HomeMy WebLinkAbout026_L2.1 LANDSCAPE DETAILSPRELIMINARY - FOR REVIEW
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
LANDSCAPE DETAILS
HAGGERTY MULTI-FAMILY
BOZEMAN, MTL2.1RPE
250389.01_LS_DETAILS.DWG
MGB
02/27/2026 SP SUBMITTAL
06/10/2026
07/31/2026
-
-
-
-
SP 2 SUBMITTAL
SP 3 SUBMITTAL
-
-
-
-
--
250389.02 DECIDUOUS TREE N.T.S.2'-8" LENGTH NON-ABRASIVE RUBBERTIES(2)3" DIA LODGE POLE PINE STAKES1-1/2' FROM TRUNK. STAKELOCATION SHALL NOT INTERFEREWITH PERMANENT BRANCHES3" DEPTH MULCHFINISH GRADEBOTTOM OF ROOT BALL RESTSON EXT OR RECOMPACTED SOILEXISTING SOILTOP OF ROOT FLARE 2" ABOVE EXTGRADE. NO SOIL ON ROOT FLARELOOSENED SOIL. DIG AND TURNTHE SOIL TO REDUCECOMPACTION TO THE AREA TODEPTH OF ROOT BALL.3 X DIA ROOT BALL MINNOTES:1.REMOVE NURSERY STAKES.2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING.3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL.4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DONOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOTBALL TO SETTLE THE SOIL.5.BACKFILL WITH AMENDED SOIL.6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON.7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS,CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS.8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION.1SHRUB PLANTINGN.T.S.NOTES:1.SHRUBS WITH BROKEN OR CRUMBLING ROOT BALLS WILL BE REJECTED. CONTAINERREMOVAL WILL NOT BE AN EXCUSE FOR DAMAGED ROOT BALLS.2.TOP OF MULCH TO BE 1" BELOW ADJ WALKWAY, CURB, EDGING, OR OTHER SURFACE.3.PRUNE OUT ALL DAMAGED OR DEAD WOOD.4.ALL PLANT MATERIAL TO BE INSPECTED UPON DELIVERY. REJECTED MATERIALS TO BEIMMEDIATELY RETURNED TO SOURCE.6.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS,CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS.TOP OF ROOT BALLSHALL BE 1-2" ABOVESURROUNDING GRADE3" DEPTH MULCH, KEEPMULCH AWAY FROM TRUNKREMOVE CONTAINER,LIGHTLY SCARIFYROOTSBACKFILL WITH 75%NATIVE SOIL, 25%COMPOST2PERENNIAL/GRASS/GROUNDCOVER PLANTINGN.T.S.NOTES:1.REMOVE SPENT FLOWERS PRIOR TO PLANTING.2.LOOSEN ROOT MASS AT BOTTOM OF ROOT BALL.3.QUANTITY AND SPACING AS NOTED IN PLANT SCHEDULE.SET PLANT ATORIGINAL DEPTHROOT BALLTOPSOILEXISTING SOIL3" DEEP MULCHKEEP AWAY FROMCROWN OF PLANT3AMENDED EXISTING NATIVETOPSOIL, REMOVE ALL LARGEDEBRIS AND ROCKS OVER 1/2"EXISTING VEGETATIONSEEDINGN.T.S.NOTE:1.EXISTING TOPSOIL WILL BE PLACED BY SITE WORK CONTRACTOR TO ROUGH GRADE.2.LANDSCAPE CONTRACTOR SHALL AMEND SOIL ACCORDING TO SOIL TEST ANALYSIS AT AMINIMUM OF 6" DEPTH.3.LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL GRADING AND SEEDINGPREPARATION.SEEDED AREA4ROCK MULCHWEED BARRIER FABRICNEW TOPSOILEXISTING SUBGRADE3"ROCK MULCHN.T.S.5EDGING DETAILN.T.S.4" BELOW GRADE MIN18" REBAR STAKES TACKWELDED AT 4' O.CNOTES:1.FINISH TO BE NATURAL, RAW STEELGROUND VARIES,SEE PLANS1/4" x 4" STEELFLAT BAR EDGING,STAKES SHALL BEON BACK SIDE6VARIED GROUNDCONDITIONS, SEE PLANCOMPACTED 3/4" MINUS SANDY-GRAVELBASE MATERIAL. COMMON ROADBASEFROM NON-RECYCLED SOURCESTOPSOIL FILLED TO THE TOP OFGRIDCOMPACTED SUBGRADE95% MODIFIED PROCTOR DENSITYTRUEGRID UNITSNOTES:1. INSTALL PER MANUFACTURER'S INSTRUCTIONS.2. DETAIL FOR DESIGN INTENT ONLY.TRUEGRID PERMEABLE PAVERSN.T.S.EDGING DETAIL6L2.105-018" MIN7P:\250389_01_Haggerty_Lane_Survey_&_CA\CADD_C3D\PRODUCTION_DWG\250389.01_LS_DETAILS.dwg, L2.1, 8/14/2026 4:08:47 PM, aschnaderbeck, 1:1