HomeMy WebLinkAboutResolutions 2026-77 - ADOPTING THE CATTAIL CREEK CORRIDOR AND ANCHOR ROUTE PARK MASTER PLANRESOLUTION 2026-77
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, ADOPTING
THE CATTAIL CREEK CORRIDOR AND ANCHOR ROUTE PARK MASTER PLAN
WHEREAS, the City of Bozeman has granted the Urban Parks and Forestry Board authority
to recommend adoption of park master plans through enabling Resolution 5328; and,
WHEREAS, the 2023 Comprehensive Parks, Recreation and Active Transportation Plan
(PRAT Plan) emphasizes the importance of welcoming, equitable access to parks; programs,
places and partnerships; pedestrian and bicycle facilities; and natural resources within parks; and,
WHEREAS, the Cattail Creek Corridor and Anchor Route Park Master Plan (Park Master
Plan) includes enhancements to active transportation infrastructure, increases equity through
inclusive engagement and new recreation types, embraces water conservation practices and
natural resource enhancement, and,
WHEREAS, the Cattail Creek Anchor Route is one of the Anchor Routes described and
conceptually depicted in the PRAT Plan, and,
WHEREAS, the Park Master Plan was created after several years of public engagement
and is designed in conjunction with, and to facilitate further, ongoing projects with community
partners and developers in the vicinity, and,
WHEREAS, individual parks along the corridor were developed individually through the
subdivision process with individual park master plans and the PRAT Plan calls for increased
balance and connectivity throughout the parks system, and
WHEREAS, on August 27, 2026 the Urban Parks and Forestry Board unanimously adopted
a Resolution Recommending Adoption of the Cattail Creek Corridor and Anchor Route Park
Master Plan (Exhibit A),
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman,
Montana, to wit:
The Cattail Creek Corridor and Anchor Route Park Master Plan is adopted and shall
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
supersede prior subdivision park master plans in the project area including Cattail Lake, Cattail
Creek, Baxter Square, West Winds, Harvest Creek, Greenway, Glenwood Meadows, Westgate,
Fowler and Babcock Meadows.
PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman,
Montana, at a regular session thereof held on the 15th day of September, 2026.
___________________________________
JOEY MORRISON
Mayor
ATTEST:
___________________________________
MIKE MAAS
City Clerk
APPROVED AS TO FORM:
___________________________________
GREG SULLIVAN
City Attorney
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CATTAIL CREEK CORRIDOR
06/14/2024 | PRECEDENT IMAGES
PROJECT OPPORTUNITY
UNIFY AS A SINGLE PARK
CATTAIL CREEK CORRIDOR ANDANCHOR ROUTE
Report Prepared by: 2026 PARK MASTER PLAN
1
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 2
TABLE OF CONTENTS
EXECUTIVE SUMMARY 3
CONTENTS INTRODUCTION 4
SITE ANALYSIS 6
a.Overview
b. Circulation
c.Park Types
d.Existing Program
e. Land Cover
f.Habitat Resources
DESIGN 10
a.Guiding Principles
b. Program Elements
c.Master Plan - Overview
d.Master Plan - Section 1
e. Master Plan - Section 2
f.Master Plan - Section 3
g.Master Plan - Section 4
PUBLIC ENGAGEMENT 29
APPENDIX 30
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 3
EXECUTIVE SUMMARY
Te primary purpose of the Catail Corridor and Anchor Route Park Master Plan (“Park
Master Plan” or “Plan”) is implementation of new guidance for parks and trails as outlined
in the 2023 Comprehensive Parks, Recreation and Active Transportation Plan (PRAT Plan).
Designed across a parkland corridor in 10 existing subdivisions and an undeveloped half-mile
gap, the Park Master Plan is a conceptual design with an emphasis on connecting a 3.25-mile
shared use path called an Anchor Route, improving ecological function within the corridor
and adding more active and passive recreation options.
Te plan is being creating in conjunction with ongoing partnership projects including the
east-west Raptor Route Wayfnding Project that the City is working with GVLT to complete
and Branch Out Bozeman’s riparian planting projects led by Gallatin Watershed Council.
Investments in this corridor will be amplifed by these community partners, collaboration
with the City’s Transportation Division, grants and new developments and will be the guide
for improvements within the corridor expected to be achievable within approximately 10-15
years.
Te Catail Corridor and Anchor Route Park Master Plan’s narrative and drawings are
intended to supersede prior subdivision by subdivision master plans created at the time of
development and will be adopted by Resolution of the City Commission.
Te Plan is a conceptual guide to be used as designs are developed, with additional public
input, for the proposed improvements. At the Site Plan/construction drawing stage of the
project implementation, further refnement will be based on more detailed analysis of existing
fdsa
Pictures of Existing Route Pictures of Existing Route City Map with Anchor Route Highlighted
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CATTAIL CREEK CORRIDOR
06/24/2024 | PROGRAMMING
These pathways connect larger community nodes. They are heavily used
with full access and are typically constructed along major transportation
corridors but can also be located outside of rights-of-way. These routes are
designed to permit two-way traffc using an impervious surface material
such as asphalt or concrete. Certain settings may not be conducive to
impervioussurfaces.
Width and Clearance
The preferred tread minimum width is 12 feet wide but can be decreased to 10
feet in interior subdivision settings.
All paths should have a 1-foot gravel shoulder and 2-foot minimum total
shoulder graded away from tread at a 2% maximum slope.
A minimum vertical clearance of 10 feet should be provided. Branches that
could reduce clearance when weighted with snow or rain should also be
removed.
Grade
The maximum tread cross slope shall be 2%, sloping one direction, not
crowned. The cross slopes on corners and curves shall be towards the inside
where drainage permits.
The maximum tread cross slope should be 5%, the cross slopes on corners
and curves shall be towards the inside where drainage permits. If there is
a segment that has a cross slope of more than 5%, the segment should be as
short as possible.
Maximum grade segments:
• 8.3% for a maximum of 15.24m (50ft)
• 10% for a maximum of 9.14m (30ft)
• 12.5% for a maximum of 3.05m (10ft)
Near the top and bottom of the maximum grade segments, the grade should
transition to less than 5%. Rest intervals should be provided within 7.6m
(25ft) of the max grade segment.
There can be no abrupt change in surface level greater than ½ inch.
Anchor Routes &
Shared Use Paths
Typical Assets and Design
Considerations
Cross Section
Concrete - The tread base shall consist of a minimum
of 3 inches of crushed gravel compacted to 95 percent
of maximum density as determined by AASHTO T99.
Concrete shall be a minimum of 6 inches of M4000.
Asphalt -Excavate 11.5 inches of material. Install a
minimum of 9 inches of crushed gravel compacted
to 95 percent of maximum density as determined by
AASHTO T99, unless otherwise dictated by sub-soil
type materials being compacted to road standard.
The overlay shall consist of 2.5 inches of asphalt
compacted to 93 percent of maximum density, as
determined by ASTMD 2041. Construction seal
shall be applied at 0.08 gallon/square yard after
installation.
Material
To decrease long term maintenance, tread surface
must predominately be impervious material such
as asphalt, concrete, pavers set on concrete, or wood
decking.
Porous surfaces (permeable pavers, porous asphalt,
porous rubber) should be a priority in sensitive areas.
The tread material including any base course will
have a total minimum thickness of 6 inches.
Wood deck planks must be run perpendicular to
the direction of travel and joints must not exceed 36
inches. Planks must be securely fastened so they do
not warp.
VARIESSHARED ROAD VARIESSHARED ROAD5’LANDSCAPE
AREA
5’LANDSCAPE
AREA
5’SIDEWALK 5’SIDEWALK2’2’
CURB &GUTTER CURB &GUTTER
12’PATHWAY
Anchor Route
VARIESLANDSCAPE
AREA
VARIESLANDSCAPE AREAVARIESWATER
Neighborhood Trail
6’-8’TRAIL
Connector Path
10’CLEAR
BUFFER
2’VARIESLANDSCAPE
AREA
VARIES
LANDSCAPE
AREA
BUFFER
2’
Shared Use Pathway
10’PAVED TRAILVARIESTRAIL BUFFER
2’2’10’DRIVE LANE
12’CLEAR
BUFFERBUFFERCURB &GUTTER
VARIES
SHARED ROAD
VARIES
SHARED ROAD
5’
LANDSCAPEAREA
5’
LANDSCAPEAREA
5’
SIDEWALK
5’
SIDEWALK
2’2’
CURB &GUTTER CURB &GUTTER
BIKE BOULEVARD
12’PATHWAY
Anchor Route
VARIESLANDSCAPE AREA
VARIESLANDSCAPE AREAVARIESWATER
4’-6’
TRAIL
Neighborhood Trail
VARIESLANDSCAPE AREA
VARIES
LANDSCAPE AREA
Shared Use Pathway
10’
PAVED TRAIL
VARIES
TRAIL BUFFER
2’2’10’DRIVE LANE
12’
CLEAR
BUFFERBUFFER CURB &GUTTER
PROJECT PROGRAMMING
VARIESSHARED ROAD VARIESSHARED ROAD5’LANDSCAPEAREA
5’LANDSCAPEAREA
5’SIDEWALK 5’SIDEWALK2’2’
CURB &GUTTER CURB &GUTTER
BIKE BOULEVARD
Anchor Route
4’-6’TRAIL
Neighborhood Trail
VARIESLANDSCAPE AREA VARIESLANDSCAPE AREA
6’-8’TRAIL
Connector Path
10’CLEAR
BUFFER
2’VARIESLANDSCAPEAREA
VARIESLANDSCAPEAREA
BUFFER
2’
Shared Use Pathway
10’PAVED TRAIL VARIESTRAIL BUFFER
2’2’10’DRIVE LANE
12’CLEAR
BUFFERBUFFER CURB &GUTTER
VARIESSHARED ROAD VARIESSHARED ROAD5’LANDSCAPEAREA
5’LANDSCAPEAREA
5’SIDEWALK 5’SIDEWALK2’2’
CURB &GUTTER CURB &GUTTER
BIKE BOULEVARD
12’PATHWAY
Anchor Route
VARIESLANDSCAPE AREA
VARIESLANDSCAPE AREAVARIESWATER
4’-6’TRAIL
Neighborhood Trail
VARIESLANDSCAPE AREA VARIESLANDSCAPE AREA
6’-8’TRAIL
Connector Path
10’CLEAR
BUFFER
2’VARIESLANDSCAPEAREA
VARIESLANDSCAPEAREA
BUFFER
2’
Shared Use Pathway
36 37
Program Enrollment
Total enrollment into the Department’s programs
was 3,414 in 2019. Aquatics had the highest
enrollment with 1,092 participants, followed by
preschool at 783, and camps at 661. Figure 5 shows
all the programs and the percentage of each of the
whole. There are some programs that are offered by
other organizations who take their own registration
(Skyhawks) and this data is not included in any of
these analyses.
Aquatics accounted for a third (32%) of the 2018-2019
enrollments, and preschool and camps accounted for
approximately one-ffth of the programming each,
21% and 19% respectively.
