HomeMy WebLinkAboutResolutions 2026-36 - APPROVING ALTERATION OR MODIFICATION OF CONTRACT WITH CK MAY EXCAVATING, INCRESOLUTION 2026-36 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION OR MODIFICATION OF CONTRACT WITH CK MAY EXCAVATING, INC WHEREAS, the City Commission did, on the 17TH day of April 2025, authorize award of the bid for the Riverside Lift Station and Force Main Project to CK May Excavating Inc; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, to wit: that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and CK May Excavating Inc, as contained in Change Order No. 2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 28TH day of April, 2026. ___________________________________ JOEY MORRISON Mayor ATTEST: ___________________________________ MIKE MAAS City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 406-586-8834 ■ 800-865-9847 (fax) ■ 1283 N. 14th Ave; Ste 101 ■ Bozeman, Montana 59715 ■ www.dowl.com April 9, 2026 Mr. Kellen Gamradt City of Bozeman P.O. Box 1230 Bozeman, MT 59771 Subject: Riverside Lift Station and Force Main – Change Order 2; Recommendation for Approval Dear Mr. Gamradt: Please see the following change order for the Bozeman Riverside Lift Station and Force Main project. This change order is the result of four field orders, miscellaneous addition, and reconciliation of final installed quantities. CO2-1: The door hardware and manual lock package was revised to include the City’s preferred Trilogy electronic lock set. This cost $1,495.62 CO2-2: The electric meter base was upsized from a 100 A base to the 200 amp base required by Northwestern Energy on any new commercial service. This resulted in an increase in cost of $2,682.75. CO2-3: The generator arrived with a weather-proof enclosure that was not needed for the interior generator installation. The enclosure was readily removed to allow the intended connections to the cooling air exhaust louver. However, some custom fabrication of a few engine exhaust fittings was required and delays incurred waiting for parts. This work increased project cost by $6,777.01. CO2-4: The City Water and Sewer Department requested the air release valve in the building discharge to the outside atmosphere rather than into the floor drain. This resulted in an increase in cost of $1,315.68. CO2-5: One additional manhole lid had to be swapped with waterproof lid, as the previous change order included moving one of the manholes into the floodplain to avoid an existing watermain found in a different location than anticipated. This resulted in an increase in cost of $1,456.68. CO2-6: The final reconciliation of quantities is included in this change order. The amount of gravity sewer increased, while other quantities decreased from the bidding to construction. This resulted in a savings of $4,032.50 The increase in the contract amount for the six items on this change order is $9,695.24. The requested increase in contract time includes delays related to Northwestern Energy arriving to relocate an existing electrical line as a required part of the project. This delayed excavation for the building foundation and below-grade piping. Additional delays were experienced waiting for delivery of the larger meter base for change order item CO2-2 and delays incurred modifying the generator engine exhaust as part of CO2-3. A total of 92 additional calendar days are recommended for an adjusted substantial completion date of April 20. We further recommend approval of this change order for the amount of $9,695.24. Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Page 2 of 2 The project is complete with no further adjustments in cost anticipated at this time. The total increase in project construction cost from the bid price of $1,782,351 is approximately $19,265. Further, the engineering services budget should have in excess of $100,000 remaining at project completion that will not need to be expended for the project. Overall, the project costs will end approximately $1 million under the estimated project costs from before bidding. Please let us know if you have any questions. Sincerely, DOWL Kevin R. Johnson, PE, BCEE Project Manager Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2 Change Order No. 2 Date of Issuance: Effective Date: Project: Riverside LS & FM Owner: Owner's Contract Rep.: Kellen Gamradt Contract: Date of Contract: June 5, 2025 Contractor: CK May Engineer's Project No.: 4563.12580.01 The Contract Documents are