HomeMy WebLinkAbout26 - Amendments Amendment Number Unknown - Jackson Contracting Group - BOGERT POOL RENOVATION PROJECTGMP AMENDMENT NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Subparagraphs 3.7.1-3.7.4 and 4.1 of the Preconstruction Services Conditions Agreement between Owner and Construction Manager this amendment dated the 3rd day of June 2025, between City of Bozeman (“Owner”) and Jackson Contracting Group (“Contractor”) for the Bogert Pool Renovation Project, this amendment dated the 2nd of September 2026, hereby establishes a Guaranteed Maximum Price and Contract Time for the portion of the Project as set forth below: GUARANTEED MAXIMUM PRICE FOR BOGERT POOL RENOVATION PROJECT The Construction Manager’s Guaranteed Maximum Price (GMP) for the Work, including the Cost of the Work and the Construction Manager’s Fee is as follows: Pool Area Construction $2,029,382.00 Winter Conditions (Allowance) $25,000.00 Testing & Inspections (Allowance) $6,000.00 Dewatering (Allowance) $10,000.00 Construction Subtotal $2,070,382.00 General Conditions – Construction Manager $444,992.00 City of Bozeman Plan Review / Permit Fees $23,820.00 Unforeseen Conditions / Construction Contingency $129,158.00 Payment & Performance Bond $26,445.00 General Liability Insurance $26,710.00 Procore Fee $5,153.00 CGRT (Contractor Gross Receipt Tax) $27,028.00 Construction Fee $220,297.00 Indirect Costs / Contingency Subtotal $2,973,985.00 Alternate 1 – In-fill Men’s Locker Room Opening $10,251.00 Alternate 4 – Add ADA Lift CFCI (Contractor Furnish / Contractor Install) $12,208.00 Alternate 8 – Waterproof Surge Pit $3,590.00 AMENDMENT # 1 GUARANTEED MAXIMUM PRICE $3,000,034.00 CONTRACT TIME The date for the Certificate of Occupancy for the Work outlined above is June 18th, 2027 EXHIBITS Exhibit A – GMP Summary Exhibit B – Executive Summary Exhibit C – Schedule Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 OWNER: CONTRACTOR: City of Bozeman Jackson Contracting Group 121 N. Rouse Ave. 146 Laura Louise Lane Bozeman, MT 59715 Bozeman, MT 59718 By:__________________________ By: __________________________ Chuck Winn, City Manager Rylan Oakland, Director of Operations Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 Final GMP Summary - EXHIBIT ABogert Pool Renovations Updated 9/1/2026 PRECONSTRUCTION GMP AMENDMENT Base Contract Assessment Estimate - COB Budget Narrative 95% CD Trends Accepted Final Pre-Con Budget Final SOV Values for GMP ALT 1 - ADDIn-fill Mens Locker Room Opening ALT 2 - ADD Double Rock Slide ALT 3 - ADD ADA Lift OFCI ALT 4 - ADD ADA Lift CFCI ALT 5 - DEDUCT Deduct ADA Ramps ALT 6 - ADDCurb in lieu of Wheel Stops ALT 7 - DEDUCTAluminum Railings in lieu of Steel ALT 8 - ADD Waterproof Surge Pit ALT 9 - ADDIncrease Pool Deck Repairs ALT 10 - ADDPool Deck Trench Drain Total w/ ALTs 1, 4 & 8 Notes for GMP Preconstruction Services Original Services 61,280.00$ -$ 61,280$ 61,280$ Original Preconstruction Agreement - amendment amount does not include General Requirements . General Requirements 146,802$ -$ 146,802$ 146,802$ Pool Structure - Temporary Cover for Winter Work 128,115$ 128,115$ 144,338$ Bid Items by Division Select Demolition & Earthwork 166,623$ -$ 166,623$ 142,729$ 1,440$ 1,440$ Suggestion to take ALT#1 - Bid 2.0 Jackson Contractor Group Structural Concrete & Flatwork 209,249$ 9,683$ 218,932$ 213,628$ Bid 3.0/3.1 Jackson Contractor GroupConcrete Pool Deck Repair & Restoration 50,601$ -$ 50,601$ 64,456$ (2,200)$ 137,742$ 4,540$ -$ Base Build Approach at Pool Deck Suggest ALT#10 via Change Order in Early Spring Masonry Complete 93,280$ 2,871$ 96,151$ 101,770$ 1,700$ 1,700$ Suggestion to take ALT#1 Bid 4.0 Tesoro Masonry Architectural Metals, Railings & Gates 55,600$ (6,641)$ 48,959$ 63,626$ (1,250)$ 27,582$ Bid 5.0 YMS FabricationGutters & Downspouts 10,789$ -$ 10,789$ 5,110$ No new gutters, simply downspouts per drawings, can address further w/ contingency Doors/Hardware & Specialties 10,201$ -$ 10,201$ 23,180$ 4,380$ 5,138$ 10,280$ 4,380$ Take ALT#6, suggest ALT#10 - Trench Drain work via Change Order in early Spring Painting & Patching 8,000$ 2,000$ 10,000$ 4,225$ 1,675$ 1,675$ No new gutters, simply downspouts per drawings, can address further w/ contingency Pool Repair, Accessories & Vertical Filter Replacement 861,470$ 83,100$ 944,570$ 877,840$ 53,667$ 956$ 10,950$ 3,220$ 14,170$ Above Bid 7.0 The Gutter Guys - Bid 8.0 Jackson Contractor Group - Bid 13.0 Select DBC Plumbing Complete 36,500$ -$ 36,500$ 18,750$ (705)$ Bid 22.0 Abbott Plumbing Electrical, Grounding/Bonding & Site Lighting Complete 54,235$ 19,646$ 73,881$ 31,800$ Bid 26.0 SES Electrical Curb, Asphalt Patching/Paving & Striping -$ 9,458$ 9,458$ 12,540$ Bid 32.0 High Country Paving Landscaping Repair & Aluminum Fence 87,500$ 12,154$ 99,654$ 117,309$ Bid 33.0 Rivers Landscaping need relocation of irrigation box at dumpster Allowances Winter Conditions 15,000$ -$ 15,000$ 25,000$ Increase at Winter of 2027 is expected to be