst Stage is a charter-bus provider that operates an airport shuttle service for passengers going from Yellowstone International Airport to Big Sky, West Yellowstone, and Mammoth. The company is also the contracted provider for Streamline bus operators and maintenance workers. First Student First Student is the contracted provider for school bus service to the Bozeman school district and surrounding area. The company also provides charter bus service for other contracted trips in the area. Gallatin County Rest Home Gallatin Rest Home is a county owned and operated senior living facility in Bozeman. The facility provides transportation services for its residents to take to medical-related appointments in and around Bozeman. Taxis, TNCs, and Shuttles Taxi service throughout the area is offered by Greater Valley Taxi, Montana Yellow Cab, DeShields Rideshare Taxi, Spartan Taxi, and Bridger Taxi. The major hotels also provide shuttle service to/from the airport and Uber and Lyft operate service in the area. West Yellowstone The West Yellowstone Foundation operates on-demand roundtrip transit service from West Yellowstone Big Sky, Belgrade, and Bozeman every Tuesday and Thursday. Advanced reservations are required on a first-come, first-served basis, and medical appointment transportation requests are given priority. Windrider Transit Windrider Transit provides fare-free, fixed-route public and paratransit services within Park County. Dial-A-Ride (DAR) services are available for medical appointments to Bozeman on Tuesday and Wednesdays. 256 Gallatin Valley MPO LRTP Existing Conditions Report 3-8 Angel Line Angel Line provides door-to-door transportation service to residents of Livingston and the surrounding communities. Angel Line is open to anyone 60 years of age or older and to anyone with a doctor’s letter of disability. Angel Line is available for all trip purposes including medical appointments, work, and recreation, on weekdays excluding holidays. Madison County Transit Madison County Transit currently provides a senior citizen shuttle service to Bozeman twice a week on Tuesdays and Thursdays, and on the 4th week of each month, provides an additional trip on Wednesdays. Riders must call the service to schedule a reservation in advance. Inter-Regional Bus Service Greyhound and FlixBus provide scheduled service from Bozeman along the I-90 corridor to Billings, Butte, and Missoula, with connections to major hubs such as Seattle, Salt Lake City, and Denver. Jefferson Lines also serves Bozeman through coordinated routes within the Greyhound/FlixBus network. KEY FINDINGS  Historical trend data gives insight into Streamline’s previous performance levels and the state of the system today. Fixed Route  Before the pandemic, ridership on the fixed-route network was variable throughout the year with approximately 30,000 monthly boardings from October to April and dropping as low as 15,000 during the summer months. This is likely influenced by MSU’s academic calendar.  Ridership has been slow to recover, and while there is still seasonal variability, there is more stability in ridership numbers month over month, which could indicate more riders are using the service year-round.  The Blueline is the highest ridership route in the system with over 70,000 riders in 2023. The Goldline and Purpleline are the next highest ridership routes with 30,000 and 20,000 riders in 2023 respectively.  The three bus stops with the highest daily ridership are Walmart, Mendenhall & Black (downtown Bozeman transfer station), and the MSU Strand Union Building. The Blueline serves all three of these stops, while the other lines serve only one or two of the highest ridership stops. 257 Gallatin Valley MPO LRTP Existing Conditions Report 3-9  Out of 162 bus stops in the system, only 13 stops (6%) have a shelter and seating.  The market assessment performed in the TDP identified secondary trip- generators such as public parks, schools, and areas of Belgrade and new markets for service. Replica data in the market assessment also identified that trips between 6 and 7 a.m. are popular and could therefore be captured by Streamline if service hours were expanded to earlier than 7 a.m. Paratransit  Galavan ridership has trended similarly to the fixed-route service with slow recovery after the drop in ridership due to the COVID-19 pandemic, and ridership has not yet returned to pre-pandemic levels. Galavan has about 1,350 monthly riders in 2025, while pre-pandemic ridership averaged 2,400 per month. Community Engagement  Students use Streamline services more than non-students.  Respondents want more morning service between 6 and 7 a.m. and more afternoon peak service between 3 and 6pm, as well as more service to Bozeman Yellowstone International Airport, Four Corners, the YMCA, Billings Clinic, Livingston, and Bridger Bowl.  The most common reason non-riders do not take transit is because of lack of service near their destinations. Former transit riders expressed similar reasons for no longer using transit because of infrequent service and inefficient routes. 258 Gallatin Valley MPO LRTP Existing Conditions Report 4-1 4 MULTIMODAL TRANSPORTATION CONDITIONS This chapter summarizes the rest of the transportation network in the study area, including driving, walking, biking, and transportation safety. FUNCTIONAL CLASS SYSTEM The roadway system is the most important piece of infrastructure in a transportation network to facilitate the movement of vehicles, public transportation, freight, active transportation, and other modes. The MPA contains 838 miles of roadway, which are broken down by functional class in Figure 24. Functional classification helps define the purpose of roads in the network and the expected traffic volumes, configuration, speed, and land use on and around them. A functional classification map of roadway for the GVMPA is shown in Figure 25. For the LRTP, roadways classified as collectors and above in MDT’s classification system will be examined for improvements along the corridors. Local jurisdictions within the MPA use their own functional classification systems, and these will also be considered when evaluating and prioritizing projects to capture more current conditions on the roadways. Most lane miles within the MPA area are owned by Gallatin County (approximately 36%) or the City of Bozeman (approximately 32%). A large share is also owned by the State of Montana (approximately 17%). The remaining streets are owned by private entities, Montana State University, or the City of Belgrade. Figure 24 Functional Classification Roadway Miles Interstate Principal Arterial Minor Arterial Major Collector Minor Collector Local Street 40 miles 42 miles 50 miles 69 miles 15 miles 622 miles Source: MDT 259 Gallatin Valley MPO LRTP Existing Conditions Report 4-2 Figure 25 Highway Functional Classification Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade Potential new road segments have been identified throughout the MPA to coordinate future land use and community planning. Based on Bozeman’s 2017 Transportation Master Plan and the Greater Triangle Area Transportation Plan, 105.3 miles of new road are proposed to be built in Bozeman, Belgrade, Four Corners. As shown in Figure 26, the majority of new roads will be collector roads, with additional minor arterial and principal arterial roads planned to accommodate future growth through the limit of their municipal planning boundary. A new network of collector roads is proposed to be built southwest of MSU between Cottonwood 260 Gallatin Valley MPO LRTP Existing Conditions Report 4-3 Road and S 19th Avenue to support the increased development in the area. Similarly, another new network in the northern part of Bozeman between Baxter and Valley Center Road is also proposed to increase connectivity. Kagy Boulevard, a minor arterial through Bozeman is also proposed to be extended farther west to Cottonwood Road. An additional road network is proposed north of Four Corners bounded by Jackrabbit Lane, Cottonwood Road, Cobb Hill Road, and Goldenstein Lane. Identified road segments are intended to be built as the land develops and needs arise and therefore do not have committed funding and are not on a defined construction timeline. Figure 26 Proposed New Road Classifications Principal Arterial Minor Arterial Collector Bozeman 4.8 mi 9.9 mi 22 mi Greater Triangle Area 7.4 mi 16.3 mi 44.9 mi Source: City of Bozeman; Greater Triangle Area Transportation Plan The Belgrade LRTP also identifies several new road segments to connect major-use roads. Frank Road experiences heavy freight activity, and new road connections to Alaskan Frontage Road and Amsterdam Road can improve freight movement. Additionally, a new network of connector roads is proposed northwest of the airport between Bolinger Road and Dry Creek Road. The LRTP may examine roadway expansion projects during project identification for inclusion in the plan. Evaluating land use around proposed expansion corridors and the MPO’s goals and objectives will help guide any recommendations for expansion in the region. 261 Gallatin Valley MPO LRTP Existing Conditions Report 4-4 TRANSPORTATION ASSET CONDITIONS Transportation asset conditions are an important performance measure in the region. The GVMPO adopted MDT’s statewide performance targets, and pavement and bridge conditions is a critical measure for the overall viability of the transportation network. Figure 27 displays the current MDT-reported conditions of select bridges within the MPA. Out of a total of 55 bridges inspected by MDT within the region between 2021 and 2024, ten are rated as being in “good” condition, 44 in “fair” condition, and one in “poor” condition. 34 of the 55 bridges inspected by MDT are owned by the state, 17 by the county, and four by the cities of Belgrade and Bozeman. The single bridge in poor condition is located at the I-90 crossing of Bear Creek at the far eastern edge of the MPA area. Figure 27 also shows the current condition of pavement along roadways inspected by MDT in 2024. Collected for the 2024 Montana Pavement Condition Report, MDT inspected 91 miles of pavement within the MPA area, focusing on the MDT-designated interstate, non-interstate National highway system, primary, and secondary roadway network. MDT collects data on various aspects of pavement quality including ride quality, rutting, and cracking. These aspects are combined into a single measure, Overall Performance Index (OPI), to assess the health of individual pavement sections and of the pavement network. Observing the OPI of pavement within the region, 31 miles of roadway were rated as having pavement in “good” condition, 46 miles in “fair” condition, and 14 miles in “poor” condition. OPI is measured on a 0-100 scale with roads being in good condition for values 63 and above and poor condition for values below 45.7 MDT has current plans for paving projects on North and South 19th Avenue and North 7th Avenue in 2025 and 2026. 72024 Pavement Performance and condition report. Montana Department of Transportation, 2024. 262 Gallatin Valley MPO LRTP Existing Conditions Report 4-5 Figure 27 Transportation Asset Conditions Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 263 Gallatin Valley MPO LRTP Existing Conditions Report 4-6 GOODS MOVEMENT Figure 28 displays the primary goods movement network within the MPA, comprised of highways, railroads, and the Bozeman Yellowstone International Airport (BZN). Also shown are areas currently zoned for industrial uses, representing locations of likely freight activity. The BNSF-owned Montana Rail Link Subdivision traverses the MPA area from northwest to southeast, passing through Downtown Belgrade and north and east Bozeman. Including two spur lines in Belgrade and Bozeman, there are 13 at-grade railroad crossings within the MPA. Figure 28 Goods Movement Network Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 264 Gallatin Valley MPO LRTP Existing Conditions Report 4-7 Highways The United States Department of Transportation’s (USDOT) Draft National Multimodal Freight Network (NMFN) includes a selection of highways and railroads that represent critical links for the movement of goods across the country. Within the GVMPA, the NMFN includes I-90 and the BNSF main line. Further, USDOT has designated the National Highway Freight Network (NHFN) to strategically direct federal resources and policies to improve highway portions of the country’s freight network. Within Montana, the NHFN is comprised of interstate highways, including I-90. Roadway-based goods movement through and within the MPA area primarily occurs along key portions of the MDT system. These include roadways designated as interstate, non- interstate National Highway System, and primary routes as listed below.  Interstate  I-90 (throughout the GVMPA)  Non-Interstate National Highway System  US 191 (Gallatin Rd)/MT 85 (Jackrabbit Ln) corridor  US 191 (Huffine Ln/Main St) corridor  Main St (Belgrade)  Airway Blvd  N 7th Ave  N 19th Ave  Primary  MT 84  MT 86  Frontage Rd  N 7th Ave Local jurisdictions, including Gallatin County and the cities of Belgrade and Bozeman, do not currently designate any roadways as goods movement/freight routes, though they have the authority to do so. As the region continues to grow, local traffic interaction with freight movement will be important to consider for safety and performance targets. 265 Gallatin Valley MPO LRTP Existing Conditions Report 4-8 Railroads BNSF operates approximately 32 trains through the at-grade crossings in the MPA during the day and 28 at night.8 Rail crossings can impact mobility by causing congestion, diverting traffic to other roads not meant for high traffic volumes, and delaying emergency response while waiting for trains to cross. At-grade crossings also present safety risks with vehicles or pedestrians attempting to cross. Aviation Several air cargo companies operate out of Bozeman Yellowstone International Airport (BZN), including FedEx and UPS. As reported in the airport’s 2025 Annual Financial Report, over 2.7 million pounds of cargo moved through the airport in 2025, which was a 22.2% decrease from the 3.5 million pounds moved in 2024. Cargo movement is an important indicator of growth as the majority of the cargo processed at the airport is off-loaded and continues to move through the freight network on the roadway system. Passenger traffic in BZN has continued to increase year over year and in 2025 increased by 5.4% from 2024 to over 2.6 million passengers. The increase can be attributed to several factors, including strong demand for travel to popular destinations in the Gallatin Valley, and population growth in Southwest Montana as a whole. As the region experiences more seasonal growth, the MPO must balance the transportation needs of permanent residents while supporting the area as a popular destination for visitors. 8 USDOT Federal Railroad Administration, FRA Crossing Viewer. 266 Gallatin Valley MPO LRTP Existing Conditions Report 4-9 HOW PEOPLE GET AROUND A reliable transportation system is essential for the livelihood of all residents, connecting them to neighborhoods, commercial and recreational areas, and job centers. Understanding how people travel will provide insight for opportunities to create a better traveling experience for them. As shown in Figure 29, driving alone is the primary transportation mode for 68% of area residents who commute to work. While the overall number of residents who drive alone to work has increased since 2019, the overall mode-share saw a 5% decrease, as more people are working from home. A mall percentage of residents take public transportation, although the share increased by 0.1% in 2023. Residents are more likely to carpool, walk, or ride a bike, though each has seen a one to two percent decrease for these modes from 2019. Remote work more than doubled in 2023, likely due to changes to commute patterns from the COVID-19 pandemic. Commute to work data does not include travel patterns for the Montana State University students in Bozeman. Figure 29 Percent of Commute Modes 2019 vs. 2023 Source: American Community Survey (ACS) 5-Year Estimates, 2019 and 2023 73% 9.4%0.5%3.2%6.3%6.8%0.9% 68% 7.8%0.6%2.5%6% 14.1% 1% 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Drive Alone Carpool Public Transit Bicycle Walking Remote work Taxi, Motorcycle, or other meansNumber of Commuters2019 2023 267 Gallatin Valley MPO LRTP Existing Conditions Report 4-10 DRIVING IN THE GALLATIN VALLEY Driving is the primary way people travel throughout the Gallatin Valley. The busiest corridors are the major roadways that connect Bozeman and Belgrade, and the roadways within each city that connect to the regional network. As shown in Figure 30, the roadways with the most vehicle trips are along I-90, Jackrabbit Lane, 19th Avenue, Main Street, and Huffine Lane. Each of these streets carry more than 20,000 vehicle trips per day. Other streets with high volumes include 7th Avenue, Oak Street, and Airway Boulevard in Belgrade. Figure 30 Annual Average Daily Trips (AADT) Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 268 Gallatin Valley MPO LRTP Existing Conditions Report 4-11 Figure 31 displays roadway volume capacity (V/C) ratios in 2022 throughout the MPA. V/C is a strong indicator of congested locations, and congestion is an important metric to evaluate alongside AADT because it illustrates where there are excess vehicle trips beyond the road capacity. Key corridors experiencing high congestion levels include 19th Avenue, Huffine Lane/Main Street, and Kagy Boulevard. Figure 31 Roadway Volume Capacity Ratios, 2022 Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 269 Gallatin Valley MPO LRTP Existing Conditions Report 4-12 Understanding paths of travel and where trips are starting and ending is important for identifying regional mobility patterns and transportation gaps. Top origin-destination pairs for travel in and out of the MPA were identified using Replica, an activity-based travel model that simulates where residents, visitors, and commercial vehicle travel happens in an area on a typical day. Figure 32 illustrates the most common paths of travel for the MPA, and Figure 33 details the total number of daily trips for each origin-destination pair, as well as the total number of daily trips within the MPA boundaries. Other than intra-MPA travel, the largest number of trips occur between the MPA and greater Gallatin County, Park County, and Madison County. These locations include top recreational areas such as Big Sky, Bridger Bowl, and Yellowstone National Park, which may contribute to trip generation. Figure 32 GVMPO Origin-Destination Travel, Spring 2025 Source: Replica, MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 270 Gallatin Valley MPO LRTP Existing Conditions Report 4-13 Figure 33 GVMPO Origin-Destination Trips, Spring 2025 Origin/Destination In Out Greater Gallatin County 32,718 31,773 Park County, MT 5,771 5,430 Madison County, MT 4,637 3,973 Broadwater County, MT 1,492 1,515 Jefferson County, MT 773 760 Teton County, WY 192 437 Park County, WY 307 92 Meagher County, MT 181 182 Fremont County, ID 147 124 Intra-MPO 432,711 Source: Replica Understanding travel patterns within the MPA is also critical to identifying local transportation needs and gaps in service. Figure 34 and Figure 35 detail the origin- destination trips occurring between Bozeman, Belgrade, and Four Corners. Bozeman and Belgrade is the top origin-destination pair and has the largest number of trips on a given day. This indicates there could be demand for more transit service beyond the current commuter route that operates between the two cities. There is no current transit service to Four Corners, but the trip volumes indicate that it is growing origin-destination, especially with Bozeman. Figure 36 shows the distribution of trips throughout the day within the MPA. There are three distinct peaks in trips at 7 a.m., 12 p.m., and the daily peak at 3 p.m., and the majority of trips occur between 7 a.m. and 3 p.m. 271 Gallatin Valley MPO LRTP Existing Conditions Report 4-14 Figure 34 Intra-GVMPO Origin-Destination Travel, Spring 2025 Source: Replica, MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade Figure 35 Intra-GVMPO Origin-Destination Trips, Spring 2025 Origin/Destination Total Trips Bozeman - Belgrade 87,500 Four Corners - Bozeman 51,850 Belgrade - Four Corners 20,800 Source: Replica 272 Gallatin Valley MPO LRTP Existing Conditions Report 4-15 Figure 36 Intra-GVMPO Trips by Time of Day, Spring 2025 Source: Replica 26,721 29,505 36,957 0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 1a 2a 3a 4a 5a 6a 7a 8a 9a 10a 11a 12p 1p 2p 3p 4p 5p 6p 7p 8p 9p 10p 11p 12a 273 Gallatin Valley MPO LRTP Existing Conditions Report 4-16 WALKING An accessible and complete sidewalk network is essential for people to walk or use mobility devices to safely reach their destination. Walking and rolling represent the most affordable way to travel and plays a part in most trips, such as walking from a parking space or getting to a bus stop. As the region continues to grow, a complete pedestrian network will need to be a priority to meet community mobility needs. Figure 37 displays missing sidewalks and gaps in shared use paths throughout Bozeman, which were identified in the Bozeman Bicycle and Pedestrian Gap Analysis study in March 2025. These gaps are defined in the study as linear gaps, which are sections of missing sidewalks, trails, or shared use paths that create gaps between existing built facilities. Linear gaps can be experiential, such as a section of sidewalk within a shared-use path, or planning gaps, which are potential strategic extensions of the network. According to the gaps analysis study, northwest Bozeman and areas south of MSU have a high concentration of sidewalk gaps, which can make it less desirable for riders to use the fixed-route service that operates in those areas. Filling in sidewalk gaps can make it safer and more accessible for riders to use transit. Complete sidewalk inventory data is not available for Belgrade or the greater MPA. The Greater Gallatin Triangle Area Transportation Plan and Belgrade Transportation Plan note there are sidewalks along some main streets and within residential neighborhoods in their respective study areas, but most of the existing pedestrian infrastructure lacks connectivity. The 2021 Triangle Trails plan proposes an expanded trails network to connect all portions of the triangle area within the MPA. New trails and shared-use paths could be used for walking, biking, rolling, or horseback riding and would connect to existing pedestrian infrastructure to support regional connectivity. 274 Gallatin Valley MPO LRTP Existing Conditions Report 4-17 Figure 37 Bozeman Pedestrian Network Gaps Source: City of Bozeman 275 Gallatin Valley MPO LRTP Existing Conditions Report 4-18 BIKING AND ROLLING Providing high quality and connected bicycle facilities is essential for supporting safe, healthy, and more affordable living in the Gallatin Valley. It also expands opportunities for physical activity and provides more reliable options for non-drive alone trips. Figure 38 displays existing bicycle infrastructure throughout the GVMPA, which were identified in the 2023 Bozeman Parks, Recreation, and Active Transportation Plan (PRAT) and Triangle Transportation Plan. Bike facilities are defined as existing infrastructure that can accommodate biking and rolling activities. Existing bike lanes in Bozeman are generally striped lanes adjacent to general purpose lanes, while shared-used paths are concrete or asphalt paths separated from vehicle traffic that may accommodate biking, walking, or rolling. The natural surface trails are dirt or unpaved trails that may be used more for recreational biking, horseback travel, or function as connector trails. Most dedicated bike lanes are located in northwest Bozeman and around MSU, so there is opportunity to expand the bike network into downtown Bozeman and other residential areas to provide more mobility connections. Dedicated bike lane data is not available for Belgrade, and existing shared-use paths and natural trails are limited, which presents another opportunity for bike network expansion. The 2021 Triangle Trails plan proposes an expanded off-street trails network in the southwest triangle area of the MPA. Commuter trails would connect to the greater Gallatin Valley, enabling more accessible biking opportunities to the urbanized areas of the region. Connector trails would link communities within the triangle area to each other to improve connectivity to schools, parks, and other points of interest. Neighborhood trails would combine with parks and open spaces to allow easier access to other neighborhood communities, parks, and schools. Current planned bike route projects include a new 3.25-mile route from E Valley Center Road to the Gallatin Valley Mall along the Cattail Creek Corridor, which was a key project recommended in the 2023 PRAT plan, a new 3-mile shared-use path on Huffine Lane between Bozeman and Four Corners, and a 2.5-mile shared-use path along Frontage Road from Valley Center Spur to the Cherry River Access. Additionally, the City of Bozeman development code requires shared-use path construction with all new arterial and collector roadways. 276 Gallatin Valley MPO LRTP Existing Conditions Report 4-19 Figure 38 Existing Bicycle Facilities Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade 277 Gallatin Valley MPO LRTP Existing Conditions Report 4-20 TRANSPORTATION SAFETY The Montana Department of Transportation (MDT) maintains records on vehicle crashes. Figure 39 displays historical crash trends within the GVMPA between 2015 and 2024. The number of annual crashes has fluctuated throughout the ten-year period, including a high of 1,469 crashes in 2022 and a low of 1,160 crashes during reduced travel conditions during the COVID-19 pandemic in 2020. The annual number of fatal and serious injury (FSI) crashes trended downward between 2015 and 2019, but abruptly increased in 2020, continuing an upward trajectory that peaked at 40 crashes in 2023 (Figure 40). The number of FSI crashes decreased to 27 in 2024. Figure 39 All Crashes, 2015-2024 Source: MDT Figure 40 Fatal and Serious Injury (FSI) Crashes, 2015-2024 Source: MDT 0 200 400 600 800 1,000 1,200 1,400 1,600 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 0 5 10 15 20 25 30 35 40 45 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 278 Gallatin Valley MPO LRTP Existing Conditions Report 4-21 Figure 41 shows the count of total FSI crashes at locations throughout the GVMPA between 2015 and 2024. The following corridors experience a high concentration of FSI crashes:  Huffine Ln between Four Corners and W College St  19th Ave between W College St and I-90  W Oak St between N 19th Ave and N 7th Ave  Main St between W College St and Rouse Ave  Jackrabbit Ln between W Main St and Baxter Ln  W College St between W Main St/Huffine Ln and S 8th Ave  Frontage Rd/N 7th Ave between Airport Rd and W Main St  I-90 throughout the GVMPA 279 Gallatin Valley MPO LRTP Existing Conditions Report 4-22 Figure 41 Fatal and Serious Injury Crash Locations 2015-2024 Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade Figure 42 shows the count of crashes involving people walking, biking, and rolling at locations throughout the GVMPA between 2015 and 2024. Crashes involving people walking, biking, and rolling are primarily located in areas likely seeing higher volumes of pedestrian and bicycle activity, such as Downtown Bozeman, the Montana State University campus, and Downtown Belgrade. Outside of these core areas, concentrations of crashes involving people walking, biking, and rolling are observed along the 19th Ave corridor, the 7th Ave corridor, near Gallatin Crossing, and along Jackrabbit Ln near the I-90 interchange. 280 Gallatin Valley MPO LRTP Existing Conditions Report 4-23 Figure 42 Bicycle and Pedestrian Involved Crash Locations 2015-2024 Source: MDT, MPA, Gallatin County, City of Bozeman, City of Belgrade Figure 43 compares the severity of crashes involving people walking, biking, or rolling to those only involving motor vehicles between 2015 and 2024. Over this ten-year period, 254 crashes involved a person walking, biking, or rolling, while crashes involving only motor vehicles totaled 12,816. A large difference in crash severity was observed for those involving people walking, biking, and rolling and those only involving motor vehicles. While crashes involving people walking, biking, or rolling only accounted for 1.9% of all crashes, they made up 7.5% of injury crashes and 16.1% of FSI crashes. Further, over 88% of crashes involving a 281 Gallatin Valley MPO LRTP Existing Conditions Report 4-24 person walking, biking, or rolling resulted in an injury, compared to just 22% of crashes involving only motor vehicles. Figure 43 Motorized Vehicle Only Crashes vs. Pedestrian and Bicycle Crashes by Injury Level, 2015- 2024 Source: MDT Figure 44 show the distribution of crashes throughout the day of vehicle-only crashes and crashes involving a bicycle or pedestrian. The time of day with the most crashes is at 5pm, which aligns with the evening commute period when many people are leaving from work or school. Figure 45 shows the fatal and serious injury crashes by time of day, which follow a similar pattern to other crashes and most often occur at 5pm. 2.1% 20.5% 19.7% 68.1% 78.2% 11.4% 0%10%20%30%40%50%60%70%80%90%100% Motorized Vehicle Only (n = 12,816) Pedestrian or Bicyclist Involved (n = 254) Fatal and Serious Injury Minor and Possible Injury No Injury/Unknown 282 Gallatin Valley MPO LRTP Existing Conditions Report 4-25 Figure 44 Crashes by Time of Day, 2015-2024 Source: MDT Figure 45 Fatal and Serious Injury (FSI) Crashes by Time of Day, 2015-2024 Source: MDT 0 5 10 15 20 25 0 200 400 600 800 1,000 1,200 1,400 12a 1a 2a 3a 4a 5a 6a 7a 8a 9a 10a11a 12p 1p 2p 3p 4p 5p 6p 7p 8p 9p 10p11p Pedestrian/Bike InvolvedVehicle OnlyVehicle Only Pedestrian/Bike Involved 0 5 10 15 20 25 30 35 0 200 400 600 800 1,000 1,200 1,400 12a 1a 2a 3a 4a 5a 6a 7a 8a 9a 10a 11a12p 1p 2p 3p 4p 5p 6p 7p 8p 9p 10p11p FSI CrashesTotal CrashesAll Crashes FSI Crashes 283 Gallatin Valley MPO LRTP Existing Conditions Report 4-26 Most crash reports include information on factors that contributed to the crash. Crash factors can be environmental factors, such as road conditions, or human factors, such as reckless driving. As shown in Figure 46, the most common crash factor for crashes within the MPA is driving in a distracted, inattentive, or careless manner. Figure 47 details the most common crash factors for fatal and serious injury FSI) crashes, with driving under the influence of alcohol, drugs, or other substances being the most common contributing factor in FSI crashes. Figure 46 Crash Factors, 2015-2024 Source: MDT 4,740 2,397 1,743 1,241 909 898 707 435 326 261 237 161 180 94 63 34 0 1,000 2,000 3,000 4,000 5,000 Drove in Distracted, Inattentive or Careless Manner Drove Too Fast For Conditions Ran Off Roadway Under the Influence of Medications/Drugs/Alcohol Failed To Keep In Proper Lane Drove in Erratic, Reckless, Negligent or Aggressive Manner Over-Correcting/Over-Steering Failed to Yield Right-Of-Way Followed Too Closely Improper Turn Swerved or Avoided Due to Road/Weather Element Disregarded Other Traffic Sign/Road Markings Emotional Asleep or Fatigued Sick or Fainted Physically Impaired 284 Gallatin Valley MPO LRTP Existing Conditions Report 4-27 Figure 47 Fatal and Serious Injury (FSI) Crash Factors, 2015-2024 Source: MDT 81 62 48 44 29 29 24 10 10 5 5 5 3 0 10 20 30 40 50 60 70 80 90 Under the Influence Of Medications/Drugs/Alcohol Drove in Erratic, Reckless, Negligent or Aggressive Manner Ran Off Roadway Drove in Distracted, Inattentive or Careless Manner Failed to Keep in Proper Lane Over-Correcting/Over-Steering Drove Too Fast For Conditions Exceeded Posted Speed Limit Disregarded Other Traffic Sign/Road Markings Asleep or Fatigued Emotional Sick or Fainted Physically Impaired 285 Gallatin Valley MPO LRTP Existing Conditions Report 4-28 KEY FINDINGS  Mode share in the Gallatin Valley has remained consistent since 2019, except for an increase in remote work, likely due to the COVID-19 pandemic which allowed more employees to work from home.  