HomeMy WebLinkAbout008 - Appendix G - Water Sewer Storm Design Report MONTANA | WASHINGTON | IDAHO | NORTH DAKOTA | PENNSYLVANIA 406.586.0277 tdhengineering.com 234 East Babcock Street Suite 3 Bozeman, MT 59715 March 11, 2026 re: BOUTIQUE HOTEL MENDENHALL 7-STORY SITE PLAN MODIFICATION WATER & SEWER DEMAND UPDATES The purpose of this letter is to provide updated water and sewer demand estimates for the Boutique Hotel Mendehall project as part of a proposed Modification to add a 7 th floor and increase the occupancy from 71 to 91 rooms. The original domestic water and sewer demands for the 71-room hotel were estimated using actual water meter data from four comparable hotel facilities within the City of Bozeman. Based on this data, a conservative estimate of 80 Gal/Day/Room was assumed for a modern hotel building inclusive of restaurant & bar amenities. The previous 71 -room domestic water and sewer demand estimates are provided below for reference as presented in the engineering design report for CCOA/SP 24147: Table 1: Previous Estimated Water Demands – 71 Room Hotel Average Day Max. Day Peak Hour New Building Demand 5,680 gpd 9.1 gpm 11.8 gpm Table 2: Previous Estimated Sewer Demands – 71 Room Hotel Average Day (gpd) Peak Hour (gpm) New Building Demand 5,680 - Lot Infiltration 62 - Total Sewer Demand 5,742 16.84 Updated domestic water and sewer demand estimates for the proposed 7-story 91-room are summarized in the following tables with supporting calculations attached. These estimates also assume 80 Gal/Day/Room based on the same Downtown Bozeman hotel water meter data that was presented with the original site plan application. March 11, 2026 PAGE NO. 2 tdhengineering.com Table 3: Updated Estimated Water Demands – 91 Room Hotel Average Day Max. Day Peak Hour New Building Demand 7,280 gpd 11.6 gpm 15.2 gpm Table 4: Updated Estimated Sewer Demands – 91 Room Hotel Average Day (gpd) Peak Hour (gpm) New Building Demand 7,280 - Lot Infiltration 62 - Total Sewer Demand 7,342 21.4 Water System Capacity: New domestic water and fire service lines for the hotel will be connected to the existing 8” ductile iron water main in E. Mendenhall Street. The fire flow requirement for the new building is 1,000 gpm based on building size and construction type as determined following International Fire Code Appendix B criteria, and the max day + fire flow demand for the 91- room hotel = 1,012 gpm. Fire hydrant flow data indicates 12,000 to 13,200 gpm will be available in the adjacent water main before dropping below a residual pressure of 20 psi. Therefore, adequate capacity is expected to be available in the City’s water system to support the proposed increase to 91 hotel rooms. Sewer System Capacity: The existing 6” clay sewer main in E. Mendenhall Street is being replaced and upsized with 8” PVC as required by the previous site plan application. The updated peak hour domestic sewer demand for the hotel is 21.4 gpm and the minimum carrying capacity of an 8” sewer flowing at 75% full at minimum 0.4% slope is 313.6 gpm. Therefore, adequate capacity is expected to be available in the upgraded sewer main to support