Loading...
HomeMy WebLinkAboutConcurrent Construction RequestCity of Bozeman Development Review Committee Re: Haggerty Lane Multi Family Site Plan 2 Application 250389 Concurrent Construction Request Please accept this letter as a request for concurrent construction of onsite/offsite public infrastructure for the proposed development of the Haggerty Multi-Family project as shown on the attached Civil Construction Plans. As soon as possible after Site Plan Approval for the site development, Haggerty Infill LLC is planning on installing a new sewer main on the west side of the site, connecting the existing sewer main in Haggerty Lane with the existing sewer along the back of the lot, and running the sewer main through a new easement. Domestic water services and sewer services will be installed along with the sewer main installation work, and rerouting of dry utilities will be required as indicated in the Civil Construction Plans. Construction of sidewalks, curb and gutter, and a drive approach will also occur in the public right-of-way concurrently to construction of the same items in the private lot. To facilitate building permit reviews, concurrent construction of public and private improvements is requested. Haggerty Infill LLC understands the need for functional infrastructure to support construction activities. Access to the site and City right-of-way will be available to City officials at any point during construction or infrastructure improvements. Haggerty Lane will be kept open for two- way traffic as much as possible during installation of the sewer main. The concurrent construction request will adhere to the Bozeman Municipal Code BMC 38.780.30 D throughout the project development. The request will be supported by the following project specific conditions and standard conditions that follow: 1. Concurrent Construction will be requested and applied for prior to Development Review Committee (DRC) review. 2. The project (site plans) will be under control of a single entity, Haggerty Infill LLC, with a single general contractor. There will be no third-party builders until public infrastructure is completed and accepted by the City of Bozeman. 3. All improvements will be designed, constructed, and installed according to the standards and criteria as adopted by the City. 4. Improvements will be completed within 2 years of completion of the Improvements Agreement. 5. Haggerty Infill LLC will provide financial securities prior to the issuance of any concurrent construction Building Permit issuance. 6. Haggerty Infill LLC will provide insurance, risk acknowledgement, and indemnification in a form acceptable to the city prior to Building Permit issuance. Docusign Envelope ID: 46F312E3-E799-8DBE-82A4-6C78857E3F01 Please let us know if there are any additional conditions required to enable concurrent public infrastructure and building construction. Sincerely, Jackson Bruff Haggerty Infill LLC Docusign Envelope ID: 46F312E3-E799-8DBE-82A4-6C78857E3F01