HomeMy WebLinkAbout023_L1.1 LANDSCAPE SCHEDULES & NOTESSYMBOLCODEBOTANICAL / COMMON NAMESIZEPFQTYTREESBJBETULA PLATYPHYLLA 'JEFPARK' / PARKLAND PILLAR® ASIAN WHITE BIRCHHEIGHT: 30-35', SPREAD: 6-10'1.5" CAL0.314QRQUERCUS RUBRA / NORTHERN RED OAKHEIGHT: 50-75', SPREAD: 50-75'1.5" CAL0.32THTILIA CORDATA X MONGOLICA 'HARVEST GOLD' / HARVEST GOLD LINDENHEIGHT: 20-40', SPREAD: 15-30'1.5" CAL0.31SHRUBSCLCOTONEASTER LUCIDUS / SHINY COTONEASTERHEIGHT: 6', SPREAD: 6'5 GAL0.310JMJUNIPERUS SCOPULORUM 'MEDORA' / MEDORA JUNIPERHEIGHT: 10-12', SPREAD: 3-4'5 GAL0.126PPPRUNUS BESSEYI 'P011S' / PAWNEE BUTTES® SAND CHERRYHEIGHT: 18", SPREAD: 5'5 GAL0.115RG2RHUS AROMATICA `GRO-LOW` / GRO-LOW FRAGRANT SUMACHEIGHT: 24", SPREAD: 7'5 GAL0.128RGRIBES AUREUM / GOLDEN CURRANTHEIGHT: 6', SPREAD: 6'5 GAL0.122GRASSESAIANDROPOGON GERARDII 'INDIAN WARRIOR' / INDIAN WARRIOR BIG BLUESTEMHEIGHT: 5-8', SPREAD: 3-4'2 GAL0.163CKCALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER' / KARL FOERSTER FEATHER REED GRASSHEIGHT: 3-4', SPREAD: 2-3'2 GAL0.3126SHSPOROBOLUS HETEROLEPIS / PRAIRIE DROPSEEDHEIGHT: 2-3', SPREAD: 3'2 GAL0.364GROUNDCOVERJBJUNIPERUS HORIZONTALIS 'BLUE CHIP' / BLUE CHIP CREEPING JUNIPERHEIGHT: 6-12", SPREAD: 6-8'1 GAL0.16PERENNIALSAMACHILLEA X 'MOONSHINE' / MOONSHINE YARROWHEIGHT: 12-36", SPREAD: 18-36"1 GAL0.126EMECHINACEA PURPUREA 'MAGNUS' / MAGNUS PURPLE CONEFLOWERHEIGHT: 25-48", SPREAD: 18"1 GAL0.363NTNEPETA X `LITTLE TRUDY` / LITTLE TRUDY CATMINTHEIGHT: 8-12", SPREAD: 12-16"1 GAL0.382SYMBOLCODEBOTANICAL / COMMON NAMECONTQTYGROUND COVERSRSRESTORATIVE SEEDINGNATIVE MIX. 25% SLENDER WHEATGRASS, 10% WESTERN WHEATGRASS, 10% THICKSPIKEWHEATGRASS, 20% MOUNTAIN BROME, 8% SANBERG'S/BIG BLUEGRASS, 23%BLUEBUNCH/SNAKE RIVER WHEATGRASS, 2% BLUE FLAX, 2% PRAIRIE CONEFLOWER.CIRCLE S SEEDS, (406) 285-3269.SEED1,832 SFTSTRUEGRID SEEDINGLAWNDRY MIX. 33% SHEEP FESCUE, 33% CANADA BLUEGRASS, 33% HARD FESCUE. CIRCLES SEEDS, (406) 285-3269.SEED2,264 SFSYMBOLCODEDESCRIPTIONQTYDETAILCONCRETE SEAT WALL1/L2.205 MetalsLANDSCAPE EDGINGSTEEL EDGING.530 LF6/L2.1STAIR HANDRAILS78 LF5/L2.2STEEL PLANTER WALL76 LF3/L2.2RockROCK MULCH3" DEPTH. 1" BLACK BASALT FROM SCENIC CITY TRUCKING. 2239AMSTERDAM ROAD, BELGRADE, MT 59714.5,862 SF5/L2.1PavingTRUEGRID PERMEABLE PAVING WITH GRASS2,265 SF7/L2.1Site FurnishingsBBQ GRILL1LANDSCAPE FORMS WDMK-54-RD-MWINDMARK SERIES ROUND TABLE. STEEL BASE CONSTRUCTION WITHMETAL TOP. 54IN. D X 29IN. H.FRAME: ONYX ARCHITECTURAL SERIES - POWDERCOATED METALTABLETOP: ONYX ARCHITECTURAL SERIES - POWDERCOATED METALSURFACE MOUNTED WITH PAVER ADAPTER.3LANDSCAPE FORMS WDMK-W-ACAST