Loading...
HomeMy WebLinkAbout26 - Notice of Awards - Fowler Avenue Connection, Segment 1EJCDC® C-510, Notice of Award. Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 of 1 NOTICE OF AWARD Date of Issuance: Owner: Owner’s Project No.: Engineer: Engineer’s Project No.: Project: Contract Name: Bidder: Bidder’s Address: You are notified that Owner has accepted your Bid dated _______ for the above Contract, and that you are the Successful Bidder and are awarded a Contract for: ____________________________________ The Contract Price of the awarded Contract is $_______________. Contract Price is subject to adjustment based on the provisions of the Contract, including but not limited to those governing changes, Unit Price Work, and Work performed on a cost-plus-fee basis, as applicable. __________ unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award, or has been transmitted or made available to Bidder electronically. ☐ Drawings will be delivered separately from the other Contract Documents. You must comply with the following conditions precedent within 15 days of the date of receipt of this Notice of Award: 1. Deliver to Owner __________ counterparts of the Agreement, signed by Bidder (as Contractor). 2. Deliver with the signed Agreement(s) the Contract security (such as required performance and payment bonds) and insurance documentation, as specified in the Instructions to Bidders and in the General Conditions, Articles 2 and 6. 3. Other conditions precedent (if any): _______________________________________________ Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within 10 days after you comply with the above conditions, Owner will return to you one fully signed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions. Owner: _____________________________________________ By (signature): Name (printed): Title: Copy: Engineer City Manager City of Bozeman, Montana X Three (3) Three (3) PO Box 1426, Belgrade, MT 59714 CK May Excavating, Inc. Fowler Avenue Connection, Segment 1 22367.01Sanbell City of Bozeman, Montana 4,018,965.00 8/27/26 Fowler Avenue Connection, Segment 1 Docusign Envelope ID: 6109E6DF-881A-8917-82AA-72D1D032BFAD Acting City ManagerXXXXXXXXXXXX Jon Henderson August 30, 2026 Mr. Bob Murray Engineering Division City of Bozeman 20 East Olive Bozeman, MT 59715 SUBJECT: BID AWARD RECOMMENDATION Fowler Avenue Connection, Segment 1, Project No. 21263.01 Dear Bob: On August 27, 2026, competitive bids for the above referenced project were accepted and publicly opened. Four bids were received from the following companies: Knife River – Belgrade, SIME Construction, Williams Civil Construction, and CK May Excavating. Listed below is a summary of the verified bids and the engineer’s opinion of probable cost: Bidder Total Base Bid Knife