wet & long Third Party Testing & Inspections 12,000$ -$ 12,000$ 6,000$ Reduce to more appropriate scope valueDewatering10,000$ (10,000)$ -$ 10,000$ Sewer Drain Failsafe in Mechanical Room 7,500$ (7,500)$ -$ -$ Main Drain Corrections at Deep End 25,000$ (25,000)$ -$ -$ Material Escalation & Tariffs 40,449$ (40,449)$ -$ -$ SUBTOTAL :61,280.00$ 2,028,914$ 49,322$ 2,078,236$ 2,070,382$ 9,195$ 53,667$ 956$ 10,950$ (4,155)$ 5,138$ 27,582$ 3,220$ 137,742$ 14,819$ 23,365$ In-Directs/Contingengy General Conditions - Construction Manager 444,992$ -$ 444,992$ 444,992$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ CPM Schedule remains unchanged from original Assessment Budget COB Plan Review/Permit Fees - By Owner 27,124$ (15,614)$ 11,510$ 23,820$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ COB will reimburse CT Payments Design Contingency 75,238$ (75,238)$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Reducted to zero as design is complete Unforeseen Conditions & Construction Contingency - 6%129,158$ -$ 129,158$ 129,158$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Payment & Performance Bond 1%27,395$ -$ 27,395$ 26,445$ 92$ 537$ 10$ 110$ (42)$ 51$ 276$ 32$ 1,377$ 148$ 234$ General Liability Insurance 1%23,518$ -$ 23,518$ 26,710$ 93$ 542$ 10$ 111$ (42)$ 52$ 279$ 33$ 1,391$ 150$ 236$ Procore - .191%5,330$ -$ 5,330$ 5,153$ 18$ 105$ 2$ 21$ (8)$ 10$ 54$ 6$ 268$ 29$ 46$ GRT 1%27,957$ -$ 27,957$ 27,028$ 94$ 549$ 10$ 112$ (42)$ 53$ 282$ 33$ 1,408$ 151$ 239$ Contractors Fee - 8% based upon Fee Structure from Pre-con 225,890$ -$ 225,890$ 220,297$ 759$ 4,432$ 79$ 904$ (343)$ 424$ 2,278$ 266$ 11,375$ 1,224$ 1,930$ TOTAL:61,280.00$ 3,015,516$ (41,530)$ 2,973,986$ 2,973,986$ 10,251$ 59,831$ 1,066$ 12,208$ (4,632)$ 5,728$ 30,750$ 3,590$ 153,562$ 16,521$ 26,048$ DESIGN DEVELOPMENT BUDGETING ALTERNATES EXHIBIT A Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 1 Bozeman Bogert Pool – GMP Amendment - Exhibit B Date: September 1, 2026 Executive Summary This document summarizes the Bozeman Bogert Pool project. The project is located at 325 South Church Avenue, Bozeman, MT 59715. The following referenced documents were used for pricing and planning of this summary, budget, and schedule. 1. Bogert Pool Assessment Report (August 2025), as prepared by Cushing Terrell. 2. Bogert Pool Renovation Drawings as prepared by Paul McGiel (March1974) 3. Equipotential Bonding Survey and Report as prepared by SES Electrical Systems, LLC. (June 2025) 4. Ground Penetrating Radar Survey as prepared by Bigman Geophysical, LLC & Geosearch, Inc. (June 2025) 5. Cushing Terrell CDs and Aquatic Design Group dated 7/31/2026 6. Bidding Addenda’s #1 (dated 8/6/2026), #2 (Dated 8/11/2026), and #3 (Dated 8/19/2026) Definitions  Allowance: An allowance is an amount specified in an agreement that is allocated to a specific portion of the work whose details are not defined when the agreement is signed. Whenever costs incurred for an item exceed or fall short of the allowance created for that item, the contract sum will be adjusted accordingly. The adjustment to the contract sum will reflect the difference between the cost incurred and the allowance. Savings realized on an allowance will be returned to the owner as a reduction in the contract sum.  Contingency: An allowance in an amount or percentage of the contract held for unpredictable changes in the project. A contingency is a helpful risk management tool that financially prepares owners for addressing risk within the project. Contingency provides a vehicle to pay for unknown conditions such as price escalation of a product; design changes in scope or due to errors and omissions; or necessary construction changes that are realized on-site during construction. Notable Risks and Challenges  Winter weather conditions. Snow removal and ice management will be required throughout construction, adding cost and coordination.  Working in and around the occupied Bogert park spaces. Jackson Contractor Group and our subcontractors will endeavor to avoid disturbing the community to the greatest extent possible.  This GMP assumes the work will be conducted start to finish in a single phase. No breaks for seasonal changes or for the opening of the Bogert Pool are included in this assessment.  Unforeseen conditions o Multiple layers of pool shell build up o Conditional of existing pool plumbing Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 2 o Due to the results of the GPR survey of the pool identifying water below the pool shell, there is uncertainty around with the integrity of the ground under the current pool structure that is to remain. There has been a leak, presumably coming from the main drain in the pool, for multiple years and this water has caused an unknown amount of soil settling and pool shell undermining o Existing landscaping does not have any current as-built drawings, so more unforeseen irrigation modifications may be required. o Potential cost escalation related to remediation of existing pool shell conditions, including exposed rebar, corrosion, and structural cracking.  