the proposed increase to 91 hotel rooms. Please let me know if you have any questions or require additional information. Sincerely, Cody Croskey PE Civil Engineer TD&H ENGINEERING I:\2024\BOZ\B24-005 BHM Mendenhall\05_DESIGN\DESIGN REPORT\7-STORY MOD UPDATE\PARTS\BHM - 7 STORY MOD W&S DEMAND LTR.DOC Comparable Hotel Water & Sewer Demand Analysis (Data through April 2023) Summary Notes: 1. Downtown Bozeman Hotels were used as a comparison because they were recently constructed, have high occupancy rates and exhibit similar uses as the proposed Boutique Hotel Mendenhall. 2. Because irrigation is minimal Downtown, average day sewer demands are assumed to be approximately equal to average day water demands. Hotel ADF Consumption (Hundred Cubic Feet) ADF Consumption (Gallons) ADF Consumption (Hundred Cubic Feet) ADF Consumption (Gallons) ADF Consumption (Hundred Cubic Feet) ADF Consumption (Gallons) ADF Consumption (Hundred Cubic Feet) ADF Consumption (Gallons) Armory 4.22 3,155.27 11.94 8,929.52 12.48 9,333.03 12.49 9,340.78 Element 7.93 5,928.34 9.72 7,269.99 9.05 6,767.43 8.72 6,522.70 Residence Inn ND ND 7.10 5,310.10 11.03 8,250.19 10.62 7,944.42 AC Marriott ND ND ND ND 9.47 7,081.12 11.53 8,628.03 Hotel Year with Largest ADF ADF Consumption (Gallons) # Rooms ADF per Room (Gallons) Armory Last 12 Months 9,340.78 122 76.56 Element 2021 7,269.99 104 69.90 Residence Inn 2022 8,250.19 104 79.33 AC Marriott Last 12 Months 8,628.03 143 60.34 Use: 80 Gal./Day/Room Avg. Day Flow (ADF) Last 12 Months Summary of Average Day Water Meter Consumption for Downtown Bozeman Hotels Summary of Per Room Average Day Consumption for Downtown Bozeman Hotels Avg. Day Flow (ADF) 2020 Avg. Day Flow (ADF) 2021 Avg. Day Flow (ADF) 2022 1 OF 8 Boutique Hotel Mendenhall 302 E. Mendenhall Street Date: 03.11.26 Water Demand Calculation - 91 Room MOD Domestic Water Demand: Hotel Use: Rooms =91 Average Demand per Room =80.0 Gal./Day/Room (See Comparable Facility Data) Average Day Demand =7,280 GPD Peak Hour Demand: Average Day Demand =7,280 GPD Average Day Demand =5.1 gpm (GPD / 1,440 minutes) Maximum Day Demand =11.6 gpm (Ave. Day x Peaking Factor = 2.3) Peak Hour Demand =15.2 gpm (Ave. Day x Peaking Factor = 3) Fire Flow Requirement - New Building: IBC Construction Type =1B Fire Flow Calculation Area =67,107 GSF Fire Flow Requirement =2,750 GPM (per IFC Table B105.1(2) for total building area) Automatic Fire Sprinkler System =Yes Fire Sprinkler System Type =NFPA 13 Reduced Fire Flow Requirement =1,000 gpm (25% of Total/1,000 GPM min. per IFC Table B105.2) CITY OF BOZEMAN Fire Flow Request Form PHONE (406) 582-3200 FAX (406) 582-3201 Date March 27, 2024 Location 302 E Mendenhall (FFR-5896) Pressure Zone HGL 5125 (S) GIS Hydrant ID# 72 and 74 Adjacent Main Size 8-inch DI Model Scenario Maximum Day Demand, Steady State, Fire Flow Reference 2017 Water Facility Plan Update1 Hydrant Curves An Excel Spreadsheet with hydrant curves has been provided for the requested location Requested Location via the Bozeman Infrastructure Viewer2 If you have questions or need further information feel free to email. Data Disclaimer: Water