Drive-alone trips continue to be the majority of commute trips in MPA area. Public transit has the smallest percentage of trips at 0.6% in 2023.  I-90, Jackrabbit Lane, 19th Avenue, Main Street, and Huffine Lane are key corridors that carry more than 20,000 vehicle trips per day.  The majority of roadway pavement is in good or fair condition, but sections of 19th Avenue and E Main Street are in poor condition.  These key corridors are also critical links for the movement of goods across the country.  8.5% of commute trips in 2023 were walking or biking, and Gallatin Valley can expand its active transportation networks to improve connectivity and mobility across the region.  Planned active transportation projects such as the Cattail Creek Corridor and Huffine Lane shared-use paths will fill in gaps for key biking and walking connections.  Top origin-destination pairs, not within the MPA, are between the MPA and greater Gallatin County, as well as Park County and Madison County.  Fatal and serious injury crashes had been increasing since 2019 but sharply decreased in 2024. From 2015 to 2024, crashes involving people walking or bicycling were less than 2% of all crashes, but 20% of crashes involving pedestrians or bicyclists were FSI crashes.  Most crashes occur between 4 p.m. and 6 p.m. The top crash factors are driving distracted or in a careless/inattentive manner, driving too fast for the conditions and running off the roadway. The most common crash factor reported for fatal and serious injury crashes is driving under the influence of alcohol, drugs, or medication. 286 Gallatin Valley MPO LRTP Existing Conditions Report 5-1 5 PROJECTED CONDITIONS The foundation of projecting future conditions is estimating 2050 travel demand on the “Existing plus Committed (E+C)” network. The E+C network is the group of capacity expanding projects that have been completed since the 2022 travel demand model base year combined with capacity expanding projects that are not currently built but are either in progress or otherwise committed to construction. The committed projects in the E+C network are shown below in Figure 48. Figure 48 Committed Projects Project Name Description Source Griffin (7th to Rouse) This project consists of reconstructing Griffin Drive, from the intersection of N. 7th Avenue to Rouse Avenue, to a three-lane urban minor arterial standard. This includes one travel lane in each direction, bike lanes on each side, curbs, and gutters 2017 Bozeman Transportation Master Plan Belgrade-South Widen to 5-lanes, add shared use path on east side, and add signals at Frank and Cameron Bridge 2018 Belgrade Long Range Transportation Plan Slope Flattening Belgrade Safety project to include widened shoulders, flatter slopes, center turn lane/turn bays 2018 Belgrade Long Range Transportation Plan Rouse Ave (Main to Oak) Reconstruction with added capacity to a three- lane urban principal arterial standard 2017 Bozeman Transportation Master Plan Kagy Blvd (S. 19th Ave to Willson Ave) Interim Improvements Improve Kagy Boulevard from approximately 500 feet west of South 11th Avenue to approximately 500 feet east of South 7th Avenue to a full three- lane cross section with two-way left-turn lane 2017 Bozeman Transportation Master Plan 287 Gallatin Valley MPO LRTP Existing Conditions Report 5-2 In order to estimate future travel demand, the MPO partnered with local and regional land- use planning teams to project housing and employment growth out to 2050. The regional socioeconomic growth projections are allocated to small units of geography known as Transportation Analysis Zones (TAZs) and are consistent with currently adopted plans, environmental constraints, infrastructure availability, and vacant developable land. State and federal land use agencies such as the Department of Natural Resources and Consvation (DNRC), Bureau of Land Management (BLM), US Forest Service, and Montana Fish, Wildlife, and Parks (FWP) manage lands surrounding the MPA, so while they would not be affected by growth within the MPA, they are important to acknowledge for future growth in the region. The geographical area covered by the travel demand model is expected to add 32,300 new households between 2022 and 2050, with most of the occuring within the MPA. Figure 49 shows the TAZ-level distribution and intensity of the projected household growth within the MPO boundary. Figure 49 2022-2050 New Households Source: Travel Demand Model 288 Gallatin Valley MPO LRTP Existing Conditions Report 5-3 The geographical area covered by the travel demand model is expected to add 55,500 new jobs between 2022 and 2050, with most of the occuring within the MPA. Similar to the household growth projections, the employment projections are consistent with currently adopted plans, environmental constraints, infrastructure availability, and vacant developable land. Figure 50 shows the TAZ-level distribution and intensity of the projected employment growth within the MPA. Figure 50 2022-2050 New Jobs Source: Travel Demand Model 289 Gallatin Valley MPO LRTP Existing Conditions Report 5-4 Figure 51 below shows how and where future travel demand (generated by the projected growth in households and jobs) impacts the regional roadway network. The map shows the project growth in vehicle volumes between 2022 and 2050. Not surprisingly, the map shows that vehicle volumes are expected to grow significantly in locations where future households and job growth is concentrated or where alternative travel routes are limited. Figure 51 2022-2050 Growth in Vehicle Volumes Source: Travel Demand Model 290 Gallatin Valley MPO LRTP Existing Conditions Report 5-5 Figure 52 below shows the future vehicle volumes from Figure 51 relative to the underlying carrying capacities of roadways segments. This map of volume-to-capacity ratios is oftentimes used as an initial indicator of need for individual roadways or corridors. The red segments on the map show where future needs are expected to be most acute, while the orange segments show segments where future needs may emerge. It is important to note that this is a depiction of need prior to the implementation of any projects or planning/policy interventions that are intended to address needs and, as such, it represents a key data point that will help inform the recommendations ultimately included in the long-range plan. Figure 52 2050 Volume-to-Capacity Ratios Source: Travel Demand Model 291 Gallatin Valley MPO LRTP Existing Conditions Report 6-1 6 CONCLUSION This report summarizes the state of the current transportation conditions in the Gallatin Valley Metropolitan Planning area and will be the foundation for creating recommendations for the MPO’s first Long-Range Transportation Plan. Key findings from this analysis and initial public engagement will be used to establish the Goals & Objectives of the plan and create an evaluation framework for assessing the potential of projects to best meet the needs of the community within the limitations of funding available. Few regions of its size are enjoying the same levels of activity as the MPA area. With a booming population, expanding economy, beautiful setting, flagship state university campus, and proximity to world-famous tourist destinations, the area faces a time of immense opportunity. From the start of the last decade, population has risen steadily, which has been compounded by an in-flux of high-net-worth individuals and remote workers from other states. This has resulted in more diversification of the economy with a growing service industry and new opportunities in technology and medicine, but wages for many are not aligned with the rising cost of living and housing. Ridership on both fixed-route transit service and paratransit has been slow to recover since the Covid-19 pandemic, however seasonal variability has declined, meaning more riders are using the service throughout the year. Bus stops with the highest daily ridership are Walmart, the downtown transfer station, and the MSU Strand Union Building. Market assessments indicate that trip-generators like public parks, schools, and parts of Belgrade may have latent demand for additional service. While remote work has grown, drive-alone trips continue to be the majority of commute trips in the region, with key corridors like 19th Avenue, Jackrabbit Lane, Main Street, and Huffine Lane carrying the highest volumes of traffic and freight after I-90. While walking and biking commute mode shares have remained relatively constant (around 8.5%) there is tremendous potential for growth in daily trip making and recreation through the delivery of recent plans to close sidewalk network gaps throughout the MPA and expand bicycle routes and shared- use paths to provide greater multimodal connectivity and access to destinations. There is also the need for more low-stress facilities for travelers of all ages and abilities. While people walking and biking made up less than two percent of crashes in the last decade, they constitute a fifth of fatalities and severe injuries, and over 50% of these crashes occurred at road intersections. These conditions will inform the new goals and objectives of the LRTP. 292 Gallatin Valley MPO LRTP Existing Conditions Report 6-2 APPENDIX A – PLAN DOCUMENT REVIEW 293 Gallatin Valley MPO LRTP Existing Conditions Report 6-3 Additional Local, State, and Regional Plans Figure 53 Documents Reviewed with Key Projects Identified Planning Document/Author Date Published Overview of the Document Key Projects from Studies City of Bozeman Parks, Recreation, and Active Transportation Plan Prepared by Agency Landscape + Planning, Sanderson Stewart, Berry Dunn, Alta Planning, Groundprint, and ETC Institute October 2023 The Parks, Recreation, and Active Transportation Plan (PRAT) is an update to the 2007 Parks, Recreation, Open Space, and Trails Plan (PROST). It establishes a vision and goals for the city’s parks, trails, and recreation facilities, with a focus on creating a cohesive trail system to connect community members to open spaces. Key issues identified by the community are as follows:  Wide roads and high vehicular speeds make crossing to parks difficult.  Residents and visitors love the existing trail network but want a more connected trail and park system. There is a lack of transitions between existing trails, shared use paths, and bicycle lanes.  Community members want to see more investments in natural trails, on-street bicycle lanes, and shared use paths. Project recommendations aim to address key issues.  Refer to the Proposed Active Transportation Map on page 83 for all proposed facilities. Belonging in Bozeman – Equity and Inclusion Plan Prepared by Morten Group 2023 The goal of the Belonging in Bozeman Equity and Inclusion Plan is to ensure that all residents, visitors, and employees can thrive regardless of their race, identity, or life circumstance. The plan covers multiple areas, including housing, transportation and access, healthcare, education, childcare and youth programs, economy, and safety. Transportation goals include:  Expand reliable public transit and paratransit services, prioritizing services during wintertime.  Center the most vulnerable road users in transportation infrastructure design.  Prioritize equity in parking management practices. While recommendations in this plan need further studies, they are relevant to inform the LRTP’s project list.  Leverage new revenue streams to support increased frequency of fixed-route transit and paratransit services.  Develop standards and formalize processes for ensure bus stops are well lit, comfortable, safe for women and girls, shaded from sun, and accessible to riders during the winter.  Pilot a “Snow Angels” program to connect volunteers and people with disabilities, older adults who are unable to remove snow from their sidewalks.  Prioritize snow and ice removal at transit stops.  Retrofit bicycle lanes to separate vehicles and cyclists. 294 Gallatin Valley MPO LRTP Existing Conditions Report 6-4 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  Leverage expertise of the disability community to educate design and building professionals on accessible community design.  Develop a public outreach and education campaign about the proper use of accessible parking spaces and access aisles. Bozeman Climate Plan Prepared by Brendle Group and Logan Simpson Group 2020 The Bozeman Climate Plan sets strategic priorities and actions to address climate change impacts, with the goal of creating a safe community while fostering a thriving economy and high quality of life. The City of Bozeman aims to reduce carbon emissions by 26% from 2008 levels by 2025, achieve 100% clean electricity by 2030, and reach carbon neutral by 2050. To meet these goals, the plan identifies three priorities followed by actions: Increase walking, bicycle, carpooling, and transit use.  Prioritize regional multimodal planning and connectivity.  Pursue innovative funding for pedestrian and bicycle connections and network.  Improve maintenance of multimodal infrastructure.  Pursue sustainable transit funding and expansion. Decrease direct vehicle emissions.  Support community EV roadmap development.  Collaborate to install publicly accessible EV infrastructure.  City fleet and transit EV investment.  Advocate for EV utility rates, incentives, infrastructure, and efficiency standard.  Limit wasteful vehicle emissions.  Support EV group buy and outreach. Improve air travel efficiency.  Build awareness of air travel impacts and alternatives.  Advocate for increased air travel efficiency.  No projects listed. Downtown Bozeman Improvement Plan Prepared by Agency Landscape + Planning, Groundprint, Intrinsik May 2019 Downtown Bozeman is experiencing rapid growth, with new homes, offices, hotels, restaurants, and shops, attracting more residents and jobs. To help accommodate the growth, the Downtown Bozeman Improvement Plan established five principles. Parking  Improve and expand downtown parking by simplifying parking requirements, adding on-street parking where possible, and replacing the parking lot with a parking structure at Olive Street and Black Avenue. 295 Gallatin Valley MPO LRTP Existing Conditions Report 6-5 Planning Document/Author Date Published Overview of the Document Key Projects from Studies Architecture, Leland Consulting  The heart of a thriving Bozeman: Create connections within downtown and surrounding districts and manage parking to ensure balanced supply and demand.  More than a Main Street: Reinforce downtown as a city center, through new and existing buildings and a diverse mix of uses. Preserve the historic district and enhance neighborhoods through context-sensitive development.  Walkable and accessible: Use streets, sidewalks, and alleys as a safe and comfortable multimodal network and expand transit and bicycle access.  Welcoming to everyone: Foster a place that is welcoming and inclusive to people of all ages, incomes, abilities, and backgrounds.  Connected to nature and culture: Ensure downtown open spaces foster gathering, recreation, and local identity. Highlight nature whenever possible Wallace Avenue  Encourage mixed use development that reinforces Wallace Avenue, Mendenhall Street, Babcock Street as major corridors.  Encourage adaptive reuse or integration of design elements that honor the area’s industrial heritage.  Remove parking on the eastside to minimize traffic conflicts and pinch points. Black Avenue  Test adding a pedestrian “scramble” intersection at Black and Main Street that synchronizes pedestrian walk signals in both directions at the same time.  Explore installing new traffic signals at the intersections of Black Avenue with Babcock Street and Mendenhall Street to reduce vehicular speeds, enhance multi- modal functionality, and provide safer pedestrian crossings through the center of downtown. Grand Avenue  Enhance pedestrian intersections for easier crossings. Introduce public art to add visual interest and strengthen pedestrian environment. Babcock Street  Install a two-way cycle track on Babcock Street. Main Street  Reconfigure the roadway from four lanes to three, removing one travel lane to create space to convert existing parallel parking into angled parking. Downtown circulator with a park-and-ride  Bi-directional circulator route that extends from Gallatin County Fairgrounds to downtown Bozeman with stops in Midtown, northeast of Bozeman Creek and connect to the existing Bridger Park Downtown Garage and proposed park-and-ride at the Gallatin County Fairgrounds.  Provide better connections to Montana State University and Bozeman Health 296 Gallatin Valley MPO LRTP Existing Conditions Report 6-6 Planning Document/Author Date Published Overview of the Document Key Projects from Studies Bozeman Community Safety Action Plan Prepared by Cambridge Systematics July 2013 The goal of the Bozeman Community Safety Action Plan is to reduce traffic fatalities and serious injuries by 25% by 2018. From 2009 to 2011, Bozeman averaged one traffic fatality and six serious injuries annually. In response, city officials and community members convened at the Bozeman Community Transportation Safety Summit and developed key actions focused on reducing inattentive driving, increasing occupant protection, and reducing bicycle and pedestrian crashes. Refer to Table E.1 of the plan for a list of strategies.  No projects listed. Bozeman Community Plan November 2020 The Bozeman Community Plan is a policy document that details Bozeman’s future growth policy for land-use and development. The goal of the plan is to guide the City’s community planning and evaluate its actions moving forward. The plan outlines goals, objectives, and actions relating to resilience, neighborhoods, development, environment/parks/open lands, mobility, economy, and regional coordination.  Future Land Use Map  Identify missing links in the multimodal system, prioritize those most beneficial to complete, and pursue funding for completion of those links  Revise current intersection level of service design standards to multimodal level of service or traffic stress for people walking, biking, and using transit Gallatin County Gallatin County Greater Triangle Area Transportation Plan Prepared by Robert Peccia and Associates April 2022 The Gallatin County Greater Triangle Transportation Plan provides recommendations to improve traffic safety, sustainability, and multimodal connections between Bozeman, Belgrade, Four Corners, and Gallatin Gateway. The county has consistently outpaced the population growth of other Montana counties, and this growth can be attributed to the evolving economies of Bozeman and Belgrade, the continued expansion of Montana State University, and migration patterns to the area.  Refer to Table 8 of the plan of projects with identified funding.  Refer to Table 9 of the plan for transportation system management improvement projects.  Refer to Table 10 of the plan for major street network improvement projects.  Refer to Table 11 of the plan roadway system expansion projects.  Refer to Table 12 of the plan for shared-use path projects.  Refer to Table 13 of the plan for on-street bicycle facilities projects.  Refer to Table 14 of the plan for spot improvements. Gallatin Valley Sensitive Lands Plan December 2023 The Gallatin Valley Sensitive Lands Plan highlights sensitive lands throughout the Gallatin Valley and identifies recommendations to improve sensitive lands conservation and management. Project goals include:  Secure the long-term ecological health of the region  No projects listed 297 Gallatin Valley MPO LRTP Existing Conditions Report 6-7 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  Create a regional model that identifies sensitive lands for protection of clean water, wildlife connectivity, and productive agriculture  Recommend how to protect the most sensitive resources during unprecedented growth  Identify benefits and best practices for development in harmony with the natural environment  Facilitate dialogue between city, county, agencies, constituents, landowners, and developers The plan also identifies regional transportation infrastructure planning as a priority recommendation. Triangle Trails Plan Prepared by Sanderson Stewart November 2021 The Triangle Trails Plan aims to connect the trail system throughout Bozeman, Belgrade, and Gallatin County while establishing design standards for different trail types. The vision of the trail system is to be connected, safe and welcoming, and inclusive for all. Community members and stakeholders consider the trail network as a highly valued community asset that should serve travelers of all ages and abilities.  See page 24 of the plan for the map of proposed trails. Although there is no timeline identified for new trail construction or maintenance, the plan recommended developing an evaluation framework to help prioritize these efforts. Triangle Community Plan Prepared by Planning Coordination Committee July 2020 The Triangle Community Plan provides policies to coordinate land use development patterns and community services and infrastructure. The Triangle area’s boundaries are the Gallatin River to the West, Frontage Road to the North, Fowler Avenue to West Garfield Street to South 19th Avenue to the East, and Blackwood Road to Four Corners Water and Sewer District to the South. Transportation policies include:  Create a network of streets that supports multimodal travel.  Improve safety for all roadway users.  Support a trail network to connect to community destinations such as parks, schools, residential areas, and city centers; and  Enhance transit access in underserved areas and new development areas. Policies in other areas that support transportation include: Land use  Ensure infrastructure is in place prior to or is concurrent with new development.  Separated bike pedestrian path along Huffine Lane from Bozeman to Four Corners 298 Gallatin Valley MPO LRTP Existing Conditions Report 6-8 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  Reduce minimum parking requirements to support greater housing density. Open Space  Maintain and improve connections between open spaces. Housing  Locate future housing near existing transportation infrastructure. Schools  Collaborate with schools on infrastructure and capital projects, including complete streets, bike paths, sidewalks, and trails. Montana State Highway Safety Improvement Program 2024 Annual Report Prepared by Montana Department of Transportation 2024 The purpose of the Highway Safety Improvement Program (HSIP) is to reduce fatalities and serious injuries on public roads. The 2024 annual report provides updates on the program structure, progress in implementing highway safety improvement projects, progress in achieving safety outcomes and performance targets, and effectiveness of the improvements and compliance assessment.  Roadway delineation and new pavement markings in east Bozeman Montana Electric Vehicle Infrastructure Deployment Plan Update Prepared by Montana Department of Transportation and Montana Department of Environmental Quality September 2024 The Montana Electric Vehicle (EV) Infrastructure Deployment Plan Update builds on the 2022 EV Deployment Plan, with the goal of creating a national network of EV chargers by 2030 that is convenient, reliable, affordable, and accessible charging for all EV drivers. Four locations along I-90 in Bozeman were identified as designated alternative fuel corridors:  31908 Frontage Road  2550 Catron Street  270 Automotive Avenue  8474 Huffine Lane Montana Freight Plan Prepared by Montana Department of Transportation 2022 The Montana Freight Plan describes the state’s freight system, highlights key issues, and sets goals to ensure a safe, efficient, and reliable network. The following key challenges were identified:  Commercial vehicle safety: Roads need to be maintained in a good state of repair to move freight efficiently and safely.  Truck parking: Certain areas of Montana continue to face a shortage of safe and secure parking facilities.  No projects listed. 299 Gallatin Valley MPO LRTP Existing Conditions Report 6-9 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  Infrastructure condition: Many of Montana’s older bridges are deteriorating due to heavy or oversized freight loads and may be unable to support heavy freight movements in the future.  Network reliability and mobility: Delays and congestion hinder freight efficiency and movement. The following goals were developed to enhance the freight network:  Improve safety for freight operators.  Preserve and maintain existing transportation infrastructure.  Improve transportation project delivery and ensure system reliability.  Promote responsible the stewardship of the built and natural environment.  Support programs that increase the freight network’s resilience to extreme weather and natural events. Transportation Asset Management Plan Prepared by Montana Department of Transportation 2022 The Transportation Asset Management Plan outlines how the State of Montana evaluates and manages pavement and bridge conditions. Montana has approximately 74,000 miles of center lanes. About 44% of non-interstate highway roads are in fair condition, 55% are in good condition, and 1% are in poor condition. About 57% of interstate highways are in good condition, 42% are in fair condition, and 1% are in poor condition. There are 1,239 bridges across the highway network, and 19% are in good condition, 74% are in fair condition, and 6% are in poor condition.  No projects listed. ADA Transition Plan Prepared by Robert Peccia and Associates November 2021 The Americans with Disabilities (ADA) Transition Plan provides methods to help MDT comply with ADA regulations and remove accessibility barriers in its communications, rights-of-way, and buildings. The plan aims to establish a consistent approach in delivering an accessible transportation system.  No projects listed. Bozeman Yellowstone International Airport Master Plan Prepared by Morrison Maierle 2020 The Bozeman Yellowstone International Airport Master Plan guides the growth of the airport for the next 20 years. The airport has become the busiest airport in Montana and has built more terminals, parking facilities, roadways, and runways to meet demand since it was first built in the 1940s. The following projects were recommended to meet the demand of increased airport usage. Runways  Extend Runway 12-30 to 10,828 feet.  Extend and widen Runway 11-29 to 8,500 feet by 150 feet. 300 Gallatin Valley MPO LRTP Existing Conditions Report 6-10 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  Extend Runway 3-21 to 5,100 feet. Taxiways  Remove general aviation apron access taxiway that aligns with connecting Taxiway A-2 to create a staggered layout. A staggered layout will be created with consideration of future high speed taxiway exit(s).  Extend all parallel taxiways with runway lengthening projects or as otherwise developed (i.e. TW B planned to be phased to accommodate north side hangar development).  Consider addition of bypass taxiways and secondary parallel taxiways to serve the existing runway system.  Consider addition of high-speed exits for capacity improvement and operational efficiency.  Increase separation between Taxiway C and Runway 11-29 to 400 feet.  Resolve “hammerhead” taxiway issue at Runway 21 threshold. Runway 12-30  Pursue improvement to the minimums of Runway 12- 30 with designation as a Category II Runway with a Runway Visual Range (RVR) of 1,200 feet (1/4 mile).  As far as practicable, bring Runway 30 to the same precision approach standards as Runway 12 including the addition of ILS and approach lighting. Runway 11-29  Pursue publication of a “sidestep maneuver” utilizing ILS on Runway 12-30.  Reserve appropriate setbacks and RPZ dimensions for additional future NPI RNAV/GPS approaches to Runway 11-29. Terminal Area  Provide for automobile parking expansion through construction of parking garages and expansion of parking lots for the general public, employees, and rental car ready and return. 301 Gallatin Valley MPO LRTP Existing Conditions Report 6-11 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  Expand the terminal from the current 12 gates to 20 gates. General Aviation  Add storage hangars for as many as 189 additional storage positions, for both small and large aircraft.  Add apron space and parking positions throughout the planning period. Airport Support  Expand the Airport’s ARFF Building with the acquisition of additional equipment.  Expand snow removal and equipment storage buildings with the addition of new maintenance and snow removal equipment, as required.  Plan for additional fuel storage facilities Montana Comprehensive Highway Safety Plan Prepared by Montana Department of Transportation 2025 The Montana Comprehensive Highway Safety Plan monitors, analyzes, and addresses key factors that cause fatalities and serious crashes, supporting the state’s commitment to Vision Zero – the goal of eliminating all roadway fatalities and serious injuries. The CHSP interim goal is to reduce fatalities and serious injuries from 984 in 2023 to 729 by 2030. The plan focuses on four priority areas:  Safe Roads  Emergency Response - Post-Crash Care  Safe Speeds/Safe Vehicles  Safe Road Users To address these priorities, the CHSP outlines strategies aimed at reducing fatal and serious injury crashes and improving safety in each area.  No projects listed. US 191 Corridor Study Four Corners to Beaver Creek Prepared by Robert Peccia and Associates October 2020 The US 191 Corridor Study Four Creeks to Beaver Creek examines the intersection of Huffine Lane/Norris Road/Jackrabbit Lane in Four Corners and the intersection of Beaver Creek Road south of Big Sky to identify safety improvements. Identified issues include:  Several locations in Gallatin Canyon were identified with rock slope conditions, causing potential for rockfall events,  Refer to Table ES-1 of the plan for a list of recommended improvements. 302 Gallatin Valley MPO LRTP Existing Conditions Report 6-12 Planning Document/Author Date Published Overview of the Document Key Projects from Studies emergency road closures, and disruption of normal traffic operations.  Two of the total 30 passing zones do not meet MDT design standards.  A total of 16 horizontal curves and one vertical curve do not meet current standards.  Traffic volumes are projected to grow at a rate of 2.4% per year though 2040 based on historic growth trends. The Four Corners intersection, Mill Street intersection, and MT 64 intersections are projected to experience failing operations during AM and PM peak hours by 2040.  Wild animal, fixed object, rear-end, and rollover crashes were the most common crash types.  Adverse road conditions, dark and not-lighted conditions, and impaired driving were common crash factors. Montana Pedestrian and Bicycle Plan Prepared by Robert Peccia and Associates and Alta Planning + Design May 2019 The Montana Pedestrian and Bicycle Plan establishes a statewide vision and goals to meet the needs of bicyclists and pedestrians and improve safety across the region.  Reduce pedestrian and bicyclist fatalities and serious injuries.  