Potential safety and compliance risk is associated with verifying and achieving proper bonding and grounding for all new pool fixtures and existing pool equipment. Notable GMP Assumptions/Clarifications/Exclusions DIVISION 1 | GENERAL CONDITIONS & GENERAL REQUIREMENTS 1. This GMP proposal includes special inspection monies as required by the State of Montana for concrete construction. 2. This GMP proposal includes the extension/amendment of the Pre-Construction agreement with the City of Bozeman and therefore does not alter the scope of work items already in that agreement. 3. State of Montana & City of Bozeman permitting costs are included. 4. Quality Control/Material Testing has been included as an allowance for the purposes of this GMP and would be applicable to concrete and soils materials testing not performed by State or Local Jurisdictions. 5. GRT has been included 6. 2026 Montana Department of Labor Prevailing Wages have been included. DIVISION 2 | EXISTING CONDITIONS 1. Demo existing drinking fountains (2). 2. Demo existing North side stairs, ramp, and landing into the building. Includes footings, foundations, and flatwork. Footing and foundation wall of concrete landing West of stairs to remain in place. 3. Demo of asphalt paving adjacent to the concrete ramps, stairs, and landings on the North and West sides of the building 4. Demo of West elevation handicap accessible ramps coming from pool exit. 5. Demo of all metal handrails and guardrails on the West and North sides of the building. Handrails will be carefully cut off existing structural steel columns. Refinishing columns in divisions 5 and 9. 6. Demo of portion of East mechanical room landing and ramp. 7. Demo of existing CMU and chainlink perimeter fence around the pool deck area. 8. Demo of existing building and parking lot ADA signage. 9. Demo of select CMU brick at drinking fountains in order to cap/reroute plumbing piping. 10. Demo of concrete pool deck at locker room entrances. Approximate areas of demo are 8’x4’. 11. At existing pool deck core and remove any unnecessary metal objects coming through the concrete. Grind down all cracks and prepare for patching back. 12. Demo of select concrete locations under CMU walls at pool deck. 13. No abatement or hazardous materials survey identified in scope of work per hazardous materials report Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 3 DIVISION 3 | CONCRETE 1. Installation of new concrete footings, foundation walls, landings, and stairs at North side of building. 2. Installation of new ADA ramps on west elevation coming from North side of building and pool deck 3. Installation of new ramp going to mechanical entrance on East side of building. 4. Installation of new thickened edge sidewalk and slab on grade on North and West sides of building. 5. Installation of new slab on grade trash pad and West entrance/exit from pool to parking lot on Southwest corner of pool 6. Installation of new structural thickened edge slab on grade under CMU wall at pool deck. 7. Pool deck repairs at cores, cracks, and removed metal objects. Patch and repair locations identified on AD101 and AD102. 8. Replace existing control joint material throughout with new expansion joint material and sealant. 9. Construction of two 8’x4' concrete landings and ramps will be installed at each locker room to pool door that ramps to the pool deck. 10. Anticipated spoils from new footing excavation are anticipated. COB to advise if material can remain onsite or if it must be hauled off. 11. Furnish and install of all necessary reinforcement has been included. DIVISION 4 | MASONRY 1. This includes 20"W x 8"D split-faced masonry columns constructed of 8" CMU, fully grouted solid with vertical and horizontal reinforcing rebar. Columns to be Block type 1, which will have split-face CMU on exterior faces only and smooth on other three sides. CMU Block type 2, which is smooth faced on all 4 sides, will be utilized at CMU fencing between columns. Each column and CMU pony wall will be finished with a precast concrete cap, sloped with a drip edge. 2. Masonry patching at the demolished drinking fountains is included. CMU blocks will be provided and installed. Painting to match existing interior and exterior of building to best of abilities. 3. Caulking and control joints as indicated. 4. No masonry sealer has not been included. DIVISION 5 | METALS 1. Furnish and installation of new guardrails and handrails on West and North sides of the building. These new guardrails and handrails will be made of steel including powder coated finish as requested. Guardrails will be constructed of 2” square metal tubes and be fascia mounted to the concrete at the new landings and ramps. Handrails will be 1 ½” diameter pipe and will be wall mounted on building side at ramps and core and grouted where they extend past guardrails and at stairs. 