River - Belgrade $ 4,706,421.75 SIME Construction $ 4,561,474.99 Williams Civil Construction $ 4,024,452.00 CK May Excavating $ 4,018,965.00 Engineer’s Opinion of Probable Cost $ 5,555,879.50 No discrepancies were noted in any of the bids. Based on this review, Sanbell recommends that the City of Bozeman move forward with a contract award to CK May Excavating in the amount of $4,018,965.00. A copy of the bid tabulation is attached for reference. Please call if you have any questions or would like further information. Sincerely, Joey Staszcuk, PE, PTOE, RSP1 Associate Principal enclosures: Bid Tabulation Docusign Envelope ID: 6109E6DF-881A-8917-82AA-72D1D032BFAD Fowler Avenue Connection Oak Street to Durston Road (#10302120) Owner: Bozeman MT, City of Solicitor: Sanbell 08/27/2026 03:00 PM MDT Engineer Estimate CK May Excavating, Inc. Williams Civil Construction Sime Construction, Inc. Knife River - Belgrade Section TitleLine Item Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Schedule I: Fowler Segment 1 $5,455,879.50 $3,918,965.00 $3,924,452.00 $4,461,474.99 $4,606,421.75 101 Mobilization and Insurance LS 1 $477,273.00 $477,273.00 $75,000.00 $75,000.00 $177,000.00 $177,000.00 $161,400.00 $161,400.00 $341,400.00 $341,400.00 102 Traffic Control LS 1 $150,000.00 $150,000.00 $5,000.00 $5,000.00 $51,900.00 $51,900.00 $49,200.00 $49,200.00 $35,000.00 $35,000.00 103 Storm Water Management and Erosion Control LS 1 $30,000.00 $30,000.00 $8,000.00 $8,000.00 $40,700.00 $40,700.00 $49,025.00 $49,025.00 $50,000.00 $50,000.00 104 Clear and Grub LS 1 $100,000.00 $100,000.00 $20,000.00 $20,000.00 $20,100.00 $20,100.00 $40,835.00 $40,835.00 $55,000.00 $55,000.00 105 Strip, Stockpile, and Replace or Dispose of Topsoil CY 11152 $10.00 $111,520.00 $21.00 $234,192.00 $11.00 $122,672.00 $20.45 $228,058.40 $16.00 $178,432.00 106 Unclassified Excavation (Includes embankment in place) CY 3271 $60.00 $196,260.00 $8.00 $26,168.00 $5.50 $17,990.50 $11.00 $35,981.00 $23.00 $75,233.00 107 Structural Import - Roadway CY 4200 $60.00 $252,000.00 $38.00 $159,600.00 $22.00 $92,400.00 $43.10 $181,020.00 $45.00 $189,000.00 108 Asphalt Removal SY 1015 $20.00 $20,300.00 $5.00 $5,075.00 $9.00 $9,135.00 $3.40 $3,451.00 $9.00 $9,135.00 109 Curb and Gutter Removal LF 560 $10.00 $5,600.00 $4.00 $2,240.00 $2.50 $1,400.00 $9.90 $5,544.00 $8.00 $4,480.00 110 Concrete Flatwork Removal SF 3785 $5.50 $20,817.50 $2.00 $7,570.00 $0.50 $1,892.50 $2.65 $10,030.25 $3.00 $11,355.00 111 Unstable Subgrade Stabilization CY 500 $100.00 $50,000.00 $55.00 $27,500.00 $43.00 $21,500.00 $73.60 $36,800.00 $78.00 $39,000.00 112 Asphalt Pavement (4-inch Section) SY 10140 $38.00 $385,320.00 $28.00 $283,920.00 $25.00 $253,500.00 $27.95 $283,413.00 $24.50 $248,430.00 113 1 1/2-inch Crushed Base Course Gravel (12-inch