distribution information is calculated using hydraulic modeling software and is subject to variation. Actual field conditions may vary. This information is provided to the requestor for evaluation purposes only, without warranty of any kind, including, but not limited to any expressed or implied warranty arising by contract, stature, or law. In no event regardless of cause, shall the City be liable for any direct, indirect, special, punitive or consequential damages of any kind whether such damages arise under contract, tort, strict liability or inequity. HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK 1 https://www.bozeman.net/home/showpublisheddocument/4977/636420174896170000 2 https://gisweb.bozeman.net/Html5Viewer/?viewer=infrastructure GIS Hydrant # Available Flow (gpm) Residual Pressure (psi)72 0 131.35 200 131.04 400 130.69 600 130.29 800 129.83 1,000.00 129.33 1,200.00 128.79 1,400.00 128.2 1,600.00 127.57 1,800.00 126.89 2,000.00 126.18 2,200.00 125.43 2,400.00 124.63 2,600.00 123.79 2,800.00 122.92 3,000.00 122 3,200.00 121.04 3,400.00 120.05 3,600.00 119.01 3,800.00 117.93 4,000.00 116.8 4,200.00 115.64 4,400.00 114.44 4,600.00 113.2 4,800.00 111.92 5,000.00 110.6 5,200.00 109.25 5,400.00 107.86 5,600.00 106.42 5,800.00 104.91 6,000.00 103.35 6,200.00 101.75 6,400.00 100.13 6,600.00 98.46 6,800.00 96.75 7,000.00 94.99 7,200.00 93.2 7,400.00 91.37 7,600.00 89.5 7,800.00 87.6 8,000.00 85.65 8,200.00 83.66 8,400.00 81.64 8,600.00 79.58 8,800.00 77.49 9,000.00 75.34 9,200.00 73.17 9,400.00 70.95 9,600.00 68.7 9,800.00 66.41 10,000.00 64.08 10,200.00 61.71 10,400.00 59.31 10,600.00 56.87 10,800.00 54.39 11,000.00 51.88 11,200.00 49.33 11,400.00 46.75 11,600.00 44.12 11,800.00 41.46 12,000.00 38.77 12,200.00 36.04 12,400.00 33.23 12,600.00 30.43 12,800.00 27.61 13,000.00 24.72 13,200.00 21.66 13,400.00 19.02 13,600.00 16.34 13,800.00 13.63 14,000.00 10.89 14,200.00 8.13 14,400.00 5.34 14,600.00 2.53 Hydrant Curve 0 20 40 60 80 100 120 140 0 2000 4000 6000 8000 10000 12000 14000 16000Residual Pressure (psi)Available Flow (gpm) Hydrant Curve 72 Data Disclaimer: Water distribution information is calculated using hydraulic modeling software and is subject to variation. Actual field conditions may vary. This information is provided to the requestor for evaluation purposes only, without warranty of any kind, including, but not limited to any expressed or implied warranty arising by contract, stature, or law. In no event regardless of cause, shall the City be liable for any direct, indirect, special, punitive or consequential damages of any kind whether such damages arise under contract, tort, strict liability or inequity. GIS Hydrant # Available Flow (gpm) Residual Pressure (psi)74 0 129.57 200 129.26 400 128.89 600 128.45 800 127.96 1,000.00 127.4 1,200.00 126.79 1,400.00 126.13 1,600.00 125.41 1,800.00 124.64 2,000.00 123.82 2,200.00 122.94 2,400.00 122.02 2,600.00 121.05 2,800.00 120.03 3,000.00 118.96 3,200.00 117.84 3,400.00 116.67 3,600.00 115.45 3,800.00 114.18 4,000.00 112.85 4,200.00 111.48 4,400.00 110.07 4,600.00 108.6 4,800.00 107.08 5,000.00 105.52 5,200.00 103.92 5,400.00 