2. Furnish and installation of two new ADA ramp handrails at pool deck, which will be aluminum. These handrails will be core and grouted into the pool deck. 3. Supply and installation of cantilevered steel bench at ground elevation on the North side of the building. DIVISION 6 | ROUGH CARPENTRY 1. Construction of a temporary pool cover consisting of wood trusses, sheathing and weather proofing has been included to allow for the pool construction during the non-operational periods as requested by the Owner. This temporary facility will be insulated and have propane heating and OSHA required lighting and ventilation to allow for the pool shell rehabilitation during the winter months. As such winter Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 4 conditions have been included, with respect to this is a specific scope of work. Please note winter conditions for other exterior work (i.e concrete, masonry, etc). DIVISION 7 | THERMAL AND MOISTURE PROTECTION 1. Exterior grade sealants have been included on the pool deck elevations and new concrete construction interfacing with the face of the existing building. Backer rod and an exterior grade sealant will be installed to prevent further water infiltration surface water runoff due to pool operations or typical weather cycles. 2. Six (6) new downspouts coming off the existing building gutters is included. Underground PVC for water drainage is included in division 22. Metal trench drains will be installed at sidewalk locations for proper drainage and to avoid slip hazards (provided by div 22 and installed by div 3). DIVISION 8 | OPENINGS 1. Gate hardware for access control has been included at (2) new aluminum gate locations. These are assumed to be keyed hardware and not electronic. Gate hardware package includes panic bars, security plates, and weld on closing hinges for security purposes. DIVISION 9 | FINISHES 1. Painting at repaired CMU block at the drinking fountain areas or other existing wall damage related to renovation activities. 2. Repair, patch and painting will occur at exposed existing building foundation that is exposed after existing ADA ramp is removed. 3. Painting at structural steel columns at North entry will be performed after existing handrails are removed from columns. Prep of column for paint is located in division 5. DIVISION 10 | SPECIALTIES 1. One surface-mounted fire extinguisher cabinet in each locker room area (Two total). DIVISION 11 | EQUIPMENT (POOL) 1. Remove the existing Nemato vertical pool filter and replace with a Neptune Benson “Defender” regenerative filter with automatic filter control as specified. 2. New Neptune Benson filter anchorage testing was not included in pricing. DIVISION 12 | FURNISHINGS 1. Not Included – Pool construction includes pool accessories/furnishes currently budgeted. DIVISION 13 | SPECIAL CONSTRUCTION (POOL) 1. Budget: 120 LF of crack isolation repair in the pool shell structure. 2. Budget: 388 LF of rebar repair in the pool shell structure. 3. Budget: 24 EA replace pool floor inlets. 4. Replace pool perimeter signage and floatation hangers. Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 5 5. Includes removal of existing main drain and install new VGC-VGBA compliant main drain grates and frames per drawings in swimming pool. Wading pool main drains to remain and be protected in place. 6. Demo of existing pool finish down to suitable substrate. This includes removal of all existing paint, plaster, and tile location in pool. Pool subcontractor has assumed 1 layer of plaster build up (or tile) when pricing the prep to suitable substrate. Pool contractor has included removal of up to ½” of existing material build up at pool shell. 7. Remove the current precast gutter coping that is set in grout and install new Daldorado Silentflow 13” parallel grating is included. 8. Finish entire pool surface with two coats of white epoxy paint. This includes curbs, lane lines, and wall targets, which will be applied per manufacturer recommendations. Resurface pool with painted finish. Basis of Design: RAMUC Specialized Coating high built epoxy two coat process. Racing lines and targets will be installed within 48 hours of pool coating installation. 9. Painting of new “No Diving” signage and depth markers at pool shell surface is included. 10. Chipping and removal of damaged concrete in designated areas to expose rebar. Compromised rebar to be repair or replaced depending on condition. 11. Removal and replacement of damaged curb heads as identified in the project documents is included in the GMP. 12. Removal of existing anchors and all other accessories is included. Pool shell will be chipped back to allow for new anchoring and bonding (by electrician) before replacing. 13. Removal of existing floor inlets and equalizer fittings is included. Pool shell will be chipped back to allow for new piping connections, which will allow for inspection to confirm sound and watertight connections. 