Section) CY 4168 $45.00 $187,560.00 $55.00 $229,240.00 $33.00 $137,544.00 $48.70 $202,981.60 $49.00 $204,232.00 114 Standard Curb and Gutter LF 6773 $25.00 $169,325.00 $23.00 $155,779.00 $34.00 $230,282.00 $23.75 $160,858.75 $22.50 $152,392.50 115 Asphalt Path (2.5-inch section, includes 9-inch base gravel) SY 4508 $30.00 $135,240.00 $35.50 $160,034.00 $30.00 $135,240.00 $37.60 $169,500.80 $32.00 $144,256.00 116 4-inch Thick Concrete Sidewalk SF 12912 $10.00 $129,120.00 $9.00 $116,208.00 $8.00 $103,296.00 $7.05 $91,029.60 $7.50 $96,840.00 117 6-inch Thick Fiber Reinforced Concrete Accessibility Ramp SF 4304 $16.00 $68,864.00 $13.00 $55,952.00 $16.00 $68,864.00 $10.25 $44,116.00 $18.25 $78,548.00 118 Truncated Dome Panel (2'x2') SF 614 $60.00 $36,840.00 $60.00 $36,840.00 $71.00 $43,594.00 $64.75 $39,756.50 $43.00 $26,402.00 119 New Sign Post & Foundation EA 32 $600.00 $19,200.00 $550.00 $17,600.00 $440.00 $14,080.00 $415.00 $13,280.00 $1,600.00 $51,200.00 120 New Sign Face EA 100 $200.00 $20,000.00 $150.00 $15,000.00 $110.00 $11,000.00 $210.00 $21,000.00 $205.00 $20,500.00 121 Surface-Mount Delineator EA 12 $20.00 $240.00 $100.00 $1,200.00 $130.00 $1,560.00 $275.00 $3,300.00 $240.00 $2,880.00 122 Type III Barricade EA 16 $600.00 $9,600.00 $400.00 $6,400.00 $510.00 $8,160.00 $395.00 $6,320.00 $500.00 $8,000.00 123 White Epoxy Pavement Markings GAL 25.5 $350.00 $8,925.00 $425.00 $10,837.50 $440.00 $11,220.00 $492.20 $12,551.10 $425.00 $10,837.50 124 Yellow Epoxy Pavement Markings GAL 29.3 $350.00 $10,255.00 $400.00 $11,720.00 $410.00 $12,013.00 $461.45 $13,520.49 $405.00 $11,866.50 125 2-inch SCH 80 PVC Conduit LF 3010 $18.00 $54,180.00 $15.00 $45,150.00 $10.00 $30,100.00 $9.00 $27,090.00 $15.00 $45,150.00 126 3-inch SCH 80 PVC Conduit LF 615 $30.00 $18,450.00 $17.00 $10,455.00 $15.00 $9,225.00 $13.00 $7,995.00 $17.00 $10,455.00 127 Pull Box-Composite Type 1 EA 44 $1,000.00 $44,000.00 $1,000.00 $44,000.00 $1,000.00 $44,000.00 $1,726.00 $75,944.00 $1,000.00 $44,000.00 128 Structural Concrete Pole Foundations (Assumes 2' x 5') CY 20.6 $1,900.00 $39,140.00 $1,850.00 $38,110.00 $2,000.00 $41,200.00 $2,962.00 $61,017.20 $1,900.00 $39,140.00 129 Conductor, Copper, #6 AWG LF 3000 $3.00 $9,000.00 $1.80 $5,400.00 $1.50 $4,500.00 $2.00 $6,000.00 $2.00 $6,000.00 130 Conductor, Copper, #8 AWG LF 5600 $2.20 $12,320.00 $1.60 $8,960.00 $1.50 $8,400.00 $1.70 $9,520.00 $1.75 $9,800.00 131 Conductor, Copper, #10 AWG LF 2100 $1.50 $3,150.00 $1.40 $2,940.00 $1.00 $2,100.00 $1.25 $2,625.00 $1.50 $3,150.00 132 Cable, Copper, 3 AWG #10 LF 110 $5.00 $550.00 $2.50 $275.00 $2.50 $275.00 $10.10 $1,111.00 $2.50 $275.00 133 Rectangular Rapid Flashing Beacon EA 4 $8,000.00 $32,000.00 $12,500.00 $50,000.00 $9,600.00 $38,400.00 $9,507.00 $38,028.00 $12,800.00 $51,200.00 134 High