Aquatics accounted for nearly half (48.8%) of the
program menu and 32% of all enrollments, which
is typical due to the smaller class size and the
advertisement of several course sections that can
be combined, if needed. For camps and preschool,
the percentage of participants is greater than the
percentage of courses offered.
Similar Providers
Bozeman residents enjoy a wide variety of recreation
programs offered by a host of different organizations
– some of these are nonproft groups and others are
private businesses. Many of these are provided space
for their activities by the Department.
The Department permits space to several affliate
groups that provide recreation programs to the
community. When discussing the permitting process
with staff regarding the local sports programs,
understanding of requirements were inconsistent.
Future policies should be clarifed for consistent
communications between the Department and
affliate groups and should consider requiring all
affliate groups to:
◊ require all coaches to submit to a criminal
background check,
top 10 prioritiesfor investment
top 10 prioritiesfor investment
Natural surface trails
On-road bike lanes orfacilities
Pools, indoor
Pools, outdoor
Trails, paved
Nature centers
Community gardens
Water access forrecreation
Spraygrounds/splashpad
Pavilions and picnicareas
Aquatics or Swimming
Arts and Culture
Winter Recreation
Fitness
Etiquette programsfor parks and trailusers
Outdoor adventure
History
Outdoor education
Seniors/Active Aging
Special Events
◊ compare the list of coaches to the state and
federal sex offender databases,
◊ charge a special feld use fee for nonresident
participants
◊ track demographics and city-county
resident status, scholarships given out and
DEI training
Fitness programs are often a desire for young adults
in communities across the country. Due to the low
percentage of programs offered by the Department for
adults, ftness opportunities within the community
were reviewed. There are several private facilities
spread out in the community offering ftness
opportunities for Bozeman residents.
In addition to the camps offered by the Department,
there are dozens and dozens of summer camps
available for Bozeman Youth. There are opportunities
for children of all interests including art, dance
(ballet, hip hop, aerial hammock, and choreography),
hiking, camping, rock climbing, STEAM (outdoor
science and coding), sports, yoga, drumming, karate,
performing arts, horseback riding, farm camp, and
more.
Community Survey
During the winter of 2021, the City released a
community survey and received 300 responses.
This survey, which is statistically valid and has a
confdence level of 95%, highlighted community-wide
desires for programs, parks, and park improvements.
The survey, which was administered by mail,
contained a cover letter, survey document, and
instructions for the survey to be taken online. The
cover letter included instructions for taking the
survey over phone for any residents that preferred to
speak a different language in their response.recreation facilitiesprogramsCattail Creek Corridor and Anchor Route Park Master Plan
Con
These pathways connect larger community nodes. They are heavily used
with full access and are typically constructed along major transportation
corridors but can also be located outside of rights-of-way. These routes are
designed to permit two-way traffc using an impervious surface material
such as asphalt or concrete. Certain settings may not be conducive to
impervioussurfaces.
Width and Clearance
The preferred tread minimum width is 12 feet wide but can be decreased to 10
feet in interior subdivision settings.
All paths should have a 1-foot gravel shoulder and 2-foot minimum total
shoulder graded away from tread at a 2% maximum slope.
A minimum vertical clearance of 10 feet should be provided. Branches that
could reduce clearance when weighted with snow or rain should also be
removed.
Grade
The maximum tread cross slope shall be 2%, sloping one direction, not
crowned. The cross slopes on corners and curves shall be towards the inside
where drainage permits.
The maximum tread cross slope should be 5%, the cross slopes on corners
and curves shall be towards the inside where drainage permits. If there i s a
segment that has a cross slope of more than 5%, the segment should be as
short as possible.
Maximum grade segments:
• 8.3% for a maximum of 15.24m (50ft)
• 10% for a maximum of 9.14m (30ft)
• 12.5% for a maximum of 3.05m (10ft)
Near the top and bottom of the maximum grade segments, the grade should
transition to less than 5%. Rest intervals should be provided within 7.6m
(25ft) of the max grade segment.
There can be no abrupt change in surface level greater than ½ inch.
Anchor Routes &Typical Assets and Design
Considerations
Shared Use Paths
Cross Section Material
Concrete - The tread base shall consist of a minimum To decrease long term maintenance, tread surface
of 3 inches of crushed gravel compacted to 95 percent must predominately be impervious material such
of maximum density as determined by AASHTO T99. as asphalt, concrete, pavers set on concrete, or wood
Concrete shall be a minimum of 6 inches of M4000. decking.
Asphalt -Excavate 11.5 inches of material. Install a Porous surfaces (permeable pavers, porous asphalt,
minimum of 9 inches of crushed gravel compacted porous rubber) should be a priority in sensitive areas.
to 95 percent of maximum density as determined by
AASHTO T99, unless otherwise dictated by sub-soil The tread material including any base course will
type materials being compacted to road standard. have a total minimum thickness of 6 inches.
The overlay shall consist of 2.5 inches of asphalt
compacted to 93 percent of maximum density, as Wood deck planks must be run perpendicular to
determined by ASTMD 2041. Construction seal the direction of travel and joints must not exceed 36
shall be applied at 0.08 gallon/square yard after inches. Planks must be securely fastened so they do
installation. not warp.
VARIES 12’ VARIES LANDSCAPE PATHWAY LANDSCAPE AREA AREA
VARIES WATER
12’ CLEAR
2’ 10’ 2’ VARIES 10’ PAVED TRAIL TRAIL BUFFER DRIVE LANE
BUFFER BUFFER CURB &GUTTER
INTRODUCTION
GUIDING DOCUMENTS & VISION
Te guiding document for the development and future implementation
of the Catail Corridor Anchor Route and Park Master Plan is the
City of Bozeman 2023 Comprehensive Parks, Recreation, and Active
Transportation Plan (or PRAT Plan). Te PRAT Plan outlines a wide
number of recommendations for recreation and active transportation
based on extensive community outreach. Included within the PRAT
PLAN are key values for public parks including equitable access,
community partnerships, natural resource stewardship, and pedestrian
and bicycle facilities. Priority recreation facilities and programs are
also highlighted.
Te PRAT Plan also introduces the concept of an Anchor Route, a
new pathway typology that will be the backbone of the new active
transportation network and will “serve as longer-distance, lower-stress,
and comfortable” pathways similar to the Gallagator Trail. Multiple
Anchor Routes are identifed in the document including the Catail
Corridor Anchor Route, which proposes to link the 1-90 frontage road
and Valley Center Lane at the north to the Gallatin Valley Mall and
Bozeman Pond Park at the south.
In the new Active Transportation Network, Anchor Routes primarily
fall along creek corridors that are currently, or are likely to become,
parkland—as such, Anchor Routes provide neighborhood connections
to key destinations with a consideration for natural resource
stewardship. Within the Catail Corridor Park Master Plan area,
there is ample room and existing natural resource vitality to create
a signifcant scenic pathway, expand native and drought-tolerant
vegetation and tree canopy, and improve the recreational aspects of
the park system while maintaining the open views and several multi-
purpose lawn areas that make up the park system today.
Te proposed improvements in the Park Master Plan are designed to
create inviting and inclusive parks, designed appropriately for their
neighborhood context, with enhanced pathway connectivity for year-
round use by all.
Anchor Route Defnition from City of Bozeman PRAT Plan
4
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CATTAIL CREEK CORRIDOR
06/14/2024 | PRECEDENT IMAGES
PROJECT OPPOR
UNIFY AS A SINGLE PARK
CATTAIL CREEK CORRIDOR
06/14/2024 | PRECEDENT IMAGES
PROJECT OPPORTUNITY
UNIFY AS A SINGLE PARK
CATTAIL CREEK CORRIDOR
05/21/2024 | MASTERPLAN EXAMPLES
PROJECT GOALS
1. Design routing for Anchor Route
Shared Use Pathway
1. Enhance riparian habitat
along corridor
2. Reduce water use in
corridor in line City goals
1. Identify and Locate
opportunities for increased
recreation in the park system
consistent with PRAT
Cattail Creek Corridor and Anchor Route Park Master Plan
INTRODUCTION
PROJECT APPROACH
Te consulting design team was ofcially onboarded in May of 2024
with base documents from the City including the PRAT Plan, GIS
data, and original recorded plats and drawings for a number of the
parks within the corridor. Te design team developed the master plan
through three phases. Phase 1 included planning scale site analysis
and feldwork, including walking and photo documenting the existing
conditions along the entire corridor. Phase 2 included recording of the
fndings from Phase 1, initial design iteration, and engagement with a
variety of local stakeholders including City departments and local non-
profts for feedback. Phase 3 was design refnement and visualization.
Afer conclusion of Phase 3, additional community outreach was
conducted through a series of meetings with neighborhood associations
and through two diferent Bike Your Park Day activation events along
the corridor.
MOBILITY
ECOLOGY RECREATION
TUNITY
PROJECT TIMELINE
•May 2024 - Project Kick Of
•May - June 2024 - Initial Analysis and Fieldwork
•June - September - Design Development
•Sept 2024 - Initial Master Plan Design Complete
•Sept 28th, 2024 - Bike Your Park Day (Area 1 of the Project)
•Sept 27th 2025 - Bike Your Park Day (Area 3 of the Project)
•Jan - May 2026 - Master Plan Documentation
•May - Fall 2026 - DRAFT Master Plan Review and Final
Adoption by Urban Parks and Forestry Board and City
Commission
•Fall 2026 - 2029 - Plan Implementation
. . . TO A
UNIFIED
CORRIDOR
Opportunity to reconceptualize the
corridor as a more cohesive place in
the City
Intersecting Values and Criteria for the Anchor Route
5
FROM MANY
PARKS . . . .
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CATTAIL CREEK CORRIDOR
06/24/2024 | PROGRAM
CORRIDOR SIZE
TOTAL LENGTH
WIDEST SEGMENT
NARROWEST SEGMENT
POP. WITHIN 1/4 MILE **
** APPROXIMATE BASED ON CENSUS DATA
3.29
700 ft
11,93720 ft
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SUMMARY OF EXISTING PATHS
Baxter LnBaxter Ln
Valley Center LnValley Center Ln
I-9
0
I-9
0
Oak StOak St
Proposed AT Network
I-90I-907th Ave7th Ave19th Ave19th AveFowler AveFowler Ave3rd Ave3rd AveDurstonDurston
Huffine LnHuffine Ln
Kagy BlvdKagy Blvd
Fowler LnFowler LnCottonwood RdCottonwood RdKagy BlvdKagy Blvd
I-90I-90Rouse AveRouse Ave3rd Ave3rd AveSourdough RdSourdough RdMain StMain St
7th Ave7th Ave19th Ave19th AveMain StMain St
N1 mile00.5
Durston RdDurston Rd
W Tamarack StW Tamarack St
3rd Ave3rd AveGriffin DrGriffin Dr
7th Ave7th AveRouse AveRouse AveOak StOak St
I-90I-90
84 85
Proposed Anchor Routes
Proposed Shared Use Paths
Proposed Connector Paths
Proposed Neighborhood Trails
Proposed Bike Boulevards
Existing Trails
Existing Shared Use Paths
City Boundary
Growth Boundary
Roads
Railroad
Streams
Lakes & Reservoirs
Future Parks
Parks
7th-Front Street
Connector
PathwayFacilities
Figure 4.6 Proposed Active Transportation network with zoom in of 7th-Front St Connector, highlighted in orange.
