Loading...
HomeMy WebLinkAbout034 - MEP Flood Plain Letter Update FLOODPLAIN DESIGN COMPLIANCE July 9, 2026 Page 1 of 1 CONFIDENTIAL – Permission must be given by Energy 1 to share or further distribute this information to any other party. Submitted via email: pandrews@intrinsikarchitecture.com Intrinsik Architecture, Inc. Attention: Peter Andrews 106 East Babcock Street Suite 1A Bozeman, Montana 59715 Re: Flood Plain Mechanical, Electrical, Plumbing Design Compliance – BHM – Boutique Hotel Mendenhall in Bozeman, MT Dear Peter, I am writing on behalf of Energy 1 to confirm that the Boutique Hotel Mendenhall project in Bozeman, MT is in compliance with all relevant floodplain regulations and codes as they pertain to the mechanical, electrical, and plumbing systems design of the building. Our original letter was for the 6-story building. Since, adding an additional (7th) level to the Boutique Hotel, the mechanical, electrical, and plumbing system designs remain in compliance with the Bozeman Municipal Code (BMC) 38.600.270.D.12-14 and all current adopted building codes for floodplain regulations. We understand that our construction documents will be reviewed during the building permit submittal and must be inspected and certified for compliance upon substantial completion of construction. Please feel free to contact me directly at 406-587-2917 or jburgett@energy-1.net should you require further information or clarification. Respectfully submitted, Jennifer Burgett, PE