ALUMINUM FRAME WITH ARMS AND WOOD SLATS.FRAME: ONYX ARCHITECTURAL SERIES - POWDERCOATED METALSEAT: JARRAH WOODGRAINS EXTERIOR12MAGLIN MBR-0500-00001500 SERIES - 500 BIKE RACK: H.S. STEEL TUBE, DIRECT BURIAL, 2BIKE CONFIGURATIONBIKE RACK: BRONZE 14 MATTE54/L2.2GAS FIREPITGLACIER FIRE PIT TABLE FROM MOTANA FIRE PITS. 40" X 40". COLORSHALL BE RUSTIC BRONZE.LANDSCAPE FORMS COCH-LCCOCHRAN SERIES LOUNGE CHAIR DESIGNED BY ANDREA COCHRAN.ALUMINUM LOOP FRAME CONSTRUCTION WITH REPLACEABLESEATING FABRIC. 31IN. W X 31IN. D X 31IN. H.FRAME: ONYX ARCHITECTURAL SERIES - POWDERCOATED METALSEAT: BLACK PHIFERTEX® PLUS2LANDSCAPE FORMS UNIV-71BACKLESS BENCH SYSTEM, TO BE MOUNTED TO SITTING HEIGHTWALL. 71IN. LENGTH.FRAME: BLUE ASH ARCHITECTURAL SERIES - POWDERCOATED METALSEAT: JARRAH WOODGRAINS EXTERIOR22/L2.2205-0105-0205-04K-101P-102S-101S-102S-103S-104S-105S-106S-10722 LF1LIMIT OF WORKSNOW STORAGE AREAPROPOSED GATE, SEE CIVILPROPOSED CONCRETEPAVING, SEE CIVILPROPOSED ASPHALT PAVING,SEE CIVILPROPOSED GRAVEL, SEECIVILPRELIMINARY - FOR REVIEW
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
LANDSCAPE SCHEDULES & NOTES
HAGGERTY MULTI-FAMILY
BOZEMAN, MTL1.1RPE
250389.01_LS_PROD.DWG
MGB
02/27/2026 SP SUBMITTAL
06/10/2026
07/31/2026
-
-
-
-
SP 2 SUBMITTAL
SP 3 SUBMITTAL
-
-
-
-
--
250389.02 PLANT SCHEDULERE4UIREDPROVIDEDCITY OF BOZEMAN LANDSCAPE AND IRRIGATION PERFORMANCE AND DESIGN STANDARDS3.2.1 LANDSCAPE DESIGN STANDARDSPRESCRIPTIVE PATHWAY OR PERFORMANCE PATHWAY.PERFORMANCE PATHWAY.TOTAL LANDSCAPED AREA (SQUARE FEET)9,897 SQUARE FEET, LANDSCAPING EXTENDS TO ADJACENT PROPERTY.TOTAL LANDSCAPED AREA WITH VEGETATIVE COVERAGE (SQUARE FEET)9,500 SQUARE FEET, LANDSCAPING EXTENDS TO ADJACENT PROPERTY.INDICATION OF METHOD USED TO MEET TOPSOIL QUALITY REQUIREMENTS.AMEND EXISTING TOPSOIL AT A RATE OF 4 CUBIC YARDS OF COMPOST/1000 SQUARE FEET.LANDSCAPED AREA COVERAGEREQUIREMENTSAT LEAST 60 PERCENT OF THE LANDSCAPED AREA MUST BE LANDSCAPED AND MAINTAINED WITH SOMECOMBINATION OF VEGETATIVE UNDERSTORY PLANTINGS. (EXEMPTIONS - AREAS WITHIN 10' OF BUILDING,LANDSCAPE AREAS UNDER 6' WIDE, STREET FRONTAGE AREAS)THIS REQUIREMENT IS SATISFIED.A MINIMUM OF 10 PERCENT OF THE LANDSCAPED AREA MUST BE VEGETATED WITH CONTAINER GROWNSHRUBS OR PERENNIALS. (TOTAL - 950 SF REQUIRED)THIS REQUIREMENT IS SATISFIED.TREE REQUIREMENTS OUTSIDE OFPARKING LOTS AND BOULEVARDS1-5 TREES - CAN HAVE 100% OF ONE SPECIES. (116 SF OF APPLICABLE LANDSCAPE AREA = 1 TREE), 11-20TREES - MAXIMUM 33% OF ANY ONE SPECIES3 TREE SPECIES ARE PROVIDED WHERE ONLY 1 TREE IS REQUIRED, EXCEEDING THE MINIMUMPLANTING REQUIREMENT. DUE