88
89
Baxter LnBaxter Ln
Oak StOak St
DurstonDurston
Huffine LnHuffine Ln
Valley Center LnValley Center Ln
I-9
0
I-9
0
19th Ave19th AveFowler AveFowler AveProposed Regional Loop Trail
Kagy BlvdKagy Blvd
Main StMain St
0 0.25 0.5
DowntownBozeman
◊ Prioritize funding to build,
connect, and maintain Anchor
Routes.
The City should add prioritized shared use
path and connector path projects to the Capital
Improvements Plan (CIP). Likewise, an annual
portion of the City’s street construction budget
should be allocated to build shared use paths
and critical connector paths. In areas of key
park connectivity beneft and where severe
barriers exist, cash-in-lieu of parkland money
can be used to close gaps. Routes not likely
to be completed with adjacent development
should be prioritized.
◊ Plan for robust maintenance of
Anchor Routes to ensure year-
round use and a high level of
accessibility.
A complete set of maintenance
recommendations are provided in the Design
Manual.
◊ Design traffc calming measures
into the routes, particularly at key
destinations to reduce potential
conficts.
As the network grows and connectivity
improves, developing design standards to
minimize conficts at key destinations will
build a safer network. These include bollards,
striping, signage, and designating space for
different mode types.
1 mile N
This is a trackable metric
This is a trackable metric
Proposed 1-5 year loop
Proposed 1-5 year loop
Proposed 5-10 year regional loop
Proposed loop expansions
Parks
Open Space
City Boundary
Future expansion of the loop system will occur as new
communities and partners are engaged
EXPANDABLE
(6’-8’ EXISTING PATH THAT
CAN BE WIDENED)
CONSTRAINED
(2’-4’ PATH THAT CANNOT
BE WINDENED)
KEY INTERSECTING PATH
MISSING
(NO EXISTING PATH)
COMPLIANT
(10’-12’ EXISTING PATH)
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SUMMARY OF EXISTING PATHS
Baxter LnBaxter Ln
Valley Center LnValley Center Ln
I-90I-90
Oak StOak St
Proposed AT Network
I-90I-907th Ave7th Ave19th Ave19th AveFowler AveFowler Ave3rd Ave3rd AveDurstonDurston
Huffine LnHuffine Ln
Kagy BlvdKagy Blvd
Fowler LnFowler LnCottonwood RdCottonwood RdKagy BlvdKagy Blvd
I-90I-90Rouse AveRouse Ave3rd Ave3rd AveSourdough RdSourdough RdMain StMain St
7th Ave7th Ave19th Ave19th AveMain StMain St
N1 mile00.5
Durston RdDurston Rd
W Tamarack StW Tamarack St
3rd Ave3rd AveGriffin DrGriffin Dr
7th Ave7th AveRouse AveRouse AveOak StOak St
I-90I-90
84 85
Proposed Anchor Routes
Proposed Shared Use Paths
Proposed Connector Paths
Proposed Neighborhood Trails
Proposed Bike Boulevards
Existing Trails
Existing Shared Use PathsCity Boundary
Growth Boundary
Roads
RailroadStreams
Lakes & Reservoirs
Future Parks
Parks
7th-Front Street Connector
PathwayFacilities
Figure 4.6 Proposed Active Transportation network with zoom in of 7th-Front St Connector, highlighted in orange.
89
Baxter LnBaxter Ln
Oak StOak St
DurstonDurston
Huffine LnHuffine Ln
Valley Center LnValley Center Ln
I-90I-90
19th Ave19th AveFowler AveFowler AveProposed Regional Loop Trail
Kagy BlvdKagy Blvd
Main StMain St
0 0.25 0.5
Downtown
Bozeman
◊ Prioritize funding to build,connect, and maintain Anchor
Routes.
The City should add prioritized shared use
path and connector path projects to the Capital
Improvements Plan (CIP). Likewise, an annual
portion of the City’s street construction budget
should be allocated to build shared use paths
and critical connector paths. In areas of key
park connectivity beneft and where severe
barriers exist, cash-in-lieu of parkland money
can be used to close gaps. Routes not likely
to be completed with adjacent development
should be prioritized.
◊ Plan for robust maintenance of
Anchor Routes to ensure year-
round use and a high level of
accessibility.
A complete set of maintenance
recommendations are provided in the Design
Manual.
◊ Design traffc calming measures
into the routes, particularly at key
destinations to reduce potential
conficts.
As the network grows and connectivity
improves, developing design standards to
minimize conficts at key destinations will
build a safer network. These include bollards,
striping, signage, and designating space for
different mode types.
1 mile N
This is a trackable metric
This is a trackable metric
Proposed 1-5 year loop
Proposed 1-5 year loop
Proposed 5-10 year regional loop
Proposed loop expansions
Parks
Open Space
City Boundary
Future expansion of the loop system will occur as new
communities and partners are engaged
Cattail Creek Corridor and Anchor Route Park Master Plan
SITE ANALYSIS
OVERVIEW
Te Catail Creek Corridor Park Master Plan area is a 3.29 mile north-
south corridor connecting a number of central and northwestern
neighborhoods in the City of Bozeman. Te corridor links Catail Lake
park to the Gallatin Valley Mall and Bozeman Pond Park. Te corridor
varies in width dramatically along its length, from as wide as 700’ to as
narrow as 20’. An estimated 20 percent of City’s population lives within
a half mile of the corridor (12,000 people).
To assist in documenting the corridor, the project outlined 4 key
areas. Te areas were grouped according to similar environmental and
development characteristics, signifed by their adjoining frontages. Each
area is bounded by recognizable streets for ease of orientation. Area 1
runs from Catail Lake in the north to Catail Street and incorporates
the largest widths in the corridor within a generally low-density
development patern. Area 2 incorporates the largely undeveloped area
from Catail Street to Baxter Avenue with a notable presence of remnant
wetland in the area. Area 3 runs from Baxter Avenue to Durston
Avenue. While not as wide as Area 1, this area is similar to Area 1 in its
density and generous green space within the corridor; however within
a few blocks larger multi-family developments are emerging that will
contribute via cash-in-lieu of parkland within the master plan area.
Area 4 runs from Durston Street to the north side of the Gallatin Valley
Mall and is the most constrained segment of the corridor with a more
dense surrounding neighborhood fabric that terminates at the back door
of a highly commercial area along East Main Street/Hufne.
KEY STATS
3.29 mile long corridor
700
20
12,000
maximum width
minimum width
approximate number of
residents within 1/4 mile
of corridor
CIRCULATION
A key goal for Anchor Routes in the PRAT PLAN is to develop a
path suitable for alternate mobility opportunities along key corridors.
Within interior subdivision setings like the Catail Corridor, 10-foot-
wide pathways are acceptable and will be the goal for the trail portion
of this project. Surface materials are likely to include asphalt, concrete,
and wood decking at watercourse crossings.
Te Catail Creek Corridor study evaluated the existing conditions
along the corridor, including existing path widths and routing to
determine its compliance with the stated goals for an anchor route.
Te analysis identifed that only one section of the existing route had
compliant paths (min. 10’ sidewalks along Catail Lake). A number
of existing paths were undersized but could be expanded successfully
and a few areas had no existing paths or did not provide enough space
within the creek corridor to successfully provide the desired Anchor
Route width. Given this constraint, alternate on-street routes, or Bike
Boulevards, are suggested for potential mobility.
Te analysis also noted the intersection with the proposed Raptor
Route which will provide a continuous alternative mobility route
from the westside of Bozeman to Downtown and beyond to the M
Trail. How these two urban corridors intersect is a key consideration
in the project and the development of the Catail Anchor Route.
LEGEND
COMPLIANT
(10’-12’ EXISTING PATH)
EXPANDABLE
(6’-8’ EXISTING PATH THAT CAN BE WIDENED)
CONSTRAINED
(2’-4’ PATH THAT CANNOT
BE WINDENED)
KEY INTERSECTING PATH
MISSING (NO EXISTING PATH)
6
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CATTAIL CREEK CORRIDOR
06/24/2024 | PROGRAM
EXISTING PARKS / PARK TYPES
Neighborhood parks are the basic unit of the park system, and serve as the recreational and social focus of the neighborhood. Focus is on informal recreation for all age groups and geared towards those living within the service area. Neighborhood parks should be centrally located within their
service area, with access uninterrupted by non-residential roads and other
physical barriers. The service area of a neighborhood park has a ¼- to ½-mile
radius.
Neighborhood
Parks
223 Acres | 34 Parks
Alder Creek
Centennial Park
Cooper Park
Creekwood Subdivision Park
Diamond Park
Enterprise Park
Flanders Creek Subdivision Park
Four Points Minor Subd. Park
Gran Cielo
Headlands Park
HRDC (West Babcock Park)
Icon Park
Jarrett Park
Legends At Bridger Creek Park
M Anderson Park
Matthew Matsen Park
Meadow Creek Park
NE Corner & N Laurel Pkwy
New Hyalite View Park
Sandan Park
South University Distict
Southside Park
The Lakes At Valley West Park
Traditions Subdivision Park
Valley Unit Park
Valley West Park
Walton Homestead Park
West Winds Park
Westbrook
Westfeld Park
Relevant Parks
Typical Assets and Design Considerations
Program & Use
Facilities include playgrounds (including adult and
senior playground equipment); informal playfelds or natural areas; basketball, tennis and volleyball courts; ice skating; trails; and picnic and sitting areas. Accommodations for off-leash recreation should be provided where feasible.
Environmental Benefts
Similar to the pocket parks and plazas typology, it is
imperative to design grading to direct stormwater
into planted areas and mitigate the need for regular
irrigation. In these active, neighborhood serving
parks, investments in low maintenance plantings and shade trees will support community use on hot days and reduce urban heat island effect from surrounding areas.
Siting/Access
The site should be accessible from throughout its service area by way of interconnecting trails,
sidewalks, or low-volume residential streets. Ease of access and walking distance are critical factors in locating a neighborhood park. A neighborhood park should have a minimum of 50 percent frontage on a
public or approved private street. Neighborhood parks
are generally 3 to 10 acres in size. Leftover parcels of
land that are undesirable for development are also
generally undesirable for neighborhood parks and
should be avoided. It is more cost-effective to select a site with inherent aesthetic qualities, rather than trying to recreate them through extensive development.
Connections and relationships within the
neighborhood will help to provide accessible and
visually cohesive relationships to surrounding
community destinations. Connections within and to the park from nearby bike lanes and greenways should be prioritized, especially those that connect into city anchor routes. Curb cuts at street crossings and wayfnding to direct visitors to surrounding amenities, especially downtown, will help orient visitors to
various destinations.
