HomeMy WebLinkAbout004_C2.1 EXISTING TOPOGRAPHY AND DEMOLITIONCP#203CP#201CP#1CP#2PROJECT SURVEY CONTROL (LDP)Point #12201203Northing (IFT)118675.34118923.77118939.52118760.15Easting (IFT)387891.57388048.99387914.09387779.80Elevation (USSF)4832.354824.624820.194831.02DescriptionCP /SPIKECP /SPIKEPC /RB5/8PC /RB5/8PRELIMINARY - FOR REVIEW
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
EXISTING TOPOGRAPHY AND DEMOLITION
HAGGERTY MULTI-FAMILY
BOZEMAN, MTC2.2RPE
250389.01_EXISTING_PROD.DWG
MGB
02/27/2026 SP SUBMITTAL
06/10/2026
07/31/2026
-
-
-
-
SP 2 SUBMITTAL
SP 3 SUBMITTAL
-
-
-
-
--
250389.02020SCALE: 1" = 20'401020SITE DEMOLITION NOTES:1.ALL LOCATIONS AND DIMENSIONS OF EXISTING AND PROPOSED FEATURESARE APPROXIMATE AND THE PROJECT DRAWINGS MAY NOT INCLUDE ALLEXISTING FEATURES WITHIN THE PROJECT BOUNDARIES. THE CONTRACTORSHALL THOROUGHLY REVIEW THE SITE PRIOR TO BIDDING ANDCONSTRUCTION TO BECOME FAMILIAR WITH THE EXISTING SITE FEATURESAND CONDITIONS. IF DISCREPANCIES ARE FOUND BETWEEN THE PROJECTDRAWINGS AND FIELD CONDITIONS THE CONTRACTOR SHALL CONTACT THEPROJECT ENGINEER FOR CLARIFICATION.2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PAYING FORALL PERMITS NECESSARY TO COMPLETE THE PROPOSED WORK INCLUDINGDEMOLITION, RIGHT-OF-WAY AND ENVIRONMENTAL PERMITS.3.ALL PUBLIC AND PRIVATE UTILITY TERMINATIONS, DISCONNECTS ANDREMOVALS TO BE COORDINATED WITH THE APPLICABLE UTILITY PROVIDERSAND PERFORMED IN ACCORDANCE TO THEIR RESPECTIVE STANDARDS ANDSPECIFICATIONS.4.ALL EXISTING MATERIALS TO BE REMOVED AND PROPERLY DISPOSED INACCORDANCE TO ALL FEDERAL, STATE AND LOCAL REGULATIONS.5.ALL REMOVED, DISTURBED OR DAMAGED EXISTING ASPHALT AND PAVEMENTMARKINGS TO BE RESTORED IN ACCORDANCE WITH MTPWSS, 7TH EDITION,APRIL, 2021 AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,OCTOBER, 2024. ALL ASPHALT MATCH LINES SHALL BE SAW CUT TO PROVIDEFLUSH TRANSITION AND SEALED.6.ALL EXCAVATIONS OR VOIDS CREATED DURING DEMOLITION SHALL BEBACKFILLED AND COMPACTED IN A CONTROLLED MANNER PER THE PROJECTGEOTECHNICAL REQUIREMENTS. SEE REQUIREMENTS IN THE GEOTECHNICALREPORT.7.ALL UTILITY JUNCTION BOXES TO BE PROTECTED IN PLACE UNLESSOTHERWISE NOTED.8.ALL TREES AND SHRUBS SHALL BE PROTECTED IN PLACE UNLESS OTHERWISENOTED.