14. Pool contractor to remove and replace expansion joint with mastic complete. 15. Furnish and installation of gutter waterproofing. 16. Removal of existing and Installation of new handrails and ladders is included. Includes new anchorage and escutcheons. 17. Remove and reinstallation of Aqua Zip and Aqua Climb is included 18. Removal of Delaware Duck slide is included. 19. Pressure testing of all existing pool piping along with new connections/equipment is included. 20. Start up, testing, balancing, and owner trainings by pool contractor are included. 21. Pool subcontractor has accounted for the cost of the chemicals for the pools for the 14 days of startup and operation. DIVISION 14 | CONVEYING EQUIPMENT 1. Not Included DIVISION 21 | FIRE SUPPRESSION 1. Not Included DIVISION 22/23 | PLUMBING/MECHANICAL 1. Removal of (2) existing drinking fountains has been included. Includes caping plumbing lines in CMU wall. 2. Installation of (1) new Elkay drinking fountain has been included. Drinking fountain has mechanical operation, so no electrical is necessary for installation. New drink fountain is in a new location, so Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 6 modifying the water supply line and drain line are required. Reworked water and drain lines will be located in the existing CMU wall. 3. New underground PVC for controlled drainage of downspouts is included. 4. Supply of metal trench drains for downspouts will be provided in this scope of work and installed by concrete subcontractor DIVISION 26/27/28 | ELECTRICAL & COMMUNICATIONS 1. Demolition of the (4) existing light poles and the associated bases is included. 2. Demolition of the existing pool deck outlets and associated exterior mounted branch circuitry is included. 3. GMP includes assumed work scope around addition of (4) exterior light poles with simple controls back to existing panels. New light pole bases are included at all new exterior light poles. New raceways to be installed from new light pole locations back to the building. No new conduit routing for lighting circuitry inside building is included. 4. GMP includes equipotential grounding/bonding of all pool lights, pool equipment, and other pool accessories as required by Code. 5. New pool outlets will be furnished in CMU columns as designed. 6. The following is included in the GMP: All line voltage electrical demolition and new work associated with the pool mechanical room and vertical filter, including shutdown/disconnect of existing filter wiring; removal of abandoned conduit, pull boxes, switches and electrical. Work also includes new feeder, disconnect, and conduit work. 7. A new SP or equivalent pool panel and board enclosure (NEMA 4X) is included in GMP. 8. Additional grounding and bonding of pool restoration work at gutter curb heads is included in GMP. DIVISION 31/32/33 | EARTHWORK/EXTERIOR IMPROVEMENTS/UTILITIES 1. Subgrade prep has been included at any new structural concrete or horizontal concrete flatwork. 2. Backfill at all new concrete footings, foundations, and flatwork has been included 3. No utilities have been included. 4. Horizontal drainage will match existing elevations set by adjacent structures. If possible, fall away from all structures will be included. 5. Furnish and install new aluminum fence panels around the perimeter of the pool deck. This package is based on the Aluminum Fences Direct commercial-grade Appalachian fencing system, utilizing 6' x 8' panels (6' tall by 8' wide) with 3-rail construction and 3/4" pickets, designed for durability and security (https://aluminumfencesdirect.net/options/commercial/). The scope includes galvanized steel line, corner, and gate posts, complete with caps. The system includes (2) 6' x 4' single-swing pedestrian gates, each equipped with self-closing hinges and gravity latches for safety and code compliance. The system also includes (1) double-swing maintenance gate with drop bar and lockable latch for safety and security. 6. Relocation of irrigation valve box at new trash pad location has been included. Exclusions 1. See above Division summaries for qualifications and exclusions if applicable. 2. Unforeseen Conditions – an allowance has instead been included for Construction Contingency 3. Abatement or Hazardous Materials Removal 4. Snow removal prior to construction commencement. 5. Ground water and mitigation if encountered - an allowance has instead been included 6. Tile and plaster work in the pool, given the selected finish is epoxy paint. 7. Asphalt patching, paving and striping outside of what is shown on the contract documents. Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 7 8. Building permit fee to be by owner 9. All project electrical, utilities, water, and associated utility costs to be by owner. 10. All winterization and locating of existing irrigation sprinkler heads to be by owner. 