modified as follows upon execution of this Change Order: Description: CO2-1: Revise door hardware package to Trilogy electronic lock set. CO2-2: Provide 200A meter base instead of 100A per Northwestern Energy. CO2-3: Remove generator weather enclosure and modify engine exhaust to discharge as shown in drawings CO2-4: Modify air release valve discharge to discharge air outside of building CO2-5: Watertight lid for second manhole that landed in the floodway after relocation to avoid water main CO2-6: Reconciliation of final unit price quantities Attachments (list documents supporting change): CO2-1: See attached documentation. Per Field Order #5 CO2-2: See attached documentation: Per Field Order #7 CO2-3: See attached documentation: Per Field Orders #8 CO2-4: See attached documentation: Per Field Orders #9 CO2-5: Field Order – Misc items. CO2-6: Reconciliation of final quantities CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: Calendar days Substantial completion (days or date): 180 $1,782,351.00 Ready for final payment (days or date): 210 Increase from previously approved Change Orders No. 1 : Increase from previously approved Change Orders No. 1: Substantial completion days: 0 $9,570.58 Ready for final payment days: 0 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion days: 180 $1,791,921.58 Ready for final payment days: 210 Increase of this Change Order: Increase of this Change Order: Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 15 April 28, 2026 EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 2 of 2 Substantial completion days: 92 $9,695.24 Ready for final payment days: 92 Contract Price incorporating this Change Order: Contract Times incorporating approved Change Orders: Substantial completion days: 272 $1,801,616.82 Ready for final payment days: 302 Item Description Total Price CO2-1 Revise door hardware package to Trilogy electronic lock set. $1,495.62 CO2-2 Provide 200A meter base instead of 100A as specified. $2,682.75 CO2-3 Remove generator enclosure and modify engine exhaust to discharge as shown in drawings. $6,777.01 CO2-4 Modify air release valve discharge $1,315.68 CO2-5 Provide watertight lid for additional manhole $1,456.68 CO2-6 Reconciliation of Final Quantities -$4,032.50 Total CO2 $9,695.24 RECOMMENDED: ACCEPTED: ACCEPTED: By: By: By: Engineer (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature) Date: Date: Date: Approved by Funding Agency (if applicable): ____________________________________________________________ Date: Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 4/29/2026 4/29/2026 Bozeman, MT QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments 1 EA $ 1,310.40 $ 1,310.40 -1 EA 536.00$ (536.00)$ 1LS $ 650.00 $ 650.00 $ - $ 71.22 Total Cost $ 1,495.62 Field Order - Pricing Detail CONTRACTOR: CK May Excavating PROJECT NAME:Riverside Lift Station and Force Main REPRESENTATIVE:Jim Blair ADDRESS: DOWL FAX:November 7, 2025 DESCRIPTION:Field Order 05: Door Hardware Description: Revise the door hardware as follows: Main Entry Door (D100): Revise hardware to include Trilogy DL2700 electronic lock set Generator Room (D200): Revise hardware to inside opening only P.O. Box 1426 Belgrade, MT 59714 PROJECT LOCATION: PHONE: 406-539-6559 REQUESTED FROM: ON DATE: Contractors Fee (15%) Description EQUIPMENT:N/A Contractors Fee (15%) Description LABOR:N/A Description MATERIALS:N/A Date: 12/23/2025Authorized Signature Description Contractors Fee (15%) SUBCONTRACT:2 - ALARM LOCK TRILOGY DL2700/26D Bozeman Safe and Lock Programming 2 - BEST 9KAB37DS3626 ENTRYLOCK Contractors Fee (5%) Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 DATES ACCOUNTING TIME in Calendar Days C.O. No. DESCRIPTION INITIATED NEGOTIATED FINALIZED COST / (CREDIT) CUMULATIVE AMOUNT TO DATE EXTENSION ADJUSTED TOTAL 2 - ALARM LOCK TRILOGY DL2700/26D 12/08/25 $1,310.40 $1,310.40 None at this time 2 - BEST 9KAB37DS3626 ENTRY LOCK 12/08/25 -$536.00 -$536.00 None at this time Bozeman Locks Programming 12/08/25 $650.00 $650.00 None at this time Change Order Total:Total:$1,424.