Centennial Park
Valley West Park
City Goal of 100% Frontage on Public Roads
Central location in residential neighborhoods
Flexible multi-use natural areasConnection to sidewalks, community trails and greenways
PlaceholderCommunity parks are larger in size and serve a broader purpose than
neighborhood parks. Their focus is on meeting the recreational needs
of the entire community. They allow for group activities and offer other
recreational opportunities not feasible – nor perhaps desirable – in a neighborhood park.
Community
Parks
Story MillCommunity Park
BozemanPond
Glen LakeRotary Park
Kirk Park
199 Acres | 8 Parks
Beall Park
Bogert Park
Bozeman Pond
Glen Lake Rotary Park
Kirk Park
Lindley Park
Story Mansion Park
Story Mill Community Park
Relevant Parks
Program & Use
Potential recreation facilities include playgrounds
(including adult and senior playground equipment); basketball, tennis and volleyball courts; informal ballfelds for youth play; ice skating rinks (temporary); swimming pools or swimming beaches; trails, including cross-country ski trails; individual and group picnic/sitting areas; general open area; unique
landscapes and features; nature study areas; and
ornamental or native plant gardens. Accommodations
for off-leash recreation should be provided where
feasible.
Environmental Benefts
Similar to the pocket parks and plazas typology, it is imperative to design grading to direct stormwater into planted areas and mitigate the need for regular irrigation. These larger parks can also direct runoff
towards designed bioretention systems (e.g., swales and rain gardens). Wherever possible, these parks should increase planting areas that can capture stormwater and support water conservation measures citywide, through low irrigation, native
plantings.
Siting/Access
Optimally, the site should be between 20 and 50 acres
in size; however the actual size should be based
on the land area needed to accommodate desired
uses. The site should be serviced by arterial and collector streets, as well as the community trail system. Parking lots should be provided as necessary to accommodate user access. The site’s natural character should play a very signifcant role in site selection, with emphasis on sites that preserve unique
landscapes within the community and/or provide
recreational opportunities not otherwise available.
Typical Assets and Design Considerations
Recreational FacilitiesConnection to community trail system Native Planting Areas
Arterial / Connector Streets + Parking Access
PlaceholderLinear parks contain pathways that serve a number of important functions:
• They tie park components together to form a cohesive park, recreation,
and active transportation system;
• They allow for uninterrupted and safe pedestrian and bicycle movement
between parks and throughout the community
• They contain clear signage that visually connects park components and
trails to better wayfnding
• They provide an opportunity for resource-based outdoor recreation.
Linear Parks
Gallagator Linear Park
Harvest Creek Park
62 Acres | 24 Parks
Babcock Meadows
Brookside Park
Diamond Estates Public Park
Gallagator Linear Park
Greenway/Westgate
Harvest Creek
Langohr Gardens Park
North 9th
Northern Pacifc Addition To Bozeman
Oak Meadows Subdivision Park
Sourdough Trail Park
Spring Meadows Park
Sundance Springs Park
The Knolls At Hillcrest Park
The Knolls At Hillcrest Park
Valley Creek Park
Village Downtown Park
West Meadows Park
Westridge East Park
Westridge North Park
Westridge South Park
Relevant Parks
Typical Assets and Design Considerations
Program & Use
Linear parks can be developed for a variety of different
recreational activities. Most notable are hiking,
walking, jogging, bicycling and cross-country skiing.
Environmental Benefts
The environmental benefts of linear parks include reduced emissions from vehicular transportation and an opportunity to create longer stretches of contiguous native vegetation, habitat and wildlife corridors. Special care should be taken to avoid the spread of weeds within linear parks.
Since these habitat corridors will also naturally support non- native species expansion, it is important to create barriers for the spread of those species.
Many linear parks exist along water courses, which
presents an opportunity to improve riparian edges.
Plantings and naturalized landscapes along the
water’s edge could support increased fsh and other
amphibious species habitat. Education signage regarding “rewilding” of these riparian edges should also be considered to raise awareness of these investments.
Siting/Access
Land availability and opportunity are the primary factors determining location. Many linear parks
will follow natural features such as watercourses,
while others will follow man-made features such as
abandoned railways. Linear parks should be at least
25 feet wide for general trail use, with additional
width required for parks used for cross-country skiing. In addition to this minimum width, which linear parks can extend beyond, linear parks should also have requirements to provide specifc amenities. Linear parks should be designed to increase connectivity for wildlife and eliminate barriers to
their movement.
Parcels with steep slopes and natural vegetationProtection of natural wetland and ponds
Connection to further trail systems
PlaceholderNatural resource areas are lands set aside for the preservation of natural
resources, remnant landscapes, and visual aesthetics or buffering.
Oftentimes, these areas are contained within existing parks, and require a
different management approach from more isolated natural areas.
For example, Mcleod Park is a neighborhood park with natural areas that have to be well designed and integrated into the park to work alongside existing recreational uses. There are similar examples in West Winds Park and Bronken Park. These lands typically consist of:
• Individual sites exhibiting natural resources;
• Lands that are unsuitable for development but offer natural resource
potential. Examples include parcels with steep slopes and natural
vegetation, drainage ways and ravines; and
• Protected lands, such as wetlands, riparian areas and ponds.
Natural Area Parks
and Natural Areas within Parks
184 Acres | 27 Parks/Areas
Alder Creek Natural Space
Allison Park
Bridger Creek Park
Bronken Park - Natural Space
Burke Park
Cattail Lake Subdivision Public Park
Flanders Creek Subdivision Park Natural Space
Grafs East Park
Hauser Park
Ice House Park
Josephine Park
Laurel Glen Park
Loyal Gardens Subdivision Park
Mcleod Park
Meadow Creek Subd Public Park
Norton East Ranch Sub Park Natural Space
Oak Springs Park Access Corridor
Peets Hill
Shady Lane Public Park
Traditions Subdivision Park Natural Space
Tuckerman Park
Valley West Park Natural Space
West Winds Park Natural Space
Willow Park
Natural Areas within Parks
Typical Assets and Design Considerations
Program & Use
Although natural areas are resource rather than user
based, they can provide some recreation opportunities
such as trails, and nature viewing and study. They
can also function as greenways. Development should
be kept to a level that preserves the integrity of the
resource.
Environmental Benefts
Natural Area Parks should be protected, restored, maintained, and considered for expansion. To do this, clear communication and barriers to prevent dumping, walking, or vehicle access to the site should be incorporated into the design of these spaces.
Minimize development of hard surfaces, including bike trails and boardwalks, and strategically place them to avoid dissecting, diminishing, or disturbing natural areas within parks.
Use the existing types of vegetation community
present in natural areas, whether forest, shrubland,
meadow, stream, or wetland to guide the restoration design for adjacent sites and for site expansion within existing parks.
These places should include educational information
(e.g. signage) that will help visitors understand
natural system functions and increase aware of
ecosystem benefts. Bozeman’s Community Plan 2020
names birds as compatible with development and encourages habitat protection
Siting/Access
Resource availability and opportunity are the primary factors determining location and size. Typically, when siting a natural area, underutilized areas of parks and areas with vegetation or animal
species of concern are ideal places for natural area
investment.
Access points should be limited and well-signed, and should connect into existing trail networks.
Access to greenways, trails and nature viewing opportunities
Protection of natural resource areas
Baxter Meadows Natural Space
Baxter Square Natural Space
Cattail Creek Natural Space
Ferguson Meadows Natural Space
Natural Area Parks
Playgrounds
Informal Playfields
Natural Areas
Basketball
Tennis Courts
Volleyball Courts
Playgrounds
Informal Playfields
Natural Areas
Swimming Pools / Areas
Basketball
Tennis Courts
Volleyball Courts
Trails
Walking
Jogging
Bicycling
Cross-Country Skiing
** Consider Rewilding of Creeks
Trails
Nature Viewing / Study
Greenways
** Prioritize integrity of the resource
Picnic
Sitting Areas
Off-leash dog areas (where feasible)
Group Picnic
Group Sitting Areas
Unique Landscapes / Features
Off-leash dog areas (where feasible)
CATTAIL CREEK CORRIDOR
06/24/2024 | PROGRAM
EXISTING PARKS / PARK TYPES
Neighborhood parks are the basic unit of the park system, and serve as the recreational and social focus of the neighborhood. Focus is on informal recreation for all age groups and geared towards those living within the
service area. Neighborhood parks should be centrally located within their service area, with access uninterrupted by non-residential roads and other physical barriers. The service area of a neighborhood park has a ¼- to ½-mile
radius.
Neighborhood Typical Assets and Design Considerations
Parks
223 Acres | 34 Parks
Relevant Parks
Alder Creek Centennial Park Cooper Park Creekwood Su bdivision Park Diamond Park Enterprise Park
Flanders Creek Subdivision Park
Four Points Minor Subd. Park
Gran Cielo
Headlands Park
HRDC (West Babcock Park)
Icon Park Program & Use sidewalks, or low-volume residential streets. Ease of Jarrett Park access and walking distance are critical factors in Facilities include playgrounds (including adult and Legends At Bridger Creek Park locating a neighborhood park. A neighborhood park senior playground equipment); informal playfelds should have a m inimum of 50 percent frontage on a M Anderson Park or natural areas; basketball, tennis and volleyball public or approved private street. Neighborhood parks Matthew Matsen Park courts; ice skating; trails; and picnic and sitting areas. are generally 3 to 10 acres in size. Leftover parcels of Meadow Creek Park Accommodations for off-leash recreation should be land that are undesirable for development are also NE Corner & N Laurel Pkwy provided where feasible. generally undesirable for neighborhood parks and
New Hyalite View Park Environmental Benefts should be avoided. It is more cost-effective to select a site with inherent aesthetic qualities, rather than Sandan Park Similar to the pocket parks and plazas typology, it is trying to recreate them through extensive development. South University Distict imperative to design grading to direct stormwater Connections and relationships within the Southside Park into planted areas and mitigate the need for regular neighborhood will help to provide accessible and The Lakes At Valley West Park irrigation. In these active, neighborhood serving visually cohesive relationships to surrounding Traditions Su bdivision Park parks, investments in low maintenance plantings and community destinations. Connections within and to Valley Unit Park shade trees will support community use on hot days the park from nearby bike lanes and greenways should and reduce urban heat island effect from surrounding Valley West Park be prioritized, especially those that connect into areas. city anchor routes. Curb cuts at street crossings and Walton Homestead Park wayfnding to direct visitors to surrounding amenities, West Winds Park Siting/Access especially downtown, will help orient visitors to Westbrook The site should be accessible from throughout various destinations. Westfeld Park its service area by way of interconnecting trails,
Centennial Park
Valley West Park
City Goal of 100% Frontage on Public Roads
Central location in residential neighborhoods
Flexible multi-use natural areas Connection to sidewalks, community trails and greenways
Playgrounds Picnic
Informal Playfields Sitting Areas
Natural Areas Off-leash dog areas (where feasible) Basketball
Tennis Courts
Volleyball Courts PlaceholderPlaceholderPlaceholderCATTAIL LAKE
SUBDIVISION
PUBLIC PARK CATTAIL CREEK
NATURAL AREA
BAXTER SQUARE
NATURAL AREA
BAXTER SQUARE
PARK
CATTAIL
CREEK
PARK
BOZEMAN
POND
WEST
WINDS
PARK
HARVEST
CREEK
BABCOCK
MEADOWS
GREENWAY
FUTURE
DEVELOPMENT
Cattail Creek Corridor and Anchor Route Park Master Plan
Community parks are larger in size and serve a broader purpose than neighborhood parks. Their focus is on meeting the recreational needs of the entire community. They allow for group activities and offer other recreational opportunities not feasible – nor perhaps desirable – in a neighborhood park.
