Loading...
HomeMy WebLinkAbout033 - Floodplain SP-MOD Certification MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA 406.586.0277 tdhengineering.com 234 East Babcock Street Suite 3 Bozeman, MT 59715 July 8, 2026 RE: BOUTIQUE HOTEL - CCOA SP 24147 & MOD 26351 FLOODPLAIN SITE PLAN MOD CERTIFICATION Lance & Simon, The purpose of this letter is to certify that changes to the Boutique Hotel Site Plan Application 24147 that were submitted with the Site Plan Modification Application 26351 do not change the floodplain development design approach, information, or calculations provided with the project’s floodplain permit application 24-674-FP. Changes proposed to the approved plan with the MOD application are limited to the upper floors of the building to add a 7th story of guestrooms. No changes to the exterior building footprint, finished floor elevations, building access locations, floodproofing strategies, structural foundation design, or exterior grades are proposed with the site plan MOD application. Therefore, the design elements, findings and conditions of approval associated with the Boutique Hotel Floodplain Permit (Floodplain permit application 24-674-FP) will not be impacted by the proposed changes to the project. Please let me know if you have any questions or require additional information. Sincerely, Cody Croskey PE Civil Engineer TD&H ENGINEERING I:\2024\BOZ\B24-005 BHM Mendenhall\05_DESIGN\FLOODPLAIN\FLOODPLAIN PERMIT\SP-MOD LETTER\BHM FLOODPLAIN SP-MOD NARRATIVE.DOC