Educate, encourage, and promote safe and responsible travel practices of motorists, pedestrians, and bicyclists.  Preserve and maintain the pedestrian and bicycle transportation system.  Improve mobility and accessibility for all.  Support walking and bicycling as important transportation modes for access to destinations, economic vitality, and health. While no specific projects were identified, a list of recommended strategies were developed to achieve the plan’s goals.  No projects listed. Belgrade to Bozeman Frontage Road Corridor Study Prepared by Robert Peccia and Associates May 2017 The Belgrade to Bozeman Frontage Road Corridor Study identifies infrastructure to improve safety, mobility, and traffic operations. Identified issues include:  Gaps in the sidewalk network  Many areas have poor drainage due to flat topography  The bridge located on RP 26.6 is in poor condition.  Refer to Table ES.1 of the plan for a list of recommended improvements. 303 Gallatin Valley MPO LRTP Existing Conditions Report 6-13 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  The intersection with Broadway Street, Oregon Street, and Griffin Drive are projected to have failing operations in the future.  382 crashes occurred between 2010 and 2015, in which there were three fatal crashes. Bridger Canyon Corridor Planning Study Prepared by Montana Department of Transportation April 2015 The Bridger Canyon Corridor Planning Study examines the intersection of MT 86 to Story Mill Road. The corridor includes private ranches, homes, Gallatin National Forest, the Bridger Bowl alpine ski area, and Bohart Ranch. These destinations attract a variety of travelers, and some roadways, like roadways leading to ski resorts, are not designed to accommodate high volumes of traffic. Roadways conditions are exasperated during the winter season due to rain and snowfall.  No projects listed. Montana Rest Area Plan Prepared by Dowl HKM February 2019 (partial update) The Montana Rest Area Plan provides guidance for upgrading aging infrastructure and addressing statewide rest area demand. Bozeman’s rest area, located on 19th Avenue along the I-90, permanently closed in May 2023 due to its deteriorating condition and maintenance issues. The Three Forks Rest Area in Wheatland, also along the I-90, opened in April 2024 and replaced Bozeman’s rest area.  No projects listed. Montana State Rail Plan Prepared by Montana Department of Transportation December 2010 The Montana State Rail Plan describes the state of freight rail system, provides historical and forecasted freight trends, and ongoing efforts to expand passenger rail service throughout the state. State of the Freight Rail System  10 freight railroads operated 3,500 rail miles in Montana.  BNSF is the largest railroad operator in Montana, accounting for 94% of the state’s Class I rail miles.  Union Pacific Railroad operates very little railroads but provides a critical connection between the Port of Montana and markets in western and southwestern US. Other regional railroad operators include:  Dakota, Missouri Valley, and Western Railroad (DMVW)  Montana Rail Link (MRL)  Central Montana Rail (CRM)  Mission Mountain Railroad (MMT)  No projects listed. 304 Gallatin Valley MPO LRTP Existing Conditions Report 6-14 Planning Document/Author Date Published Overview of the Document Key Projects from Studies  Transco Railway Products (TRRZ)  Butte, Anaconda, and Pacific Railway (BAP)  Global Rail Group (GRGL)  Alder Gulch Short Line Railroad Historical and Forecasted Freight Trends  By 2035, total freight tonnage in Montana is projected to increase by 101% to 216.8 million tons and by 2050 to 236 million tons Passenger Rail Expansion  There is no passenger rail in southern Montana, but there is a possibility of reinstating the passenger rail service along the former North Coast Hiawatha route.  Amtrak operates the Empire Builder through northern Montana 305 Gallatin Valley MPO LRTP Existing Conditions Report 6-1 306 Streamline/Gallatin Valley UTD Transit Strategic Plan November 2025 307 308 Streamline/Gallatin Valley UTD Transit Strategic Plan i Table of Contents Page 1 Introduction .................................................................................................................. 1-1 Introducing the Organizations and Plans ........................................................................................... 1-1 Organization of the Transit Strategic Plan ......................................................................................... 1-5 2 Existing Conditions....................................................................................................... 2-1 Gallatin Valley Context............................................................................................................................... 2-1 Transit Conditions .................................................................................................................................... 2-12 3 Long-Range Vision ..................................................................................................... 3-32 Current System Challenges ................................................................................................................... 3-32 Tenets of a Successful System ............................................................................................................. 3-35 Best Practices in Optimizing Transit Performance and Growing Ridership ....................... 3-37 Case Studies ................................................................................................................................................ 3-44 Long-Range Recommendations ......................................................................................................... 3-46 4 Implementation and Funding ..................................................................................... 4-1 Operations and Maintenance Costs ..................................................................................................... 4-1 Capital Costs .................................................................................................................................................. 4-2 Implementation Steps and Cost Summary ........................................................................................ 4-5 Funding Sources........................................................................................................................................... 4-5 Table of Figures Page Figure 1 MPO Boundaries ........................................................................................................................ 1-4 Figure 2 Population Growth .................................................................................................................... 2-2 Figure 3 Population Density .................................................................................................................... 2-3 Figure 4 Employment Growth ................................................................................................................ 2-4 Figure 5 Employment Density ................................................................................................................ 2-5 Figure 6 Major Employment Sectors ................................................................................................... 2-6 Figure 7 Population and Employment Density ................................................................................ 2-7 Figure 8 Median Home Listing Price in Gallatin County, 2017-2024 ...................................... 2-8 Figure 9 Renter-Occupied vs. Owner-Occupied Housing Units ................................................ 2-9 Figure 10 Transit Propensity ................................................................................................................... 2-11 Figure 11 Streamline Fixed-Route Service ........................................................................................ 2-13 Figure 12 Fixed Route Span and Frequency ..................................................................................... 2-14 309 Streamline/Gallatin Valley UTD Transit Strategic Plan ii Figure 13 Historical Fixed-Route Ridership ...................................................................................... 2-16 Figure 14 Average Weekday Stop Ridership August 2021 – December 2022 .................... 2-16 Figure 15 Average Weekend Stop Ridership August 2021 – December 2022 .................... 2-18 Figure 16 Annual Route Ridership 2021-2023................................................................................. 2-19 Figure 17 Bus Stop Amenities ................................................................................................................ 2-20 Figure 18 Streamline Paratransit Service Area ................................................................................. 2-22 Figure 19 Historical Paratransit Ridership ......................................................................................... 2-23 Figure 20 Fixed-Route and Paratransit Fleets .................................................................................. 2-24 Figure 21 CatTracks Academic Year Routes ..................................................................................... 2-25 Figure 22 CatTracks Summer Route .................................................................................................... 2-26 Figure 23 Examples of Transit Priority Infrastructure: Bus Stops .............................................. 3-39 Figure 24 Examples of Transit Priority Infrastructure: Transit Lanes ....................................... 3-40 Figure 25 Examples of Transit Priority Infrastructure: Traffic Control ..................................... 3-41 Figure 26 Land Use Density and Recommended Transit Service ............................................. 3-42 Figure 27 Fixed Route and Paratransit Fleet Needs ...................................................................... 3-47 Figure 28 Recommended High-Frequency Transit Corridors .................................................... 3-48 Figure 29 Recommended Fixed Route Corridor Frequencies .................................................... 3-50 Figure 30 Updated Streamline Paratransit Service Area .............................................................. 3-51 Figure 31 Recommended Transfer Point Improvement Locations .......................................... 3-54 Figure 32 Recommended Belgrade On-Demand Transit Service Area .................................. 3-56 Figure 33 Recommended South Bozeman On-Demand Transit Service Area .................... 3-57 Figure 34 Recommended Four Corners On-Demand Transit Service Area .......................... 3-58 Figure 35 Recommended Late Night On-Demand Transit Service Area ............................... 3-59 Figure 36 Long-Range Vision Service Levels ....................................................................................... 4-1 Figure 37 Long-Range Recommendations Operations & Maintenance Cost Summary ... 4-2 Figure 38 Unit Costs for Capital Cost Estimation .............................................................................. 4-2 Figure 39 Long-Range Recommendations Capital Cost Summary ............................................ 4-4 Figure 40 Long-Range Implementation Steps and Cost Summary ............................................ 4-5 310 Streamline/Gallatin Valley UTD Transit Strategic Plan 1-1 1 INTRODUCTION INTRODUCING THE ORGANIZATIONS AND PLANS Who is Streamline? Streamline is the Gallatin Valley’s zero-fare public transportation service operator, offering service within the cities of Bozeman and Belgrade, along with the urbanized areas of Gallatin County. Streamline began service in 2006, following Montana State University College of Engineering’s decade-long study of growing public transportation needs in Gallatin County. This study culminated in the Greater Bozeman Area Transit Development Plan (TDP), which laid the foundation for the transit system and helped facilitate a request for federal transit funding from the Montana Department of Transportation (MDT). The Human Resource Development Council (HRDC) was selected as the organization best suited to operate Streamline’s fixed route service, joining HRDC’s existing Galavan senior and paratransit service. Rapid population growth in Gallatin County between 2010 and 2019 led to a reassessment of Streamline service through the Redesign Streamline 2020 planning process. The process resulted in a new TDP, which recommended near- and long-term service changes. Recommended short-term service changes were implemented by Streamline in 2021. Continued population growth led to a change in the region’s classification from a rural area to a small urban area during the 2020 United States Census. This reclassification meant that non-profit agencies such as HRDC could no longer receive federal funding for operating transit. In seeking a new agency to operate transit service in the Gallatin Valley and receive federal funding through the Federal Transit Administration’s (FTA) Section 5307 Urbanized Area Formula Funding Program, local stakeholders recommended the creation of an urban transportation district (UTD). The establishment of the Gallatin Valley Urban Transportation District (GVUTD) was approved by voters in 2023. 311 Streamline/Gallatin Valley UTD Transit Strategic Plan 1-2 Streamline’s Vision, Mission, and Values Vision: Community connection through public transportation. Mission: All district residents benefit from high-quality transit services that promote quality of life and community identity. Values:  Sustainability: Streamline is environmentally and fiscally sustainable.  Quality: Streamline provides transit services that are reliable, frequent, convenient, safe, and comfortable.  Equity: Streamline improves equity in access to transportation and the availability of transportation choices for all community members.  Collaboration: Streamline operates in concert with area institutions, nonprofits, local governments, and the community.  Innovation: Streamline is creative and responsive to changing community needs, patterns, and technologies. Streamline’s Transit Strategic Plan Building off the near- and long-term recommendations included in prior TDPs updated every three to five years, Streamline’s Transit Strategic Plan is intended to be the long-range vision for growing transit service in the Gallatin Valley. The Plan identifies current system challenges and those observed in prior planning efforts and outlines the tenets of a successful transit system in a Gallatin Valley context. The Plan recommends long-range transit service changes and the needed capital infrastructure to support this growth, along with implementation steps and potential sources of funding. Streamline and the Gallatin Valley MPO’s Joint Effort The 2020 census marked an important milestone for the Bozeman area, with the population surpassing 50,000 and launching the formation of the Gallatin Valley Metropolitan Planning Organization (GVMPO). Federal regulations require MPOs to develop a Long-Range Transportation Plan (LRTP), providing the opportunity for the City of Bozeman, City of Belgrade, and urbanized areas in in Gallatin County within the MPO boundaries (shown in Figure 1) to create a multi-decade vision for transportation infrastructure and mobility programming. This process brings agency partners and the community to establish priorities and shared values for the region. 312 Streamline/Gallatin Valley UTD Transit Strategic Plan 1-3 The Gallatin Valley LRTP is a multi-decade plan that looks at all modes of transportation and identifies future priorities for projects and funding. This federally required fiscally constrained plan will help steer the community toward a healthier, safer, and more efficient future while preserving and expanding mobility for all residents. The LRTP will build upon existing plans and projects while identifying new opportunities to create an integrated transportation system that meets the needs of community members. A strong transportation plan is critical to the success of Gallatin Valley’s growth and prosperity. In early 2025, Streamline and GVMPO partnered in engaging the services of Nelson\Nygaard to integrate the Transit Strategic Plan into GVMPO’s first LRTP. While intended to be a standalone document laying out the long-range vision for growing transit service in the Gallatin Valley, the Transit Strategic Plan’s integration into the region’s first LRTP will start transit on a strong foundation for future LRTP updates and ensure that transit is a key component of regional mobility going into the future. 313 Streamline/Gallatin Valley UTD Transit Strategic Plan 1-4 Figure 1 MPO Boundaries Source: MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade Streamline Transit Development Plan (TDP) Streamline intends to refresh its ten-year vision for identifying transit service improvements every three to five years through updates to the agency’s TDP. The first TDP, developed as a result of Montana State University’s (MSU) study of growing transit needs in the region, laid the foundation for the start of Streamline service in 2006. A TDP update focused on maximizing access to opportunity with limited resources followed in 2020, with its near-term recommendations being implemented in 2021. In Fall 2024, Streamline began the process of 314 Streamline/Gallatin Valley UTD Transit Strategic Plan 1-5 refreshing the agency’s TDP. This update, recognizing the need for additional funding to realize the region’s full transit potential, is intended to be the roadmap for achieving growth in expanded service over a ten-year horizon. The TDP includes recommendations on more frequent service to key destinations, longer hours of operation, and coverage to new areas. Streamline plans to finalize the plan in 2025, with anticipated adoption by the GVUTD Board in Winter 2025. ORGANIZATION OF THE TRANSIT STRATEGIC PLAN This document outlines Streamline’s Transit Strategic Plan, intended to be the long-range vision for growing transit service in the Gallatin Valley. The document is organized into the following chapters:  Chapter 2 – Existing Conditions provides background context for the Gallatin Valley region and describes Streamline’s existing service.  Chapter 3 – Long-Range Vision discusses the current challenges faced by transit in the Gallatin Valley, outlines the tenets of successful transit systems, describes transit performance best practices, and walks through the recommended components of Streamline’s long-range vision.  Chapter 4 – Implementation and Funding outlines an estimate of the operations and maintenance and capital funding required to realize the long-range vision described in Chapter 3, presents a prioritized list of implementation steps for achieving the vision, and describes potential sources of funding. 315 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-1 2 EXISTING CONDITIONS This chapter provides background context for the Gallatin Valley region and describes Streamline’s existing service. GALLATIN VALLEY CONTEXT Population and Employment Growth and Trends The data below represents trends within the Gallatin Valley Metropolitan Planning Area (GVMPA), referred to going forward as the study area. The study area has experienced rapid growth over the past decade, with a compound annual growth rate of 3.3%1. As population and employment opportunities continue to grow in the region, high-quality transportation infrastructure and services should be a priority. Population Over the past decade, the population within the study area increased by 38% from 65,044 residents in 2013 to 89,855 residents in 2023 (Figure 2). Growth has slowed in recent years, but the area has continued to add residents year over year. 1 American Community Survey, 2023 316 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-2 Figure 2 Population Growth Source: American Community Survey (ACS) 5-Year Estimates, 2023 Areas of high population density are clustered in downtown Bozeman, neighborhoods surrounding MSU, and the River Rock development in Belgrade west of I-90, with about 8-19 people per acre. The majority of the study area has low population density with less than 2 people per acre (Figure 3). 50,000 55,000 60,000 65,000 70,000 75,000 80,000 85,000 90,000 95,000 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 317 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-3 Figure 3 Population Density Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade Employment Jobs in the study area increased by 47% in the past decade, with a total of 56,759 jobs in 2022. The number of jobs decreased slightly in 2020, likely due to the COVID-19 pandemic, but have since surpassed pre-pandemic numbers (Figure 4). Major employment hubs are concentrated in the Bozeman and Belgrade urbanized areas (Figure 5). The industries with the most jobs are retail trade and educational services, which account for about one-quarter 318 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-4 of all jobs in the region (Figure 6). Other jobs (26.9%) include other services, waste management, wholesale trade, finance and insurance, public administration, transportation, and arts/entertainment, among others. As the region continues to grow, transportation options need to be considered to connect people from where they live to where they work. Figure 4 Employment Growth Source: Longitudinal Employer-Household Dynamics (LEHD), 2022 30,000 35,000 40,000 45,000 50,000 55,000 60,000 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 319 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-5 Figure 5 Employment Density Source: Longitudinal Employer-House Dynamics (LEHD), 2022; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade 320 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-6 Figure 6 Major Employment Sectors Sector % of Total Employment Share Retail Trade 13.9% Educational Services 11.8% Accommodation and Food Services 11.6% Health Care and Social Assistance 10.6% Construction 10.1% Professional, Scientific, and Technical Services 9.2% Manufacturing 5.8% Other 26.9% Source: Longitudinal Employer-House Dynamics (LEHD), 2022 Population and Employment Combining population and employment data can better highlight areas that are anticipated to be more supportive of transit service. Locations with higher densities of population and employment can benefit the most from transportation investments, and transit service is more productive in these areas. As shown in Figure 7, the areas with the highest combined population and employment density are concentrated in downtown Bozeman and surrounding the university. 321 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-7 Figure 7 Population and Employment Density Source: American Community Survey (ACS) 5-Year Estimates, 2023; Longitudinal Employer-House Dynamics (LEHD), 2022; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade Changes in Affordability Housing prices in the Gallatin Valley have risen at an exceptional pace, significantly outpacing local wage growth and creating challenges in housing affordability. Given displacement pressures from escalating housing costs, affordable transportation options are critical to connect residents with jobs, schools, various services, and recreational opportunities. 322 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-8 Based on ACS 5-Year estimates for 2023, about 21% of households in the study area have an annual income of less than $40,000. As of 2025, the official poverty rate, as defined by the Bureau of Labor Statistics, is $15,650 for an individual and $21,150 for a household with two people. In 2023, 8.8% of Gallatin County residents were living below the poverty line, while within the GVMPA, 11.2% residents live below the poverty line. Additionally, the median home listing price in Gallatin County doubled between 2017 and 2023, posing challenges for residents to live comfortably in the area (Figure 8). Home prices decreased in 2024 but are still well above pre-pandemic prices and have overall increased by 68% since 2017. 55% of study area residents own their home and 45% rent. This percentage may change in the future if housing prices begin to rise and more people choose to rent due to the high price to purchase a home (Figure 9). Vacant and part-time residential housing units are also an area of focus due to Bozeman being an amenity destination during both the summer and winter months. This impacts housing supply for full-time residents in an already constrained market.2 Figure 8 Median Home Listing Price in Gallatin County, 2017-2024 Source: Realtor.com, 2024 2 “2025-2045 Bozeman Population and Housing Forecast.” Engage Bozeman, Economic & Planning Systems, Inc., 5 Sept. 2025.” 400,000 500,000 600,000 700,000 800,000 900,000 1,000,000 1,100,000 1,200,000 2017 2018 2019 2020 2021 2022 2023 2024 323 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-9 Figure 9 Renter-Occupied vs. Owner-Occupied Housing Units Source: American Community Survey (ACS) 5-Year Estimates, 2023 Transit Propensity Using select demographic, socioeconomic, and employment data can help determine the overall transit need for a given area. Areas of higher propensity, or demand, are more likely to generate ridership and support transit service that is provided. To assess transit propensity, the following demographic and socio-economic factors were used as individuals from these groups are more likely to use transit:  Young people between the ages of 15 to 24: Young people are less likely to have a driver’s license or access to a vehicle and therefore have greater reliance on public transit or other multimodal services to access their destinations. Additionally, students at Montana State University are an important ridership base for public transit services.  Older adults over 65 years old: People who are older than 65 years old may no longer be able to drive due to aging-related changes in sight, hearing, and mobility. Older adults are less able to utilize other active modal options and may rely solely on others driving them places or public transportation. Older adult care facilities are often located along bus routes to provide access for older adults.  People with a disability: People who are unable to drive alone or may require additional assistance rely more heavily on public transportation, whether that be fixed-route service or paratransit services. Owner Occupied 55% Renter Occupied 45% 324 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-10  Low-income households, defined as earning less than 150% of the federal poverty level: Low-income households are more financially burdened by transportation options and are likely to use transit due to the high costs of vehicle ownership.  Zero-vehicle households: People without access to a vehicle are more reliant on public transit to meet their travel needs that cannot be completed by walking, biking, or rolling.  Minority persons: The Federal Transit Administration define a minority person as one who self-identifies as American Indian and Alaska Native, Asian, Black or African American, Hispanic or Latino, or Native Hawaiian or Other Pacific Islander.3  Limited English proficiency (LEP) individuals: LEP is often an indicator of immigrant communities, who are more likely to take transit.4 In the Gallatin Valley MPO area, using Census Journey to Work data, all seven of these variables were associated with having a higher correlation of using transit than the overall population. A composite transit propensity score was computed for each block group by summing up the individual percentages of population or households in each block group that met the given criteria. A higher composite score indicates a greater transit propensity. As shown in Figure 10, downtown and northwest Bozeman have areas with the highest propensity to use transit. A small portion in central Belgrade also has high transit propensity. 3 “Title VI Circular to 4702.1B.” Title VI Requirements and Guidelines for Federal Transit Administration Recipients, Federal Transit Administration, 1 Oct. 2012, www.transit.dot.gov/sites/fta.dot.gov/files/docs/FTA_Title_VI_FINAL.pdf. 4 “Movement after Migration: Immigrants’ Disproportionate Reliance on Public Transportation.” Migration Policy Institute, 21 Mar. 2021, https://www.migrationpolicy.org/article/movement-migration-immigrants- public-transportation. 325 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-11 Figure 10 Transit Propensity Source: American Community Survey (ACS) 5-Year Estimates, 2023; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade Key Findings  The population within the GVMPA has grown steadily over the past decade, increasing by 38 percent since 2013. The largest increase was from 2020 to 2021, most likely due to the rise of remote work during the COVID-19 pandemic and lower cost of living. 326 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-12  Population density is concentrated in downtown Bozeman and neighborhoods surrounding MSU. Belgrade also has a growing population.  Jobs increased by 47% in the past decade except for a slight decrease in 2020, during the COVID-19 pandemic. Employment is concentrated in downtown Bozeman and surrounding MSU.  The median home listing price in Gallatin County doubled between 2017 and 2023. While listing prices have since decreased slightly, they are still well above pre- pandemic levels.  Areas in downtown and northwest Bozeman have the highest propensity to use transit, as well as areas of Belgrade. TRANSIT CONDITIONS System Overview Fixed Route – Streamline Streamline serves Bozeman with zero-fare connections in and around the city of Bozeman and to Belgrade, as illustrated in Figure 11 below. Streamline offers fixed-route, commuter, and seasonal transit service, as well as complementary Americans with Disabilities Act (ADA) and senior paratransit services through Galavan. Streamline also operates a seasonal route connecting Livingston to Bozeman from October to April. Streamline interconnects to the Skyline Bus System for travel to and from Big Sky and Jefferson Lines Intercity Bus Service. 