AY
Community
Parks
Story Mill Community Park
Bozeman Pond
Glen Lake Rotary Park
Typical Assets and Design Considerations
199 Acres | 8 Parks
Relevant Parks
Beall Park
Bogert Park
Bozeman Pond
Glen Lake Rotary Park
Kirk Park
Lindley Park
Story Mansion Park
Story Mill Community Park
Program & Use towards designed bioretention systems (e.g., swales
and rain gardens). Wherever possible, these parks Potential recreation facilities include playgrounds should increase planting areas that can capture Kirk (including adult and senior playground equipment); stormwater and support water conservation Park basketball, tennis and volleyball courts; informal measures citywide, through low irrigation, native ballfelds for youth play; ice skating rinks (temporary); plantings. swimming pools or swimming beaches; trails, including cross-country ski trails; individual and Siting/Access group picnic/sitting areas; general open area; unique Optimally, the site should be between 20 and 50 acres landscapes and features; nature study areas; and in size; however the actual size should be based ornamental or native plant gardens. Accommodations on the land area needed to accommodate desired for off-leash recreation should be provided where uses. The site should be serviced by arterial and feasible. collector streets, as well as the community trail Environmental Benefts system. Parking lots should be provided as necessary
to accommodate user access. The site’s natural Similar to the pocket parks and plazas typology, it is character should play a very signifcant role in site imperative to design grading to direct stormwater selection, with emphasis on sites that preserve unique into planted areas and mitigate the need for regular landscapes within the community and/or provide irrigation. These larger parks can also direct runoff recreational opportunities not otherwise available.
Recreational Facilities Connection to community trail system Native Planting Areas
Arterial / Connector Streets + Parking Access
Playgrounds Group Picnic
Informal Playfields Group Sitting Areas
Natural Areas Unique Landscapes / Features
Swimming Pools / Areas Off-leash dog areas (where feasible)
Basketball
Tennis Courts
Volleyball Courts
Trails
Linear Parks Typical Assets and Design Considerations
62 Acres | 24 Parks
Relevant Parks Linear parks contain pathways that serve a number of important functions:
Babcock Meadows • They tie park components together to form a cohesive park, recreation, Brookside Park and active transportation system; Diamond Estates Public Park • They allow for uninterrupted and safe pedestrian and bicycle movement Gallagator Linear Park between parks and throughout the community
Greenway/Westgate • They contain clear signage that visually connects park components and Harvest Creek trails to better wayfnding Langohr Gardens Park • They provide an opportunity for resource-based outdoor recreation. North 9th Northern Pacifc Addition To Bozeman
Oak Meadows Subdivision Park
Sourdough Trail Park
Spring Meadows Park
Sundance Springs Park
Parcels with steep slopes and natural vegetation Protection of natural wetland and ponds
Connection to further trail systems
The Knolls At Hillcrest Park
The Knolls At Hillcrest Park
Gallagator Linear Park
Harvest Program & Use amphibious species habitat. Education signage Creek Park Valley Creek Park regarding “rewilding” of these riparian edges should Linear parks can be developed for a variety of different also be considered to raise awareness of these Village Downtown Park recreational activities. Most notable are hiking, investments. West Meadows Park walking, jogging, bicycling and cross-country skiing.
Westridge East Park Siting/Access Westridge North Park Environmental Benefts Land availability and opportunity are the primary The environmental benefts of linear parks include Westridge South Park factors determining location. Many linear parks reduced emissions from vehicular transportation will follow natural features such as watercourses, and an opportunity to create longer stretches of while others will follow man-made features such as contiguous native vegetation, habitat and wildlife abandoned railways. Linear parks should be at least corridors. Special care should be taken to avoid the 25 feet wide for general trail use, with additional spread of weeds within linear parks. width required for parks used for cross-country Since these habitat corridors will also naturally skiing. In addition to this minimum width, which support non- native species expansion, it is important linear parks can extend beyond, linear parks should to create barriers for the spread of those species. also have requirements to provide specifc amenities.
Linear parks should be designed to increase Many linear parks exist along water courses, which connectivity for wildlife and eliminate barriers to presents an opportunity to improve riparian edges. their movement. Plantings and naturalized landscapes along the
water’s edge could support increased fsh and other
Walking
Jogging
Bicycling
Cross-Country Skiing
** Consider Rewilding of Creeks
Natural Area Parks Typical Assets and Design Considerations
and Natural Areas within Parks
184 Acres | 27 Parks/Areas
Natural Areas Natural resource areas are lands set aside for the preservation of natural within Parks resources, remnant landscapes, and visual aesthetics or buffering. Oftentimes, these areas are contained within existing parks, and require a Alder Creek Natural Space different management approach from more isolated natural areas. Allison Park For example, Mcleod Park is a neighborhood park with natural areas that Bridger Creek Park have to be well designed and integrated into the park to work alongside Bronken Park - Natural Space existing recreational uses. There are similar examples in West Winds Park Burke Park and Bronken Park. These lands typically consist of:
Cattail Lake Subdivision Public Park • Individual sites exhibiting natural resources;
Flanders Creek Subdivision Park • Lands that are unsuitable for development but offer natural resource Natural Space
Access to greenways, trails and nature viewing opportunities
Protection of natural resource areas
potential. Examples include parcels with steep slopes and natural Grafs East Park vegetation, drainage ways and ravines; and Hauser Park • Protected lands, such as wetlands, riparian areas and ponds. Program & Use Use the existing types of vegetation community
Ice House Park present in natural areas, whether forest, shrubland, Although natural areas are resource rather than user meadow, stream, or wetland to guide the restoration Josephine Park Natural Area based, they can provide some recreation opportunities design for adjacent sites and for site expansion within Laurel Glen Park such as trails, and nature viewing and study. They Parks existing parks. Loyal Gardens Subdivision Park can also function as greenways. Development should These places should include educational information Baxter Meadows Natural Space be kept to a level that preserves the integrity of the Mcleod Park (e.g. signage) that will help visitors understand resource. Baxter Square Natural Space Meadow Creek Subd Public Park natural system functions and increase aware of Cattail Creek Natural Space Environmental Benefts ecosystem benefts. Bozeman’s Community Plan 2020 Norton East Ranch Sub Park names birds as compatible with development and Natural Space Ferguson Meadows Natural Natural Area Parks should be protected, restored, Space encourages habitat protection Oak Springs Park Access maintained, and considered for expansion. To do Corridor this, clear communication and barriers to prevent Siting/Access Peets Hill dumping, walking, or vehicle access to the site should Resource availability and opportunity are the be incorporated into the design of these spaces. Shady Lane Public Park primary factors determining location and size. Traditions Subdivision Park Minimize development of hard surfaces, including Typically, when siting a natural area, underutilized Natural Space bike trails and boardwalks, and strategically place areas of parks and areas with vegetation or animal them to avoid dissecting, diminishing, or disturbing Tuckerman Park species of concern are ideal places for natural area natural areas within parks. investment. Valley West Park Natural Space Access points should be limited and well-signed, and West Winds Park Natural Space should connect into existing trail networks. Willow Park
Trails
Nature Viewing / Study
Greenways
** Prioritize integrity of the resource
SITE ANALYSIS
PARK TYPOLOGIES
Since the proposed anchor route runs through a series of existing park
systems in the City of Bozeman, the design team also reviewed the
classifcations for the existing parks. Per the adopted PRAT PLAN, the
corridor is bookended by a Natural Area Park at the North (Catail Lake)
and a Community Park (Bozeman Pond) to the south. In between,
the corridor is running within Neighborhood Parks and Linear Parks.
Given the wetland characteristics of Area 2, it is anticipated that it may
be more of a Natural Area Park when the corridor is fully developed.
Additionally, the corridor is adjacent and/or connects to multiple
existing neighborhood parks including Sandan Park, Baxter Creek Park,
and Harvest Creek Park. Rose Park and Gallatin County Regional Park
are also connected via the proposed Raptor Trail.
Within the PRAT PLAN, key program types are outlined for each park
classifcation, ranging from more active to more passive and mobility-
oriented uses. Tese designations suggest opportunities for an infll
program and park improvements to complement the corridor and
create additional destinations and recreational opportunities within the
master plan area.
CATTAIL LAKE
SUBDIVISION
PUBLIC PARK CATTAIL CREEK
NATURAL AREA
BAXTER SQUARE
NATURAL AREA
BAXTER SQUARE
PARK
CATTAIL
CREEK
PARK
BOZEMAN
POND
WEST
WINDS
PARK
HARVEST
CREEK
BABCOCK
MEADOWS
GREENW
FUTURE
DEVELOPMENT
7
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
06/24/2024 | OBSERVATIONS
FLEXIBLE LAWN
BRIDGES COURTS BENCHES
ORIENTATION NATURAL AREASSUMMARY OF EXIS
CATTAIL CREEK CORRIDOR
TING
PROGRAM
11 BRIDGES
2 BASKETBALL COURTS
13 BENCHES
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SUMMARY OF EXISTING
PROGRAM
11 BRIDGES
2 BASKETBALL COURTS
13 BENCHES
Cattail Creek Corridor and Anchor Route Park Master Plan
SITE ANALYSIS
EXISTING PARK PROGRAMS
Te design team also prepared a survey of existing recreational facilities
and programs along the corridor. In general, the parks were relatively
under-programmed and feature mostly fexible lawn areas and paths
for walking and biking. Periodically benches are provided for siting or
taking in views of the creek or ponds. A few active programs such as
basketball courts and a playground occur primarily in Areas 1 and Area
3.
Promotion of a cohesive and unique identity or sense of place within the
corridor is relatively understated. Tere are some existing wayfnding
signs and multiple bridges along the corridor. However, the wayfnding
and branding of the corridor is inconsistent and understated. By
promoting a more prevalent and high-profle wayfnding system and
enhancing key site features, greater interest and unique identity within
the corridor would improve.
