Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
020_A31.W BUILDING ELEVATIONS
T.O. SUBFLOOR (L2 -N)109' -7 7/8"T.O. SUBFLOOR (L3 -N)120' -3 3/4"T.O. PLATE (L3 -N)129' -4 7/8"FENESTATION VARIATIONS T.O. RIDGE ROOF (N)136' -11 1/2"MIRRORED FACADEST.O. SLAB (ENTRY -N)100' -0"1' - 3"9' - 7 7/8" 10' - 7 7/8" 9' - 1 1/8" 2' - 4" 5' - 2 5/8"38' - 2 1/2"RF 27RF 27RF 27RF 27ST 06FENESTATION VARIATIONS T.O. TRUSS HEEL (N)131' -8 7/8"T.O. SLAB (GARAGE DOOR -N)98' -9"T.O. PLATE (L3 -S)134' -4 7/8"T.O. SUBFLOOR (L3 -S)125' -3 3/4"T.O. SUBFLOOR (L2 -S)114' -7 7/8"T.O. TRUSS HEEL (S)136' -8 7/8"M2M3M3M1M6M1M4M8M3M5M1M3M1M6M4M4M8M5M5M1M3M1M6M4M4M5M1M3M1M6M4M4M5M5M8M5M4M3M1M3M2M1M61' - 3"9' - 7 7/8" 10' - 7 7/8" 9' - 1 1/8" 2' - 4" 5' - 2 5/8"38' - 2 1/2"KD10MJJD1AAAAD10KD1AAD10KJKAAD1AAJMLKD1D1M8M8M59"1' - 7"1' - 6"1' - 6"3 3/8" / 1'-0"3 3/8" / 1'-0"3 3/8" / 1'-0"3 3/8" / 1'-0"3 3/8" / 1'-0"RF 23RF 23RF 23RF 23RF 23ST 06M9HEIGHT FROM GRADE36' - 9"HEIHGT FROM GRADE40' - 1"M9T.O. SLAB (ENTRY -S)105' -0"T.O. SLAB (GARAGE DOOR -S)103' -9"MLMLMJMLD10D10LT.O. RIDGE ROOF (S)141' -11 1/2"T.O. SUBFLOOR (L2 -N)109' -7 7/8"T.O. SUBFLOOR (L3 -N)120' -3 3/4"T.O. PLATE (L3 -N)129' -4 7/8"38' - 2 1/2"T.O. RIDGE ROOF (N)136' -11 1/2"T.O. SLAB (ENTRY -N)100' -0"7' - 6 5/8"9' - 1 1/8"10' - 7 7/8"GROUND STORY HEIGHT9' - 7 7/8"1' - 3"FENESTATION VARIATIONS MIRRORED FACADESRF 27RF 27RF 27RF 27ST 06FENESTATION VARIATIONS T.O. PLATE (L2 -N)118' -9"T.O. PLATE (L1 -N)108' -1 1/8"T.O. TRUSS HEEL (N)131' -8 7/8"T.O. SLAB (GARAGE DOOR -N)98' -9"T.O. PLATE (L3 -S)134' -4 7/8"T.O. SUBFLOOR (L3 -S)125' -3 3/4"T.O. SUBFLOOR (L2 -S)114' -7 7/8"T.O. TRUSS HEEL (S)136' -8 7/8"M6M3M3M4M6M3M3M4EQ 41RF 26EQ 41M6M3M3M4RF 26EQ 41M6M3M3M4RF 26EQ 41M6M3M3M4RF 26EQ 41M5M5M5M5M5RF 263" / 1'-0"3" / 1'-0"3" / 1'-0"3" / 1'-0"3" / 1'-0"RF 23RF 23RF 23RF 23RF 231' - 6"EQ 38EQ 38EQ 38EQ 38RF 27IHFGD11D11D11D11D11HHHHHHHHIFGIFGIFGGFI1' - 6"1' - 7"9"M8M85' - 2 5/8"2' - 4"9' - 1 1/8"10' - 7 7/8"9' - 7 7/8"1' - 3"38' - 2 1/2"HEIHGT FROM GRADE39' - 0"HEIGHT FROM GRADE36' - 9"T.O. SLAB (ENTRY -S)105' -0"T.O. SLAB (GARAGE DOOR -S)103' -9"T.O. RIDGE ROOF (S)141' -11 1/2"EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38EQ 38T.O. SUBFLOOR (L2 -N)109' -7 7/8"T.O. SUBFLOOR (L3 -N)120' -3 3/4"T.O. PLATE (L3 -N)129' -4 7/8"38' - 2 1/2"T.O. RIDGE ROOF (N)136' -11 1/2"T.O. SLAB (ENTRY -N)100' -0"5' - 2 5/8"2' - 4"9' - 1 1/8"10' - 7 7/8"GROUND STORY HEIGHT9' - 7 7/8"1' - 3"ST 06DRIVE AISLEHEIGHT FROM GRADE40' - 0 1/4"FFE3' - 0 3/4"T.O. TRUSS HEEL (N)131' -8 7/8"T.O. SLAB (GARAGE DOOR -N)98' -9"M8M5M2M2M3M1M3M4M5RF 263" / 1'-0"EDD10BCLDRIVE AISLET.O. PLATE (L3 -S)134' -4 7/8"T.O. SUBFLOOR (L3 -S)125' -3 3/4"T.O. SUBFLOOR (L2 -S)114' -7 7/8"T.O. TRUSS HEEL (S)136' -8 7/8"RF 26RF 27EDLM5M8M3M4M3M1M3M2M25' - 2 5/8"2' - 4"9' - 1 1/8"10' - 7 7/8"9' - 7 7/8"1' - 3"38' - 2 1/2"METER BANKS3" / 1'-0"HEIGHT FROM GRADE37' - 2"T.O. SLAB (ENTRY -S)105' -0"T.O. SLAB (GARAGE DOOR -S)103' -9"BD10T.O. RIDGE ROOF (S)141' -11 1/2"1' - 6"NORTH ELEVATION RESIDENTIAL TRANSPARENT AREAUPPER STORY (LVL 3) TOTAL FACADE AREA: UPPER STORY (LVL 3) TRANSPARENT AREA: UPPER STORY (LVL 2) TOTAL FACADE AREA:UPPER STORY (LVL 2) TRANSPARENT AREA:GROUND STORY (LVL 1) TOTAL FACADE AREA:GROUND STORY (LVL 1) TRANSPARENT AREA:389 SF60 SF (15%) 289 SF78 SF (27%)152 SF49 SF (32%)8' - 0"FINISHED GROUND FLOOR LEVEL12' - 10 1/2"EXTERIOR FINISH LEGENDM1BOARD AND BATTEN SIDINGM2NATURAL WOOD SIDING & SOFFITM3CEMENTITIOUS PANEL SIDINGM6ASPHALT SHINGLE ROOFINGM7METAL GUTTER & DOWNSPOUTM8EXTERIOR RAILINGSM4BOARD AND BATTEN SIDING -RANDOM SPACEDM5CEMENTITOUS FASCIA & TRIMM9PLATE STEEL RETAINER/PLANTERSKEYNOTESNORTH ELEVATION RESIDENTIAL TRANSPARENT AREAUPPER STORY (LVL 3) TOTAL FACADE AREA: UPPER STORY (LVL 3) TRANSPARENT AREA: UPPER STORY (LVL 2) TOTAL FACADE AREA:UPPER STORY (LVL 2) TRANSPARENT AREA:GROUND STORY (LVL 1) TOTAL FACADE AREA:GROUND STORY (LVL 1) TRANSPARENT AREA:398 SF60 SF (15%) 289 SF78 SF (27%)152 SF26 SF (17%)FINISHED GROUND FLOOR LEVEL1' - 6"8' - 0"708 N Rouse Ave Suite CBozeman, MT 59715aspektarch.com406.317.5333PRELIMINARY NOT FOR CONSTRUCTIONARCHITECTURE & DESIGNSHEETPROJECTREVISIONS© 2026 ASPEKT ARCHITECTURE LLCAutodesk Docs://HMF Haggerty Multi-Family/HMF.rvtA31.WEAST EDGE CONDOSBUILDING ELEVATIONS219 HAGGERTY LN, BOZEMAN,MT 59715MINOR SUB 16B, S08, T02 S, R06E, Lot 2A1, ACRES 0.468, REARRELKS CLUB PROPERTY08.14.2026HMF1/8" = 1'-0"A31.W1WEST ELEVATION -WEST BUILDING1/8" = 1'-0"A31.W2EAST ELEVATION -WEST BUILDING1/8" = 1'-0"A31.W3NORTH ELEVATION -WEST BUILDING1/8" = 1'-0"A31.W4SOUTH ELEVATION -WEST BUILDINGEQ 38 VENT - PAINT TO MATCH SIDINGEQ 41 WALL MOUNTED CONDENSING UNITRF 23 RIDGE VENTRF 26 GUTTERRF 27 DOWNSPOUTST 06 PLANTER - SEE LANDSCAPE DRAWINGS & A14ELEVATION SHOWN FOR REFERENCE ONLY. REFER TO EAST BUILDING FOR TYPICAL REQUIREMENTSELEVATION SHOWN FOR REFERENCE ONLY. REFER TO EAST BUILDING FOR TYPICAL REQUIREMENTSELEVATION SHOWN FOR REFERENCE ONLY. REFER TO EAST BUILDING FOR TYPICAL REQUIREMENTSELEVATION SHOWN FOR REFERENCE ONLY. REFER TO EAST BUILDING FOR TYPICAL REQUIREMENTSNo. Description Date1 SP REVISION 1 06.09.262 SP REVISION 2 08.14.262