327 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-13 Figure 11 Streamline Fixed-Route Service Source: Streamline; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade 328 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-14 Span of Service and Frequency On weekdays, Streamline operates four routes locally within Bozeman and one commuter route between Bozeman and Belgrade. On weekends, four hourly local routes are available. The Northeast Bozeman shuttle operates to provide direct service to social services, such as the food bank and warming shelter, trails and local parks. Figure 12 provides an overview of all Streamline routes. Figure 12 Fixed Route Span and Frequency Route Description Span Frequency Alignment Length Number of Stops Weekday Blueline Serves north to south: MSU, downtown Bozeman, Walmart, Smiths, Community Health Partners, Family Promise, and north Bozeman shopping center 6:45 am - 9:45 pm 60 minutes, with 30-minute service at peak hours while MSU is in session 14.2 miles 46 Weekday Goldline Connects residential areas in west Bozeman to the Gallatin Valley Mall and MSU: 6:45 am - 10:09 pm 60 minutes, with 30-minute service at peak hours while MSU is in session 8.5 miles 31 Weekday Purpleline Serves east to west: Bozeman Health, downtown Bozeman, Gallatin Crossing, and Ferguson Farms 6:45 am - 7:36 pm 60 minutes, with 30-minute service at peak hours 12.4 miles 39 Weekday Brownline Serves west Bozeman, Gallatin High School, Bozeman High School, Bozeman Senior Social Center, and downtown Bozeman 6:45 am - 6:47 pm 60 minutes 11.9 miles 52 Pinkline (Belgrade) Connects Bozeman and Belgrade: Walmart, downtown Belgrade, Belgrade High School 7:04 am -7:01 pm Four trips in each direction 20.4 miles 14 Livingston Seasonal service operates between October and April. Serves Walmart, Ace Hardware, Bozeman Health, and MSU 5:50 am -6:45 pm One trip in the morning and evening 60.0 miles 6 329 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-15 Route Description Span Frequency Alignment Length Number of Stops Late-night (not currently operating) Provides nighttime service for MSU 7:55 pm -2:25 am 30 minutes 6.6 miles 21 Weekend Blueline Serves same destinations as weekdays 9:13 am - 6:13 pm 60 minutes 14.2 miles 46 Weekend Goldline Shortened line connecting Gallatin Crossing and MSU 9:32 am - 5:54 pm 60 minutes 4.5 miles 31 Weekend Purpleline Shortened line connecting Bozeman Health, downtown Bozeman, & Gallatin Crossing 9:15 am - 6:15 pm 60 minutes 8.7 miles 40 Weekend Brownline Serves same destinations as weekdays 9:16 am - 6:16 pm 60 minutes 11.9 miles 52 Shuttle to Northeast Bozeman Connects to HRDC’s Community Commons campus, Market Place building, Story Mill Park, and Glen Lake Rotary Park 9:35 am -7:00 pm Six daily trips 2.5 miles 3 Source: Streamline 330 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-16 System Ridership Streamline has experienced a significant drop in ridership during the COVID-19 pandemic (Figure 13). Ridership has been slow to recover, and current ridership is only at 30% of pre- pandemic levels. 5 Several factors have contributed to this slow recovery, including staff shortages, the inability to operate 30-minute peak services, and the suspension of the Late- night route. Additionally, ridership is heavily influenced by the academic calendar at MSU, with levels dropping during summer and winter breaks and rising again when classes resume. As of September 2023, seasonal 30-minute peak service resumed on the Blueline, Goldline, and Purpleline routes in alignment with MSU’s new semester. Figure 13 Historical Fixed-Route Ridership Source: Streamline Error! Not a valid bookmark self-reference. and Figure 15 show the weekday and weekend daily boardings for all bus stops in Streamline’s system from August 2021 to December 2022.6 For both weekdays and weekends, the three stops with the highest ridership are Walmart, Mendenhall & Black (Downtown Transfer Station), and the MSU Strand Union Building. The majority of bus stops have five or less daily weekday riders, which correlates with the routes that have the lowest ridership overall. 5 Streamline Transit Development Plan, 2024 6 Streamline Transit Development Plan, 2024 331 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-17 Figure 14 Average Weekday Stop Ridership August 2021 – December 2022 Source: Streamline; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade 332 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-18 Figure 15 Average Weekend Stop Ridership August 2021 – December 2022 Source: Streamline; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade 333 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-19 As shown in Figure 16, ridership on all routes has continued to grow, with the exception of the Brownline and Pinkline.7 Streamline implemented service improvements and route changes in August 2021, and ridership has increased overall since then. Prior to the changes, Streamline averaged around 9,000 riders per month in 2021, and by 2023, Streamline a averaged nearly 11,500 riders per month. The Blueline has the highest ridership at 70,000 riders in 2023 and serves the top three bus stops. The second highest ridership route, the Goldline, had 30,000 riders in 2023, and serves one of the top bus stops at MSU, and also the fourth-busiest stop at Gallatin Crossing. The Purpleline has also grown since 2021, providing service to the Gallatin Crossing and to the Downtown Transfer Station at Mendenhall & Black, another top-three stop. Similarly, the Brownline and Pinkline only serve one of the key ridership stops, which provides insight into their lower ridership numbers compared to the Blueline. Figure 16 Annual Route Ridership 2021-2023 Source: Streamline 7 Streamline Transit Development Plan, 2024 334 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-20 Bus Stops and Amenities Streamline currently has 162 active stops in its system (Figure 17). Based on a September 2025 review of existing bus stops using Google Street View imagery, 113 stops are marked with a pole, sign face, and route indicator. Ten of these stops have a shelter and bench, and one has a standalone bench. The 49 stops without signage are primarily located along the following corridors, several of which being federal-aid, MDT-maintained roadways:  7th Ave  Huffine Ln  Main St  Oak St  Rouse Ave When installing or replacing transit stop signage along such roadways, MDT considers the work a catalyst requiring transit agencies make ADA upgrades to fully bring the area into compliance. While important, these improvements are often disproportionate to the scale and cost of the signage project, substantially increasing expenses compared to installations on local roadways. Being key mobility corridors, MDT roadways form a core part of the network on which Streamline services operate and this requirement has a broad cost impact on maintaining or improving transit stop signage. Figure 17 Bus Stop Amenities Amenity Number of Stops Percent Signage 102 63% No Signage 49 30% Signage + Shelter + Bench 10 6% Signage + Bench 1 1% Total Bus Stops 162 100% Source: Streamline, Google Street View 335 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-21 Paratransit – Galavan Streamline operates complementary door-to-door paratransit service through its Galavan program. As shown in Figure 18, the service operates within two miles of regular Streamline fixed-routes service, which is beyond the legal minimum of ¾-mile as set by ADA requirements. Galavan ridership has trended similarly to the fixed-route service with slow recovery after the drop in ridership that occurred during the COVID-19 pandemic, and ridership has not yet returned to pre-pandemic levels (Figure 19). In 2019, Galavan averaged about 2,400 riders each month, while in 2023, the service had about 1,600 riders per month.8 8 Streamline Transit Development Plan, 2024 336 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-22 Figure 18 Streamline Paratransit Service Area Source: Streamline; MDT; GVMPO; Gallatin County; City of Bozeman; City of Belgrade 337 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-23 Figure 19 Historical Paratransit Ridership Source: Streamline9 9 Streamline Transit Development Plan, 2024 338 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-24 Fleet and Facilities Streamline has 11 vehicles in its fixed-route fleet and seven vehicles in its paratransit fleet for Galavan services. An additional seven fixed-route vehicles and two paratransit vehicles have been procured by the agency but are not in service as of September 2025. A detailed fleet roster of both services with age and replacement year is show in Figure 20. Figure 20 Fixed-Route and Paratransit Fleets Service Number of Vehicles Year Make Replacement FY Galavan 1 2015 Ford 2020 Fixed-Route 2 2016 GILLIG 2024 Fixed-Route 1 2017 IC Bus 2024 Galavan 1 2017 Ford 2022 Galavan 1 2017 Dodge 2028 Galavan 1 2019 Ford 2023 Galavan 1 2021 Ford 2025 Fixed-Route 4 2021 El Dorado 2029 Fixed-Route 4 2023 El Dorado 2033 Fixed-Route 4* 2023 El Dorado 2033 Galavan 1 2023 Ford 2031 Galavan 1* 2023 Ford 2031 Fixed-Route 3* 2024 El Dorado 2034 Galavan 1 2024 Ford 2031 Galavan 1* 2024 Ford 2031 Source: Streamline; vehicles marked with * are yet to be delivered to Streamline and are not currently in use Streamline has one major transfer station, located at the Bridger Park garage in downtown Bozeman, where riders can transfer between the Blueline, Purpleline, and Brownline. The transfer station has capacity for two buses without independent pull-in/pull-out. An indoor waiting area for passengers is provided within the Bridger Park garage, however the waiting area is closed as of September 2025 due to a plumbing issue. The waiting area is expected to reopen in 2026. Streamline shares its operations and maintenance facility with the City of Bozeman at 1812 Rouse Avenue in northeast Bozeman. The current facility stores the paratransit vehicles for the Galavan program and is close to reaching storage capacity. 339 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-25 Other Local and Regional Providers CatTracks Campus Shuttle CatTracks is pilot program that provides MSU with a parking shuttle service. The shuttles connect MSU’s perimeter parking lots to key locations on the main campus. The service runs every 30 minutes on weekdays from 7am to 6pm. During the academic year, two routes operate one-way loop service: the Blue line operates on a westbound loop, and the Gold line operates on an eastbound loop (Figure 21). From May to August, the Summer line replaces the Blue and Gold line service with one route that combines key destinations from both (Figure 22). Figure 21 CatTracks Academic Year Routes Source: Montana State University 340 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-26 Figure 22 CatTracks Summer Route Source: Montana State University Skyline Skyline is the public transportation service that operates Big Sky Connect within Big Sky as fare-free on-demand services. Skyline also operates fixed-route Link buses between Big Sky and Bozeman seven days a week. The Link route overlaps with the Streamline Blueline at the Walmart bus stop and the Goldline and Blueline at MSU before continuing to Four Corners and then south to Big Sky. Fares are required on Link buses, and schedules differ between the summer and fall seasons. HRDC Community Commons The Human Resource Development Council (HRDC) is the founding organization of Streamline. In addition to Streamline’s fixed routes, shuttle service was implemented to northeast Bozeman for riders to access the new Community Commons campus. Shuttles operate six trips on weekdays excluding holidays. The shuttles operate from 9:30am to 7pm and serve the downtown transfer station, Walmart, and HRDC Market Place. 341 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-27 Bridger Bowl Streamline operates weekend seasonal bus service in partnership with Bridger Bowl to connect visitors to the ski area with Park & Ride locations at MSU and the Gallatin County Fairgrounds. Bridger Bowl is committed to operating their ski areas in the most socially responsible manner possible, and partnering with Streamline to provide transportation service significantly reduces the impact on Bridger Canyon Road during peak ski access times. Shuttle service also helps address parking capacity issues at Bridger Bowl. Reach Reach is a non-profit organization that supports adults with developmental disabilities. Reach has a fleet of 20 vehicles to provide transportation services to clients to get to work, appointments, recreational activities, and other transportation needs. In order to receive services, you must be eligible for Medicaid and qualify for the state’s Developmental Disability Program (DDP). Karst Stage Karst Stage is a charter-bus provider that operates an airport shuttle service for passengers going from Bozeman Yellowstone International Airport to Big Sky, West Yellowstone, and Mammoth. The company is also the contracted provider for Streamline bus operators and maintenance workers. Karst Stage was acquired by Jefferson Lines in April 2025. First Student First Student is the contracted provider for school bus service to the Bozeman school district and surrounding area. The company also provides charter bus service for other contracted trips in the area. Gallatin County Rest Home Gallatin Rest Home is a county owned and operated senior living facility in Bozeman. The facility provides transportation services for its residents to take to medical-related appointments in and around Bozeman. Taxis, Shuttles, and TNCs Taxi service throughout the area is offered by Greater Valley Taxi, Montana Yellow Cab, DeShields Rideshare Taxi, Spartan Taxi, and Bridger Taxi. Major hotels offer shuttle service to/from the airport, and Transportation Network Companies (TNCs) such as Uber and Lyft operate in the area. 342 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-28 West Yellowstone The West Yellowstone Foundation operates on-demand roundtrip transit service from West Yellowstone, Big Sky, Belgrade, and Bozeman every Tuesday and Thursday. Advanced reservations are required on a first-come, first-served basis, and medical appointment transportation requests are given priority. Windrider Transit Windrider Transit provides fare-free, fixed-route public and paratransit services within Park County. Dial-A-Ride (DAR) services are available for medical appointments to Bozeman on Tuesday and Wednesdays. Angel Line Angel Line provides door-to-door transportation service to residents of Livingston and the surrounding communities. Angel Line is open to anyone 60 years of age or older and to anyone with a doctor’s letter of disability. Angel Line is available for all trip purposes including medical appointments, work, and recreation, on weekdays excluding holidays. Madison County Transit Madison County Transit currently provides a senior citizen shuttle service to Bozeman twice a week on Tuesdays and Thursdays, and on the 4th week of each month, provides an additional trip on Wednesdays. Riders must call the service to schedule a reservation in advance. 343 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-29 Market Assessment A transit market assessment was completed in 2024 as part of Streamline’s in-progress Transit Development Plan update. The market assessment analyzed key characteristics of the physical environment and customer demand to better understand mobility needs in the Gallatin Valley. It was comprised of four components—density, destinations, design, and demand—using data from the US Census 2022 American Community Survey (ACS) 5-year estimates. Because densities of key socioeconomic metrics were discussed earlier in Chapter 2, this section will review the remaining three components. The destinations analysis reviewed existing and future land use, zoning, and major activity generators to understand activity demand and generation throughout the region. Future development and land use in the region will be focused on expanding mixed-use development in key corridors, which will inform Streamline’s growth as well. Currently, major activity generators such as MSU, Bozeman Health, and core commercial and retail districts are served by Streamline service. Secondary trip generators such as public parks and schools and rapidly growing parts of Belgrade are not served by current fixed routes and could be potential markets. The design analysis assessed how the current built environment influences people’s ability to use transit and where transit can be most successful. Streamline’s current service is within areas with high intersection density, which allows the buses to travel more efficiently and pedestrians to connect to many different streets. Walkability is confined to the central areas of both Bozeman and Belgrade and decreases at the outskirts of the cities as land uses become less intense and street layouts move away from the traditional grid pattern The demand analysis examined how people travel in the region as a whole as compared to transit travel using Replica data. Replica compared 2019 to 2023 weekday travel across all modes and saw a 33% increase, which aligns with the region’s rapid growth. Morning trips between 6am and 7am continue to be popular, which may be an opportunity for Streamline to grow ridership by starting service earlier than 7am. Most trips were found to be less than four miles long and were most commonly taken for shopping, work, and school trips. The most common origin-destination pairs in the area were between north of downtown Bozeman and MSU and between the center of Belgrade and east of it. These are key areas planned for more development and contain block groups with the most residents traveling from them. 344 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-30 Phase 1 TDP Community Engagement Survey The TDP Community Engagement Survey was conducted between August and November 2024 and gathered feedback on the needs of preferences of riders and non-riders across the Gallatin Valley. The feedback was used to make recommendations and strategies for transit services. Altogether, 639 responses were collected for this survey. Respondents were categorized into transit riders, former riders, and non-riders. Key findings across all groups include:  Participants are familiar with both Streamline and Galavan. However, college students are more likely to only be familiar with Streamline.  Students use Streamline services more than non-students, reflecting Streamline’s focus on serving MSU students.  Participants want more service during the morning peak hours between 6am and 7am and afternoon peak hours between 3pm and 6pm.  Participants want more transit services to the Bozeman Yellowstone International Airport, Four Corners, the YMCA, Billings Clinic Bozeman, Livingston, and Bridger Bowl. Transit riders:  Transit riders use Streamline four or more times a week.  The most common trips that riders take are to the university and tech school, personal/recreational/social activities, and work.  Most participants do not typically transfer buses to complete their trips. Former riders:  Participants who no longer use transit are more likely to drive.  The primary reasons former riders no longer use transit include:  Infrequent or insufficient service  Inefficient routes  Lifestyle changes  Use of other modes of transportation Non-riders:  The most common reason non-riders do not take transit is because of the lack of bus stops near their destinations.  Participants indicated that they are more likely to take transit if bus frequency increased and more bus stops were added. 345 Streamline/Gallatin Valley UTD Transit Strategic Plan 2-31  About 40% of participants indicated that they would be more likely to ride if their desired conditions were met. Key Findings  Historical trend data gives insight into Streamline’s previous performance levels and the state of the system today. Fixed Route  Before the pandemic, ridership on the fixed-route network was variable throughout the year with approximately 30,000 monthly boardings from October to April and dropping as low as 15,000 during the summer months. This is likely influenced by MSU’s academic calendar.  Ridership has been slow to recover, and while there is still seasonal variability, there is more stability in ridership numbers month over month, which could indicate more riders are using the service year-round.  The Blueline is the highest ridership route in the system with over 70,000 riders in 2023. The Goldline and Purpleline are the next highest ridership routes with 30,000 and 20,000 riders in 2023 respectively.  The three bus stops with the highest daily ridership are Walmart, Mendenhall & Black (downtown Bozeman transfer station), and the MSU Strand Union Building. The Blueline serves all three of these stops, while the other lines serve only one or two of the highest ridership stops.  Out of 162 bus stops in the system, only 13 stops (6%) have a shelter and seating.  The market assessment performed in the TDP identified secondary trip- generators such as public parks, schools, and areas of Belgrade and new markets for service. Replica data in the market assessment also identified that trips between 6am and 7am are popular and could therefore be captured by Streamline if service hours were expanded to earlier than 7am. Paratransit  Galavan ridership has trended similarly to the fixed-route service with slow recovery after the drop in ridership due to the COVID-19 pandemic, and ridership has not yet returned to pre-pandemic levels. Galavan has about 1,600 monthly riders in 2023, while pre-pandemic ridership averaged 2,400 per month. Community Engagement  Students use Streamline services more than non-students 346 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-32  Respondents want more morning service between 6am and 7am and more afternoon peak service between 3pm and 6pm, as well as more service to Bozeman Yellowstone International Airport, Four Corners, the YMCA, Billings Clinic, Livingston, and Bridger Bowl.  The most common reason non-riders do not take transit is because of lack of service near their destinations. Former transit riders expressed similar reasons for no longer using transit because of infrequent service and inefficient routes. 3 LONG-RANGE VISION This chapter discusses the current challenges faced by transit in the Gallatin Valley, outlines the tenets of successful transit systems, describes transit performance best practices, and walks through the recommended components of Streamline’s long-range vision. CURRENT SYSTEM CHALLENGES The current transit network in Bozeman offers primarily coverage-based service that connects the region’s major destinations and serves most critical transit markets but faces several challenges. These are listed below. Transit service in Gallatin Valley is limited and operates infrequently. Although Streamline provides good coverage to many of the most important destinations, the service operates infrequently, making it time-consuming to travel across town. Additionally, the limited service makes it difficult for passengers to transfer between routes, thereby limiting the overall access that the transit system provides. Streamline cannot expand service because their storage facility is at capacity. The current facility where buses are stored is unable to handle additional vehicles. Until the facility is expanded or a new facility is identified, no additional vehicles can be purchased, and service will not be able to expand. This prevents an increase in frequency or the addition of new routes to the current network. Relocating the storage facility may positively impact operating costs and bus scheduling. Streamline could consider coordinating with other 347 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-33 agencies on storage options that would provide better location for vehicles to reduce deadheading and other operating costs. Lack of a well-connected street network. Travel within the Gallatin Valley is not always direct, due to a street network that is inconsistent and missing connections. This is the result of uncoordinated development and movement away from a gridiron network. Many streets lack pedestrian and bicycle infrastructure. The largest, busiest, and most direct streets are best suited for transit service. However, often, these streets lack sidewalks, crosswalks, and other amenities for people traveling on foot. Most of these streets were not designed with pedestrians or transit use in mind when they were developed, and this poses access and safety challenges for transit as well as psychological barriers for riders. Many bus stops lack signage or accessibility. Signs indicating bus stop locations do not exist at many stops on Streamline’s network. Additionally, many stop locations do not meet ADA requirements and lack amenities. Investments in existing stops are not being made due to concerns about the cost of upgrades to meet ADA requirements. The Downtown Transfer Station is inadequate. The facility has capacity for only two buses, and these spaces don’t allow for independent pull-in/pull-out. The Transfer Station includes an indoor waiting area for passengers that protects them from the elements (the indoor waiting area is temporarily closed due a plumbing issue in the parking garage but expects to reopen in 2026). Also, the location of the bus stop buses is not visible from the indoor waiting area, meaning riders are less likely to use the indoor area as to not miss their bus. Major destinations lack sufficient transit signage and have insufficient routing. Gallatin Crossing is currently one of the busiest stops in the system, however the stop locations lack sufficient signage and amenities to indicate its presence. Transit at major destinations should be clearly visible, and explicit that they are a place to access bus service to connect to other parts of the community. Additionally, the stops require buses to travel through parking lots which can add time and introduce delays. For bus routes that terminate at Gallatin Crossing, there are no dedicated areas for drivers to take a break and use restrooms. Transit service is not well-coordinated with MSU. MSU is the largest institution in Bozeman and generates a significant share of the demand. MSU students are a robust transit market, but they are not fully being served. Transit service is not keeping pace with growth. The growth in population and jobs within the Gallatin Valley has led to new development, and new travel patterns. However, the region’s transit network coverage and service levels have not expanded to match that growth. As the region continues to grow, serving new areas will continue to be a challenge. Increased traffic congestion is requiring more time in transit schedules. As the population increases and traffic volumes go up, there are more vehicles on the road that add 348 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-34 to traffic delays and congestion. As buses share the same streets with cars and trucks, buses are slowed down and increasingly take a longer time to run the same routes. This increases operating costs and can lead to reduced service without a commensurate increase in operating hours and buses. There are not sufficient amenities and infrastructure for operators. Bus operators take time at the end of a trip to take breaks, and to add extra time between trips to ensure the system operates on on-schedule. Restroom facilities are currently lacking at end-of-the lines. 349 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-35 TENETS OF A SUCCESSFUL SYSTEM To develop a successful transit system, there are various actions and investments that cities and transit agencies should consider. Although not every region is the same, many of these characteristics can be scaled for larger or smaller jurisdictions. Provide frequent transit service. Bozeman and Belgrade are small communities by area. The size of these communities means someone can reach most destinations in a short amount of time. At such short distances, driving is faster and easier than other modes for most trips. With transit, for example, wait times for the bus can easily be as long as the travel time itself. Therefore, transit can only compete if service is more frequent than hourly service. Service every 30-minutes is a good start, but even more frequent service will be most useful for the shortest trips and will support longer trips as well. Make transfers easy. It is not possible for transit to connect all potential start and end points for all trips in a city, even in small cities like Bozeman or Belgrade. Therefore, some trips on transit will require a transfer between two or more routes. To facilitate transfers, the transfer locations should provide good facilities, and access to services. Transfers could be made at intersections of two routes, or at a dedicated facility like a transit center. At intersections of two routes, there should be consideration for access and safety (including crosswalks and traffic controls), amenities for passengers (benches for waiting, shelters/heaters for weather protection, shade offering protection from the sun), and proximity to key destinations such as libraries, colleges, grocery stores, and other commercial and retail businesses. Where routes connect at a transit center, there should be plenty of seating, access to restrooms, signage and real-time arrival information, and weather protection with shelters or indoor waiting areas. Focus on serving key population groups. Some groups of people, particularly college students and low-income workers, tend to rely on transit at much higher rates than the general population. Although these groups are not the only market for transit, serving these groups well is an effective way to capitalize on the transit demand that exists. However, it is important not to isolate these groups, and to instead serve the mobility needs of all groups. For example, university transit demand should be integrated into the systemwide transit network. Student housing should be connected to the university, but also to other parts of town where students may want or need to travel. These routes should also serve the demand of residents who are not affiliated with the university. On-demand services support lower-demand areas. Fixed-route service works best for areas with sufficient demand to warrant consistent, all-day service. But some areas are not dense enough to warrant service, even though some level of transit service may be needed. 350 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-36 In these instances, on-demand service may be the most cost-effective way to serve the needs of people living in or traveling to these areas. Provide accessible and recognizable bus stops. Bus stops serve as the front door to transit service; if people cannot reach a bus stop, they will not use the transit network. Bus stops should be clear and recognizable for all users, as this can also serve as a marketing tool to indicate the presence of transit. Additionally, bus stops should be well-located to maximize access to surrounding areas based on the street network and street crossings. Transit and development decisions should be coordinated. As cities expand and neighborhoods change, transit services should adjust to account for new markets and changes in travel patterns. As cities grow, routes should be extended, especially if the growth is high density development or includes major activity centers. Existing neighborhoods may also change, including new infill development, or even population loss if demographics or economics change. This requires adjusting service levels to meet overall demand across the service area. The transit service should be focused on where it is needed most, with frequent services connecting the most important, high-demand corridors. Build partnerships and collaborate with regional partners. Although transit services may be provided by a single transit agency, it requires strong relationships with other agencies and local governments. Important partnerships include the local municipalities who maintain the streets on which transit vehicles operate and have a lot of influence on transit speed and reliability, bus stop locations, pedestrian access, and signal delay. Other important partnerships are with major employers and educational institutions who may contribute to most of the ridership and have a strong role in the success of transit. Partnerships with universities may include coordination on scheduling to serve key times of day, stop locations on or near campus, funding agreements to financially contribute to transit services, and serving travel demand between student housing and the university. Community partnerships are discussed further in the following section. Provide service in the late evening for service workers. The busiest times of day on the transportation network is usually in the morning and in the evening, when there is a convergence of travel to and from work, to and from school, and for medical, social, and other purposes. The higher travel demand and limited capacity of the roadway network tend to result in more intensive transit service during these times of day. However, service workers often work later in the evening and during the night, and these are times when there is overall less service. Providing access to jobs is an important function of transit networks, and this includes for people who work non-traditional schedules. These transit services are particularly important for workers in downtown or university areas, where parking is constrained and/or expensive. 