TO SITE CONSTRAINTS AND LIMITED PLANTING SPACE,COMPACT COLUMNAR TREE SPECIES WERE PRIMARILY UTILIZED TO MAXIMIZE TREEQUANTITY AND MAINTAIN SITE FUNCTIONALITY.A MINIMUM OF 75 PERCENT OF PROPOSED TREES MUST BE DROUGHT ADAPTED OR HAVE A PLANT FACTOR OF0.3 OR LESS.TREES HAVE A PLANT FACTOR OF 0.3. SEE PLANT SCHEDULE FOR SPECIES INFORMATION.TREES MUST BE PLANTED AT A MINIMUM RATE OF 1 PER 1600 SQUARE FEET OF LANDSCAPED AREA. (116 SFOF APPLICABLE LANDSCAPE AREA = 1 TREE)17 TREES PROVIDED. 2 TREES ARE LOCATED ON ADJACENT PROPERTY.A MINIMUM OF 50 PERCENT OF TREES MUST BE CANOPY TREES.CANOPY TREES HAVE BEEN PROVIDED WHERE SPACE ALLOWS. DUE TO SITE CONSTRAINTSAND LIMITED PLANTING SPACE, COMPACT COLUMNAR TREE SPECIES WERE PRIMARILYUTILIZED TO MAXIMIZE TREE QUANTITY AND MAINTAIN SITE FUNCTIONALITY.CITY OF BOZEMAN MUNICIPAL CODESEC. 38.220.040. - B-2MSTREETSCAPESIDEWALK WIDTH (MIN): 6', BOULEVARD STRIP WIDTH (MIN): 6', TREE SPACING (MAX): 25-30' AVG. ONCENTER)SIDEWALK WIDTH: SATISFIED, BOULEVARD STRIP WIDTH: NOT SATISFIED AS THE SIDEWALKMUST BE 1' OFF OF THE PROPERTY LINE AND THERE IS NOT ENOUGH AVAILABLE SPACEBETWEEN THE SIDEWALK AND EXISTING ROAD, TREE SPACING: NOT SATISFIED DUE TOEXISTING UNDERGROUND UTILITIES PREVENTING TREE PLACEMENT.BOZEMAN MUNICIPAL CODE RE4UIREMENTSGENERAL NOTES1.THE CONTRACTOR SHALL OBTAIN, AT THEIR OWN EXPENSE, APPLICABLE LICENSES, STANDARDS, PERMITS, ETC.WHICH ARE NECESSARY TO PERFORM THE WORK.2.THE CONTRACTOR SHALL LOCATE, CLEARLY MARK AND MAINTAIN EXISTING UTILITIES ON THE SITE PRIOR TO WORKSTART UP. CALL FOR UTILITY LOCATES PRIOR TO COMMENCING WORK.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES AND REPAIR OF UTILITIES IFDAMAGED. REPAIR SHALL BE DONE AT NO ADDITIONAL COST TO THE OWNER4.ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. ANY DEVIATION FROMTHESE PLANS MUST BE APPROVED BY OWNER OR LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION.5.LIMIT OF WORK IS AS INDICATED ON THE PLANS.6.COORDINATE SITE ACCESS, STAGING, STORAGE AND CLEANOUT AREAS WITH OWNER'S REPRESENTATIVE.MATERIALS NOTES1.MATERIAL QUANTITIES SHOWN IN SCHEDULE FOR REFERENCE PURPOSES. CONTRACTOR TO SELF-VERIFY MATERIALAMOUNTS AND TOTALS BASED ON PLAN REVIEW.2.CONTRACTOR TO SUBMIT MATERIAL SAMPLES FOR APPROVAL BY LANDSCAPE ARCHITECT. ALL MATERIALS SHALLCOMPLY WITH THEIR RESPECTIVE AND APPLICABLE STANDARDS.3.PRODUCTS AND MATERIALS SHALL BE DELIVERED AND INSPECTED PRIOR TO ACCEPTANCE FROM TRUCKINGCOMPANY. CONTRACTOR IS RESPONSIBLE FOR PRODUCTS AND MATERIALS THAT ARE DAMAGED, BROKEN, OROTHERWISE UNUSABLE TO THE OWNER, AT NO EXPENSE TO THE