11. No snow melt or heat trace has been included in this GMP. 12. No low voltage work has been included in this GMP. 13. Pool chemicals after the first 14 days of startup and operation have been completed. Owner to provide chemicals after the first 14 days expire. 14. Piping repairs identified during existing pool piping pressure test. ALTERNATES The below summary of alternates includes all mark-ups and fee for Owner inclusion into the GMP Agreement if desired. Please note the valuations indicated below can be incorporated into the GMP as an additional amendment up to October 25th, 2025. Any elected alternates taken thereafter will require reassessment of cost and schedule implications, including additional General Conditions/Requirements. ADD/ALT # DESCRIPTION GMP ADD OR (DEDUCT) 1 Infill Men’s Locker Room Door – Demo HM Door infill CMU $10,221 2 Baby Slide – Install new ADA Double Rock Slide $59,831 3 ADA Lift 1 – Owner Furnished, Contractor Installed $1,066 4 ADA Lift 2 – Contractor Furnished, Contractor Installed $12,208 5 No ADA Ramp from Locker Room – Leave concrete as is, but keep plumbing work and new drinking fountain ($4,632) 6 Continuous Curb in Lieu of Wheel Stops – Parking along west side of Pool $5,728 7 (Deduct) Aluminum Guardrails and Handrails in Lieu of Steel $30,750 8 Waterproofing at Surge Chamber $3,590 9 Pool Deck Repair – Repairs per Addendum #2 sheet AD103 $153,562 10 Pool Deck Trench Drain – Add Two trench drains per P100 $16,521 ALLOWANCES DIVISION/ITEM DESCRIPTION VALUE Winter Conditions Site maintenance during construction See exclusion #4 $25,000 3rd Party Special Inspections & Testing Concrete and subgrade testing – CT may contract $6,000 Dewatering High ground water may be present during Fall start $10,000 TOTAL Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 8 UNIT PRICING Pricing is cost of work only. No markups included in the following pricing DIVISION/ITEM DESCRIPTION PRICING 3.1 - Concrete Epoxy Crack Repair at Pool Deck. Demo Plan AD101 and 102 $72/LF 3.1 - Concrete Control Joint R&R at Pool Deck. Demo Plan AD101 and 102 $85/SF 3.1 - Concrete Existing Anchor R&R at Pool Deck. Demo Plan AD101 and 102 $188/SF 13 - Pool Crack Repair in Pool Shell. Note 17 / DP-1 $50/LF 13 - Pool Pool Shotcrete & Exposed Rebar in Pool Shell. Note 9 / DP-1 $90/SF 13 - Pool Pool Reinforcement Rust Repair. Note 17 / DP-1 $56/SF Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 8/6/2026 Bogert Pool Renovation Hunter Clark Line Name Duration Start Finish 2026 2027 August September October November December January February March April May June JulyJuly A 6 13 20 27 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 BOGERT POOL RENO BOGERT POOL RENO BOGERT POOL RENO MILESTONES GMP Amendment Notice to Proceed GMP For Pool Work Established Final Overall GMP Established GMP For Pool Work Accepted Substantial Completion Final Completion PARK EVENTS Pool Closes for Public Use Irrigatrion Blowout Pool Opens For Public Use PRECONSTRUCTION CITY OF BOZEMAN DESIGN AND ENGINEERING PERMITTING Permitting - City of Bozeman Demo Permit MEP Permit Traffic Permit SUBMITTALS / PROCUREMENT Hydrostatic Relief Valve and MainDrain VGB Gutter Grate Crack Repair Materials Epoxy Paint Finish Steel Fencing LED Pole Lights Drinking Fountains Pool Fillter Pool Temp Structure North Side Handrails Shop Drawings SUBCONTRACTOR BIDDING Pre-Solicitation Pool Contractor Invitation to Bid Published Bidding Pool Contractor Bid Reconciliation Bids Due Bid Review 385d 552ed 9eh 385d 385d 210d 5d 253d 164d 108d 29d 29d 3d 3d 3d 89d 28d 30d 21d 21d 56d 63d 35d 84d 20d 30d 21d 10d 1d 13d 5d 1d 3d 12/18/2025 12/18/2025 * 12/18/2025 12/18/2025 12/18/2025 9/4/2026 * 9/4/2026 9/4/2026 9/8/2026 6/18/2027 6/23/2027 8/21/2026 8/21/2026 * 9/28/2026 * 6/21/2027 * 1/19/2026 1/19/2026 3/2/2026 8/3/2026 8/3/2026 * 9/4/2026 9/4/2026 9/4/2026 9/9/2026 9/9/2026 9/9/2026 9/9/2026 9/9/2026 9/9/2026 9/9/2026 9/9/2026 9/9/2026 9/11/2026 * 12/3/2026 8/3/2026 8/3/2026 8/6/2026 * 8/7/2026 8/17/2026 8/26/2026 8/27/2026 6/23/2027 6/23/2027 6/23/2027 6/23/2027 12/18/2025 9/4/2026 9/4/2026 9/4/2026 9/8/2026 6/18/2027 6/23/2027 6/21/2027 8/21/2026 10/2/2026 6/21/2027 1/15/2027 9/8/2026 7/31/2026 9/11/2026 9/11/2026 9/9/2026 9/9/2026 9/9/2026 1/15/2027 10/16/2026 10/20/2026 10/7/2026 10/7/2026 11/25/2026 12/8/2026 10/27/2026 1/8/2027 10/8/2026 1/15/2027 8/31/2026 8/14/2026 8/6/2026 8/25/2026 8/21/2026 8/26/2026 8/31/2026 BOGERT POOL RENO Notice to Proceed GMP For Pool Work Established Final Overall GMP Established GMP For Pool Work Accepted Substantial Completion Final Completion Pool Closes for Public Use Irrigatrion Blowout Pool Opens For Public Use + + Permitting - City of Bozeman Demo Permit MEP Permit Traffic Permit Hydrostatic Relief Valve and Main Drain VGB Gutter Grate Crack Repair Materials Epoxy Paint Finish Steel Fencing LED Pole Lights Drinking Fountains Pool Fillter Pool Temp Structure North Side Handrails Shop Drawings Pre-Solicitation Pool Contractor Invitation to Bid Published Bidding Pool Contractor Bid Reconciliation