351 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-37 Additionally, late evening service may also benefit other groups such as students or people traveling to evening entertainment and can reduce impaired driving. BEST PRACTICES IN OPTIMIZING TRANSIT PERFORMANCE AND GROWING RIDERSHIP Community Partnership Opportunities While improvements to bus and paratransit services are important opportunities to consider, there are other transit modes and services that can help expand mobility in the region. These services may supplement or enhance existing services and relate to broader community goals of connectivity and mobility. The following partnerships have been discussed with stakeholders and will be explored further. Montana State University CatTracks MSU’s CatTracks service is a pilot program that provides an important connector for students, staff, and visitors to the university. There is an opportunity for Streamline to coordinate more closely with MSU on delivering service in and around the campus area. Currently, CatTracks service overlaps with parts of Streamline’s Blueline and Goldline routes. Enhanced coordination could help ensure routes are not duplicative and competing for the same riders. Resources such as bus stops, transfer stations, and layover facilities could also be shared between the two to provide the best service to meet campus needs. Recreation Shuttle The GVMPO area is uniquely positioned nearby many outdoor recreation activities and attractions, and as a result, residents and visitors need a way to reach them. Seasonal transit services to trailheads or ski areas can not only connect people to them who do not have access to a car but can also help alleviate problems with limited parking at recreation sites. Streamline’s existing Bridger Bowl service could be replicated for other outdoor attractions with partnership opportunities to help fund the service. Some examples of recreational shuttle services currently operating are:  Roaring Fork Transportation Authority zero-fare fall transit pilot or Maroon Bells shuttle in Aspen, CO  LINK Transit ski shuttle in Chelan County, WA 352 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-38  Cascades East Transit float shuttle in Bend, OR  Boulder County Recreational Shuttles fare free shuttles in Boulder, CO. Micromobility Support Micromobility refers to lightweight vehicles such as scooters and bikes meant to travel short distances. Micromobility systems involve fleets of shared-use micromobility devices that can be rented for point-to-point trips. These fleets can consist of e-scooters, pedal bikes, or pedal-assist electric bikes (e-bikes), or a combination of types. Micromobility systems are typically either dockless, where devices can be picked up or dropped off in the public right- of-way, or station-based with designated docking stations for the devices to return to. Transit agencies can partner with micromobility service providers to offer first- and last-mile connections to fixed route service, extending access to transit beyond typical ¼ or ½-mile walksheds. Priority locations for implementing micromobility alongside transit include key transit centers and transfer facilities, transit stops along high-frequency routes, transit stops connecting to the active transportation network (shared use paths, trails, and bike lanes), and within activity centers such as downtown cores, university campuses, and retail centers. Transit Priority Infrastructure Buses operate in shared roadways with other traffic, making transit susceptible to traffic delays and increased signal delay. Dwell time at stops also increases variability of travel time and can make it difficult for buses to keep up with signal timing to facilitate vehicle movement. Transit priority infrastructure focuses on improving bus delay and prioritizing bus movements over general traffic. Figure 23 details various infrastructure improvements proven to enhance bus speed and reliability, outlining the types of locations where an improvement is suitable, how transit benefits from the improvement, and a high-level assessment of the level of effort required to implement. Examples include enhancements to bus stop placement and design, allocated space for bus travel, and traffic control methods. Coordination with local jurisdictions would be required for implementation of this infrastructure. Specifically, if any were planned on a federal-aid, state maintained route, additional collaboration with MDT would be required. 353 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-39 Figure 23 Examples of Transit Priority Infrastructure: Bus Stops Treatment Description Benefits Example Level of Effort Farside Bus Stops Farside stops are placed after intersections, allowing buses to clear signals before picking up or dropping off passengers. Suitable for stops where the farside land use is available for a new stop. Minimizes bus delay at red lights after pausing to pick up or drop off passengers because the bus will clear the intersection first Low Bus Stop Balancing Stop balancing is relocating or consolidating stops to optimize the space between stops. These are beneficial for routes with several close- together, lower ridership stops. Reduces dwell time and deceleration/ acceleration time, and more efficient use of limited bus stop infrastructure Low Curb Extension Curb extensions extend the curb and sidewalk out to the edge of the parking lane to create an in-lane bus stop. Suitable for local collector roads with more pedestrian activity. Reduces delay from merging into travel lane and improves pedestrian visibility and safety Medium Transit Island Transit islands feature a bike lane behind the station area while providing an in-lane bus stop. Best suited for locations with higher bicycle and pedestrian activity. Reduces delay from merging into travel lane and improves pedestrian visibility and safety Medium Near-Level Boarding The platform is slightly below the bus floor, with a minimal ramp or bridge plate used to close the gap. Typically implemented at key stops or transit centers with raised curbs or specialized boarding areas. Improves boarding speed, accessibility, and service reliability with lower costs than full level boarding. High Source: Nelson\Nygaard 354 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-40 Figure 24 Examples of Transit Priority Infrastructure: Transit Lanes Treatment Description Benefits Example Level of Effort Peak Hour Lane Peak hour lanes are either exclusively or primarily for transit use during specified hours, usually during times of highest demand. Suitable for high-traffic roads where the bus experiences the most delay during peak hours. Buses take precedence over parking and curbside access during hours when it most benefits bus operations Medium Bus on Shoulder A transit operation strategy where buses are allowed to use the highway shoulder (within constraints) to bypass traffic congestion when traffic is moving extremely slow, typically under 35 MPH. Buses re- enter the regular travel lane when traffic speeds up. Improves bus speed and reliability while using shoulders in a cost-effective manner. Medium Dedicated Bus Lane Dedicated bus lanes are for exclusive use by public transit vehicles to minimize conflict with other vehicles. Most suitable for arterial roads where buses experience high delay. Improves bus speeds and travel time because buses are separated from mixed through traffic and not stuck in congestion High Business Access and Transit (BAT) Lane BAT lanes are primarily dedicated for transit use but allow some general traffic use for turning into driveways or intersecting streets. Suitable for local arterial or collector streets with residential or commercial use. Maintains business and residence access while prioritizing bus travel High 355 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-41 Figure 25 Examples of Transit Priority Infrastructure: Traffic Control Treatment Description Benefits Example Level of Effort Queue Jump Signal A queue jump signal is a special signal phase used to advance buses through an intersection before general traffic. Suitable for locations without a receiving lane for buses and the bus experiences delay when merging into traffic. Decreases travel time as buses advance ahead of general traffic at intersections Medium Bus Movement Exemptions Bus movement exemptions (right-turn- only except bus, transit- only access, etc.) allow buses to make movements that are prohibited for other vehicles. Best suited for locations with existing right turn pockets and receiving lane space farside of the intersection. Reduces travel time because buses can advance ahead of general traffic at an intersection or is separated from general vehicle traffic Medium Transit Signal Priority (TSP) TSP refers to signal technologies that give buses additional or dedicated time for moving through intersections. Most suitable for arterial roads with high bus activity and delay. Reduces bus wait time at signals, improving travel time and travel time variability High Transit-Supportive Land Use and Design The type and amount of transit service an area can support is largely determined by the population and employment densities in the area. Figure 26 shows approximate population and employment densities, their corresponding built environments, and appropriate types of transit and frequency as applicable, based on market research performed by Nelson\Nygaard. 356 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-42 Based on the population and employment density data discussed in Chapter 2, the GVMPA is mainly classified by the rural/low density and mixed/suburban mixed-use neighborhoods land use categories. Fixed-route service does not currently operate outside of the Bozeman and Belgrade urbanized areas, and there is likely not enough demand to support it. However, on-demand service could be appropriate to fill in gaps in the transit system in these areas. Current densities in Downtown Bozeman indicate support for up to 15-minute transit frequencies, which would be an improvement from current 60- and 30-minute frequencies. Integrating land use design with transit is a coordinated effort with the cities, communities, and transit agency. As the community grows and new development is planned, new transit markets could be created, and it will be important to consider how people will travel to jobs or homes in, between, and along those areas. The Gallatin County future land use map (FLUM) was adopted in December 2024 and should be at the forefront of transit and land use planning.10 Figure 26 Land Use Density and Recommended Transit Service 10 “Envision Gallatin.” Gallatin County Growth Policy, 10 Dec 2024, gallatingrowthpolicy_dec2024_0.pdf. 357 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-43 358 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-44 CASE STUDIES Three systems were identified due to demographic and cultural similarities to Bozeman, along with the presence of large universities. These systems all provide service into the evening, all provide some service that operates at least every 30 minutes (with some routes even more frequently), and they all provide downtown transit facilities that allow for passenger waiting areas and transfers between multiple routes to facilitate region-wide mobility. Two of the systems operate fare-free, and all provide service that supports the local university and student community, while also ensuring access for residents and other parts of the community. The systems all have ridership and service levels that are high enough to meet federal criteria for additional operating funds through the FTA’s Small Transit Intensive Cities (STIC) Program. STIC provides funding for operations to urbanized areas of 200,000 people or less that meet one or more of the STIC performance factors. The funding awarded is scaled based on the number of performance factors met, including but not limited to vehicle revenue mile (VRM) per capita, passenger miles per VRM, or passenger trips per capita. Flagstaff, AZ The Mountain Line Transit Authority provides transit service to Flagstaff and surrounding areas with nine fixed routes, on-demand microtransit service, vanpools, and ADA paratransit. Their fixed-route service operates seven days a week from 6am to 10pm, and most routes run at 20-30-minute frequencies, with one bus rapid transit (BRT) route running every eight minutes. Mountain Line recently added a winter route that serves nearby snow recreation areas to mitigate growing traffic delays during the winter. The Downtown Connection center is Mountain Line’s central bus transfer facility near downtown Flagstaff. It provides an off-site location for buses to layover and for passengers to transfer between all bus lines. Mountain Line opened a new building in 2025 that includes restrooms, customer service desk, and offices for administrative and operations support staff. Mountain Line partnered with the Flagstaff Unified School District (FUSD) to promote students using public transit to get to school when FUSD was faced with school bus driver shortages. The school district supplied bus passes to students and the agency helped educate students and families on how to use the bus system. The partnership was successful, and FUSD has since eliminated yellow bus service for high school students within city limits, which has added over 1,000 student riders on public transit. Mountain Line receives funding through the FTA’s Small Transit Intensive Cities (STIC) Program. For FY2025, Mountain Line achieved five out of the six performance factors. 359 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-45 Missoula, MT The Missoula Urban Transit District (MUTD) operates public transit in Missoula with their Mountain Line system. Mountain Line has 12 fixed routes that operate between 6am and 9pm, and all but two routes operate seven days a week. Most routes operate on 30-to-60- minutes frequencies, while two routes operate every 15 minutes. Mountain Line is also a fare-free system, which contributed to a large increase in ridership from 2015 to 2016 when it was implemented. While fixed-route ridership has not fully recovered from the COVID-19 pandemic, it has seen significant gains in recent years due to expansion in evening and weekend service times. Paratransit ridership has also increased by more than 50% since 2019. Missoula’s Downtown Transfer Center serves as a central connecting point for nearly all lines in the system. Most routes terminate here. A second transit center is proposed near the Southgate Mall to serve multiple routes. Like the Flagstaff system, Missoula’s system receives funding from the STIC program and also achieves five out of the six performance factors. Logan, UT The Cache Valley Transit District (CVTD) operates Connect Transit in Logan, UT and surrounding areas. The transit system began with local bus service in Logan and has since expanded to offer regional routes to nearby cities who are supplying funding for service. Connect is a fare-free system across all services, including the 14 fixed routes, on-demand service, Call-A-Ride paratransit service, and downtown loop connector. Fixed routes operate every 30 minutes on weekdays and every 60 minutes on Saturdays, and there is no Sunday service. The downtown loop operates every 15 to 20 minutes and connects key destinations such as Utah State University to downtown Logan and Walmart. There is also a commuter route that operates two trips in morning and evening between Logan and the city of Preston. Utah State University is a major destination and employment hub in Logan. USU operates a free campus shuttle during the academic year. Connect Transit partners with Bear River Association of Governments (BRAG) to provide transportation assistance to seniors, people with disabilities, and low-income households for critical trips when no viable public transit options exist. Connect Transit receives funding from the STIC program and achieves two of the six performance factors. 360 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-46 LONG-RANGE RECOMMENDATIONS Overview The Gallatin Valley has experienced rapid growth over the past decade, with further growth likely to continue into the future. This growth has necessitated a reevaluation of transit needs and services in the region across both the near- and long-term. While rapid growth presents near-term challenges, it introduces an opportunity to plan for transformational long-term changes to transit service that not only react to growth but anticipate and prepare for growth when it occurs. This section outlines the Transit Strategic Plan’s six key long-range strategies for growing transit service in the Gallatin Valley:  Increase bus base and facility capacity  Acquire vehicles needed to grow service  Introduce high-frequency service  Expand fixed route service  Enhance the rider experience through capital improvements  Pilot on-demand transit Through the six recommended long-range strategies, the Gallatin Valley will see transit service with 30-minute or better frequencies reach new areas, expanding to be within walking distance of most residents within the GVUTD, while improving mobility for existing riders. The recommended strategies will introduce high-frequency service to corridors connecting key destinations, making transit a more competitive option for travel. Further, the long-range recommendations specify the capital investments needed to support the additional transit service and to improve the rider experience through facilities that allow for more comfortable and convenient transfers. Each of these strategies takes into consideration the current challenges faced by Streamline, tenets of successful systems, and transit best practices presented in the preceding sections, along with the region’s current and future planning context. The recommended strategies also build upon and align with the work completed to-date for the in-progress TDP update. An estimate of operations and maintenance and capital funding needed to implement the long-range strategies, along with recommended implementation steps, is presented in Chapter 4. Increase Bus Base and Storage Facility Capacity Prior to expanding service, Streamline requires sufficient space and capacity to store and maintain additional vehicles. The current bus operations and maintenance facility in northern 361 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-47 Bozeman does not have the capacity to accommodate an expanded bus fleet. However, it is important for Streamline to develop a facility that is sufficient for long-term investments, rather than planned short-term growth. Skyline has also expressed interest in sharing facilities and procurement with Streamline, which will require additional long-range planning to align with the future service levels, routes, and fleet recommended in this section. Expand the Bus Fleet The service plan as recommended in the in-progress TDP, along with the high-frequency service recommended in the following section, will require a significant increase in vehicles. Based on the number of buses required in the long-range vision, as shown in Figure 27, Streamline’s peak bus pull will be approximately 28 buses for fixed route service, three vehicles for on-demand service, and 16 vehicles for paratransit. Streamline should include additional vehicles set aside as spares to maintain service continuity in case of breakdowns, maintenance and repairs. A 20% spare ratio is considered best practice.11 Including spares, Streamline would need 34 vehicles for fixed route services, four vehicles for on-demand, and 20 vehicles for paratransit. Although scheduling practices and route adjustments could lower the overall fleet required in the long-term, this quantity of vehicles is likely a reasonable starting point for Streamline to budget and plan for future vehicle acquisition. Figure 27 Fixed Route and Paratransit Fleet Needs Fixed Route On-Demand Paratransit Vehicles to operate 28 3 16 Spares (20%) 6 1 4 Total vehicles 34 4 20 Introduce High-Frequency Service When services run frequently, riders can travel when it is convenient for them and avoid having to set aside as much buffer time to wait on a bus arrival. Conversely, infrequent service provides riders with little flexibility, especially for those who must transfer to another line. Improving service frequencies from any level improves convenience and has the potential to attract more riders. 11 The FTA requires a 20% spare ratio for agencies operating 50 or more fixed-route vehicles. Although smaller systems, such as Streamline, are not subject to this requirement, having a set of spare vehicles is best practice to prevent service disruptions and accommodate maintenance needs for the vehicles. 362 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-48 Based on the analysis of where transit demand is highest within the study area, two key corridors are identified as good candidates for high-frequency, 15-minute service (see Figure 28). An east-west route from Downtown Bozeman to Gallatin Crossing would connect major commercial areas in the city, as well as provide transfer points to many other routes in the system. The other high-frequency corridor would connect the highest ridership stops of Gallatin Crossing, MSU, downtown Bozeman, and Walmart with one transit line. This route would combine portions of the Blueline and Goldline, which are the highest ridership lines in the system, and offer transfer points to many other routes. The highlighted routes in Figure 28 establish a solid foundation that will be further refined to determine precise alignments as the project progresses. Figure 28 Recommended High-Frequency Transit Corridors 363 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-49 Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade Expand Fixed Route Service Development has rapidly expanded in the GVMPA and has subsequently created new markets for transit service. Suburban jobs and lower-density suburban housing have been traditionally difficult to serve with transit due to dispersed development patterns. However, opportunities to improve access exist when considering population and employment density. The recommended transit network as part of the Long-Range Plan includes adding routes to connect key destinations, improving frequency on high-utilization routes, and expanding transit service to areas currently without service. As shown in Figure 29, fixed route network coverage is expanded throughout the GVMPA, and a new airport express service is introduced. Several Streamline routes currently run at 30-minute frequencies during the morning and evening peak periods and every 60 minutes during the midday. The proposed network would increase most routes to all-day 30-minute service, with two key corridor routes having 15- minute service. The proposed Grayline and Airport Express would operate every 60 minutes. Along several key corridors, overlapping service between routes further introduces additional high-frequency service. 364 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-50 Figure 29 Recommended Fixed Route Corridor Frequencies Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade Paratransit Impacts With the proposed expansion of Streamline fixed-route network, the paratransit service that operates within two miles of the fixed routes will also expand to match this coverage (Figure 30). This expansion will require growth in the paratransit fleet, including additional vehicles, operators, and scheduling resources, to maintain service quality and ADA compliance. The larger service area will also cover approximately 8,900 additional people, representing a 15% increase compared to the current service area, resulting in greater access for seniors, individuals with disabilities, and others who rely on accessible transportation. 365 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-51 Senior Van Program Streamline could consider offering a senior van program to offer a mobility option for seniors other than Galavan. Senior van programs are complementary to paratransit programs and can typically be operated with minivans and operators with less specialized training, which have lower operating costs than dedicated paratransit vehicles. These programs often have better response times and increased flexibility for scheduling trips, which could make it a desirable option for riders. Galavan will continue to provide dedicated paratransit service for eligible riders, and a senior van program could help reduce Galavan’s capital and operating expenditures. Figure 30 Updated Streamline Paratransit Service Area 366 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-52 Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade Enhance the Rider Experience through Capital Investments Although frequency of service is a critical component of addressing passenger needs and increasing ridership, other factors can improve passenger experience and facilitate transit use, particularly capital investments. Many of these capital investments can be categorized into passenger improvements or operational investments. One-time capital investments can create long-term ridership dividends through attracting new riders and retaining current riders. Passenger Improvements Passenger improvements are capital investments that make it easier for people to access and use transit and improve the experience for passengers. Bus Stop Signage Signs provide clear information for both passengers and operators about where buses stop to pick up and drop off passengers and present information on which routes serve the location. This signage also can act as a marketing tool that informs the public about the presence and availability of transit. First- and Last-Mile Access Improvements Every transit trip starts and ends by traveling by foot or other mobility device between a transit stop and a destination. The availability of sidewalks and crosswalks is important in providing these connections and ensuring residents can access the service. Transfer Locations Several locations in the transit network provide critical connections between two or more routes. These are also areas that typically have higher transit demand or support major destinations. These locations should have a higher level of investment, including more robust seating, weather protection, and real-time arrival information. The locations are shown in Figure 31 and listed below:  Montana State University  Gallatin Crossing  Walmart 367 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-53  Downtown Bozeman transfer facility Station Area Enhancements Station areas shape how riders understand and experience the system. Enhancing these areas improves comfort, and clarity. Amenities such as lighting, signage, seating, routing, and real- time information make stops more visible, accessible, and welcoming. Strengthening these spaces supports both rider experience and overall system performance. Smaller stations could provide 1-2 elements, while larger ones could offer ten or more. 368 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-54 Figure 31 Recommended Transfer Point Improvement Locations Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade Operational Investments Operational investments improve and facilitate bus service and maintain reliability. Layover/Recovery Areas Designated areas for bus operators to wait between trips is important for both operational performance (service reliability and on-time performance) and workplace safety. Operators 369 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-55 need breaks between trips to rest and relax. But the time also ensures reliability by adding extra time between trips that can be used to ensure on-time departures on the next trips. Operator Facilities At the beginning and end of routes, operator facilities provide locations for operators to take breaks and use restrooms. Transit Priority Infrastructure Buses operate in shared roadways with other traffic, making transit susceptible to traffic delays and increased signal delay. Transit priority infrastructure focuses on improving bus on-time reliability and prioritizing bus movements over general traffic. Transit priority infrastructure is detailed in a preceding section of Chapter 3, with examples of infrastructure improvements presented in Figure 23. It is important to note that implementing transit priority infrastructure would be a multi-jurisdictional effort within the MPA to modify roads, signals, and bus facilities owned and operated by the cities, county, or state. Pilot On-Demand Transit Microtransit, also referred to as on-demand transit (ODT), is a form of demand-responsive, shared-ride public transit system that uses software technology to request trips. Unlike a fixed-route system, microtransit has variable routes and schedules based on when and where rides are requested. Microtransit is typically implemented in areas with lower transit demand, areas with lower population and employment densities, or areas with circuitous and/or disconnected road networks that make fixed-route transit less efficient. Microtransit services can use vehicles with a variety of sizes such as shuttles, vans, sedans, or standard buses. Riders can typically book trips through a smartphone app, website, kiosk, or calling a customer service representative, depending on the transit system. Many areas within the GVMPA are not currently served by transit and have population and employment levels that are not high enough to justify fixed-route service. However, there are still mobility needs in these areas. Microtransit could fill in the gaps in the current transit network and provide first-/last-mile connections to fixed-route service. The long-range plan proposes four on-demand transit zones throughout the study area to complement the fixed-route service. The Belgrade zone would cover the city, including the Bozeman Yellowstone International Airport (Figure 32). The South Bozeman zone would span the area south of MSU’s campus from Fowler Lane to the Bozeman Deaconess Hospital, with an extension to cover Gallatin College as well (Figure 33). The Four Corners zone would capture most residential areas and provide connection to the proposed Purpleline extension (Figure 34). The new Late-Night zone would replace the Latenight Streamline fixed-route 370 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-56 service and would cover the majority of the recommended Streamline network when fixed routes are not operating (Figure 35). The Belgrade, South Bozeman, and Four Corners zones would operate each day from 6am to 8pm, while the Late-Night zone would operate from 10pm to 1am on weekdays, 7pm to 1am on Saturdays, and 7pm to 10pm on Sundays. Figure 32 Recommended Belgrade On-Demand Transit Service Area Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade 371 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-57 Figure 33 Recommended South Bozeman On-Demand Transit Service Area Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade 372 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-58 Figure 34 Recommended Four Corners On-Demand Transit Service Area Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade 373 Streamline/Gallatin