Loading...
HomeMy WebLinkAboutFire Hydrant Correspondence1Sina Seyedian From:Shane Brandhorst <Shane.Brandhorst@bozemanmt.gov>Sent:Thursday, April 23, 2026 7:59 AMTo:Sina SeyedianCc:Bobby Egeberg; Duncan Fraser; Scott Freimuth; Jackson Bruff; Royce RheinschildSubject:Re: [EXTERNAL]RE: 26128 Haggerty Multi Family SP - Fire CommentsAttachments:Outlook-Fire DeparGood morning, I am good with the location and angle of the gate, pleas e ensure that signs are placed indicating it is a fire lane and there is no parking. Dumpster location should be fine as well. The fire hydrant's location will work as long as access is maintained year-round, this wil l include any removal of snow in the winter with a path for the FD to access in the event of an emergenc y. I hope this helps, please let me know if you have any other questions. Shane Brandhorst, CFO, FM Deputy Fire Chief-Prevention-Fire Marshal City of Bozeman | Fire Prevention Bureau 300 E Oak St, Bozeman, MT. 59715 Office (406)-599-3553 Shane.Brandhorst@bozemanmt.gov www.bozemanfire.com “Excellence and Integrity” From: Sina Seyedian <sina@aspektarch.com> Sent: Thursday, April 16, 2026 4:32 PM To: Shane Brandhorst <Shane.Brandhorst@bozemanmt.gov> Cc: Bobby Egeberg <begeberg@sanbell.com>; Duncan Fraser <duncan@painegroup.com>; Scott Freimuth <scott@aspektarch.com>; Jackson Bruff <jsbruff@gmail.com>; Royce Rheinschild <royce@aspektarch.com> Subject: [EXTERNAL]RE: 26128 Haggerty Multi Family SP - Fire Comments CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Shane, Just checking in to see if you have had a chance to review the markup attached and confirm that the one fire hydrant on the south will suffice for this project. As a disclaimer, the new dumpster location in the markup is something we’re trying to get input on before we start re-designing. Please additionally advise if the new dumpster location would pose any issues to your operations. 2 Thanks, Sina Seyedian Architect, Project Manager ASPEKT ARCHITECTURE m 303.513.6256 aspektarch.com From: Sina Seyedian Sent: Monday, April 13, 2026 1:25 PM To: 'Shane Brandhorst' <sbrandhorst@bozeman.net> Cc: 'Bobby Egeberg' <begeberg@sanbell.com>; 'Duncan Fraser' <duncan@painegroup.com>; Scott Freimuth <scott@aspektarch.com>; 'Jackson Bruff' <jsbruff@gmail.com>; Royce Rheinschild <royce@aspektarch.com> Subject: RE: 26128 Haggerty Multi Family SP - Fire Comments Hi Shane, Thanks for chatting through this comment with me last week. I wanted to reach back out with our markup showing the grade to the hydrant and the required 2nd access gate due to parking concerns. The existing ground south of the property boundary is roughly 14% grade and the proposed grade in the property is ~8.9%. It should be easy walkable access at those grades. I’m curious - has the trail around the softball field historically been the planned access to hydrants 548 & 549? Additionally, I think if we were able to angle the gate on the adjacent property (see attached), it would deter parking as well as ease snow maintenance on the adjacent parking lot. This would help keep the fire access through these properties clear of snow. Lastly, we have been internally discussing bringing the dumpster enclosure to the end of the drive aisle. Would this change give you any pause in regards to accessing the fire hydrant? Thanks, Sina Seyedian Architect, Project Manager ASPEKT ARCHITECTURE m 303.513.6256 aspektarch.com From: Sina Seyedian Sent: Thursday, April 9, 2026 9:44 AM To: Shane Brandhorst <sbrandhorst@bozeman.net> Cc: Bobby Egeberg <begeberg@sanbell.com>; Duncan Fraser <duncan@painegroup.com>; Scott Freimuth <scott@aspektarch.com>; Jackson Bruff <jsbruff@gmail.com>; Royce Rheinschild <royce@aspektarch.com> Subject: 26128 Haggerty Multi Family SP - Fire Comments Hi Shane, We’re looking through the comments that have been coming in for 26128 Haggerty Multi Family SP. We thought we 3were compliant with City & IFC standards with just the fire hydrant along the South end of the site. Providing one along Haggerty could lead to future maintenance issues with flushing as this would be a dead end water line to the hydrant that we would need to get engineering on board with as well. If you could please provide some more clarification on the reasoning behind the requirement for the hydrant, that would be greatly appreciated. As a reminder, each townhouse unit will be separated by a two hour fire wall. Our civil engineer Bobby from Sanbell (CC’d) can speak better to the technical side of things and will be the best person to discuss the fire hydrant with. Thanks, Sina Seyedian Architect, Project Manager ASPEKT ARCHITECTURE m 303.513.6256 aspektarch.com City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record retention policies. Emails that contain confidential information such as information related to individual privacy may be protected from disclosure under law.