Bids Due Bid Review BOGERT POOL RENO Notice to Proceed GMP For Pool Work Established Final Overall GMP Established GMP For Pool Work Accepted Substantial Completion Final Completion Pool Closes for Public Use Irrigatrion Blowout Pool Opens For Public Use + + Permitting - City of Bozeman Demo Permit MEP Permit Traffic Permit Hydrostatic Relief Valve and Main Drain VGB Gutter Grate Crack Repair Materials Epoxy Paint Finish Steel Fencing LED Pole Lights Drinking Fountains Pool Fillter Pool Temp Structure North Side Handrails Shop Drawings Pre-Solicitation Pool Contractor Invitation to Bid Published Bidding Pool Contractor Bid Reconciliation Bids Due Bid Review Exhibit CDocusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 8/6/2026 Bogert Pool Renovation Hunter Clark Line Name Duration Start Finish 2026 2027 August September October November December January February March April May June JulyJuly A 6 13 20 27 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 CONSTRUCTION MOBILIZATION Job Trailer Delivery and Set Up Job Trailer Delivery Temporary Power and Internet SITE PREP Install Site Fencing and SWPPP Plug Drain to Keep Debris Out Pool Consultant Demolition Inspection Protect Building and ExistingFinishes Pool Accessory Demolition BLDG DEMO PREP Demo and safe off electrical Demo and safe off plumbing NORTH SIDE ENTRY RAMP Seperate Current Ramp andLanding From Building Asphalt Saw Cutting Demo Current Ramp, Landing, and Stairs Excavation & Prep for New Concrete Prep Footings & Stem Walls Footings & Stem Wall Inspection Pour Footings & Stem Walls Removing Shoring & Backfill/compact Prep Flat work Flat work Inspection Flat work Ramp Strip Forms & ReclaimSurrounding Area Install Handrails at Building (North/West) Paint Building Waiscott and Steel POOL REPAIRS AND UPGRADES Pool Main Drain Investigation Main Drain VGB Corrections at Swimming Pool Install Temporary Structural Enclosure Structural Pool Repairs (Cracks/Degraded Rebar) Inlets and Equalizer Modifications Install and Bond Rope Anchors Pool Gutter Waterproofing and Coping Pool Shell Wash and Cure Pool Epoxy Painting (2 Coats) Remove and Replace Vertical Pool Filter Remove Temporary Structure 182d 2d 1d 1d 1d 7d 2d 1d 1d 2d 5d 9d 5d 4d 148d 3d 1d 7d 5d 5d 1d 1d 2d 15d 1d 1d 2d 10d 5d 158d 5d 15d 15d 20d 10d 5d 20d 15d 10d 10d 10d 9/14/2026 9/14/2026 9/14/2026 * 9/15/2026 9/15/2026 9/16/2026 9/16/2026 9/16/2026 9/17/2026 9/18/2026 9/18/2026 9/17/2026 9/17/2026 9/24/2026 9/30/2026 9/30/2026 10/5/2026 10/6/2026 10/15/2026 10/22/2026 10/29/2026 10/30/2026 11/2/2026 11/4/2026 11/25/2026 11/30/2026 12/1/2026 1/18/2027 4/23/2027 9/18/2026 9/18/2026 10/19/2026 11/9/2026 12/2/2026 12/16/2026 12/31/2026 1/8/2027 2/5/2027 2/26/2027 3/12/2027 3/12/2027 6/1/2027 9/15/2026 9/14/2026 9/15/2026 9/15/2026 9/24/2026 9/17/2026 9/16/2026 9/17/2026 9/21/2026 9/24/2026 9/29/2026 9/23/2026 9/29/2026 4/29/2027 10/2/2026 10/5/2026 10/14/2026 10/21/2026 10/28/2026 10/29/2026 10/30/2026 11/3/2026 11/24/2026 11/25/2026 11/30/2026 12/2/2026 1/29/2027 4/29/2027 5/3/2027 9/24/2026 11/6/2026 12/1/2026 12/30/2026 12/30/2026 1/7/2027 2/4/2027 2/25/2027 3/11/2027 3/25/2027 3/25/2027 Job Trailer Delivery and Set Up Job Trailer Delivery Temporary Power and Internet Install Site Fencing and SWPPP Plug Drain to Keep Debris Out Pool Consultant Demolition Inspection Protect Building and Existing Finishes Pool Accessory Demolition Demo and safe off electrical Demo and safe off plumbing Seperate Current Ramp and Landing From Building Asphalt Saw Cutting Demo Current Ramp, Landing, and Stairs Excavation & Prep for New Concrete Prep Footings & Stem Walls Footings & Stem Wall Inspection Pour Footings & Stem Walls Removing Shoring & Backfill/compact Prep Flat work Flat work Inspection Flat work Ramp Strip Forms & Reclaim Surrounding Area Install Handrails at Building (North/West) Paint Building Waiscott and Steel Pool Main Drain Investigation Main Drain VGB Corrections at Swimming Pool Install Temporary Structural Enclosure Structural Pool Repairs (Cracks/Degraded Rebar) Inlets and Equalizer Modifications Install and Bond Rope Anchors Pool Gutter Waterproofing and Coping Pool Shell Wash and Cure Pool Epoxy Painting (2 Coats) Remove and Replace Vertical Pool Filter Remove Temporary Structure Job Trailer Delivery and Set Up Job Trailer Delivery Temporary Power and Internet Install Site Fencing and SWPPP Plug Drain to Keep Debris Out Pool Consultant Demolition Inspection Protect Building and Existing Finishes Pool Accessory Demolition Demo and safe off electrical Demo and safe off plumbing Seperate Current Ramp and Landing From Building Asphalt Saw Cutting Demo Current Ramp, Landing, and Stairs Excavation & Prep for New Concrete Prep Footings & Stem Walls Footings & Stem Wall Inspection Pour Footings & Stem Walls Removing Shoring & Backfill/compact Prep Flat work Flat work Inspection Flat work Ramp Strip Forms & Reclaim Surrounding Area Install Handrails at Building (North/West) Paint