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACTOR SHEETS REFERENCED RESPONSE DATE Big Horn Customs 08 71 00 Riverside Lift Station and Force Main 1 12/08/25 Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 EJCDC C-942 Field Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 1 Field Order No. 5 Date of Issuance: 11-7-2025 Effective Date: 11-7-2025 Project: Riverside LS and FM Owner: City of Bozeman Owner's Contract No.: Contract: Lift Station and Force Main Date of Contract: June 5, 2025 Contractor: CK May Excavating, Inc. Engineer's Project No.: 4563.12580.01 Attention: You are hereby directed to promptly execute this Field Order issued in accordance with General Conditions Paragraph 9.04.A, for minor changes in the Work without changes in Contract Price or Contract Times. If you consider that a change in Contract Price or Contract Times is required, please notify the Engineer immediately and before proceeding with this Work. You are hereby directed to promptly execute this Field Order issued in accordance with General Conditions Paragraph 9.04.A, for minor changes in the Work without changes in Contract Price or Contract Times. If you consider that a change in Contract Price or Contract Times is required, please notify the Engineer immediately and before proceeding with this Work. You are hereby directed to promptly execute this Field Order issued in accordance with General Conditions Paragraph 9.04.A, for minor changes in the Work without changes in Contract Price or Contract Times. If you consider that a change in Contract Price or Contract Times is required, please notify the Engineer immediately and before proceeding with this Work. Reference: 08700 – Door Hardware A1-1 – Door Hardware Schedule (Specification Section(s)) (Drawing(s) / Detail(s)) Description: Revise the door hardware as follows: Main Entry Door (D100): Revise hardware to include Trilogy DL2700 electronic lock set Generator Room (D200): Revise hardware to inside opening only. Attachments: Door hardware cut sheets Engineer: Receipt Acknowledged by Contractor: Date: Copy to Owner Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Trilogy® T2: DL2700 #1 most popular standalone pushbutton cylindrical lock Durable electronic digital locks available in indoor and outdoor models Ideal for schools, healthcare, pharmacies, offices, retail and airports. • Grade 1 Durability. Dependable lockset with rugged clutch mechanism, plus vandal-proof all metal keypad. • Multi-level user codes: Master, 10 managers, 90 users, 3 service codes • Up to 100 different user codes (3-5 digits) • 100% keypad programmable with a fingertip • Individual, group or total user lockout codes • Easy passage mode by manager and/or master • Easy to install in about an hour, retrofits cylindrical knobsets and digital locks using slightly modified ANSI 161 Series Prep • Standalone battery operated; 5 AA batteries rated at 200,000 cycles • Non-handed for easy installation and versatility • 2-wire remote override • Visual and audible entry indicators • WP Models for weatherproof performance, water-sealed for use inside and out, with operational temperature range of +151°F to -31°F (+66°C to -35°C) (Note: all Trilogy models are available in WP weatherproof and non-WP standard models for interior doors.) Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 1 7/8 in.1 11/16 in.3 1/4 in.3 1/4 in. 2 1/8 in. 8 in.8 1/4 in. 1 3/4 in. 2 9/16 in.4 3/4 in. 2 1/4 in. OUTSIDEINSIDEOUTSIDEINSIDE Lever set in US3 DL2700/3 With IC Core in 26D DL2700IC/26D Secure battery compartment on inside door DL2775/26D OPERATION: Clutch mechanism permits turning lever without retracting latch and reduces stress on lock bodies and spindle. Outside lever free turning in locked position. Entering access code, key bypass, or remote bypass will allow lever to retract latch. Inside lever always instant egress. DOOR THICKNESS: 1 5/8" to 1 7/8." Other thicknesses. Please consult Alarm Lock. BACKSET: 2 3/4" Standard. 2 3/8" backset also available. KEYPAD: All metal, 12 button programmable for multi-level access functions including group or individual user codes, master and management codes, passage and emergency or service code, lockout and remote override capability and allowable entry time from 5 to 20 seconds. 