Efficacy Luminaire LED EA 32 $1,000.00 $32,000.00 $850.00 $27,200.00 $500.00 $16,000.00 $388.00 $12,416.00 $860.00 $27,520.00 135 Standard Luminaire Pole EA 32 $6,000.00 $192,000.00 $2,400.00 $76,800.00 $2,600.00 $83,200.00 $4,920.00 $157,440.00 $2,500.00 $80,000.00 136 Service Assembly EA 1 $4,000.00 $4,000.00 $7,500.00 $7,500.00 $8,000.00 $8,000.00 $4,385.00 $4,385.00 $7,500.00 $7,500.00 137 Private Utility Relocations / Crossings LS 1 $5,000.00 $5,000.00 $1.00 $1.00 $5,400.00 $5,400.00 $11,385.00 $11,385.00 $12,000.00 $12,000.00 138 Type II Bedding CY 100 $50.00 $5,000.00 $35.00 $3,500.00 $60.00 $6,000.00 $54.25 $5,425.00 $58.00 $5,800.00 139 Connect to Ex Storm Drain Manhole EA 1 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $3,400.00 $3,400.00 $2,375.00 $2,375.00 $2,500.00 $2,500.00 140 Connect to Ex Storm Drain Inlet EA 1 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $1,900.00 $1,900.00 $1,845.00 $1,845.00 $1,900.00 $1,900.00 141 Standard Storm Drain Frame EA 1 $2,000.00 $2,000.00 $750.00 $750.00 $640.00 $640.00 $985.00 $985.00 $1,100.00 $1,100.00 142 Curb Inlet Frame and Grate EA 22 $2,150.00 $47,300.00 $1,250.00 $27,500.00 $1,200.00 $26,400.00 $1,520.00 $33,440.00 $1,600.00 $35,200.00 143 48" Storm Drain Inlet Structure Base EA 20 $6,500.00 $130,000.00 $3,700.00 $74,000.00 $4,000.00 $80,000.00 $3,260.00 $65,200.00 $3,500.00 $70,000.00 144 60" Storm Drain Inlet Structure Base EA 3 $8,000.00 $24,000.00 $5,000.00 $15,000.00 $5,700.00 $17,100.00 $5,125.00 $15,375.00 $5,500.00 $16,500.00 145 60" Storm Drain Manhole Structure Base EA 1 $8,000.00 $8,000.00 $6,000.00 $6,000.00 $6,600.00 $6,600.00 $5,640.00 $5,640.00 $6,000.00 $6,000.00 146 15" FETs EA 5 $1,500.00 $7,500.00 $2,300.00 $11,500.00 $2,600.00 $13,000.00 $1,890.00 $9,450.00 $2,000.00 $10,000.00 147 18" FETs EA 2 $2,000.00 $4,000.00 $2,500.00 $5,000.00 $2,600.00 $5,200.00 $1,985.00 $3,970.00 $2,100.00 $4,200.00 148 24" FETs EA 1 $2,500.00 $2,500.00 $2,800.00 $2,800.00 $2,900.00 $2,900.00 $2,290.00 $2,290.00 $2,400.00 $2,400.00 149 36" ARCH Equivalent FETs EA 2 $5,000.00 $10,000.00 $4,000.00 $8,000.00 $3,900.00 $7,800.00 $3,310.00 $6,620.00 $3,500.00 $7,000.00 150 Trash Guard EA 1 $600.00 $600.00 $2,000.00 $2,000.00 $1,900.00 $1,900.00 $2,010.00 $2,010.00 $2,200.00 $2,200.00 151 12" Storm Drain RCP LF 190 $100.00 $19,000.00 $110.00 $20,900.00 $95.00 $18,050.00 $116.90 $22,211.00 $125.00 $23,750.00 152 15" Storm Drain RCP LF 495 $110.00 $54,450.00 $110.00 $54,450.00 $71.00 $35,145.00 $100.90 $49,945.50 $108.00 $53,460.00 153 18" Storm Drain RCP LF 228 $120.00 $27,360.00 $115.00 $26,220.00 $74.00 $16,872.00 $105.85 $24,133.80 $114.00 $25,992.00 154 24" Storm Drain RCP LF 47 $150.00 $7,050.00 $140.00 $6,580.00 $110.00 $5,170.00 $131.50 $6,180.50 $141.00 $6,627.00 155 12" Storm