KEY STATS
bridges 11
basketball courts 2
13 benches
playground 1
FLEXIBLE LAWN ORIENTATION NATURAL AREAS
BRIDGES COURTS BENCHES
8
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SUMMARY OF EXISTING LAND COVER
WATER
TURF
RIPARIAN SHRUBS
20 acres
39 acres
72 acres
19 acres
GRASS LAND
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SUMMARY OF HABITAT RESOURCES
MEDIUMLOW HIGH
WETWETWETDRY1 4
5
63
2 8
7
9
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SUMMARY OF HABITAT RESOURCES
MEDIUMLOW HIGH
WETWETWETDRY1
2
3
4
5
6
7
8
9
Cattail Creek Corridor and Anchor Route Park Master Plan
SITE ANALYSIS
EXISTING LAND COVER
To beter understand the environmental character of the corridor, the
team mapped the existing land cover. 4 key categories were used to
defne landcover: Surface Water, Turf, Native Grass Mix, and Riparian.
Surface Water includes perennial wet portions of the creek and existing
ponds. Turf is defned as a traditionally maintained grass area, requiring
recurring water and mowing practices. Native Grass mix was generally
naturalized areas without supplemental water and requiring minimal
maintenance. Riparian areas are the more ecologically diverse and
habitat rich zones that incorporate a mix of trees, shrubs and riparian
oriented sub-shrub and grass species.
Te survey was conducted in a coarse manner via aerial photography
and visual ground surveys to understand the larger land types. Te
team’s fndings suggested that transitioning some of the turf within
the corridor to either native grasses or riparian landscapes could
substantially improve the quality of the corridor’s ecology. Doing so
would also support multiple City goals for recreation opportunities
and sustainability defned with the PRAT Plan and other planning
documents. Benefts would include reducing water and maintenance
inputs within the corridor, create more opportunities for “natural”
recreation within the City, and reducing urban heat island efect with
additional tree canopy.
KEY STATS
20 acres water
39 acres turf
72 acres native grass mix
19 acres riparian landscape
EXISTING HABITAT RESOURCES
As part of the land cover survey and visual analysis of the existing
corridor, the design team noted a variety of habitat quality and types
being ofered within the corridor. In general, remnant riparian
and wetland habitat in Area 2 and part of Area 1 were the highest
quality. More habitat potential existed with Area 1 and 3 given the
amount of space available to bufer the creek; however, maintenance
practices limit the existing quality. Area 4 was the most constrained
and challenged given narrowness of the parkland yet some stretches
feature notable tree and shrub coverage and shading along the creek
with the potential to help keep water temperature cool.
1 4
5
6 3
2 8
7
9
1
2
3
4
5
6
7
8
9
9
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CATTAIL CREEK CORRIDOR
06/24/2024 | DESIGN TENETS
DESIGN TENETS
REDUCE LAWN CONNECT & BUFFER HABITAT
NODAL VS. DISTRIBUTED LOGICAL CROSSINGS
CATTAIL CREEK CORRIDOR
06/24/2024 | DESIGN TENETS
DESIGN TENETSFLOW
REDUCE LAWN CONNECT & BUFFER HABITAT
NODAL VS. DISTRIBUTED LOGICAL CROSSINGS
CATTAIL CREEK CORRIDOR
06/24/2024 | DESIGN TENETS
DESIGN TENETSFLOW
CONNECT & BUFFER HABITAT
NODAL VS. DISTRIBUTED LOGICAL CROSSINGS
CATTAIL CREEK CORRIDOR
06/24/2024 | DESIGN TENETS
DESIGN TENETSFLOW
REDUCE LAWN
NODAL VS. DISTRIBUTED LOGICAL CROSSINGS
CATTAIL CREEK CORRIDOR
06/24/2024 | DESIGN TENETS
DESIGN TENETS
FLOW
REDUCE LAWN CONNECT & BUFFER HABITAT
NODAL VS. DISTRIBUTED LOGICAL CROSSINGS
CATTAIL CREEK CORRIDOR
06/24/2024 | DESIGN TENETS
DESIGN TENETS
FLOW
REDUCE LAWN CONNECT & BUFFER HABITAT
LOGICAL CROSSINGS
CATTAIL CREEK CORRIDOR
06/24/2024 | DESIGN TENETS
DESIGN TENETS
FLOW
REDUCE LAWN CONNECT & BUFFER HABITAT
NODAL VS. DISTRIBUTED
Cattail Creek Corridor and Anchor Route Park Master Plan
DESIGN
KEY PRINCIPLES
Following site analysis, the design team developed initial design
scenarios for the project. 5 key principles were developed to guide the
routing of the anchor route and recommendations for environmental
and park enhancements along the route.
Principal 1 - Flow
Since the primary goal for an Anchor Route is improving alternative
mobility options and connections within the City, the design of the route
will prioritize fow and directness within the corridor over meandering
layouts. By doing so, connections will be more direct between
destinations along the corridor and mobility times will be reduced to
make biking, walking and running more efcient and potentially more
atractive than vehicular travel. In some areas, meandering gravel fnes
trails will remain in place as an alternate or complimentary option to the
primary Anchor Route.
Principal 2 - Nodal vs. Distributed
When considering where to propose program additions or enhancements,
the design will prioritize aggregating programs into more substantial
nodes. By doing so, it will create signifcant active areas to promote
use, feelings of safety, and variety of experiences within more visible
park areas along the corridor. It should also provide more efcient
maintenance and capital improvements strategies.
Principal 3 - Logical Crossings
Given that the corridor and anchor route crosses over numerous City
Streets, including major east-west thoroughfares, the proposed plan
utilizes existing street crossing or logical midblock locations that can
be implemented with improved safety for cars, bikers and pedestrians.
Parks and Recreation staf will work with the Transportation Department
to coordinate improvements at street crossings and where the Anchor
Route will be on-street.
FLOW
NODAL VS. DISTRIBUTED
LOGICAL CROSSINGS
Principal 4 - Reduce Lawn
Given the sustainability concerns related to lawn, the design will
look to reduce lawn to where it is more valuable within the corridor
such as larger, multi-purpose felds with good street frontage. Where
considered less valuable and useful, the design will reduce irrigated
lawn through conversion into other park programs or through
renaturalizing and replanting recommendations.
Principal 5 - Connect & Bufer Habitat
Consistent with ecological best practices, the project will look to
connect isolated patches of high quality habitat and bufer the creek
edge to support movement of wildlife along the creek and through
the City.
REDUCE LAWN
CONNECT & BUFFER HABITAT
10
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 11
DESIGN
PROGRAM ELEMENTS
To help develop the potential for the corridor, the design team
identifed program types that could be implemented to support
the goals for the project. Tese initial ideas include recreational,
ecological and mobility oriented programs based on the stated goals
for the Anchor Route and Park typologies within the PRAT Plan. Te
programs are not exclusive for future implementation but intended to
be illustrative of the potential for the corridor to beneft many goals
within the City.
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
MASTER PLAN
OVERVIEW
Te master plan outlines the preferred Anchor Route and parkland
alignment and a series of suggested improvements to the parks and
landscape along the parkland corridor. Tese improvements are
illustrated through a series of renderings, blow-up concept plans, and
section drawings.
Given the length of the corridor, the plan is broken into four areas for
more detailed information and review. Section 1 runs from Catail Lake
to the south end of the Catail Subdivision. Section 2 runs from the
Catail Subdivision to Baxter Lane and is the area of the plan that has
not developed. Parkland dedication and/or trail easements are needed
to complete this segment. Section 3 includes West Winds and Harvest
Creek subdivision parks between Baxter Lane and Durston. Section
4 is that narrowest parkland that connects to Gallatin Valley Mall and
Bozeman Pond Park.
Te area north of Section 1 is outside of the plan study area but has
properties in the development review process that will help make the
fnal connection to Valley Center’s shared use pathway.
SECTION 1
SECTION 2
SECTION 3
SECTION 4
12
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
13
CATTAIL
LAKE
SANDAN PARK
A
D
E
F
F
F
MATCHLINE - REFER TO SECTION 2
A
B
C
D
E
F
KEY
ANCHOR ROUTE
BIKE BOULEVARD
PEDESTRIAN SIDEWALK
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS
SECTION 1
CATTAIL LAKE TO CATTAIL STREET
Section 1 of the proposed masterplan runs from Catail Lake to Catail
Street. It starts at the Catail Lake Subdivision and runs through the
Catail Creek Subdivision Park system and features ample space to
incorporate the Anchor Route and improvements.
Te proposed plan recommends reusing the existing 10’ sidewalk
at Catail Lake and routing a new crossing of the creek to align with
Warbler Way as part of future infll developments. Within Catail
Creek Parks, the route will utilize the existing eastside path as a
primary alignment. Te path would be widened to the proposed
anchor standard and take advantage of existing crossings.
Additional programming, as illustrated in the following enlarged
concept plans, is also recommended for the park. An improved 50’
landscape bufer at the creek edge is also proposed. More signifcant
recreational enhancements are proposed at three nodes within the
park.
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 14
1 09/28/2024 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMANCATTAIL CREEK PARK PLAN
1 09/28/2024 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMANCATTAIL CREEK PARK PLAN
1 09/28/2024 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMANCATTAIL CREEK PARK PLAN
A
B
C
D
E
F
G
H
KEY
ANCHOR ROUTE
SECONDARY PATHWAYS
EXISTING POND
EX. STORMWATER
WETLAND
OVERLOOK
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS
SECTION 1
CATAMOUNT TO CATRON STREET
ENLARGED PLAN
Two new recreational areas are proposed in this section of the Master
Plan area. Te frst is a proposed picnic and pavilion area at the corner
of Warbler Way and Catamount Street where existing turf area can be
replaced to take advantage of the views to the Bridger Mountains and
provide another destination node at the northern end of the corridor.
Te second area repurposes an existing turf zone to further develop a
sports and activity node near Sundew Lane. Te node would feature
outdoor exercise equipment, multipurpose sports courts, and berms
to help enclose the space and provide passive viewing opportunities to
the mountains beyond.
A
B
B
C
F
E
G
G
H
D
D
Concept Plan for Picnic Node
Concept Plan for Sports and Athletic Node
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
BEFORE
PROPOSED
Visualization of the improved Anchor Route in this section, including improved planting, wayfnding and identity elements
15
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
1 02/21/2025 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMAN
Cattail Creek Corridor and Anchor Route Park Master Plan
OPEN TURF
REPROGRAMMED TURF
EXISTING SECTION
PROPOSED SECTION
OPEN TURF
VARIES VARIES
VARIES
CREEK
CREEK
BUFFER
AUGMENTED RIPARIAN BUFFER
PATH
ASPEN & COTTONWOOD
VIEWING BERM
6’-0”
12’-0”
BUFFER
AUGMENTED RIPARIAN BUFFER
VARIES 5’-0” to 10’-0”
VARIES 25’-0” to 50’-0”
VARIES 5’-0” to 10’-0”
VARIES 45-0” to 100’-0”
SIDE WALK
SIDE WALK
6’-0”
6’-0”
MULTIPURPOSE COURT MULTIMODAL ANCHOR ROUTE
PUBLIC ART
PAVILLION
MINIMUM 50’ DESIRED WATER COURSE SET BACK MINIMUM 50’ DESIRED WATER COURSE SET BACK
WILLOWS & DOGWOOD
ASPHALT OR CONCRETE PATHWAY
SECTION
NOTE: NO NON-VEGETATED IMPROVEMENTS WITHIN 30’-0” OF WATERCOURSE UNLESS NOTED MINIMUM OF 50’-0” WATERCOURSE SETBACK DESIRED IN ALL LOCATIONS
Existing cross section of the corridor and proposed improved cross section, including widened Anchor Route, additional programming and bufered riparian corridor.