Valley UTD Transit Strategic Plan 3-59 Figure 35 Recommended Late Night On-Demand Transit Service Area Source: Streamline, MDT, GVMPO, Gallatin County, City of Bozeman, City of Belgrade 374 Streamline/Gallatin Valley UTD Transit Strategic Plan 4-1 4 IMPLEMENTATION AND FUNDING This chapter outlines an estimate of the operations and maintenance costs and capital funding required to realize the long-range vision described in Chapter 3, presents a prioritized list of implementation steps for achieving the vision, and describes potential sources of funding. OPERATIONS AND MAINTENANCE COSTS The long-range vision for fixed route service is expected to require approximately 89,000 annual service hours, or an increase of approximately 270% from current service levels of approximately 24,300 annual service hours (see Figure 36). Based on a cost of approximately $99.57 per service hour12, the increased fixed route service would cost approximately $6.5 million per year. Figure 36 Long-Range Vision Service Levels Service Existing Annual Service Hours Long Range Vision Annual Service Hours Change % Change Weekday Annual 19,285 76,420 +57,135 +296% Saturday Annual 3,115 6,370 +3,255 +104% Sunday Annual 1,920 6,350 +4,430 +231% Annual Total 24,320 89,140 +64,820 +267% On-demand service will require 5,100 annual hours for each of the three on-demand zones, and 4,400 annual hours for the evening on-demand zone. This represents 19,700 annual 12 NTD 2023. HRDC Agency Profile. https://www.transit.dot.gov/sites/fta.dot.gov/files/transit_agency_profile_doc/2023/80235.pdf 375 Streamline/Gallatin Valley UTD Transit Strategic Plan 4-2 hours. Assuming a cost of $61.37 per service hour13, this would cost approximately $1.2 million each year. Future paratransit costs are estimated based on the size of the service area. Today, Galavan operates across an area of approximately 32 square miles. The future service area will be approximately 51 square miles. Assuming a proportionate increase in operating costs (or 59% increase), service will increase from approximately $755,000 annually today to $1.2 million with the future vision. The total annual cost to operate the long-range vision is approximately $9 million. As shown in Figure 37, this includes the cost for fixed route services, paratransit, and on-demand services. Figure 37 Long-Range Recommendations Operations & Maintenance Cost Summary Service Annual Cost Estimate (2025 $) Fixed route $6.5 million Paratransit $1.2 million On-demand $1.2 million Total $8.9 million Note: Cost values are estimates and will vary significantly based on many factors. CAPITAL COSTS In addition to operations and maintenance expenses, Streamline will need to invest in its fleet, infrastructure and various capital improvements to operate the service and improve passenger amenities. This includes additional vehicles, a new operations & maintenance facility, investments in the transfer locations recommended in Chapter 3, and bus stop amenity improvements. Unit costs for various capital improvements are included in Figure 38. These costs only account for the purchase and capital cost of each improvement, and don’t account for land acquisition, planning, design, engineering, or installation/construction. Figure 38 Unit Costs for Capital Cost Estimation Item or Improvement Cost Estimate (2025 $) Fixed Route Vehicles 40-foot Diesel bus $520,000 13 Ibid. Hourly cost of paratransit service assumed to represent hourly on-demand service cost. 376 Streamline/Gallatin Valley UTD Transit Strategic Plan 4-3 Item or Improvement Cost Estimate (2025 $) 40-foot CNG bus $620,000 40-foot Hybrid bus $870,000 40-foot Electric bus $1,080,000 Paratransit Vehicles Accessible Van $75-98k Accessible Van (Low Floor) $152-155k Light Transit Vehicle $105-123k Light Transit Vehicle (Narrow) $118-123k Light Transit Vehicle (Low Floor) $159-210k On-Demand Vehicles Modified Minivan $71,000 Accessible Van $75-98k Accessible Van (Low Floor) $152-155k Operations & Maintenance Facility Operations & Maintenance Facility $30-80 million Transfer Facility Transfer Facility $22 million14 Real Time Arrival Signage $7,000-9,000 Bus Stops Bus stop sign $400-900 ADA boarding pad $800-2,000 Small bench $800-1,000 Standard bench $1,500 Shelter (no amenities) $9,000 Shelter with seating $10-20k Note: Cost values are estimates and will vary significantly based on many factors. The fixed-route fleet will increase by approximately 16 buses above the 18 buses in Streamline’s current fleet. These additional buses are likely to cost approximately $13.9 million in 2025 dollars, assuming a cost of $870,000 for each new Hybrid 40-foot bus. This 14 Based on approximate cost of $3.2 million per bay. Assumes seven bus bays for a single transfer facility, which should accommodate demand at each of the planned transfer locations. 377 Streamline/Gallatin Valley UTD Transit Strategic Plan 4-4 represents a higher end of investment and could be lower with less expensive propulsion types. The paratransit fleet will increase by approximately 11 vehicles above the nine vehicles in the current Galavan fleet. This additional set of vehicles is likely to cost approximately $1.2 to $1.4 million in 2025 dollars, assuming a cost of $105,000 to $123,000 for each new Light Transit Vehicle. The on-demand fleet will include 4 new vehicles, which is likely to cost $300,000 to $392,000 in 2025 dollars, assuming $75,000 to $98,000 for each new Accessible Van. The long-range vision also assumes:  Four new transfer facilities, at $22 million each, for $88 million total  250 new bus stops spaced approximately every one-fifth mile, with all stops having a sign and ADA boarding pad, for $300,000 to $725,000 total.  An annual capital program to install amenities at 10 stops each year, to slowly expand bus stop amenities throughout the system:  Five stops with new shelters and integrated seating  Five stops with new benches A summary of the capital costs is shown in Figure 39. Note that the fleet costs only account for the new vehicles necessary to expand beyond the current size of the fleet. Additional bus purchases will be necessary to replace buses after they reach the end of their life, usually after 12-15 years of operation. Additionally, the annual bus stop amenity program cost is for a single year and should be an ongoing expenditure. Figure 39 Long-Range Recommendations Capital Cost Summary Capital Item or Improvement Cost Estimate (2025 $) Fixed route fleet $13.9 million Paratransit fleet $1.2-1.4 million On-demand fleet $300-392k Operations & maintenance facility $30-80 million Transfer facilities $88 million Bus stops $300-725k Bus stop shelters and benches annual program $56-108k Total $134-185 million Note: Cost values are estimates and will vary significantly based on many factors. 378 Streamline/Gallatin Valley UTD Transit Strategic Plan 4-5 IMPLEMENTATION STEPS AND COST SUMMARY Aligning with the recommended long-range strategies outlined in Chapter 3, Figure 40 displays the prioritized implementation steps that Streamline should undertake to achieve the long-range vision. A full summary of associated operations and maintenance costs and capital costs are also provided. Figure 40 Long-Range Implementation Steps and Cost Summary Strategy Cost Estimate (2025 $) Priority 1: Increase Bus Base and Maintenance Facility Capacity Operations & maintenance facility (capital costs) $30-80 million Priority 2: Acquire Vehicles Needed to Grow Service Fixed route fleet (capital costs) $13.9 million Paratransit fleet (capital costs) $1.2-1.4 million Priorities 3 and 4: Introduce High-Frequency Service and Expand Fixed Route Service Fixed route (operations & maintenance costs) $6.5 million Paratransit (operations & maintenance costs) $1.2 million Priority 5: Enhance the Rider Experience through Capital Improvements Transfer facilities (capital costs) $88 million Bus stops (capital costs) $300-725k Bus stop shelters and benches annual program (capital costs) $56-108k Priority 6: Pilot On-Demand Transit On-demand fleet (capital costs) $300-392k On-demand (operations & maintenance costs) $1.2 million Total Annual Operations & Maintenance Costs $8.9 million Total Capital Costs $134-185 million Note: Cost values are estimates and will vary significantly based on many factors. FUNDING SOURCES This section outlines potential sources of funding, beyond Streamline’s current federal formula funding, local contribution, and partner support mix, that the agency should consider pursuing in working towards implementing the long-range vision outlined in Chapters 3 and 4. 379 Streamline/Gallatin Valley UTD Transit Strategic Plan 4-6  FTA Small Transit Intensive Cities (STIC) funding: STIC funding is a part of the FTA Section 5307 Urbanized Area Formula Funding Program makes funding available for transit capital and operating assistance and transportation-related planning in urbanized areas. For urbanized areas of 50,000 to 199,999 in population, Section 5307 funding is allocated by formula based on population, low-income population, and population density. Beyond this formula funding, small urbanized areas are eligible to receive STIC funding if transit service provided in the urbanized area meets or exceeds the following six STIC performance criteria. For each criterion, the performance of the small urbanized area is compared against the average performance of urbanized areas with a population between 200,000 and 999,999. 1. Passenger miles per vehicle revenue mile 2. Passenger miles per vehicle revenue hour 3. Vehicle revenue mile per capita 4. Vehicle revenue hour per capita 5. Passenger miles per capita 6. Passenger trips per capita  FTA Areas of Persistent Poverty Program: Provides funding to transit agencies for planning, engineering, or development of technical or financing plans for projects that will assist “Areas of Persistent Poverty” or “Historically Disadvantaged Communities”. Eligible activities include planning, engineering, or development of technical or financing plans for improved transit services; new transit routes; engineering for transit facilities and improvements to existing facilities; innovative technologies; planning for low or no emission buses; planning for a new bus facility or intermodal center that supports transit services; integrated fare collections systems; or coordinated public transit human service transportation plans to improve transit service in an Area of Persistent Poverty or Historically Disadvantaged Community, or to provide new service such as transportation for services to address the opioid epidemic, as well as increase access to environmental justice populations, while reducing greenhouse gas emissions and the effects of climate change.  FTA 5339 Grants for Buses and Bus Facilities Formula Program: Provides funding to states and transit agencies through a statutory formula to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities. In addition to the formula allocation, the Grants for Buses and Bus Facilities program (49 U.S.C. 5339) includes two competitive components: the Bus and Bus Facilities Competitive Program and the Low or No Emissions Bus Vehicle Program.  FTA Innovative Coordinated Access and Mobility (ICAM) Program: Provides funding to transit agencies to improve access to public transportation by building partnerships among health, transportation and other service providers. The program 380 Streamline/Gallatin Valley UTD Transit Strategic Plan 4-7 provides competitive funding to support innovative projects for the transportation disadvantaged that will improve the coordination of transportation services and non- emergency medical transportation services.  Safe Streets and Roads for All (SS4A) Grant Program: Provides funding to agencies to support transportation initiatives and improvements aimed at preventing roadway fatalities and serious injuries. The SS4A program provides funding for Planning and Demonstration Grants and Implementation Grants. Planning and Demonstration Grants are used to develop, complete, or supplement an action plan, while Implementation Grants are used to implement projects that are consistent with an existing action plan to address a roadway safety problem. Streamline could partner with other SS4A applicants when creating a safety plan. 381 2027 2028 2029 2030 2031 NHPP (3) - $8,978,186 $17,794,865 $750,000 $750,000 $750,000 $29,023,051 $3,318,570 $63,052,830 $92,075,881 $29,867,130 $33,185,700 IM - $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000 $1,510,197 $28,693,743 $29,943,743 $13,591,773 $15,101,970 NH - $8,728,186 $17,544,865 $500,000 $500,000 $500,000 $27,773,051 $1,808,373 $34,359,087 $62,132,138 $16,275,357 $18,083,730 NHFP - - - - - - - - - - - - STP (3) $24,594,567 $3,853,906 $7,631,092 $2,622,504 $7,663,569 $2,434,020 $24,205,091 $3,165,696 $60,148,224 $108,947,882 $28,491,264 $31,656,960 STPU $13,445,204 $368,335 $1,045,888 $1,530,046 $1,530,046 $1,530,046 $6,004,361 $1,530,046 $29,070,874 $48,520,439 $13,770,414 $15,300,460 STPX, STPS, SFCN $9,533,466 $87,485 $5,482,531 - - - $5,570,016 $579,596 $11,012,324 $26,115,806 $5,216,364 $5,795,960 UPP - $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 $191,135 $3,631,565 $6,131,565 $1,720,215 $1,911,350 TA (Statewide) (4) - $2,494,112 $198,699 $188,484 $5,229,549 - $8,110,844 $460,945 $8,757,955 $16,868,799 $4,148,505 $4,609,450 TA (MPO) (5) $1,615,897 $403,974 $403,974 $403,974 $403,974 $403,974 $2,019,870 $403,974 $7,675,506 $11,311,273 $3,635,766 $4,039,740 BR - $17,845 $2,438,885 $2,617,434 - - $5,074,164 $878,931 $16,699,685 $21,773,849 $7,910,377 $8,789,308 HSIP - $480,629 $6,868,744 $200,000 $200,000 $200,000 $7,949,373 $420,854 $7,996,226 $15,945,599 $3,787,686 $4,208,540 MACI (CMAQ) (11) - $1,992,388 $3,451,600 - - - $5,443,988 $347,528 $6,603,030 $12,047,018 $3,127,751 $3,475,279 CR (6) $1,125,353 $579,613 - - - - $579,613 - - $1,704,966 - - FTA (3) $380,421 $3,101,410 $2,857,133 $2,857,133 $2,857,133 $2,857,133 $14,529,942 $1,833,011 $34,827,209 $49,737,572 $16,497,099 $18,330,110 FTA 5307 - $2,760,633 $2,760,633 $2,760,633 $2,760,633 $2,760,633 $13,803,165 $1,492,234 $28,352,446 $42,155,611 $13,430,106 $14,922,340 FTA 5339 - Formula (7) $380,421 $96,500 $96,500 $96,500 $96,500 $96,500 $482,500 $96,500 $1,833,500 $2,696,421 $868,500 $965,000 FTA 5339 - Discretionary (8) - - - - - - - - - - - - FTA 5310 - $244,277 - - - - $244,277 $244,277 $4,641,263 $4,885,540 $2,198,493 $2,442,770 Grants (9) - $17,341,405 $25,000,000 - - - $42,341,405 $1,600,000 $30,400,000 $72,741,405 $14,400,000 $16,000,000 FWP - $125,000 - - - - $125,000 $25,000 $475,000 $600,000 $225,000 $250,000 RRS - - - - - - - $50,000 $950,000 $950,000 $450,000 $500,000 TransADE - $115,658 $115,658 $115,658 $115,658 $115,658 $578,290 $115,658 $2,197,502 $2,775,792 $1,040,922 $1,156,580 Operations and Maintenance - $1,507,353 $1,507,353 $1,507,353 $1,507,353 $1,507,353 $7,536,765 $1,507,353 $28,639,706 $36,176,471 $13,566,176 $15,073,529 Fuel Tax (3) - $3,397,031 $3,397,031 $3,397,031 $3,397,031 $3,397,031 $16,985,154 $3,397,031 $64,543,584 $81,528,738 $30,573,277 $33,970,307 Fuel Tax - City of Belgrade (10) - $495,383 $495,383 $495,383 $495,383 $495,383 $2,476,916 $495,383 $9,412,282 $11,889,199 $4,458,450 $4,953,833 Fuel Tax - City of Bozeman (10) - $2,063,369 $2,063,369 $2,063,369 $2,063,369 $2,063,369 $10,316,847 $2,063,369 $39,204,020 $49,520,868 $18,570,325 $20,633,695 Fuel Tax - County (10) - $838,278 $838,278 $838,278 $838,278 $838,278 $4,191,390 $838,278 $15,927,281 $20,118,671 $7,544,502 $8,382,780 TOTAL $26,100,341 $41,490,424 $71,062,361 $14,067,113 $16,490,744 $11,261,195 $154,371,835 $16,659,631 $316,532,996 $497,005,172 $149,936,682 $166,596,314 Note: NEVI (National Electric Vehicle Infrastructure) funding is not included because the GVMPO Financial Plan notes NEVI funding does not apply to newly-designated MPOs. Note: NHFP (National Highway Freight Program) appears only as a category heading in the draft TIP's Projects sheet with no projects or dollar figures programmed for GVMPO in this TIP cycle. All values are shown as zero pending future project identification. Note: The draft TIP and GVMPO Financial Plan report CMAQ funding for this MPO under a single MACI line with no further split into "Guaranteed" vs. "Discretionary" portions. (7) FTA 5339 - Formula 2032-2050 annual projected funding reflects the GVMPO Financial Plan estimate. The draft TIP has only programmed this funding in FFY2027 pending future project identification. Note: FTA 5307 and FTA 5310 figures combine the federal share and required local match into a single total funding amount for each year, consistent with how other federal programs (STPU, IM, NH, SFCN, HSIP, BR, UPP, MACI) already report combined federal-plus-match totals per the source TIP. (11) Pure CMAQ funds that come to Montana based on the federal formula and are directed to Missoula, Montana's only moderate CO non-attainment area. Projects are prioritized through the MPO process. Montana Air & Congestion Initiative (MACI) Discretionary Program: Projects using MACI discretionary funds are selected through a proposal process administered by the Transportation Planning Division of MDT. Projects are prioritized and selected amongst all eligible areas based on air quality benefits. Montana Air & Congestion Initiative (MACI) Guaranteed Program: MACI guaranteed funds are distributed to Billings and Great Falls at a level equivalent to what Missoula receives each year in CMAQ funds. Projects are prioritized through the MPO planning process. (10) Fuel Tax revenues are received by the City of Belgrade, City of Bozeman, and Gallatin County and are primarily used for routine operations and maintenance. Excess funds are prioritized for capital expenditures based on need and priority. The draft TIP's REVENUE sheet and GVMPO Financial Plan both label this revenue "Gas Tax" internally; it is shown here as "Fuel Tax", since the tax applies to both gasoline and diesel. The draft TIP's REVENUE sheet reports only a combined City total (Belgrade + Bozeman) for FFY2027-2031; the Belgrade/Bozeman figures above prorate that combined total using each city's share of the GVMPO Financial Plan's individual city estimates. 2032-2050 annual averages use the Financial Plan's city-specific and county estimates directly. (9) Grants reflects competitively awarded federal discretionary grants (e.g., BUILD, RAISE, SS4A) rather than a recurring formula funding source, currently consisting of the Belgrade Urban Improvements grant ($25,000,000, FFY2027) and Gallatin County SS4A grant ($13.9 million). The 2032-2050 annual amount is a simplified projection equal to the FFY2027-2031 total divided evenly across 5 years and held constant for the outyears; this is a modeling assumption only and is not a guaranteed or expected revenue stream. The annual projected average for grants was initially set at $5 million per year, but after direction from MDT, it has been adjusted to $1.6 million per year. (8) FTA 5339 - Discretionary is a competitive federal program; no recurring annual amount is assumed for 2032-2050 given its non-formula, competitive nature. (6) Carbon Reduction Program (CR) shows $0 for the 2032-2050 horizon projection. MDT does not anticipate any further CR funding following the expiration of the Continuing Resolution. (5) TA (MPO) reflects the Gallatin Valley MPO's direct population-based sub-allocation of Transportation Alternatives funding under STP, separate from the statewide competitive TA pool but still part of the same STP set-aside. (4) TA (Statewide) and TA (MPO) are both components of the STP roll-up above, since Transportation Alternatives is a federally-mandated set-aside of the Surface Transportation Block Grant Program (STP) that splits into a statewide competitive pool and a direct MPO suballocation. TA (Statewide) funding is competitive and not guaranteed. (3) NHPP, STP, FTA, and Fuel Tax are roll-up totals computed as the sum of their component rows directly below them. (2) Projected Funding for 2032-2050 is estimated using the GVMPO Financial Plan (per-project/per-year annualized averages prepared by MDT) and is the best information available at this time. There is no guarantee that funding will be available in the future. (1) Based on funding information provided by the Montana Department of Transportation regarding the DRAFT FFY2027-2031 GVMPO TIP. Mid-Term Funding (2032-2040) Long-Term Funding (2041-2050) FEDERAL STATE AND LOCAL Projected Funding by Funding Source (Estimated) – Gallatin Valley MPO Source: Montana Department of Transportation, GVMPO Financial Plan and Draft FFY2027-2031 GVMPO TIP Funding Source FFY 2027 Beginning Balance Committed Funding (1)2027-2031 Committed Funding 2032-2050 Annual Projected Funding Average (2) 2032-2050 Total Projected Funding Total Funding (2027-2050) 382 Appendix B Community Involvement Summary Introduction The Gallatin Valley Metropolitan Planning Organization was tasked with establishing a Long Range Transportation Plan for areas across Bozeman, Belgrade and portions of Gallatin County. A comprehensive and multifaceted outreach approach was implemented to engage the Gallatin Valley community in this planning effort. Multiple engagement methods were used to gather meaningful community feedback, including tabling events, a community survey, and stakeholder meetings. Outreach activities were conducted in three phases, each designed to collect and incorporate public feedback into transportation strategies for the Gallatin Valley. This comprehensive process ensured that the plan reflects a wide range of perspectives from residents, stakeholders, and community partners. Phase I: Listen and Learn Timeframe: August to December 2025 The first phase of engagement focused on listening to the community’s needs, goals, and objectives for the future of transportation in the Gallatin Valley. This phase aimed to raise awareness of the planning efforts, gather preliminary information, and lay the foundation for subsequent engagement. Several key activities were conducted, ranging from initial project material development, tabling events, a community survey, a virtual public meeting, and the formation of the Community Advisory Panel (CAP). Engagement Activities:  Tabling Events: Tabling activities were conducted in both Bozeman and Belgrade. The Bozeman Farmers Market and Belgrade Albertsons provided an excellent setting to engage with community members across the project area. Project team members were available to answer questions and receive comments regarding transportation challenges.  Printed & Digital Materials: Postcards, maps, and display boards were used to increase the project's visibility and for tabling events.  Community Survey: A survey was provided at tabling events and on the plan website to collect information about how residents and visitors get around the Gallatin Valley and their transportation concerns and priorities. This survey was available in a paper and digital version. 383  Virtual Community Meeting: An online public meeting was held on December 18 via Teams. Members of the project team provided an update on existing conditions and community engagement to date. Attendees participated in a goals and objectives activity and time was reserved at the end of the meeting for questions. A recording of the meeting and the goals and objectives of the activities were available on the plan web page for community members who were unable to attend the meeting but were interested in learning more and sharing ideas.  Community Advisory Panel: The CAP was formed during this phase to bring together representatives of different communities, interests, and perspectives across the Gallatin Valley. The panel held its first meeting on November 5, 2025, beginning a series of milestone-based meetings throughout development of the LRTP. Discussions at this first meeting focused on transportation needs and priorities, helping develop and refine the plan’s vision, goals, and objectives, as well as completing a Mentimeter exercise. KEY TAKEAWAYS: Community engagement in Phase I revealed several themes, including the need for improved transit options to places like the airport and Gallatin College and a desire for improved bike and pedestrian access, particularly on the frontage road and between Bozeman and Four Corners. FIGURES 1-4: TABLING EVENTS AND PRINTED AND DIGITAL MATERIALS 384 Phase II: Create and Apply Timeframe: January – April 2026 The purpose of this engagement phase was to build on the feedback gathered from the community during Phase One and incorporate those insights into project development. This phase helped refine our understanding of community priorities regarding proposed projects, while also increasing awareness of how projects are evaluated, prioritized, selected, and ultimately funded. Engagement Activities:  Community Advisory Panel: The CAP reconvened on April 1, 206 to review draft materials and activities for the spring public workshops and provide feedback on emerging project concepts. The panel provided input, helped refine the engagement approach, and improved the activities before the public workshops.  Workshop Activities: In-person community workshops were held in three project areas: Belgrade, Bozeman, and Four Corners. Each workshop provided attendees with the opportunity to participate in multiple engagement activities designed to generate insights, ideas, and conversations around transportation across the Gallatin Valley. 385 FIGURE 5: SPRING WORKSHOP FLYER Activity 1: “This or That” Transportation Alternatives Attendees were asked to indicate their preferences between two improvement options that address a transportation concern. Five scenarios were provided, each providing improvement alternatives. The goal of this activity is to demonstrate the limitations in choices available and explore tradeoffs. Attendees were asked to drop a provided pom- pom into the jar that represented their preference for each scenario. The activity provided the project team with useful information on which improvements are preferred by residents and helped attendees understand how various treatments can address transportation concerns. The results for this activity in Four Corners were inconclusive. TABLE 1: ACTIVITY ONE SCENARIOS AND TRANSPORTATION ALTERNATIVES Scenario “This” (or) “That” “There’s limited funding for roads and maintenance. Do we prioritize new roads and trails or maintain and repair what we have?” New Roadways and Trails: Expand the road and trail network to accommodate new growth. Maintenance and System Repair: Keep existing sidewalks, roads, and bridges in good shape through resurfacing or repairs. “Bus ridership trends are increasing. Do we expand the Expand Bus Route Network: includes improving bus service Increase Bus Frequency: Improves the bus service by 386 bus route network or increase bus frequency one existing routes?” by expanding the hours of service or adding bus routes to serve new parts of the region. increasing how often the bus arrives and making trips easier to plan. “We have more cyclists on the streets. Do we add more bike lanes on the roads or build out separated shared-use routes?” Separated Shared-Use Routes: Off-street paths for people walking and cycling separate from vehicle traffic. They provide safe travel options for people of all ages and abilities. Bike Lanes: Located on the street but provides dedicated space for people on bikes along the roadway to make it easier to do day-to-day activities. “There are more cars and pedestrians using the roads. Do we invest in more mobility for cars or access for pedestrians?” Roadway Improvements: Includes widening, left turn lanes, or new signals that help keep traffic moving and improving safety. Intersection Improvements: Make it safer for people walking and biking to cross the street by adding crosswalks, curb ramps, and flashing beacons to improve visibility. “You need to add lanes to accommodate new growth. Should you add a new connection or widen busy roads?” New Connection: Create new roads or extend facilities to link more destinations with the transportation network. Added Capacity: Expands current roadways to accommodate more traffic with additional lanes or wider roads. Belgrade KEY TAKEAWAYS Participants emphasized:  Expanding the bus route network  Bike lanes  Intersection improvements TABLE 2: ACTIVITY ONE SUMMARY FOR BELGRADE Priority Votes Share of Total Priority Expand Bus Route Network 7 18.9% High Bike Lanes 7 18.9% High Intersection Improvements 5 13.5% High New Connections 4 10.8% Medium Maintenance and System Repair 4 10.8% Medium Separated Shared Use Facilities 3 8.1% Medium New Roadways and Trails 3 8.1% Medium Roadway Improvements 3 8.1% Medium Added Capacity 1 3% Low Increase Bus Frequency 0 0% Low Bozeman KEY TAKEAWAYS 387 Participants emphasized:  Safer intersections  Better connectivity  Shared-use facilities  Maintaining existing infrastructure TABLE 3: ACTIVITY ONE SUMMARY FOR BOZEMAN Priority Votes Share of Total Priority Intersection Improvements 8 18% High Separated Shared Use 7 16% High New Connection 7 16% High Maintenance and System Repair 6 14% High New Roadways and Trails 5 11% Medium Expand Bus Route Network 4 9% Medium Increase Bus Frequency 4 9% Medium Bike Lanes 2 5% Low Added Capacity 1 2% Low Roadway Improvements 0 0% Low Activity 2: Budgets, Benefits, and Trade-Offs Attendees were given $100 ‘Transportation Dollars’ and asked to use that money to fund the improvements based on their priorities. Multiple transportation improvements were offered as options, and information was provided about each improvement, including cost, benefits, and trade-offs. Corresponding jars were available for participants to add their money as they divided their available funds. This activity not only provided valuable insight about how residents prioritize transportation improvement but also gave participants a better understanding of improvement costs and the challenges of fiscal constraint. TABLE 4: BUDGETING ACTIVITY: IMPROVEMENTS, COSTS, BENEFITS, AND TRADE-OFFS Improvement Cost Benefits Trade-Offs On-Street Parking Lane $35 Provides parking for vehicles and buffers sidewalk from travel lanes Convenience vs throughput Painted bike lane $20 Space for biking Lower safety vs less space Bus only lane $45 Increase reliability of transit service and makes boarding easier Transit vs vehicle delay Roadway Reconfiguration $45 Improve safety and provide space for sharing road between modes Lower speed vs increase safety for all modes Add a travel lane $75 Adds vehicle capacity Increases vehicle traffic vs reduces 388 space for other modes Improved bus stops and amenities $20 Enhances rider comfort and information for riding transit Transit vs vehicle delay Remove street trees and obstacles $15 Allow for faster vehicle travel and removes obstacle car could crash into Pedestrian safety vs vehicle speed Add street trees, landscaping, and beautification $15 Shade, buffer, and beautification between travel lanes and sidewalk May reduce width of roadway or sidewalk Wider sidewalks and ADA improvements $25 More space for walking and rolling comfortably May reduce width of roadway Shared-Use Path $40 Highest level of comfort and safety for walking High cost of implementation Increase speed limit $5 Allow for faster vehicle travel Safety vs vehicle speed Reduce speed limit $5 Reduce crash severity Safety vs vehicle delay Enhance pedestrian crossing $30 Easier and safer pedestrian crossings. Can include crosswalk signs, refuges, and extended curb ramps Safety vs vehicle delay Add Off-Street Parking $50 Allows for more parking, may require demolishing buildings or taking up downtown space Convenience vs space Grade-Separated Railway Crossing $1000 Eliminates conflicts