Drain PVC Pipe LF 95 $70.00 $6,650.00 $65.00 $6,175.00 $44.00 $4,180.00 $63.10 $5,994.50 $68.00 $6,460.00 156 15" Storm Drain PVC Pipe LF 525 $75.00 $39,375.00 $70.00 $36,750.00 $54.00 $28,350.00 $65.55 $34,413.75 $70.00 $36,750.00 157 24" Storm Drain PVC Pipe LF 230 $120.00 $27,600.00 $100.00 $23,000.00 $80.00 $18,400.00 $94.40 $21,712.00 $101.00 $23,230.00 158 36" ARCH Equivalent Storm Drain Pipe LF 95 $250.00 $23,750.00 $325.00 $30,875.00 $220.00 $20,900.00 $288.35 $27,393.25 $310.00 $29,450.00 159 Class I Angular Riprap SF 120 $50.00 $6,000.00 $20.00 $2,400.00 $13.00 $1,560.00 $23.50 $2,820.00 $25.00 $3,000.00 160 Connect to Ex Sanitary Sewer Manhole EA 3 $3,000.00 $9,000.00 $2,500.00 $7,500.00 $6,900.00 $20,700.00 $2,140.00 $6,420.00 $2,300.00 $6,900.00 161 60" Sanitary Sewer Manhole x 5' Depth EA 11 $7,500.00 $82,500.00 $6,800.00 $74,800.00 $7,500.00 $82,500.00 $5,715.00 $62,865.00 $6,100.00 $67,100.00 162 60" Sanitary Sewer Manhole Additional Depth (over 5') VF 55.5 $250.00 $13,875.00 $500.00 $27,750.00 $480.00 $26,640.00 $495.00 $27,472.50 $500.00 $27,750.00 163 48" Sanitary Sewer Manhole x 5' Depth EA 2 $6,000.00 $12,000.00 $5,800.00 $11,600.00 $5,000.00 $10,000.00 $4,730.00 $9,460.00 $5,000.00 $10,000.00 164 48" Sanitary Sewer Manhole Additional Depth (over 5') VF 9.4 $200.00 $1,880.00 $350.00 $3,290.00 $390.00 $3,666.00 $400.00 $3,760.00 $430.00 $4,042.00 165 8" Sanitary Sewer Pipe LF 574 $60.00 $34,440.00 $75.00 $43,050.00 $65.00 $37,310.00 $86.45 $49,622.30 $93.00 $53,382.00 166 24" Sanitary Sewer Pipe LF 2713 $150.00 $406,950.00 $100.00 $271,300.00 $120.00 $325,560.00 $107.05 $290,426.65 $115.00 $311,995.00 167 8" Sanitary Sewer Cap EA 4 $500.00 $2,000.00 $50.00 $200.00 $190.00 $760.00 $295.00 $1,180.00 $315.00 $1,260.00 168 Connect to ex 8" Sanitary Sewer Main EA 1 $1,500.00 $1,500.00 $1,000.00 $1,000.00 $1,900.00 $1,900.00 $1,580.00 $1,580.00 $1,700.00 $1,700.00 169 Remove & Dispose Existing Sanitary Sewer Pipe LF 1676 $50.00 $83,800.00 $8.00 $13,408.00 $28.00 $46,928.00 $52.05 $87,235.80 $56.00 $93,856.00 170 Remove Sanitary Sewer Manhole EA 7 $5,000.00 $35,000.00 $550.00 $3,850.00 $1,600.00 $11,200.00 $1,635.00 $11,445.00 $1,800.00 $12,600.00 171 Connect to ex 8" Water Main EA 4 $3,000.00 $12,000.00 $1,500.00 $6,000.00 $2,300.00 $9,200.00 $2,370.00 $9,480.00 $2,600.00 $10,400.00 172 Connect to ex 12" Water Main EA 1 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $7,700.00 $7,700.00 $5,740.00 $5,740.00 $6,200.00 $6,200.00 173 8" Zinc Coated Class 51 Ductile Iron Water Main LF 2520 $120.00 $302,400.00 $85.00 $214,200.00 $80.00 $201,600.00 $90.70 $228,564.00 $98.00 $246,960.00 174 6" Zinc Coated Class 51 Ductile Iron Water Main LF 65 $110.00 $7,150.00 $85.00 $5,525.00 $40.00 $2,600.00 $89.80 $5,837.00 $97.00 $6,305.00 175 8"x8" Cross