16
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 17
1 09/28/2024 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMANCATTAIL CREEK PARK PLAN
1 09/28/2024 BYLA
L A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMANCATTAIL CREEK PARK PLAN
A
B
C
D
E
F
G
H
KEY
ANCHOR ROUTE
SECONDARY PATHWAYS
EXISTING POND
EX. STORMWATER
WETLAND
OVERLOOK
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS
SECTION 1
CATTAIL STREET ENLARGED PLAN
Tis area of the park system would not see signifcant programmatic
changes. Tere is ample room for widening the primary pathway and
upgrading its surface material. Auxiliary meandering gravel paths
would stay intact on the west side of the creek. Expansion of the sports
court area along Catail is proposed warranting support infrastructure
such as shade structures, restroom facilities and drinking fountains.
Section 1 presents an opportunity for conversion from mown turf lawn
to diverse riparian vegetation. With the help of the Gallatin Watershed
Council, the Forestry Division and changes to the Parks Division’s
maintenance practices, natural processes can be encouraged to take
over closer to the water to improve water quality and animal habitat.
Overlook areas and bridge crossings will provide enjoyment of the
watercourse which is noted in the PRAT Plan amongst the top 10 most
desired park features.
A
A
B
B
C
F
F
F
H
G
G
E
Concept Plan for Sports and Athletic Node featuring a walking loop,
outdoor exercise equipment, pavilions and expanded multi-purpose
courts
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
2 02/21/2025 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMAN
Cattail Creek Corridor and Anchor Route Park Master Plan
ASPEN & COTTONWOOD
MULTIMODAL ANCHOR ROUTE
MINIMUM 50’ DESIRED WATER COURSE SET BACK MINIMUM 50’ DESIRED WATER COURSE SET BACK
WILLOWS & DOGWOOD
TURF ZONE TURF ZONE
VARIES VARIES
CREEK BUFFER PATH
5’-0”
BUFFER
VARIES 5’-0” to 10’-0” VARIES 5’-0” to 10’-0”
SIDE WALK PATH
6’-0” 6’-0”
OPEN TURF
VARIES
EXISTING SECTION
PROPOSED SECTION
CREEK AUGMENTED RIPARIAN BUFFER
OVERLOOK
12’-0”
AUGMENTED RIPARIAN BUFFER
VARIES 25’-0” to 50’-0” VARIES 25’-0” to 70’-0”
SIDE WALK GRAVEL FINES
6’-0” 6’-0”
OPEN TURF
VARIES
PLAYGROUND
BENCH
ASPHALT OR CONCRETE PATHWAY
SECTION
NOTE: NO NON-VEGETATED IMPROVEMENTS WITHIN 30’-0” OF WATERCOURSE UNLESS NOTED MINIMUM OF 50’-0” WATERCOURSE SETBACK DESIRED IN ALL LOCATIONS
Existing cross section of the corridor and proposed improved cross section, including widened Anchor Route, additional programming and bufered riparian corridor.
18
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
A
B
C
D
E
F
KEY
ANCHOR ROUTE
BIKE BOULEVARD
PEDESTRIAN SIDEWALK
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS SECTION 2 (GapArea)
CATTAIL STREET TO BAXTER LANE
Section 2 of the proposed masterplan coves an area that is not
yet parkland but is the most likely area for park dedication when
developed. Tis area includes wetlands, an historic railroad berm, and
some mature vegetation including large trees that should be protected.
Te Anchor Route routing in this section is proposed to run south
from Catail Street and look to cross the creek in an opportunistic
location near the existing intersection of Georgia Maria and Hoover
Way. Tis westward shif is proposed to align the path toward existing
Bozeman Public School District property and toward a crossing at
Baxter Lane at Hunters Way . Sensitivity in the development of the
route will be needed given the environmental assets within this area,
and to negotiate implementation successfully with future developments
BOZEMAN SCHOOLS PARCEL
A
C
C
F
MATCHLINE - REFER TO SECTION 1
MATCHLINE - REFER TO SECTION 3
PROPOSED KIMBERWICKE STREET
CATTAIL STREET
PROPOSED RAWHIDE RIDGE PROPOSEDHUNTERS WAY 19
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
A
B
C
D
E
F
KEY
ANCHOR ROUTE
BIKE BOULEVARD
PEDESTRIAN SIDEWALK
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS
SECTION 3
WEST WINDS AND HARVEST PARKWAY
Within West Winds park, the proposed plan recommends a path
alignment that mixes new paths and expansion of existing paths. A
new midblock crossing with trafc calming is suggested on Tradewind
Lane, and existing crossings at Tschache Lane and Breeze Lane are
redesigned for pedestrian safety. Alternate connections to Oak Street
were studied with the fnal recommendation to connect the path to the
existing crossing at Oak Street and Hunters Way due to proximity to
the Harvest Creek trailhead and opportunity for on-street connection
to Monkey Park.
At Harvest Creek’s linear parks, a gravel fnes trail and bridge crossings
are already intact in a serene seting with mature trees and well-
manicured and irrigated lawn. Care will need to be given to balance
privacy concerns with safety as new vegetation is considered and
the trail is widened. Tis area is not likely to see the frst round of
improvements as the focus will be connecting missing links in years 1
and 2, but new maintenance practices could be employed to reduce the
area of irrigated lawn in select locations.
MATCHLINE - REFER TO SECTION 2
MONKEY PARK
ROSE
PARK
RAPTOR ROUTE
A
D
E
F
F
F
MATCHLINE - REFER TO SECTION 4
20
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 21
2 09/28/2024 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMANWEST WIND PARK PLAN
SECTION 3
WEST WINDS ENLARGED PLAN
Given the importance of the intersection of the Raptor Route with
the Catail Creek Anchor Route and the availability of cash-in-lieu
of parkland funding in this area, a more detailed concept plan was
developed within West Winds in anticipation of Site Plan/construction
drawing production with additional neighborhood input in 2026-
2027. Te plan proposes an enhanced bike roundabout crossing for
the intersection to help guide trafc going in each direction. Sidewalk
widening to the east is already underway in partnership with the
Transportation Division and a new bridge has been installed to the
west in partnership with the Gallatin Valley Land Trust.
Tis important hub presents an opportunity to redesign the
playground and add programming to create a more robust
neighborhood park. Picnic groves, creative seating and gardens are
proposed in this plan, to be guided by the aesthetic package that
was the result of a Girls Park workshop, along with areas reserved
for fexible turf and multipurpose courts. Additional programs will
KEY
A
B
C
D
E
F
G
H
I
J
ANCHOR ROUTE
RAPTOR ROUTE
NEIGHBORHOOD DOG PARK
EX. STORMWATER
WETLAND
OVERLOOK
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS
OUTDOOR EXERCISE
STATION
MIDBLOCK CROSSING
A
A
A
B
B
C
D
F
F
F
G
G
I
I
J
H
H
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 22
SECTION 3
WEST WINDS PARK ENLARGED PLAN
be considered through a more focused design and neighborhood
engagement process and ongoing coordination with the City’s
Transportation Division will contribute to the enhanced safety of street
crossings.
Te plan should balance safety and privacy concerns along with
natural resource impacts while increasing public access, vegetation and
the diversity of oferings at the park.
A
B
C
D
E
F
G
H
I
J
KEY
ANCHOR ROUTE
BIKE ROUNDABOUT
PLAYGROUND
PICNIC GROVE
COMMUNITY GARDEN
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS
MULTIPURPOSE COURT
RAPTOR ROUTE
A
A
B
C
D
E
F
F
G
G G
H
H
J
J
I
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
3 02/21/2025 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMAN
Cattail Creek Corridor and Anchor Route Park Master Plan
MULTIMODAL ANCHOR ROUTE
ASPEN & COTTONWOOD
COMMUNITY GARDEN
MINIMUM 50’ DESIRED WATER COURSE SET BACK MINIMUM 50’ DESIRED WATER COURSE SET BACK
WILLOWS & DOGWOOD
GRASSLAND
DROUGHT-TOLERANT MEADOW
EXISTING SECTION
PROPOSED SECTION
TURF ZONE
VARIES VARIES
VARIES
CREEK
CREEK
BUFFER
BUFFER
PATH
GRAVEL FINES
6’-0”
12’-0” 6’-0”
BUFFER
BUFFER
VARIES 5’-0” to 10’-0”
VARIES 25’-0” to 50’-0”
VARIES 5’-0” to 10’-0”
VARIES 45’-0” to 75’-0”
SIDE WALK
SIDE WALK
ADJACENT PRIVATE LOT
ADJACENT PRIVATE LOT
5’-0”
5’-0”
VARIES
VARIES
NEW WALKING PATH
ASPHALT OR CONCRETE PATHWAY
SECTION
NOTE: NO NON-VEGETATED IMPROVEMENTS WITHIN 30’-0” OF WATERCOURSE UNLESS NOTED MINIMUM OF 50’-0” WATERCOURSE SETBACK DESIRED IN ALL LOCATIONS
Existing cross section of the corridor and proposed improved cross section, including widened anchor route and bufered riparian corridor.
23
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
A
B
C
D
E
F
KEY
ANCHOR ROUTE
BIKE BOULEVARD
PEDESTRIAN SIDEWALK
RENATURALIZED AREA
TURF AREA
ENHANCED CROSSINGS
A
A
C
D
F
F
F
B
B
BOZEMAN POND PARK GALLATIN VALLEY
MALL
MATCHLINE - REFER TO SECTION 3
F
SECTION 4
DURSTON STREET TO GALLATIN
VALLEY MALL
Tis section of the Anchor Route is the most constrained location,
moving through more developed and dense neighborhoods. As a
result, implementing an Anchor Route at its preferred width and
setback from the creek is not feasible in many locations. To resolve
these conficts, the design team recommended additional bike
boulevards and shared path strategies to provide a mix of bike and
pedestrian pathways. Recreational improvements for these areas is
limited so the emphasis is on safer and more atractive connections to
larger park areas.
24
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CAPTION
Cattail Creek Corridor and Anchor Route Park Master Plan
PROPOSED
BEFORE
25
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
4 02/21/2025 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMAN
Cattail Creek Corridor and Anchor Route Park Master Plan
MULTIMODAL ANCHOR ROUTE
MINIMUM 50’ DESIRED WATER COURSE SET BACK MINIMUM 50’ DESIRED WATER COURSE SET BACK
ASPEN & COTTONWOOD
WILLOWS & DOGWOOD
TURF W/ MATURE TREES
TURF W/ MATURE TREES AUGMENTED AND NATURALIZED LANDSCAPE
EXISTING SECTION
PROPOSED SECTION
TURF W/ MATURE TREES
AUGMENTED AND NATURALIZED LANDSCAPE
VARIES
VARIES 30’-0” to 50’-0”
VARIES
VARIES VARIES 25’-0” to 40’-0”
CREEK
CREEK
PATH
GRAVEL PATHWAY
6’-0”
12’-0”
PUBLIC ART
SECTION
NOTE: NO NON-VEGETATED IMPROVEMENTS WITHIN 30’-0” OF WATERCOURSE UNLESS NOTED MINIMUM OF 50’-0” WATERCOURSE SETBACK DESIRED IN ALL LOCATIONS
Existing cross section of the corridor and proposed improved cross section, including widened anchor route and bufered riparian corridor.
