Loading...
HomeMy WebLinkAbout219 Haggerty Lane - Geotechnical Addendum #1 - April 2026Civil • Geotechnical • Water Resources • Land Surveying • Construction Services Corporate Office 32 Discovery Dr. Bozeman, MT 59718 Ph: (406) 582-0221 www.alliedengineering.com SAM UEI: LYARYWD1YSZ1 CAGE: IGHU7 April 16, 2026 Haggerty Infill LLC c/o: Jackson Bruff 402 E. Main Street, Suite 3 Bozeman, MT 59715 Email: jsbruff@gmail.com RE: Addendum #1 to the Geotechnical Report for 219 Haggerty Lane dated January 2026 Bozeman, Montana Dear Mr. Bruff: As requested, this letter is Addendum #1 to the Updated Geotechnical Report issued for 219 Haggerty Lane in January of 2026. This addendum is intended to address the possibility of reducing the thickness of the geogrid-reinforced section of structural fill originally recommended under the buildings from 3.0 feet to 2.0 feet. Based on our analysis, modifying the present 3.0-foot geogrid-reinforced section with three layers of grid to a 2.0-foot geogrid-reinforced section with two layers of grid results in an approximate 36 percent increase in estimated settlements. However, the total settlement is still estimated to remain under one inch (industry standard) with minimal differential settlement. Therefore, we believe it is acceptable to reduce the thickness of the geogrid- reinforced section under foundations from 3.0 to 2.0 feet and reduce the number of layers of grid from three to two. Please note that our analysis assumes continuous, 2.0-foot-wide strip footings buried 4.0 feet deep, with an applied bearing pressure of 2,000 pounds per square foot. Groundwater was assumed to be at 7.0 feet. The 2.0-foot geogrid-reinforced section should be installed the same manner as the originally proposed 3.0-foot geogrid-reinforced section. The 2.0-foot section simply eliminates one of the layers of geogrid and one foot of structural fill. All structural fill under foundations should be compacted to 98 percent of its Standard Proctor density. The subgrade should be proof-rolled to an unyielding condition prior to the placement of fabric, geogrid, and structural fill. Any wet/soft spots identified in the subgrade will need to be removed and replaced with compacted structural fill. We ask that we be allowed to view the subgrade soils at the time of construction such that we can modify our recommendations if needed. In summary, reducing the geogrid-reinforced section of structural fill under foundations from 3.0 to 2.0 feet should not pose an issue from a geotechnical perspective, assuming the other recommendations found in our 2026 report are followed. Addendum #1 to the Geotechnical Report for 219 Haggerty Lane dated January 2026 Bozeman, Montana Proj. # 22-097.01 4/16/2026 Bozeman Office: 32 Discovery Drive. Bozeman, Montana 59718. ● Ph: (406) 582-0221 ● Fax: (406) 582-5770 Page 2 We appreciate the opportunity to perform these services. Please call if you have any questions. Sincerely, Allied Engineering Services, Inc. ____________________________________ ____________________________________ Craig Madson, PE Jessi Ellingsen, EI President/Geotechnical Engineer Geotechnical Engineer P:\2022\22-097 219 Haggerty Lane Geotechnical Investigation and Report\05 Design\Geotech\Addendum - April 2026\219 Haggerty Lane - Geotechnical Addendum - April 2026.docx