EA 1 $2,000.00 $2,000.00 $1,500.00 $1,500.00 $1,400.00 $1,400.00 $1,190.00 $1,190.00 $1,300.00 $1,300.00 176 12"x8" Tee EA 1 $1,500.00 $1,500.00 $1,800.00 $1,800.00 $1,800.00 $1,800.00 $1,730.00 $1,730.00 $1,800.00 $1,800.00 177 8"x8" Tee EA 5 $1,250.00 $6,250.00 $1,900.00 $9,500.00 $1,000.00 $5,000.00 $965.00 $4,825.00 $1,000.00 $5,000.00 178 8"x6" Tee EA 6 $1,000.00 $6,000.00 $1,200.00 $7,200.00 $920.00 $5,520.00 $865.00 $5,190.00 $930.00 $5,580.00 179 8" Bends EA 5 $1,500.00 $7,500.00 $1,000.00 $5,000.00 $730.00 $3,650.00 $610.00 $3,050.00 $650.00 $3,250.00 180 8" Gate Valve EA 13 $3,000.00 $39,000.00 $3,600.00 $46,800.00 $2,700.00 $35,100.00 $3,515.00 $45,695.00 $3,800.00 $49,400.00 181 6" Gate Valve EA 6 $2,500.00 $15,000.00 $3,000.00 $18,000.00 $1,700.00 $10,200.00 $2,915.00 $17,490.00 $3,100.00 $18,600.00 182 2" Water Service Saddle and Connection EA 1 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $710.00 $710.00 $965.00 $965.00 $1,000.00 $1,000.00 183 2" Water Service Pipe LF 48 $75.00 $3,600.00 $100.00 $4,800.00 $93.00 $4,464.00 $112.65 $5,407.20 $121.00 $5,808.00 184 Irrigation Meter Pit and Assembly EA 1 $5,000.00 $5,000.00 $8,500.00 $8,500.00 $8,400.00 $8,400.00 $9,570.00 $9,570.00 $10,300.00 $10,300.00 185 Irrigation Curb Stop and Waste EA 2 $1,000.00 $2,000.00 $1,300.00 $2,600.00 $890.00 $1,780.00 $1,140.00 $2,280.00 $1,300.00 $2,600.00 186 8" Water Plug & Thrust EA 4 $1,800.00 $7,200.00 $1,000.00 $4,000.00 $790.00 $3,160.00 $460.00 $1,840.00 $500.00 $2,000.00 187 Fire Hydrant Assembly EA 6 $6,000.00 $36,000.00 $5,800.00 $34,800.00 $6,900.00 $41,400.00 $5,690.00 $34,140.00 $6,200.00 $37,200.00 188 2" Blowoff Assembly EA 5 $2,000.00 $10,000.00 $3,500.00 $17,500.00 $3,200.00 $16,000.00 $3,560.00 $17,800.00 $3,800.00 $19,000.00 189 Rigid Foam Insulation LF 294 $40.00 $11,760.00 $20.00 $5,880.00 $26.00 $7,644.00 $32.85 $9,657.90 $35.00 $10,290.00 190 Irrigation Sleeving LF 1300 $2.00 $2,600.00 $9.00 $11,700.00 $5.00 $6,500.00 $14.75 $19,175.00 $12.00 $15,600.00 191 6" Screened Top Soil CY 150 $45.00 $6,750.00 $50.00 $7,500.00 $18.00 $2,700.00 $58.90 $8,835.00 $57.00 $8,550.00 192 Organic Compost Amendment CY 1100 $65.00 $71,500.00 $82.00 $90,200.00 $71.00 $78,100.00 $87.55 $96,305.00 $72.00 $79,200.00 193 Fine Grading SF 175000 $0.12 $21,000.00 $0.25 $43,750.00 $0.09 $15,750.00 $0.25 $43,750.00 $0.09 $15,750.00 194 POC for Irrigation LS 1 $3,000.00 $3,000.00 $10,000.00 $10,000.00 $10,100.00 $10,100.00 $11,645.00 $11,645.00 $10,200.00 $10,200.00 195 Irrigation Clock LS 1 $3,500.00 $3,500.00 $6,500.00 $6,500.00 $9,700.00 $9,700.00 $10,345.00 $10,345.00 $9,800.00 $9,800.00 196 Decomposed Granite Mulch CY 55 $75.00 $4,125.00 $310.00 $17,050.00 $300.00 $16,500.00 $180.80 $9,944.00 $300.00 $16,500.00 197 Area for Drip Emitter Irrigation