between trains and traveling public High cost and complexity vs improved movement Belgrade KEY TAKEAWAY Participants strongly favored:  Shared-use paths  Bicycle facilities  Pedestrian crossing improvements  Parking improvements  Community beautification Transit-only improvements received minimal support. TABLE 5: ACTIVITY TWO SUMMARY FOR BELGRADE Budgeting Menu Contribution ($) Votes Priority Add street trees, landscaping, and beautification 75 5 High Painted bike lane 80 4 High 389 Enhance pedestrian crossing 90 3 Medium Shared-Use Path 120 3 Medium Add Off-Street Parking 100 2 Low Increase speed limit 10 2 Low Reduce speed limit 10 2 Low Add a travel lane 75 1 Low Improved bus stops and amenities 20 1 Low On-Street Parking Lane 35 1 Low Wider sidewalks and ADA improvements 25 1 Low Roadway Reconfiguration 45 1 Low Grade Separated Railway Crossing 0 0 Low Bus only lane 0 0 Low Remove street trees and obstacles 0 0 Low Bozeman KEY TAKEAWAYS Participants strongly prioritized:  Shared-use paths and trail infrastructure  Pedestrian crossing improvements  Reconfiguring roadways for better functionality and safety There was very little support for:  Additional parking  Bus-only facilities  Speed-limit changes TABLE 6: ACTIVITY TWO SUMMARY FOR BOZEMAN Budgeting Menu Contribution ($) Votes Priority Enhance pedestrian crossing 195 6.5 High Add street trees, landscaping, and beautification 95 6.3333333 High Shared-Use Path 210 5.25 High Roadway Reconfiguration 175 3.88888889 High Reduce speed limit 15 3 Medium Wider sidewalks and ADA improvements 75 3 Medium Painted bike lane 25 1.25 Low Add a travel lane 75 1 Low Improved bus stops and amenities 10 0.5 Low Grade Separated Railway Crossing 45 0.045 Low On-Street Parking Lane 5 0.14285714 Low Bus only lane 0 0 Low Remove street trees and obstacles 0 0 Low 390 Increase speed limit 0 0 Low Add Off-Street Parking 0 0 Low Four Corners KEY TAKEAWAY Participants prioritized:  Shared-use paths and trail infrastructure  Pedestrian improvements  Bicycle facilities  Parking improvements  Community beautification Transit-focused investments received minimal support. TABLE 7: ACTIVITY TWO SUMMARY FOR FOUR CORNERS Budgeting Menu Contribution ($) Votes Priority Add street trees, landscaping, and beautification 75 5 High Painted bike lane 80 4 High Shared-Use Path 120 3 Medium Enhance pedestrian crossing 90 3 Medium Grade Separated Railway Crossing 0 0 Low Bus only lane 0 0 Low Roadway Reconfiguration 45 1 Low Add a travel lane 75 1 Low Improved bus stops and amenities 20 1 Low Remove street trees and obstacles 0 0 Low On-Street Parking Lane 35 1 Low Wider sidewalks and ADA improvements 25 1 Low Increase speed limit 10 2 Low Reduce speed limit 10 2 Low Add Off-Street Parking 100 2 Low Activity 3: Existing Planned Projects A display board outlined multiple planned and proposed projects within the planning area. Participants were provided with stickers to indicate their top three priorities. This activity allowed attendees to learn about potential projects to address transportation concerns in the planning area and share their priorities among the listed projects. FIGURE 6: ACTIVITY THREE EXISTING PLANNED PROJECTS WORKSHOP MAP 391 Belgrade KEY TAKEAWAY Project A-85 emerged as the clear favorite, receiving over one-third of all project votes. Two additional projects, S-71 and R-24/R-26, formed a second tier of support. TABLE 8: ACTIVITY THREE SUMMARY FOR BELGRADE Project Votes Share of Total Priority A-85 6 27% High S-71 3 14% High R-24/R-26 3 14% High A-86 2 9% Medium S-72 2 9% Medium A-10 1 5% Low A-48 1 5% Low A-113 1 5% Low A-114 1 5% Low A-115 1 5% Low S-65 1 5% Low A-47 0 0% Low A-79 0 0% Low R-44 0 0% Low 392 Bozeman KEY TAKEAWAY Support was concentrated among a small group of projects, with A-85 and A-114 emerging as the clear leaders. TABLE 9: ACTIVITY THREE SUMMARY FOR BOZEMAN Project Votes Share of Total Priority A-85 4 17% High A-114 4 17% High A-113 3 13% High S-71 3 13% High A-86 2 9% Medium R-24/R-26 2 9% Medium A-47 1 4% Low A-48 1 4% Low A-79 1 4% Low A-115 1 4% Low S-65 1 4% Low R-44 1 4% Low A-10 0 0% Low S-72 0 0% Low Four Corners KEY TAKEAWAY Project A-85 was the clear favorite, receiving more than one-third of all votes. S-71 and R-24/R-26 formed a second tier of support. TABLE 10: ACTIVITY THREE SUMMARY FOR FOUR CORNERS Project Votes Share of Total Priority A-85 6 29% High S-71 3 14% High R-24/R-26 3 14% High A-86 2 10% Medium S-72 2 10% Medium A-10 1 5% Low A-113 1 5% Low A-114 1 5% Low A-115 1 5% Low S-65 1 5% Low 393 A-47 0 0% Low A-79 0 0% Low R-44 0 0% Low A-48 0 0% Low Activity 4: The Sky’s the Limit A map of the planning area was available for attendees to identify areas of concern and share ideas for improvements that could address current conditions. Sticky string was available for participants to add roads, trails and bike lanes where they don’t currently exist and stickers were provided to add things like beautification (trees, bushes, flowers, etc), lighting, pedestrian crossings, safety enhancements, and signal improvements. This activity did not limit participant engagement to the currently proposed projects or budget but allowed them to share solutions if there were no budgetary or logistical constraints. The station provided the project team with an understanding of challenges and possible solutions that may not have previously been considered. FIGURE 7: ACTIVITY FOUR CONSOLIDATED MAP FROM ALL WORKSHOP LOCATIONS NOTABLE PATTERNS 394  Trail improvements were the most common recommendation across all workshops.  Four Corners showed the strongest emphasis on trails, with over 50,000 units of trail length proposed.  Lighting was suggested across Huffine between Gooch Hill Rd and Fowler Ave. COMMON PARTICIPANT COMMENTS Several line features included notes indicating priorities such as:  Better trail connectivity  New trails in Belgrade  Connections to existing regional paths  Improved roadway design and safety  Truck route considerations  Redesign of roadway interchanges/cloverleafs  Exit from Belgrade to Bozeman  Empty lot near One11 Apartments OVERALL CONCLUSION Workshop participants overwhelmingly prioritized active transportation infrastructure, particularly trails and bike lanes, over roadway expansions. The strongest recurring theme was improving connectivity between communities, neighborhoods, and existing trail systems. Activity 5: Online Map and Mentimeter Survey An online map of the planning area was made available to workshop attendees and others who could not attend the workshop but wished to contribute thoughts and ideas. The map and survey provided participants with the options to indicate specific areas of concern and add comments and ideas for transportation improvements. Summary of Online Public Comments Community members shared 102 public comments related to transportation, mobility, and infrastructure planning. The comments reveal strong support for improving safety and expanding multimodal transportation options throughout the region. TABLE 11: SUMMARY OF ONLINE PUBLIC COMMENTS Comments Location (nearest intersection / cross streets) direct road connecting Melissa Way to frontage Rd Melissa Way to Frontage Rd A sidewalk from thorp-Amsterdam intersection to jackrabbit- Amsterdam intersection would be really great and help connect River rock to Belgrade Amsterdam Rd between Thorpe Rd and Jackrabbit Ln; pin near the I-90 crossing 395 Crosswalks and bus stop N Rouse Ave near Bridger Center Dr (Glen Lake trail access) Improved/safe crossing for the gallagator trail please! S Willson Ave at the Gallagator Trail crossing, near W Mason St The LRTP is a great opportunity to re-enagage with the MOR about continuing the Gallagator trail through. This is a key gap in a corridor that connects thousands of existing and future homes to downtown. Gallagator Trail gap at Museum of the Rockies, south of W Kagy Blvd reconstruct Church Street to modern standards and finish the grid - connect to Lincoln and Garfield (the ROW exists, just needs to be built). Making this street fully functional is a far better idea than widening Highland Blvd. S Church Ave near Lincoln St; proposed connections to Lincoln and Garfield St remove on street parking and create buffered bike lanes. Peach/Durston is a critical E/W biking corridor. W Peach St near N Black Ave (Peach–Durston corridor) complete shared use path to Belgrade Frontage Rd (MT 205), near Lake Dr, northwest of E Valley Center Rd Create a trail along South 19th for bikers and walkers, 19th is highly used by bikers and runners going south from town to Hyalite Canyon.. Pin near Blackwood Rd west of Gooch Hill Rd Flashing crosswalk light to and from park please S Fowler Ave & Laredo Dr (Bozeman Pond Park access) This stretch of road towards Fowler is very congested. Can you place signs that state Slow Down, Pedestrian Crossing? Laramie Dr near Golden Valley Dr, west of S Fowler Ave Please widen Durston Road between Love Lane and the Bozeman City limit to allow for a shoulder or bike lane on each side of the road. Durston is a major east-west bicycle commuting route within Bozeman, but the risk for cyclists increases exponentially west of the city limit due to the road narrowing and the speed limit increasing! Durston Rd between Love Ln and the western city limit, near Westgate Ave Speed bumps before and after this crosswalk and a light up pedestrian sign Ravalli St & Treasure Ave Better crosswalk infrastructure in Ferguson. Either painted crosswalks on the road, pedestrian signs, a middle stop point or something for pedestrians to feel safer crossing at Ravalli, Granite, and Babcock S Ferguson Ave & Ravalli St; also Granite Ave and W Babcock St crossings Stop light at this intersection E Valley Center Rd & Davis Ln Bike path that connects Fowler bike path and then continues along Garfield until the university W Garfield St & S Fowler Ave; connection east toward MSU Bike path that connects Fowler and college without cutting through the mall parking lot Harmon Stream Blvd near Huffine Ln / W College St (mall trail connection) There needs to be a wide bike path/sidewalk on the north side of college W College St near S 12th Ave Stop sign on north/south intersection for ravalli Ravalli St & Yellowstone Ave Please please please PLEASE add a light or roundabout at this intersection! I commute from Bozeman to Belgrade for work and this intersection is horrendous during rush hours. E Valley Center Rd & Love Ln Please please please PLEASE add a light or roundabout at this intersection! I commute from Bozeman to Belgrade for work and this intersection is horrendous during rush hours. E Valley Center Rd & S Alaska Rd Please do something to widen, straighten or provide better sight-line at this curve in the road. It is dangerous, especially for those of us who live on Westgate Ave. and have to turn onto Durston here every single day. Vehicles heading east are FLYING around this curve and it's so hard to see them coming. It would also be great to have better signage to help remind drivers to slow down well before this curve. Durston Rd at the curve near Westgate Ave Completing this section of the Gallagator trail and providing a safe crossing on Kagy would make this a fantastic route for Sacajawea students (and other trail users) W Kagy Blvd at the Gallagator Trail gap, near Museum of the Rockies 396 Debris in the bike lanes on Babcock between 19th and 11th is so bad as to make bike lanes unusable W Babcock St between S 19th Ave and S 11th Ave; pin near S 15th Ave 11th and Babcock crossing is challenging and unprotected for both bikers and walkers, but fairly key to accessing the high school and swim center. W Babcock St & S 11th Ave Surely there should be a way to connect bikes to the bike park? McIlhattan Rd at the bike park access, north of St Andrews Dr If changes to Main St are impossible, are the alternative options for creating E/W corridors for bike that would parallel Main? Wide bike lanes on Babcock and Mendenhall? Downtown Main St corridor; parallel routes on W Babcock St and W Mendenhall St This section of Rouse is miserable to ride on or walk along, but a key connection for parks, bike kitchen, HRDC, etc. Is the railroad dirt path an option for access? N Rouse Ave between Bond St and Bryant St, north of I-90 Is this section likely to connect to the new E/W bike path between L st and Rouse? N Bozeman Ave near E Tamarack St (trail connection toward L St / N Rouse Ave) Crossing directly at trail. Why redirect down the block? W Graf St at the trail crossing near Macnab St, east of S 11th Ave Connect the middle schools with the bus system. Get the kids started on public transportation early! Sacajawea Middle School, near S 3rd Ave & Cambridge Dr Connect the middle schools with the bus system. Get the kids started on public transportation early! Chief Joseph Middle School, near Kimberwicke St & Milkhouse Ave Koch is a very natural E/W corridor for bikes, but could use additional infrastructure and signage to emphasize its role W Koch St near S 12th Ave (east–west bicycle corridor) Make 15th into a major N/S bike corridor. Separated bike lanes and protected intersections N 15th Ave near Juniper St Can this trail be continued N/S to Baxter? Cattail St near Thomas Dr; proposed trail connection south toward Baxter Ln Continue Shady Lane Trail...a great way to travel Shady Lane Trail near S 19th Ave & W Graf St This pedestrian crossing is scary, especially with little kids, but increasingly used by preschoolers at Mountain Meadows at Hope Lutheran. Can additional flashing lights or pedestrian island be added to improve visibility and safety? S 19th Ave & W Graf St (Hope Lutheran crossing) possible to gain access for bike/pedestrian path away from 19th? West of S 19th Ave near the Remington Way alignment, north of Stucky Rd Improve pedestrian crossing S 19th Ave & Blackwood Rd Flashy lights? Useful connection to Glen Lake trails N Rouse Ave near Bridger Center Dr (Glen Lake trail access) More frequent bus access with stops at Glen Lake and Story Mill Griffin Dr near Manley Rd; transit access to Glen Lake and Story Mill Pedestrian highway crossing connecting Griffin with 15th trails I-90 crossing near Mandeville Ln, between Griffin Dr and N 15th Ave trails Sidewalks? Protection of any kind for pedestrians and bikers connection Pete's Hill and Ice Pond Rd S Church Ave near Ice Pond Rd / the south end of Peets Hill Protected bike lane on Graf W Graf St near S 3rd Ave & Fieldstone Dr Continue sidewalk at least to Westridge S 3rd Ave between W Kagy Blvd and Westridge Dr Roundabout S Willson Ave & W College St Widening sidewalk, remove parking from S side of street to improve bus stop visibility. W Babcock St & S Black Ave (bus stop area) Purpleline stop W Main St near N 9th Ave (Purpleline stop) either improve timing for this crossing signal or get rid of it. It takes SO LONG to change that it's basically useless! why??! W Main St pedestrian crossing near N 13th Ave / Bozeman High School 397 Loop Airport Rd to Frontage on Pinkline Airway Blvd near Gallatin Field Rd (airport approach); comment proposes Airport Rd– Frontage loop We need a traffic light at Kagy and Sourdough. Many bikers and runners come through this intersection, and it’s getting busier and busier with cars, E Kagy Blvd & Sourdough Rd BIG need for safe biking route to go east/west across the Valley. Stucky is the logical route, but, we need road shoulders for safe biking. Also traffic speed calming. Especially true for Stucky just west of 19th. best Discovery Ln. Stucky Rd near Fowler Ln; corridor west of S 19th Ave, including Discovery Dr The intersection of Jackrabbit and Huffine is a death trap for pedestrians and bicyclists trying to cross the road. Please plan for strong pedestrian and bicycle safety features. Huffine Ln & Jackrabbit Ln / US 191 (Four Corners) There is a huge gap here where the shared use path does not exist due to a conservation easement. This needs to be completed for the system to be safe for people walking and biking. Huffine Ln shared-use path gap west of Gooch Hill Rd, near Middle Creek slow the speed limit on Huffine Lane to 45MPH Huffine Ln & Red Mountain Dr This section of Huffine Lane needs to have a slower speed so that safety is increased for all people using the roadway and noise is reduced for residents. Huffine Ln near Biondi Way / War Bonnet Trl This is a residential area, but there are no safe crossings within 3/4 of a mile. Please add a stop light or RRFB. Huffine Ln & Shed Horn Dr / Arrowhead Trl There should be an extension of the shared use path here. Huffine Ln between S Fowler Ave and S Ferguson Ave There is no safe way for children who live west of here to get to Monforton School. A shared use path and safe crossings are essential to their wellbeing and social drivers of health. US 191 / Gallatin Rd near Fourth St, south of Huffine Ln These intersections are dangerous for all roadway users. Reduce speed and use traffic calming approaches to change the engineering so that it reduces speed. W Oak St near N Ferguson Ave & New Sun Way This area is next to a park, but built as a raceway. Reduce to one lane with chicanes to slow traffic and protect people walking and biking. W Oak St & Meagher Ave (west side of park) This area is inhospitable for people walking and biking. Our community needs to control operations on this roadway so that safe crossings can be established, speed reduced, and it can be more prosperous of a commercial area. We deserve better performance metrics that prioritize people in our community over moving metal boxes as fast as possible. W Main St near Professional Dr / W College St don't waste money on widening this road. Invest that money into pedestrian and bicycle safety features and transit. W Kagy Blvd between S 19th Ave and S 17th Ave This intersection of the shared use path and roadway is very dangerous for pedestrians. drivers turning onto Huffine will only look west and do not see people traveling west. Drivers turning off of Huffine are too concerned with oncoming traffic and do not see people walking biking. Please increase safety here. Huffine Ln / W College St & Harmon Stream Blvd Lead pedestrian intervals would help to make sure drivers yielded to pedestrians at this intersection. Why can they have lead pedestrian intervals in Washington DC, but not Bozeman Montana? Also, the crossing time is too fast for people (children, older adults, people with disability) walking to get across safely.? Huffine Ln & S Fowler Ave Was this road purposefully built for speed? So many students crossing, but the 85th percentile is above 35 MPH. Narrowing the lanes and building curb extensions with in-road yielding signs would make this much safer. Is safety the priority, or LOS? S 11th Ave between W Kagy Blvd and Stucky Rd / Campus Blvd 398 Why are we waiting for developers to make this safer? It's time to put the transportation budget where they community continually says they want it... pedestrian and bicycle facilities. S Church Ave between E Kagy Blvd and Lincoln St, near Arcola Dr The Gallagator is an example of success and should be emulated across the county. Gallagator Trail near S Black Ave & E Cleveland St Another example of prioritizing safety for people over car LOS. Thank you for creating spaces for other modes of transportation! Grant St near Bobcat Cir (MSU campus) Fund streamline! Each jurisdiction needs to invest more money into Streamline. It is ridiculous that we do not have a fully functioning transit system, but we can continue to build, widen, and maintain roadways for personal automobile use. Widening Kagy would't even be needed if the government entities invested their money into transit. But instead, we continue paving paradise. Grant St near S 7th Ave (MSU); comment concerns regional Streamline funding Tax funds are used to plow city streets for cars to move around, but it is the property owner's responsibility to plow sidewalks? Think of the mode share changes that would occur if the priority was on walking and bicycling maintenance first. What is the point of all the climate action planning if we continue to prioritize the use of personal automobile? Change the code to reflect the values the community continually asks for.. Maintain walking/biking infrastructure before automobile infrastructure. W College St near S 20th Ave; comment concerns citywide sidewalk maintenance Please DO NOT widen Dursten road. Do add a shared use path and reduce speed. Durston Rd west of Westgate Ave, toward Love Ln The current crossing is an example of how our city is not prioritizing people over cars. There is no reason we cant have a direct crossing for people rather than redirecting them to an intersection. Nobody goes to the intersection anyway. build a crossing here. W Graf St at the trail crossing near Macnab St, east of S 11th Ave it's obvious that there needs to be a mid-block crossing here. Each jurisdiction points blame at the other, but they both refuse to create a solution that prioritizes safety for people walking across the street. Put up a mid-block crossing! S 11th Ave just south of Lincoln Rd, near Bobcat Cir MDT should not be allowed to rip through our community. Take over jurisdiction from the state and make this safer for people and more productive commercially. N 7th Ave near Birch St, south of W Oak St Why is this the only intersection on Main without a traffic light? It is difficult for pedestrians to cross safely. Flashing beacon at least. W Main St & S 3rd Ave Get the trucks off of Main Street. E Main St near N Rouse Ave (downtown truck route) For speed control and better business, this should be a two way street. W Mendenhall St near N Willson Ave More profit for businesses would come from slower speeds and two way roads. W Babcock St between S 3rd Ave and S Willson Ave Why do we subsidize automobile storage when we don't subsidize any other personal property storage. Bring back paid parking downtown. Invest the proceeds into Streamline, bikeshare, and sidewalk snow removal. Main St near Black Ave; comment concerns downtown parking Lots of high schoolers need to cross here. There could be more safety improvements such as lead pedestrian intervals, wider and more vibrant crosswalks. W Main St & N/S 11th Ave This is not a healthy place for people. The way built, people can only exist in metal boxes. Jackrabbit Ln & Alaska Frontage Rd, just south of I- 90 I love the shared use path here! Nice work!! Let's do this kind of multi-modal safety throughout the county! Alaska Frontage Rd east of Yukon Ln, south of I-90 I appreciate that the county plows the snow from the shared use path in Four Corners and along Jackrabbit. This type of investment in pedestrian facility maintenance should be prioritized throughout the planning area. Thank you Gallatin County! Huffine Ln near Sundance Trl (Four Corners shared- use path) 399 Thank you for this shared use path to the M. Can we have more of this type of people prioritizing? Bridger Dr near Creekwood Ln (shared-use path toward the M) Do not put a parking lot here. invest that money into a shared use path to have people ride their bikes to the park. McIlhattan Rd at the bike park access, north of St Andrews Dr Did you know you can ride a bike from Four Corners to the airport on protected path/bike lanes? It's amazing! We need more of this pedestrian and bicycle connectivity! Airway Blvd & Frontage Rd (airport bicycle connection) There is clearly a need to transit in Four Corners, but our community did not prioritize funding Streamline. Now, people are stuck walking along Huffine lane to get to Bozeman. Fund streamline! Huffine Ln & Shed Horn Dr / Arrowhead Trl (Four Corners transit access) Someone moved in here and closed off the connecting "cowpath" that allowed neighbors to travel to schutz ln. Now there is no safe connection. Could we get some trail easements to increase mobility in Four Corners? South end of Big Chief Trl; former connection toward Schultz Ln A trail easement to get children to Monforton school without having to travel along Huffine would be a good investment. East of Jackrabbit Ln near Forkhorn Dr; proposed connection toward Monforton School We know from research that unprotected left hand turns are a major safety threat to pedestrians. Can we please separate pedestrians at this intersection through time and space? A protected left hand turn off of Huffine would help a whole lot. Huffine Ln & S Ferguson Ave https://highways.dot.gov/safety/proven-safety-countermeasures Can we just apply these all across the county rather than nit picking the map. Plan safety in from the beginning. Huffine Ln west of S Cottonwood Rd; comment requests countywide safety measures Adopt an MPO wide complete streets policy. Stucky Rd & S Cottonwood Rd; comment requests an MPO-wide Complete Streets policy Please adopt an MPO wide policy that removes all parking minimums. Automobile storage is part of the transportation system and should be regulated as such. If we are actually interested in environmental protections, we wouldn't be subsidizing storage of personal property on public spaces. Love Ln south of Hulbert Rd; comment requests MPO-wide removal of parking minimums Unsafe and overcrowded mouth of intersection due to newly allowed daycare centers "by-right." No sidewalks, no curb, and no parking for clientele. Terrible planning; this should have required an SUP like the previous regulations did. Childcare center started operating without an approved SUP and did so with notice to the City and they just let it slide with arbitrary and capricious code enforcement. Congratulations. Durston Rd & N 17th Ave Lower speed limits as they get in the canyon from 70 MPH to at maximum 55MPH Pin near Violet Rd Convert the one way streets to two-way traffic for pedestrian safety. W Mendenhall St near N 5th Ave Grind down the high spots on the sidewalks and see if you have a change in the number of people who are falling down and getting hurt. E Main St between Black Ave and Bozeman Ave (downtown sidewalks) Please look in to bike path along rolling hills to connect sypes cnyn to the M trails!! would make a great loop Pin near Old Farm Rd please monitor scale and massing of development in this area to maintain walkability and bikeability for all Front St near Ida Ave / E Aspen St As a wildlife advocacy organization, the Gallatin Wildlife Association would like to work with the city to emphasize the need for wildlife infrastructure on I-90 near Bozeman Pass or at the mouth of the canyon near the Bear Creek exit. We realize that moving eastward from this exit lies outside the city limits, but the city's support for such action could prove valuable. There has been some discussion concerning the possibility of an overpass west of this location for elk and possible other I-90 near Bear Canyon Rd, Exit 313; comment also references Bozeman Pass 400 unglulates as well. Please contact the Gallatin Wildlife Association for further details, Clint Nagel at 406-600-1792. Major Themes 1. SAFETY IMPROVEMENTS (MOST FREQUENT THEME) Approximately one-third of comments focused on safety concerns, including:  Safer pedestrian crossings and crosswalks  Reduced vehicle speeds  Better intersection design  Improved visibility for pedestrians and cyclists  Traffic calming measures in residential and school areas Examples:  Requests for lead pedestrian intervals at signals  Calls for lower speed limits on major corridors  Concerns about dangerous crossings and high-speed traffic 2. BICYCLE INFRASTRUCTURE Many commenters advocated for:  Protected bike lanes  East-west and north-south bicycle connections  Wider road shoulders for cyclists  Better separation between vehicles and bicycles Representative requests included:  Protected bike lanes on key streets  Safe regional bike routes across the valley  Improved connections between existing bicycle facilities 3. TRAIL AND SHARED-USE PATH EXPANSION Trail connectivity was one of the strongest recurring themes. Residents requested: 401  New shared-use paths  Extension of existing trails  Connections between neighborhoods, schools, parks, and commercial areas  Improved regional trail networks Several comments specifically mentioned:  Gallagator Trail improvements  Shady Lane Trail extensions  Multi-use paths as alternatives to driving 4. ROADWAY AND TRAFFIC OPERATIONS Comments included requests for:  Intersection redesigns  Additional roadway connections  Roundabouts and signal improvements  Better traffic flow management Some commenters also emphasized balancing vehicle mobility with pedestrian and bicycle safety. 5. PUBLIC TRANSIT IMPROVEMENTS Transit-related comments included:  Expanded bus service  Better connections to schools  Increased transit accessibility  Encouraging public transportation use among younger residents 6. CONNECTIVITY AND MULTIMODAL TRANSPORTATION A recurring message throughout the comments was the desire for a transportation system that supports:  Walking  Biking  Transit  Driving Many residents emphasized reducing dependence on automobiles and creating a more connected transportation network. ADDITIONAL THEMES 402 Several comments also addressed:  Wildlife crossings and environmental considerations  Parking policies and parking minimums  Access to parks and recreation areas  Growth management and transportation planning  Accessibility for all users OVERALL TAKEAWAY The public feedback strongly favors a safer, more connected, multimodal transportation system. The most common priorities were: 1. Improved pedestrian safety 2. Expanded bicycle infrastructure 3. More trails and shared-use paths 4. Better connectivity between destinations 5. Enhanced transit options Overall, residents appear to support investments that reduce reliance on automobiles while improving safety and accessibility for people walking, biking, and using transit. Phase III: Integrate and Refine Timeframe: August to December 2026 Engagement Activities:  Community Advisory Panel: At its third meeting, held on August 25, 2026, the CAP reviewed and provided input on the draft Policies, Programs, and Practices chapter. Members worked collaboratively with MPO staff to refine proposed strategies and implementation considerations. The CAP was also briefed on the top scoring projects that emerged from the evaluation process. We’re planning to meet again in late October 2026.  Community Events: We anticipate presenting a final draft of the LRTP during the months of November and December by taking advantage of local events such as the farmer's market and other community events. 403 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 1 Gallatin Valley MPO Long Range Transportation Plan Project and Program Evaluation Criteria This document describes how the evaluation approach was developed to help screen, score, and prioritize projects for funding and implementation for the GVMPO’s first Long Range Transportation Plan. (LRTP) through the horizon year 2050. This assessment builds off community input and consensus building conducted during public engagement events, uses local plans’ recommended projects as a starting point, and assesses the benefits of each potential project through the Evaluation Framework as follows: 1. Collection – Gathered proposed and potential capital transportation projects through a call for projects with partner agencies and the public. 2. Screening – Reviewed and updated project list and submitted projects to revise project extents and map inputs, confirm project descriptions, and combine or remove duplicative, completed, or ineligible projects. 3. Scoring – Identify top scoring projects based on location and project type when scored against 21 quantitative metrics developed to advance the objectives for the six GVMPO LRTP goals. 4. Alternatives – Use the regional travel demand model to test network performance. 