26
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
CAPTION
Cattail Creek Corridor and Anchor Route Park Master Plan
PROPOSED
BEFORE
27
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
5 02/21/2025 BYLAL A N D S C A P E A R C H I T E C T S
323 Lewis . | Ketchum, ID(208) 726 5907 • (208) 720 0215www.byla.us
CATTAIL CREEK CORRIDOR BOZEMAN
Cattail Creek Corridor and Anchor Route Park Master Plan
SECTION
MULTIMODAL ANCHOR ROUTE
ASPEN & COTTONWOOD
WILLOWS & DOGWOOD
TURF ZONE
PLANTED BUFFER PLANTED BUFFER
EXISTING SECTION
PROPOSED SECTION
VARIES
VARIES 5’-0” to 35’-0” VARIES 5’-0” to 35’-0”
CREEK
CREEK
PATH
GRAVEL PATHWAY
5’-0”
5’-0”
SIDEWALK
SIDEWALK BIKE BOULEVARD
ADJACENT PRIVATE LOT
ADJACENT PRIVATE LOT
5’-0”
10’-0”
VARIES
VARIES
PAVMENT - GREEN
BIKE BOULEVARD SIGN
NOTE: NO NON-VEGETATED IMPROVEMENTS WITHIN 30’-0” OF WATERCOURSE UNLESS NOTED MINIMUM OF 50’-0” WATERCOURSE SETBACK DESIRED IN ALL LOCATIONS
Existing cross section of the corridor and proposed improved cross section, including widened anchor route and bike boulevard
28
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan 29
PUBLIC ENGAGEMENT
Te Catail Corridor and Anchor Route Park
Master Plan has been in progress for roughly
two years and has been discussed at several
meetings of the Urban Parks and Forestry
Board and City Commission during that
time. Information was provided on the City’s
“Engage” website throughout the process
and news posts went out to page subscribers
via email.
Parks and Recreation held its annual Bike
Your Park Day in 2 parks along the corridor
in 2024 and 2025 to draw atention to the
project and gain input, with art banners
created by Mountain Time Arts installed
along the pathway to heighten awareness.
Parks and Recreation staf presented
virtually to the Catail Creek, West Winds
and Harvest Creek Subdivision Home
Owners Associations including question and
answer sessions.
Te outcome of public engagement has
resulted in some changes to the initial
proposal. At West Winds, direct access to
the larger park of Hunters Way at Flurry
Lane was added and emphasis was placed
on the retention of multi-purpose felds.
Further neighborhood discussions will result
in additional refnement during Site Plan/
construction drawing creation.
Lastly, as stated in the introduction, the Park
Master Plan’s vision was a direct result of
city-wide engagement during the creation of
the 2023 Comprehensive Parks, Recreation
and Active Transportation Plan. Tis
project is the City’s frst major step toward
implementation of the PRAT Plan.
Images from Girls Park Workshop Images from Bike Your Park Days along the Corridor
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
30
APPENDIX
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
CATTAIL CREEK CORRIDOR
BENCH
WATER ACCESS
SPORTS COURT
DOG STATION
PLAYGROUND
PROGRAM OPPORTUNITY
(E) WAYFINDING
VIEW
WAYFINDING OPPORTUNITY
BRIDGE
(E) CROSSWALK
(E) PATHWAY
XXXXX
CROSSWALK OPPORTUNITY
(E) HABITAT FEATURE
RESTORATION OPPORTUNITY
PROPERTY LINE
AREA EXTENT
PATH DESIRE
SIDEWALK
06/24/2024 | OBSERVATIONS WARBLER WAY DAVIS LANE SITE ANALYSIS - CORRIDOR OBSERVATIONS
OBSERVATIONS - SECTION 1A
CATTAIL POND
CATAMOUNT STREET MIDBLOCK CROSSING?
MAINTENANCE PRACTICES
MAINTENANCE PRACTICES
DIVERSIFY MATRIX FOR HABITAT
SUNDEW LANE BRIDGE IDENTITY BLACKBIRD STREET FEN WAYNEED FOR NEW PATH
31
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
BENCH
WATER ACCESS
DOG STATION
PLAYGROUND
PROGRAM OPPORTUNITY
(E) WAYFINDING
VIEW
WAYFINDING OPPORTUNITY
BRIDGE
(E) CROSSWALK
(E) PATHWAY
XXXXX
CROSSWALK OPPORTUNITY
(E) RIPARIAN HABITAT
RESTORATION OPPORTUNITY
PROPERTY LINE
AREA EXTENT
PATH DESIRE
SIDEWALK
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
CATTAIL
S
T
R
E
E
T DAVIS LANE WARBLER WAY SITE ANALYSIS - CORRIDOR OBSERVATIONS
OBSERVATIONS - SECTION 1B
SANDAN PARK OVERLOOK OPPORTUNITY
AMPLIFY WAYFINDING BLACKBIRD STREET CONNECTIVITY TO ADJACENT PARKS FEN WAYMAINTENANCE PRACTICES
CATRON STREET
MATURE REMANENT
32
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SITE ANALYSIS - CORRIDOR OBSERVATIONS
OBSERVATIONS - SECTION 2
PROPOSED KIMBERWICKE STREET
REMANENT HABITAT
PROPOSED RAWHIDE RIDGE
SCHOOL DISTRICT PARCELS
PATH ROUTING NEED
PREFERRED CONNECTION POINT PROPOSED HUNTERS WAYBLACKBIRD STREETNATURAL EXPERIENCE POTENTIAL HOOVER WAYTHOMAS DRIVE GEORGIA MARIE LANE RENEE WAY BAXTER SQUARE
EQUESTRIAN LANE
CONSTRAINED PATH LOCATION
PROGRAMMABLE PARK
BAXTER LANE
33
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
BENCH
WATER ACCESS
DOG STATION
PLAYGROUND
PROGRAM OPPORTUNITY
(E) WAYFINDING
VIEW
WAYFINDING OPPORTUNITY
BRIDGE
(E) CROSSWALK
(E) PATHWAY
XXXXX
CROSSWALK OPPORTUNITY
(E) RIPARIAN HABITAT
RESTORATION OPPORTUNITY
PROPERTY LINE
AREA EXTENT
PATH DESIRE
SIDEWALK
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SITE ANALYSIS - CORRIDOR OBSERVATIONS
OBSERVATIONS - SECTION 3A
PROGRAM OPPORTUNITY
PATH ROUTING NEED
TSCHACHE LANE
PROPOSED RAPTOR TRAIL
CONSTRAINED PATH
EXISTING CROSSING HUNTERS WAYBUCKRAKE AVE OPPORTUNITY TO REVEG
OFFSET CONNECTION TO OAK STREET TRAILS
BAXTER LANE
TRADE WIND LANE
TURBULENCE LANE
OPPORTUNITY TO DENSIFY PROGRAM
PROPOSED RAPTORTRAIL
BREEZE LANE
34
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
BENCH
WATER ACCESS
DOG STATION
PLAYGROUND
PROGRAM OPPORTUNITY
(E) WAYFINDING
VIEW
WAYFINDING OPPORTUNITY
BRIDGE
(E) CROSSWALK
(E) PATHWAY
XXXXX
CROSSWALK OPPORTUNITY
(E) RIPARIAN HABITAT
RESTORATION OPPORTUNITY
PROPERTY LINE
AREA EXTENT
PATH DESIRE
SIDEWALK
06/24/2024 | OBSERVATIONS HUNTERS WAY
25TH AVE
SITE ANALYSIS - CORRIDOR OBSERVATIONS
OBSERVATIONS - SECTION 3B
OAK STREET
CONSTRAINED PATH
PED PATH TO LOCAL SCHOOL
ANNIE STREET
OFFSET CROSSING CONNECT TO OPEN SPACE
ROSE STREET BUCKRAKE AVE POTENTIAL BIKE BOULEVARD?
DRY CREEK BED - NO HABITAT STRUCTURE
MONKEY EMILY DICKINSON SCHOOL PARK
DURSTON ROAD
CATTAIL CREEK CORRIDOR
35
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
BENCH
WATER ACCESS
DOG STATION
PLAYGROUND
PROGRAM OPPORTUNITY
(E) WAYFINDING
VIEW
WAYFINDING OPPORTUNITY
BRIDGE
(E) CROSSWALK
(E) PATHWAY
XXXXX
CROSSWALK OPPORTUNITY
(E) RIPARIAN HABITAT
RESTORATION OPPORTUNITY
PROPERTY LINE
AREA EXTENT
PATH DESIRE
SIDEWALK
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
SITE ANALYSIS - CORRIDOR OBSERVATIONS
OBSERVATIONS - SECTION 4A DURSTON RD
NODE / PLACEMAKING OPPORTUNITY
MEADOW QUALITY NORTH MEADOWS PARK
VILLARD STREET
OPPORTUNITY TO VEGETATE TO MITIGATE PUBLIC / PRIVATE INTERFACE
NODE / PLACEMAKING OPPORTUNITY
WILLOW PARK NO PATH FEASIBLE
MENDENHALL STREET
NO PATH FEASIBLE HUNTERS WAY POTENTIAL BIKE BOULEVARD? HUNTERS WAY MICHAEL GROVE AVEBABCOCK STREET
36
Docusign Envelope ID: 8C15485E-3C96-8225-827E-0AC080BC56ED
Cattail Creek Corridor and Anchor Route Park Master Plan
BENCH
WATER ACCESS
DOG STATION
PLAYGROUND
PROGRAM OPPORTUNITY
(E) WAYFINDING
VIEW
WAYFINDING OPPORTUNITY
BRIDGE
(E) CROSSWALK
(E) PATHWAY
XXXXX
CROSSWALK OPPORTUNITY
(E) RIPARIAN HABITAT
RESTORATION OPPORTUNITY
PROPERTY LINE
AREA EXTENT
PATH DESIRE
SIDEWALK
CATTAIL CREEK CORRIDOR
06/24/2024 | OBSERVATIONS
MAIN ST
R
E
E
T
SITE ANALYSIS - CORRIDOR OBSERVATIONS
OBSERVATIONS - SECTION 4B
BABCOCK STREET
MATURE RIPARIAN SPECIES
POTENTIAL BIKE BOULEVARD?
BOZEMAN POND PARK DONNA AVE GALLATIN VALLEY MALL
CONSTRAINED PATH
CONSTRAINED PATH
PLACEMAKING OPPORTUNITY / CONNECTION TO THE MALL VIRGINIA WAY 37