SF 4900 $1.35 $6,615.00 $3.50 $17,150.00 $5.00 $24,500.00 $3.35 $16,415.00 $5.00 $24,500.00 198 Area for Drip Line Irrigation SF 16100 $1.50 $24,150.00 $2.00 $32,200.00 $3.50 $56,350.00 $3.05 $49,105.00 $3.30 $53,130.00 199 Area for Rotary Irrigation SF 155000 $0.95 $147,250.00 $0.80 $124,000.00 $1.38 $213,900.00 $0.95 $147,250.00 $1.40 $217,000.00 200 Organic Mulch CY 85 $65.00 $5,525.00 $180.00 $15,300.00 $120.00 $10,200.00 $130.00 $11,050.00 $117.00 $9,945.00 201 Trees with Irrigation EA 164 $1,200.00 $196,800.00 $520.00 $85,280.00 $600.00 $98,400.00 $1,050.00 $172,200.00 $600.00 $98,400.00 202 Shrubs (5 gal) EA 52 $75.00 $3,900.00 $75.00 $3,900.00 $110.00 $5,720.00 $145.55 $7,568.60 $116.00 $6,032.00 203 Perennials (1 gal) EA 67 $65.00 $4,355.00 $40.00 $2,680.00 $47.00 $3,149.00 $45.15 $3,025.05 $44.00 $2,948.00 204 Grasses (1 gal) EA 296 $55.00 $16,280.00 $40.00 $11,840.00 $44.00 $13,024.00 $57.40 $16,990.40 $44.00 $13,024.00 205 Area for Seed SF 171000 $0.45 $76,950.00 $0.15 $25,650.00 $0.24 $41,040.00 $0.19 $32,490.00 $0.25 $42,750.00 207 Contech Stormwater Chamber System LS 1 $35,000.00 $35,000.00 $32,500.00 $32,500.00 $29,100.00 $29,100.00 $33,280.00 $33,280.00 $44,500.00 $44,500.00 208 Sanitary Sewer Bypass LS 1 $50,000.00 $50,000.00 $18,500.00 $18,500.00 $42,500.00 $42,500.00 $32,570.00 $32,570.00 $35,000.00 $35,000.00 209 Decorative Median Concrete SF 1380 $20.00 $27,600.00 $35.00 $48,300.00 $21.00 $28,980.00 $18.40 $25,392.00 $21.00 $28,980.00 210 Valley Gutter/Fillets SF 800 $18.00 $14,400.00 $16.00 $12,800.00 $18.00 $14,400.00 $15.65 $12,520.00 $14.00 $11,200.00 211 Mountable Roundabout Curb LF 176 $30.00 $5,280.00 $50.00 $8,800.00 $38.00 $6,688.00 $23.30 $4,100.80 $32.00 $5,632.00 212 Durston and Oak Transverse Trench Flow Fill CY 183 $120.00 $21,960.00 $200.00 $36,600.00 $170.00 $31,110.00 $202.25 $37,011.75 $195.00 $35,685.00 213 3"minus Durston SS Lateral Trench Backfill CY 637 $45.00 $28,665.00 $35.00 $22,295.00 $24.00 $15,288.00 $44.45 $28,314.65 $28.00 $17,836.00 214 1.5" Crushed Base Course Sidewalk Gravel (6" Section) CY 319 $45.00 $14,355.00 $65.00 $20,735.00 $28.00 $8,932.00 $115.25 $36,764.75 $33.00 $10,527.00 215 Oak St Concrete Median Cap Replacement SF 387 $10.00 $3,870.00 $6.50 $2,515.50 $17.00 $6,579.00 $12.95 $5,011.65 $8.75 $3,386.25 216 Oak St Pin Down Curb Replacement LF 48 $20.00 $960.00 $50.00 $2,400.00 $30.00 $1,440.00 $23.75 $1,140.00 $55.00 $2,640.00 Schedule I: Fowler Segment 1-Fixed $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 206 Miscellaneous Work UNIT 100000 $1.00 $100,000.00 $1.00 $100,000.00 $1.00 $100,000.00 $1.00 $100,000.00 $1.00 $100,000.00 Base Bid Total: $5,555,879.50 $4,018,965.00 $4,024,452.00 $4,561,474.99 $4,706,421.75 Docusign Envelope ID: 6109E6DF-881A-8917-82AA-72D1D032BFAD