5. Prioritizing and Recommending – Identify recommended projects to be implemented and funded through a phased implementation approach based on adopted goals, performance, and feedback collected throughout Summer 2026. 404 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 2 Collection Projects were collected in two phases. First, existing projects named in local and regional plans were collected and filtered for relevancy. Next, an agency call for projects was held for MPO partners to submit their relevant project concepts to be considered for inclusion in the LRTP. Additionally, new project concepts from the public outreach were also included. Screening Over 900 potential projects were submitted for evaluation. The projects were then screened for eligibility and filtered into one of four project types:  Safety: Projects aimed at reducing or eliminating conflicts at intersections and key corridors and improving safety for people using non-motorized modes. Types of projects include:  Traffic signals and roundabouts  New or upgraded pedestrian crossings  Curb extensions and lane configurations  Signal phasing improvements  Active Transportation: Projects aimed at providing dedicated space for people to walk, bike, or roll to destinations throughout the region. Types of projects include:  Constructing new sidewalks or filling in sidewalk gaps  Pedestrian/bicycle tunnels and overpasses  Dedicated bike lanes and shared-used paths/trails  Roadways: Projects designed to increase vehicle connectivity and enhance the roadway system through creation, redesign, and reconstruction of streets and bridges. Types of projects include:  Reconstructing or widening to upgrade road classification  Restriping and reconfiguring lanes  New extensions for network connectivity  Maintenance: Projects designed to preserve the roadway system through maintenance efforts. Types of projects include:  Bridge maintenance or replacement  Pavement seal, mill, and overlay  Streetscape improvements 405 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 3 Scoring The project team developed scoring criteria using 21 quantitative metrics based on project goals to identify the top-ranking projects in the GVMPO. The quantitative metrics focus on geographic criteria, which makes it possible to evaluate many projects quickly and adjust weighting of goals or criteria as needed. Projects were assigned tiers based on an aggregate score out of 29 available points. Goal Desired Outcomes Criteria 1. Support Safe Travel Across All Modes 1. Eliminate all traffic-related fatalities and serious injuries across all transportation modes 2. Improve safety outcomes and reduce barriers for non-motorized travel 3. Improve safety performance on high-injury corridors and intersections 4. Improve accessibility and safety by reducing existing facility gaps and ADA deficiencies 5. Reduce conflicts and barriers that undermine safety, comfort, and personal security 6. Maintain safe and secure conditions for transit riders and operators 7. Strengthen partnerships to support reaching Vision Zero goals Crash Reduction 1 point – Project is located within 500ft of a corridor with 2 or more crashes on average per year resulting in serious or fatal injury of any mode Bicycle and Pedestrian Safety 1 point – Project will improve bicycle/pedestrian safety within 500ft of a corridor with 2 or more crashes on average per year involving a pedestrian or cyclist Accessibility 1 point – Project contributes to or closes a gap in the ADA network 2. Ensure a Well- Maintained Transportation System 1. Maintain a state of good repair for roadway, bridge, and transit assets 2. Maintain reliable travel times across the transportation system 3. Improve pedestrian conditions to and within pre- 1980s neighborhoods, activity centers, and transit stops 4. Improve long-term system performance through preservation-focused investment decisions Facility Preservation 1 point – Project improves pavement, bridge, or transit facility with fair condition rating 2 points – Project improves pavement, bridge, or transit facility with poor condition rating Pedestrian Conditions 1 point – Project repairs, restores, or improves pedestrian conditions in pre-1980s neighborhoods, including sidewalks, curb ramps, crossings, pedestrian gaps, lighting, furnishings, or other elements that improve pedestrian access, comfort, or perceived safety 406 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 4 Goal Desired Outcomes Criteria 3. Expand Mobility Choices Throughout the Region 1. Improve access between schools, jobs, services, and key destinations 2. Improve street and pathway connectivity to support more direct multimodal travel 3. Expand transportation infrastructure to support trips made by not driving alone 4. Improve access, comfort, and safety to and at transit stops and transfer locations 5. Expand access to everyday non-driving travel options that lower household costs 6. Improve continuity and comfort by filling missing gaps in the pedestrian network 7. Establish a regional bike network connecting key destinations for all ages and abilities Access to Essential Services 1 point – Project improves multimodal access within ½ mile of schools and hospitals 2 points – Project directly connects to or expands multimodal access to schools and hospitals Access to Jobs 1 point – Improves access to some employment centers 2 points – Improves access to many key commercial and industrial employment centers Route Choice 1 point – Project improves network access and connectivity by increasing intersection density, which may result in shorter block lengths, connected block patterns, and/or four- way intersections Transit Access 1 point – Project closes a gap, removes a barrier, or improves transit operations within ½ mile of a Streamline bus route or stop Active Transportation Network 1 point – Project contributes to or fills a gap in the pedestrian or bicycle network 2 points – Project completes a continuous low-stress walking or bicycling connection with separate facilities from general traffic 407 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 5 Goal Desired Outcomes Criteria 4. Enhance Health, Quality of Life, and Preserve Regional Character 1. Improve access to non-motorized facilities that support active travel options 2. Improve transportation access to parks, trails, and recreation areas 3. Reduce wildlife-vehicle conflicts and improve safe wildlife movement across corridors 4. Reduce transportation-related impacts on environmentally sensitive areas 5. Reduce per capita air emissions from the transportation system Access to Recreational and Active Facilities 1 point – Project provides multimodal access within ½ mile of a public recreation facility, park, or trail 2 points – Project directly connects to or expands multimodal access to a public recreation facility, park, or trail Wildlife 1 point – Project does not negatively impact a moderate sensitivity or moderate use wildlife corridor 2 points – Project does not negatively impact a high sensitivity or high use wildlife corridor Natural Preservation 1 point – Project is outside of environmentally sensitive areas Emissions 1 point – Project will reduce vehicle miles traveled (VMT), single-occupancy vehicle (SOV) trips, or carbon emissions 408 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 6 Goal Desired Outcomes Criteria 5. Enhance Transportation and Land Use Planning Coordination 1. Align transportation system and network decisions with adopted growth plans 2. Encourage land use decisions consistent with transportation investments and policies 3. Align transportation system design to support walkable, human-centered, and well-connected places 4. Support placemaking, economic vitality, and access in centers 5. Prioritize year-round needs to avoid overbuilding driven by season travel demand 6. Reduce speed-related conflicts through context- sensitive design Connectivity to Destinations 1 point – Project adds a connection within a half mile of 2 or more key destinations 2 points – Project adds a connection between 2 or more neighborhoods and/or urban renewal districts Growth Plans 1 point – Project is within a Moderately Suitable area (as identified in the Gallatin Valley FLUM) or a TAZ projected to have growth 2 points – Project is within a Most Suitable area (as identified in the Gallatin Valley FLUM) -1 point – Project is inconsistent with an adopted formal plan or primarily supports unplanned outward expansion Walkable Place Support 1 point – Project improves pedestrian access and provides a more complete, comfortable, and place-supportive walking environment Complete Streets Design 1 point – Project supports slower operating speeds through Complete Streets design features that better align the street or road with surrounding land use, access needs, and multimodal activity 6. Improve Transportation System Resilience 1. Improve the adaptability, flexibility, and resilience of the transportation network design 2. Maintain and enhance system design for the reliable movement of people and goods 3. Maintain a transportation system that can accommodate emerging technologies 4. Strengthen coordination, cooperation, and preparedness among transportation partners to support mobility, access, and logistics during emergency response and recovery Freight Reliability and Access 1 point – Project is located on a Freight Flow Corridor or is located within ½ mile of a trucking area Network Redundancy 1 point – Project improves route options, parallel circulation, emergency access, or system redundancy Transit Reliability and Access 1 point – Project advances the Transit Strategic Plan recommendations or improves reliable transit operations 409 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 7 Alternative Futures Analysis The project team compiled alternatives that combine projects based on scoring results, geography, and project types. The alternatives were developed in partnership with MPO staff, and TTAC. It was expected there would be three future land use alternatives to evaluate against the metrics developed to support the project goals. However, the project team chose to evaluate alternatives based on connectivity to better understand if additional connectivity or increased capacity on existing road segments would best improve network performance. Alternatives were tested within the regional travel demand model to assess future network performance and other outcomes for 2050. Prioritizing and Recommending After scoring the projects and developing alternatives, the project team conducted a work session with the MPO staff and TTAC to determine which projects are highest priority. This final round of prioritization review included public feedback collected throughout the life of the project and future revenue projections. A fiscally-constrained list of projects was produced based on the outcome of this work session. The final recommended projects will have the greatest implementable return on investment for the community and are expected to advance GVMPO’s goals and network performance. The prioritization questions are listed below. Prioritization Questions Does the project have any committed or partial funding? Does the project have any major feasibility constraints for design? Does the project have strong support or concerns from the public? Does the project depend on significant future development or increase in traffic volumes to warrant investment? Is the project in an advanced state of shovel readiness (i.e. preliminary design or engineering)? Will the project significantly increase future costs for roadway preservation, maintenance, and snow removal? Does the project address an area or population experiencing transportation barriers, safety burdens, limited access, or other documented mobility needs? Does the project support infill development or affordable housing for areas identified as priority for regional growth? Is there anything missing from the project description that could materially change the scores? 410 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 8 Scoring Results Project ID Name Description Sub-Category Score Tier A-137 Peach St Complete Street Improvements Improve sidewalks, crosswalks, and bicycle facility on Peach St between N 7th and N Rouse in the city of Bozeman. Sidewalks 25 Tier 1 R-130 Mendenhall & Babcock Streetscape Complete streetscape improvements along Mendenhall Street and Babcock Street to include curb bulb-outs, landscaping and crossing enhancements. Road Construction 25 Tier 1 R-90 Oak St: 7th to 19th Safety Improvement Redesign Oak St from 7th to 19th in the City of Bozeman to improve safety and access control. Road Construction 23 Tier 1 R-38 Church (Main St to Kagy Blvd) Reconstruct Church Street from the intersection with Main Street south to the intersection with Kagy Boulevard to a two-lane urban "collector" standard. Road Construction 23 Tier 1 A-133 Madison Ave/Broadway St - Jackrabbit Ln to Main St Bike lane; bike-ped route and connector; Reconstruct to urban minor arterial standards to include on-street parking, curb, gutter, sidewalks, bike lanes Shared Use Path 21 Tier 1 S-85 Streamline Downtown Transfer Station Improvements Repairs bus pull through lane and improved ADA compliance. Transit 21 Tier 1 R-22 Main Street (North Quaw Boulevard to Gallatin Field Road) Reconstruct to urban principal arterial standards to include 8-foot shoulder/parking, center turn lane/turn bays, curbs, and gutters; Non motorized facilities should be constructed Road Construction 21 Tier 1 R-125 Bozeman Trail/Haggerty Ln (Main St to Kagy Blvd) Bozeman Trail should be reconstructed to a three-lane urban "minor arterial" roadway from the intersection with Kagy Boulevard north to the intersection with Haggerty Lane. Haggerty Lane should also be upgraded to a three-lane urban "minor arterial" roadway Road Construction 21 Tier 1 A-123 Airway Blvd - Gallatin Field Rd to E Frank Rd Bike lane or shared use path; partial commuter. Shared Use Path 20 Tier 1 A-134 Jackrabbit Ln - Frontage Rd to Amsterdam Rd/Alaska Frontage Rd Bike lane; bike-ped route and connector. Shared Use Path 20 Tier 1 R-54 Amsterdam Rd - Thorpe Rd to Jackrabbit Ln Reconstruct to 5-lane urban minor arterial standards with appropriate non-motorized accommodation like parallel multi-use path. Road Construction 20 Tier 1 A-84 Bozeman to Belgrade Shared Use Path Shared use path recommended in the 2007 PROST Plan; has robust public support. Locate to the north of existing Frontage Road and east of North 7th Avenue. Only includes portion of path between Bozeman (I-90) and TMP study area boundary (~5 miles in length). Shared Use Path 19 Tier 1 411 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 9 Project ID Name Description Sub-Category Score Tier A-131 Amsterdam Rd - Clovehitch Rd to Jackrabbit Ln Shared use path; commuter. Shared Use Path 19 Tier 1 R-57 Jackrabbit Ln Overpass (Amsterdam Rd to Colorado St) Widen/replace overpass to accommodate additional lanes and non-motorized accommodations; reconstruct off-ramp to increase capacity. Road Construction 19 Tier 1 M-16 Lamme St Bridge Rehabilitation Rehabilitate or replace the existing structure on Lamme St between N Bozeman and N Rouse in the city of Bozeman to improve structure condition and hydraulic capacity. Bridge 19 Tier 1 R-128 Highland (Main to Kagy) Street improvements on Highland Boulevard from the intersection with Main Street to the intersection with Ellis Street, upgrading to a two-lane urban "minor arterial" arterial standard, and from the intersection with Ellis Street south to the intersection with Kagy Road Construction 19 Tier 1 R-60 Frontage Rd - Bolinger Rd to Jackrabbit Ln Reconstruct to urban minor arterial standards to include widened shoulders, sidewalks on north side, center turn lane/turn bays. Road Construction 19 Tier 1 R-102 N 19th Ave (Interstate 90 to Springhill Rd) Widen N. 19th Avenue from Interstate 90 to the intersection with Springhill Road to a 5- lane urban arterial standard. This project includes widening the I-90 overpass along N. 19th Avenue. Road Construction 19 Tier 1 M-19 Downtown Bozeman Creek Structure Rehabilitation Bozeman Creek traverses downtown Bozeman through a series of three tunnels under Olive St, Rouse Ave, Babcock St, and Main St. for a total length of approximately 700 LF. This infrastructure is critical for the function of urban, primary, and NHS routes. The tunnel system is approaching the end of its useful life and requires rehabilitation, replacement, and hydraulic capacity improvements to manage flooding. Road Preservation 19 Tier 1 R-113 Ferguson (Huffine to Johnson) - Collector Recommended Extension - Collector Road Construction 19 Tier 1 R-91 Fowler Lane: Garfield to Stucky This project will construct Fowler Lane from Garfield to Stucky as a 2-lane minor arterial in the city of Bozeman to provide an alternate N/S route to S 19th. Road Construction 18 Tier 1 R-108 Harper Puckett (Deadman's Gulch / Cattail St to Valley Center) - Principal Arterial Recommended Extension - Principal Arterial Road Construction 18 Tier 1 A-86 Huffine Lane Shared Use Path Complete the shared use path between Circle F Trail and Bozeman City Limits to create a continuous non-motorized route between Four Corners and Bozeman. Shared Use Path 17 Tier 2 R-59 Frontage Rd - Airway Blvd to City Limits Reconstruct to urban street standards. Road Construction 17 Tier 2 R-56 Jackrabbit Ln - Mayfair Dr to Frontage Rd Reconstruct to urban minor arterial standards to be consistent with southern portion of the corridor; realign side streets. Road Construction 17 Tier 2 412 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 10 Project ID Name Description Sub-Category Score Tier R-20 S 3rd Ave (Graf St to Kagy Blvd) This project consists of reconstructing S. 3rd Avenue from the intersection with Graf Street to the intersection with Kagy Boulevard to a three-lane urban "collector" roadway. This includes one travel lane in each direction, bike lanes on each side, and curbs Road Construction 17 Tier 2 R-97 Garfield (Fowler to Ferguson) - Collector Recommended Extension - Collector Road Construction 17 Tier 2 S-60 US 191 Improvements Complete safety recommendations from MDT’s 2020 US 191 Corridor Study, including: modifying lanes and intersections, adding pedestrian crossings, installing curve warning signs, bridge maintenance, and improving intersection/roadway lighting Road Construction 17 Tier 2 S-73 Jackrabbit Ln/Driveway Tunnel under Jackrabbit Ln Pedestrian Tunnel/Bridge 16 Tier 2 R-106 I-90 Overpass/Underpass New overpass/underpass across I-90 Road Construction 16 Tier 2 R-58 Amsterdam Rd - Countryside Ln/Royal Rd to Thorpe Rd Reconstruct to 5-lane urban minor arterial standards with appropriate non-motorized accommodations. Road Construction 16 Tier 2 S-63 Belgrade to Bozeman Frontage Road Improvements Evaluate and modify existing passing and no-passing signing and striping to meet current standards; Construct centerline rumble strips along the rural portions of the corridor as appropriate; develop a path between Bozeman and Belgrade; Reconstruct the corridor to include one travel lane in each direction, center left-turn lane (where appropriate), and eight-foot shoulders Road Construction 16 Tier 2 R-37 Valley Center (Valley Center Spur to 27th Ave) This project consists of upgrading Valley Center Drive from the intersection with the Valley Center Underpass to the intersection with N. 27th Avenue to a three-lane urban arterial standard complete with one travel lane in each direction, bike lanes on each side. Road Construction 16 Tier 2 R-155 Stucky Road (S 19th Avenue to Gooch Hill Road) Reconstruct roadway to urban collector standards Road Construction 16 Tier 2 R-122 Davis (Baxter to Valley Center) This project consists of upgrading Davis from the intersection with Baxter to the intersection with Valley Center Road to a five-lane urban "minor arterial" standard. This includes two travel lanes in each direction, bike lanes on each side, curbs, and gutters. Road Construction 16 Tier 2 R-110 Catamount St (Davis Ln to Love Lane) - Minor Arterial Recommended Extension - Minor Arterial Road Construction 16 Tier 2 413 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 11 Project ID Name Description Sub-Category Score Tier R-120 Kagy Boulevard (Willson Avenue to Highland Boulevard) This project consists of widening Kagy Boulevard, from the intersection of S. 19th Avenue to Willson Avenue, to a four-lane urban principal arterial standard. This includes two travel lanes in each direction, bike lanes on each side, curb and gutter. Road Construction 16 Tier 2 R-121 Cottonwood (Baxter Ln to Deadman's Gulch / Cattail St) Complete the construction of Cottonwood Road, from Baxter Lane to Deadman's Gulch / Cattail Street, to a five-lane urban "principal arterial" standard. This includes two travel lanes in each direction, bike lanes on each side, curbs, and gutters. Road Construction 16 Tier 2 R-165 N 19th Interchange Modifications This project would construct modifications to the N 19th Interchange with I-90 (westbound exit ramp) to support street infrastructure for the North Park development currently under MDT Systems Impact review. Road Construction 15 Tier 2 R-96 S 11th Ave (Blackwood to Goldenstein) - Collector Recommended Extension - Collector Road Construction 15 Tier 2 R-117 Baxter (Cottonwood to MPA Boundary) - Minor Arterial Recommended Extension - Minor Arterial Road Construction 15 Tier 2 R-118 Laurel Parkway (Valley Center to Oak) - Collector Recommended Extension - Collector Road Construction 15 Tier 2 R-148 Cameron Bridge Road (Alaska Road South to Jackrabbit Lane) Reconstruct roadway to urban minor arterial standards Road Construction 15 Tier 2 A-57 Frontage Road Connector Shared path connecting northeast I-90 Frontage Rd to E Valley Center Shared Use Path 14 Tier 3 A-79 Gallatin Road (Four Corners to Gallatin Gateway) Extend existing shared use path Shared Use Path 14 Tier 3 A-136 Valley Center Spur Multimodal Connection This project will construct a multimodal connection along Valley Center Spur between the existing Frontage Rd shared use path and E Valley Center. Detailed planning and design will determine facility type. Signal modifications at each existing intersection are anticipated. Shared Use Path 14 Tier 3 S-77 Jackrabbit Ln/I-90 Grade-separated crossing. Pedestrian Tunnel/Bridge 14 Tier 3 R-23 Frontage Road (Weaver Road to Bolinger Road) Reconstruct to rural minor arterial standards to include widened shoulders, recoverable side slopes, center turn lane/turn bays. Road Construction 14 Tier 3 R-143 Baxter Lane (Harper Puckett Road to Jackrabbit Lane) Reconstruct roadway to rural minor arterial standards Road Construction 14 Tier 3 414 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 12 Project ID Name Description Sub-Category Score Tier R-152 Cottonwood Road (Oak Street to Hulbert Road) Reconstruct roadway to urban principal arterial standards Road Construction 14 Tier 3 R-46 S. 19th Avenue (Kagy Blvd to Hyalite Canyon Road) Reconstruct roadway to urban principal standards from Kagy Blvd to Goldenstein Road, rural principal arterial standards from Goldenstein Road to Johnson Road, and minor arterial standards to Hyalite Canyon Road Road Construction 14 Tier 3 R-164 Stucky Rd: Fowler to S 19th This project will reconstruct Stucky Rd to a 2-lane urban collector from Fowler Ln to S 19th including constructing a roundabout (preferred) or traffic signal at the intersection of Stucky Rd and Fowler Ln to improve safety and manage increasing traffic volumes. Road Construction 14 Tier 3 R-36 Cottonwood Rd (Loyal Drive to Graf St) Reconstruct Cottonwood Road, from the intersection of Loyal Drive to Graf Street, to a three-lane urban "principal arterial" standard. This includes one travel lanes in each direction, bike lanes on each side, curbs, and gutters. Road Construction 14 Tier 3 R-149 Cameron Bridge Road (Harper Puckett Road to Alaska Road South) Reconstruct roadway to urban minor arterial standards Road Construction 14 Tier 3 R-126 Cattail St (Ferguson to Cottonwood Rd) This project consists of upgrading Cattail Street from the intersection with Davis west of its current termini point to a three-lane urban "collector" roadway. A new link between the current western termini point of Cattail Street and Cottonwood Road sho Road Construction 14 Tier 3 R-109 Kagy Blvd (Cottonwood to S 27th Ave) - Principal Arterial Recommended Extension - Principal Arterial Road Construction 14 Tier 3 R-115 Graf St (Cottonwood to S 31st) - Collector Recommended Extension - Collector Road Construction 14 Tier 3 R-119 Babcock (Water Lily to Love Ln) - Collector Recommended Extension - Collector Road Construction 14 Tier 3 R-161 Alaska Road South (Frank Road to E Valley Center Road) Reconstruct roadway to rural minor arterial standards Road Construction 13 Tier 3 A-59 Amsterdam Road (Royal Road to Fishing Access) Extend the existing shared use path from Royal Road to Erwin Bridge Fishing Access Site. Shared Use Path 13 Tier 3 R-150 Harper Puckett Road / Gooch Hill Road (Cameron Bridge Road to Durston Road) Reconstruct roadway to urban minor arterial standards, complete connection between Durston Road and Harper Puckett Road. Road Construction 13 Tier 3 A-91 Cottonwood Rd Shared Use Path (Northbound) Proposed Shared Use Path on Cottonwood between Farmers Canal and Stucky Shared Use Path 13 Tier 3 R-74 New Roadway (Future) - Happy Ln to Dry Creek Rd New roadway. Road Construction 13 Tier 3 415 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 13 Project ID Name Description Sub-Category Score Tier S-48 S 3rd Ave and Graf St Installation of a traffic signal or roundabout at the intersection of South 3rd Ave, W Graf St, and Wagonwheel Dr. Intersection Improvements 13 Tier 3 A-14 W. Valley Center Road (Jackrabbit Lane to Path) Construct approximately 100 feet of shared use path to connect existing facilities at the intersection. Shared Use Path 13 Tier 3 R-142 Love Lane (Huffine Lane to E Valley Center Road) Reconstruct roadway to rural principal arterial standards Road Construction 13 Tier 3 R-145 Oak Street (Cottonwood Road to Love Lane) Reconstruct roadway to urban principal arterial standards, complete connection between Forest Glen Drive and Love Lane Road Construction 13 Tier 3 R-33 Kagy Blvd (Highland to Bozeman Trail) This project consists of widening Kagy Boulevard from the intersection with Highland Boulevard to the intersection with Bozeman Trail to a three-lane urban "principal arterial" standard complete with one travel lane in each direction, bike lanes on each Road Construction 13 Tier 3 R-114 S 27th Ave (Blackwood to Patterson) - Collector Recommended Extension - Collector Road Construction 13 Tier 3 R-116 Deadman's Gulch/Cattail St (Cottonwood to Study Area Boundary) - Collector Recommended Extension - Collector Road Construction 13 Tier 3 R-151 Gooch Hill Road (Durston Road to Huffine Lane) Reconstruct roadway to urban minor arterial standards Road Construction 13 Tier 3 R-67 Kingston Rd (Future) - Collins Rd to Dry Creek Rd New collector roadway. Road Construction 12 Tier 4 R-72 E Valley Center Rd - Alaska Rd to Love Ln Upgrade to minor arterial; maintain shared use path. Road Construction 12 Tier 4 S-76 Madison Ave/I-90 Construct underpass. Pedestrian Tunnel/Bridge 12 Tier 4 R-137 Frank Road (Jackrabbit Lane to Alaska Road South) Reconstruct and extend to urban minor arterial standards Road Construction 12 Tier 4 R-135 Story Mill N / Mcllhattan Rd (Boyland Rd to Landfill) This project consists of reconstructing Story Mill Road north to Mcllhattan, and Mcllhattan northwest to the Landfill, to a two-lane urban "collector" road standard. This would include one travel lane in each direction, bike lanes on each side, and curb. Road Construction 12 Tier 4 R-144 Durston Road (Gooch Hill Road to Jackrabbit Lane) Reconstruct roadway to urban minor arterial standards (Gooch Hill Road to Love Lane) and rural minor arterial standards (Love Lane to Jackrabbit Lane), complete connection between Parklands Trail and Jackrabbit Lane. Road Construction 12 Tier 4 416 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 14 Project ID Name Description Sub-Category Score Tier R-107 Oak Street (West Terminii to Love Ln) - Principal Arterial Recommended Extension - Principal Arterial Road Construction 12 Tier 4 R-112 Gooch Hill (Durston to Harper Puckett) - Minor Arterial Recommended Extension - Minor Arterial Road Construction 12 Tier 4 R-95 Blackwood Road (Fowler to S 31st Ave) - Collector Recommended Extension - Collector Road Construction 12 Tier 4 R-15 Cruiser Lane (Dry Creek Road to Westwood Circle) Reconstruct to Urban major collector standard Road Construction 11 Tier 4 R-53 Frontage Rd - Thorpe Rd to Bolinger Rd Reconstruct to urban typical standard. Road Construction 11 Tier 4 R-65 E Cameron Bridge Rd - Alaska Rd to Harper Puckett Rd Upgrade from minor collector to major collector. Road Construction 11 Tier 4 R-71 Tarmac Trail (New Airport Rd) - Jetway Dr to Frontage Rd New roadway. Road Construction 11 Tier 4 R-77 W Frank Rd - Thorpe Rd to Jackrabbit Ln Reconstruct to collector standards. Road Construction 11 Tier 4 M-17 E Griffin Bridge Replacement This project will replace the existing Bozeman Creek bridge on E Griffin Dr between N Rouse and Story Mill Rd. Bridge 11 Tier 4 R-153 Cobb Hill Road / Elk Lane (Gallatin Road to Red Mountain Drive) Reconstruct roadway to rural minor arterial standards Road Construction 11 Tier 4 R-103 Harper Puckett (Gooch Hill Rd to E Valley Center Road) Reconstruct to a 3-lane urban minor arterial Road Construction 11 Tier 4 R-159 Oak Street (Forest Glen Road to Love Lane) Principal Arterial Road Construction 11 Tier 4 R-146 Hulbert Road (Love Lane to Jackrabbit Lane) Reconstruct roadway to rural minor arterial standards Road Construction 10 Tier 4 R-162 Gooch Hill Road (Huffine Lane to Stucky Road) Reconstruct roadway to urban minor arterial standards Road Construction 10 Tier 4 R-64 Spooner Rd - Weaver Rd to Cruiser Ln Roadway improvements. Road Construction 10 Tier 4 R-66 Harper Puckett Rd - E Cameron Bridge Rd to E Valley Center Rd Roadway improvements. Road Construction 10 Tier 4 417 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 15 Project ID Name Description Sub-Category Score Tier R-76 Bolinger Rd - Weaver Rd to Cruiser Ln Reconstruct to minor collector standards. Road Construction 10 Tier 4 R-156 Durston Road (Parklands Trail to Monforton Drive) Minor Arterial Road Construction 10 Tier 4 R-98 Durston (Gooch Hill Rd to Study Area Boundary) - Minor Arterial Recommended Extension - Minor Arterial Road Construction 10 Tier 4 R-73 Weaver Rd - West Of Thorpe Rd to Dry Creek Rd Upgrade to 4-lane arterial with center median. Road Construction 9 Tier 4 M-18 Story Mill Bridge Replacement Replace the existing Bridger Creek bridge on Story Mill Rd in Bozeman with improved structural capacity and shared use path on or adjacent to the bridge Bridge 9 Tier 4 R-160 Elk Lane (Red Mountain Drive to Gooch Hill Road) Minor Arterial Road Construction 9 Tier 4 R-147 Hulbert Road (Harper Puckett Road to Love Lane) Construct roadway to urban minor arterial standards Road Construction 8 Tier 4 R-154 Stucky Road (Gooch Hill Road to Elk Lane) Extend Stucky Road between Gooch Hill Road and Elk Lane / Red Mountain Drive intersection as rural minor arterial. Road Construction 8 Tier 4 R-158 Gooch Hill Road (Durston Road to Hulbert Road) Minor Arterial Road Construction 8 Tier 4 R-63 Thorpe Rd - Planning Area Boundary to Royal Rd Roadway improvements if western interchange occurs. Road Construction 6 Tier 4 418 Evaluation Criteria Memo Gallatin Valley MPO Nelson\Nygaard Consulting Associates | 16 419