OWNER.4.ALL PRODUCTS SHALL BE STORED AS PER MANUFACTURER'S RECOMMENDATIONS.PLANTING NOTES1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PLANT QUANTITIES. GRAPHIC QUANTITIES TAKEPRECEDENCE OVER WRITTEN QUANTITIES.2.ALL LANDSCAPE AREAS SHALL RECEIVE SOIL PREPARATION AS SPECIFIED.3.ALL EXISTING GRASS STAND AREAS DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE SOIL PREPARED ANDSEEDED BY THE CONTRACTOR.4.EXISTING TURF AREAS THAT ARE DISTURBED DURING CONSTRUCTION, ESTABLISHMENT AND THE MAINTENANCEPERIOD SHALL BE RESTORED WITH NEW SOD TO MATCH EXISTING TURF SPECIES.5.ALL LANDSCAPE MATERIALS SHALL BE INSTALLED ACCORDING TO SOUND HORTICULTURAL PRACTICES ANDAMERICAN NURSERY STANDARDS IN A MANNER DESIGNED TO ENCOURAGE QUICK ESTABLISHMENT AND HEALTHYGROWTH.6.REPAIR DISTURBED AREAS BENEATH SHRUBS BY HAND.7.REPAIR AND RESEED STAGING AREA.8.CONTRACTOR SHALL COORDINATE IRRIGATION AND PLANTING WORK SUCH THAT INSTALLED IRRIGATIONEQUIPMENT SHALL NOT CAUSE ADJUSTMENT OF PLANTING LOCATIONS CONTRARY TO THE PLANS. IF IRRIGATIONEQUIPMENT IS INSTALLED IN LOCATIONS OBSTRUCTING THE INTENDED LOCATIONS OF THE PLANTINGS, NOTIFYTHE LANDSCAPE ARCHITECT FOR CLARIFICATION.9.THE CONTRACTOR SHALL WARRANTY ALL CONTRACTED WORK AND MATERIALS FOR A PERIOD OF ONE YEAR AFTERSUBSTANTIAL COMPLETION HAS BEEN ISSUED BY THE OWNER'S REPRESENTATIVE FOR THE ENTIRE PROJECT UNLESSOTHERWISE SPECIFIED IN THE CONTRACT DOCUMENTS OR SPECIFICATIONS.10.AMEND EXISTING TOPSOIL AT A RATE OF 4 CUBIC YARDS OF COMPOST/1000 SQUARE FEET. COMPOST MUST MEETTHE STATE OF MONTANA'S COMPOST REQUIREMENT FOR SOIL AMENDMENT (ADMIN. RULE MONT. 17.50.1716).COMPOST MUST BE SPREAD AND MIXED EVENLY INTO THE TOP 6 INCHES OF TOPSOIL.11.PLANTING BEDS TO BE AMENDED WITH A MIN. 6" DEPTH TOPSOIL PRIOR TO PLANTING.12.AREAS TO BE SEEDED TO BE AMENDED WITH A MIN. 6" DEPTH TOPSOIL PRIOR TO SEEDING.13.PRIOR TO COMMENCING ANY WORK, THE CONTRACTOR MUST ATTEND A PRE-INSTALLATION MEETING WITH THECITY OF BOZEMAN WATER CONSERVATION DISTRICT. THE SOIL TEST MUST BE DATED NO MORE THAN 60 DAYSPRIOR TO CONDUCTING THE PRE-INSTALLATION MEETING AND MUST BE PROVIDED TO THE REVIEW AUTHORITY ATTHE PRE-INSTALLATION MEETING.14.ALL TREES PLANTED IN SEEDED AREAS SHALL BE INSTALLED WITH A WOOD MULCH RING EXTENDING A MINIMUM OFTWO TIMES THE DIAMETER OF THE ROOT BALL.15.STONES OVER 2" IN DIAMETER, STICKS, ROOTS, CONSTRUCTION DEBRIS, AND OTHER EXTRANEOUS MATTER MUSTBE REMOVED OF AND DISPOSED OF LEGALLY.MATERIALS SCHEDULELEGENDP:\250389_01_Haggerty_Lane_Survey_&_CA\CADD_C3D\PRODUCTION_DWG\250389.01_LS_PROD.dwg, L1.1, 8/14/2026 4:03:25 PM, aschnaderbeck, 1:1