102.27 5,600.00 100.57 5,800.00 98.81 6,000.00 96.98 6,200.00 95.1 6,400.00 93.18 6,600.00 91.22 6,800.00 89.2 7,000.00 87.14 7,200.00 85.02 7,400.00 82.87 7,600.00 80.67 7,800.00 78.41 8,000.00 76.12 8,200.00 73.77 8,400.00 71.38 8,600.00 68.95 8,800.00 66.47 9,000.00 63.94 9,200.00 61.38 9,400.00 58.76 9,600.00 56.1 9,800.00 53.39 10,000.00 50.64 10,200.00 47.8 10,400.00 45 10,600.00 42.11 10,800.00 39.18 11,000.00 36.21 11,200.00 33.19 11,400.00 30.13 11,600.00 27.02 11,800.00 23.88 12,000.00 20.68 12,200.00 17.45 12,400.00 14.14 12,600.00 10.81 12,800.00 7.45 13,000.00 4.05 13,200.00 0.61 Hydrant Curve 0 20 40 60 80 100 120 140 0 2000 4000 6000 8000 10000 12000 14000Residual Pressure (psi)Available Flow (gpm) Hydrant Curve 74 Data Disclaimer: Water distribution information is calculated using hydraulic modeling software and is subject to variation. Actual field conditions may vary. This information is provided to the requestor for evaluation purposes only, without warranty of any kind, including, but not limited to any expressed or implied warranty arising by contract, stature, or law. In no event regardless of cause, shall the City be liable for any direct, indirect, special, punitive or consequential damages of any kind whether such damages arise under contract, tort, strict liability or inequity. Boutique Hotel Mendenhall 302 E. Mendenhall Street Date: 03.11.26 Sewer Demand Calculation - 91 Room MOD Average Day Sewer Demand : Hotel Use: Rooms =91 Average Demand per Room =80.0 Gal./Day/Room (See Comparable Facility Data) Average Day Demand =7,280 GPD Infiltration: Property Size =0.41 acres Infiltration Flow =62 GPD (150 gpd/acre per COB Design Standards) Total Development Average Day Demand: 7,342 GPD (domestic + infiltration) Total Development Peak Sewer Flow: Average Day Demand =7,280 GPD (domestic only) Equivalent Population =113 People (GPD / 64.4gpcd - 2015 Wastewater Facilities Plan) P =0.1130 (population/1,000) Peaking Factor =4.23 Peak Sewer Demand =30,784 GPD (avg. day demand)*(peaking factor) + Infiltration Flow =62 GPD (not peaked) Total Peak Flow =30,846 GPD (peaked domestic + infiltration) Peak Sewer Flow =21.42 GPM (peak flow)/(24 hrs/day)/(60 min/hr) 𝑄𝑚𝑎𝑥 𝑄𝑎𝑣𝑔 =18 +𝑠ℎ𝑛𝑠𝑠𝑎𝑛𝑑𝑠𝑛𝑑𝑛𝑑𝑛𝑛𝑙𝑑1/2 4 +𝑠ℎ𝑛𝑠𝑠𝑎𝑛𝑑𝑠𝑛𝑑𝑛𝑑𝑛𝑛𝑙𝑑1/2 Boutique Hotel Mendenhall Offsite Sewer Main Replacement Date: 10.07.2025 8" Sewer Main Pipe Capacity Input Values d =0.67 ft =8" y =0.500 ft =75% Calculated Values (Equations from Fluid Mechanics by Chow) Theta (Θ)4.19 rad 2*arccos(1-y/(d/2)) Area (A)0.28 ft2 (1/8)*(Θ-sinΘ)d2 Wetted Perimeter (P)1.40 ft 0.5Θd Hydraulic Radius (R )0.20 ft (.25)*(1-(sinΘ)/Θ)d Top Width (T)0.58 ft (sin 0.5Θ)d Mannings Equation (Equation from Fundamentals of Mechanics by Munson) n =0.013 (per COB Design Standards) S0 =0.0040 ft/ft (0.4% Min. Slope) Q =0.70 cfs Q = 1.49/n*A*R2/3*S00.5 Q =313.6 gpm Q gpm = (Q cfs)(7.48 gal/ft3)(60 sec/min) V =2.49 ft/s V = Q/A Results An 8" diameter sewer main flowing 75% full at a min. slope of 0.4% has a carrying capacity of 313.6 gpm. I:\2024\BOZ\B24-005 BHM Mendenhall\05_DESIGN\DEQ Water & Sewer\Parts\SEWER\B24-005 Offiste Sewer Calcs_DEQ.xls 1 OF 1