Building Waiscott and Steel Pool Main Drain Investigation Main Drain VGB Corrections at Swimming Pool Install Temporary Structural Enclosure Structural Pool Repairs (Cracks/Degraded Rebar) Inlets and Equalizer Modifications Install and Bond Rope Anchors Pool Gutter Waterproofing and Coping Pool Shell Wash and Cure Pool Epoxy Painting (2 Coats) Remove and Replace Vertical Pool Filter Remove Temporary Structure Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86 8/6/2026 Bogert Pool Renovation Hunter Clark Line Name Duration Start Finish 2026 2027 August September October November December January February March April May June JulyJuly A 6 13 20 27 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 Modify Pool Mech Room Piping Install all Pool Entry Handrails ADA Lift Reinstall Climbing Wall Reinstall Zip Line Reinstall Small Slide Reinstall at Deep End POOL DECK AND FENCE Demo existing CMU Fence Infill/Modify CMU Walls on Westand South of Building Prep for new Concrete Footings Place new Concrete Footings Install CMU Walls for Fence Install Pool Fencing at CMU Demo, patch, and repair pool deck concrete Install Pool Deck Handrails (Bathrooms) Install new Drinking Fountain SITE FINISHES Rough in New LED Pool Lights Install LED Light Pole Bases Install LED Light Poles West Pool ConcreteApproach/Trash Pad Prep/Install Asphalt Paving Prep and Install Landscaping Repairs Asphalt Striping CLOSEOUT & COMMISSIONING PUNCHLIST Clean, Fill Pool, and PerformFinal Balancing Perform Owner Training Pool Consultant Punchlist Pool Consultant PunchlistCorrections Contractor Punchlist Contractor Punchlist Corrections Owner/Architect Punchlist Owner/Architect PunchlistCorrections FINAL INSPECTIONS Planning and Zoning Inspection Engineering Inspection Plumbing Inspection Life Safety Inspection Health Department Inspection Final Inspection 10d 3d 1d 1d 1d 1d 139d 10d 10d 5d 2d 30d 15d 20d 5d 2d 47d 8d 8d 5d 5d 10d 12d 3d 35d 35d 14d 1d 1d 5d 2d 5d 2d 5d 5d 1d 1d 1d 1d 1d 1d 3/26/2027 4/23/2027 4/28/2027 4/29/2027 4/30/2027 5/3/2027 10/15/2026 10/15/2026 10/29/2026 12/3/2026 12/10/2026 12/14/2026 1/27/2027 3/26/2027 4/23/2027 4/30/2027 3/26/2027 3/26/2027 4/7/2027 4/19/2027 4/23/2027 4/30/2027 5/14/2027 5/14/2027 5/4/2027 5/4/2027 5/4/2027 5/24/2027 5/25/2027 5/26/2027 6/3/2027 6/7/2027 6/14/2027 6/16/2027 6/14/2027 6/14/2027 6/15/2027 6/16/2027 6/17/2027 6/17/2027 6/18/2027 4/8/2027 4/27/2027 4/28/2027 4/29/2027 4/30/2027 5/3/2027 5/3/2027 10/28/2026 11/11/2026 12/9/2026 12/11/2026 1/26/2027 2/16/2027 4/22/2027 4/29/2027 5/3/2027 6/1/2027 4/6/2027 4/16/2027 4/23/2027 4/29/2027 5/13/2027 6/1/2027 5/18/2027 6/22/2027 6/22/2027 5/21/2027 5/24/2027 5/25/2027 6/2/2027 6/4/2027 6/11/2027 6/15/2027 6/22/2027 6/18/2027 6/14/2027 6/15/2027 6/16/2027 6/17/2027 6/17/2027 6/18/2027 Modify Pool Mech Room Piping Install all Pool Entry Handrails ADA Lift Reinstall Climbing Wall Reinstall Zip Line Reinstall Small Slide Reinstall at Deep End Demo existing CMU Fence Infill/Modify CMU Walls on West and South of Building Prep for new Concrete Footings Place new Concrete Footings Install CMU Walls for Fence Install Pool Fencing at CMU Demo, patch, and repair pool deck concrete Install Pool Deck Handrails (Bathrooms) Install new Drinking Fountain Rough in New LED Pool Lights Install LED Light Pole Bases Install LED Light Poles West Pool Concrete Approach/Trash Pad Prep/Install Asphalt Paving Prep and Install Landscaping Repairs Asphalt Striping Clean, Fill Pool, and Perform Final Balancing Perform Owner Training Pool Consultant Punchlist Pool Consultant Punchlist Corrections Contractor Punchlist Contractor Punchlist Corrections Owner/Architect Punchlist Owner/Architect Punchlist Corrections Planning and Zoning Inspection Engineering Inspection Plumbing Inspection Life Safety Inspection Health Department Inspection Final Inspection Modify Pool Mech Room Piping Install all Pool Entry Handrails ADA Lift Reinstall Climbing Wall Reinstall Zip Line Reinstall Small Slide Reinstall at Deep End Demo existing CMU Fence Infill/Modify CMU Walls on West and South of Building Prep for new Concrete Footings Place new Concrete Footings Install CMU Walls for Fence Install Pool Fencing at CMU Demo, patch, and repair pool deck concrete Install Pool Deck Handrails (Bathrooms) Install new Drinking Fountain Rough in New LED Pool Lights Install LED Light Pole Bases Install LED Light Poles West Pool Concrete Approach/Trash Pad Prep/Install Asphalt Paving Prep and Install Landscaping Repairs Asphalt Striping Clean, Fill Pool, and Perform Final Balancing Perform Owner Training Pool Consultant Punchlist Pool Consultant Punchlist Corrections Contractor Punchlist Contractor Punchlist Corrections Owner/Architect Punchlist Owner/Architect Punchlist Corrections Planning and Zoning Inspection Engineering Inspection Plumbing Inspection Life Safety Inspection Health Department Inspection Final Inspection Docusign Envelope ID: 2C879851-D09E-842B-81DA-76F89BC36B86