July 8, 2026
RE: BOUTIQUE HOTEL - CCOA SP 24147 & MOD 26351
FLOODPLAIN SITE PLAN MOD CERTIFICATION
Lance & Simon,
The purpose of this letter is to certify that changes to the Boutique Hotel Site Plan
Application 24147 that were submitted with the Site Plan Modification Application 26351 do
not change the floodplain development design approach, information, or calculations
provided with the project’s floodplain permit application 24-674-FP.
Changes proposed to the approved plan with the MOD application are limited to the upper
floors of the building to add a 7th story of guestrooms. No changes to the exterior building
footprint, finished floor elevations, building access locations, floodproofing strategies,
structural foundation design, or exterior grades are proposed with the site plan MOD
application. Therefore, the design elements, findings and conditions of approval associated
with the Boutique Hotel Floodplain Permit (Floodplain permit application 24-674-FP) will not
be impacted by the proposed changes to the project.
Please let me know if you have any questions or require additional information.
Sincerely,
Cody Croskey PE
Civil Engineer
TD&H ENGINEERING