4 Different keypad tones and keypad may be silenced. STANDARD KEY OVERRIDE CYLINDERS: Solid brass 6 pin tumbler cylinder pinned 5, SC1 keyway, furnished in all locks. Additional tailpieces included: HW580 fits Schlage, Corbin/ Russwin CL, Sargent 480 Series, ASSA65-611. Model HW620 fits Ilco and Lori cylinders. INTERCHANGEABLE CORE MODELS: Accepts 6 & 7 Pin Cylinders from: Best, Arrow, KSP, Medeco Keymark & Kaba Peaks. Also available IC Core models for Yale, Medeco, Sargent, Corbin/ Russwin CL and Schlage. Alarm Lock Tailpiece is supplied; IC Core is not included. LATCHBOLT: UL Listed, fire rated, 3 hours, 1/2” throw, solid brass, deadlocking. Reversible. Adjustable front for flat or beveled doors. STRIKE: 1 1/8” x 2 3/4” T strike & 1 1/4” x 4 7/8” ASA strike included. With screws for wood or metal jambs. LATCH FRONT: 1 1/8” x 2 1/4” wrought brass or stainless steel. HANDING: Non-handed. FINISHES: US3 polished brass, US26D satin chrome, 10B Duronodic. POWER: 5 AA alkaline batteries are now rated at 200,000 cycles, supplied. Audible low battery alert, visual and audible entry indicators, unique Flex Drive® motor. DOOR PREP: Standard ANSI 161 Series Prep, modified by adding additional through-bolt holes. COMPLIANCES: Grade I, heavy duty cylindrical lockset, UL listed and FCC certified. ADA compliant leversets. Alarm Lock Systems, LLC (A Divsion of NAPCO Security Technologies, Inc.) 333 Bayview Ave, Amityville, New York 11701 1-800-ALA-LOCK • ++ 631.842.9400 • Fax 631-789-3383 www.alarmlock.com • salesinfo@alarmlock.com Trilogy, Networx and LocDown are trademarks of NAPCO Security Technologies. Other trademarks listed are those of their respective companies. Preliminary specifications subject to change without prior notice. © 2016.3 ALA129 Trilogy is available in many additional models, including those for outdoors, and/or Mortise, plus with Prox ID card reader, dual-sided keypads, wireless lock networks and more. Some other Trilogy Options: DL2700LD: With LocDown™ Indicator Light Bar & Keyfob DL2800: Economical Audit Trail Security Lock provides keyless entry for up to 200 users DL1200/1300: Models for Narrow Stile Glass Doors DL/PDL5300: Dual-Sided PIN/Prox Lock with audit/trail DL3000, DL3200: Advanced digital electronic door lock with audit trail See Trilogy Networx™ Locks for wireless network capabilities Finish: /3 = US3 Polished Brass /26D = US26D Satin Chrome /10B = Duronodic Special Order IC Prep: -Y = Yale -M = Medeco -R = Sargent -C = Corbin/Russwin -S = Schlage DL 27 00 WP IC /26D -Y Model & Series: DL27 = Trilogy T2 SeriesTrim: 00 = Lever 75 = Regal Trim Lever Exterior / Interior Use: WP = Weatherproof for exterior use (Note: No “WP” indicates standard, interior use.)Cylinder: IC = Standard Interchangeable Core Prep for Best, Falcon, Arrow, KSP (Note: No “IC” indicates standard K.O. cylinder.) Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Code compliance Specifications CL2 Series Grade-2 cylindrical lever locks Chassis Steel, zinc dichromated for corrosion resistance Trim 5” solid zinc die-cast levers, 3-3/8” wrought brass roses Lever Return Anti-sag mechanism with independent lever return springs to prevent lever sag Handing Non-handed, completely reversible Backset 2-3/4" standard, 2-3/8" optional Latch Stainless steel, 1/2” throw spring latch or deadlatch, 1-1/8" x 2-1/4" face standard Strike 4-7/8” x 1-1/4” ASA/ANSI strike with curved lip, optional t-strike or full lip strike Cylinder Options 6-pin conventional, C keyway, keyed different, with 2 keys or Prepared for (SFIC) small format interchangeable core (less core) Thru-bolts Removable thru bolts, can be installed without thru-bolts Fasteners Combination screws for wood or metal doors & frames Door Prep ANSI A115.2 - 2-1/8” crossbore with (2) 3/8” thru-bolt holes Door Thickness Factory set for 1-3/4” - can be adjusted to fit 1-3/8” up to 2” thick doors Finishes US26D/626 satin chrome, 622 matte black Warranty Limited lifetime warranty Copyright © 2023 Trudoor LLC, Trudoor - Doors & Hardware, and TRUDOOR® All Rights Reserved. TRUDOOR.COM | 1-844-TRUDOOR ANSI/BHMA Meets & exceeds ANSI/BHMA A156.2, Series 4000, Grade 2 standards UL/cUL UL listed for “A” label 3 hour fire-rated doors ADA Meets ADA and ANSI A117.1 accessibility codes CA Fire Meets California code for 1/2” lever return to door face Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 CL2 Series Grade-2 cylindrical lever locks Latch bolt operated by inside lever. Non-removable blank plate outside. Inside lever always free for immediate egress. CL2-111 ANSI F111 Communicating Passage/Exit Latch Copyright © 2023 Trudoor LLC, Trudoor - Doors & Hardware, and TRUDOOR® All Rights Reserved. TRUDOOR.COM | 1-844-TRUDOOR Keyed functions Outside lever is always locked. Entrance by key only. Inside lever is always unlocked and always free for immediate egress. CL2-86-SFIC CL2-86 ANSI F86 Storeroom Outside lever is locked and unlocked by key. Inside lever is always unlocked and always free for immediate egress. CL2-84-SFIC CL2-84 ANSI F84 Classroom Turn / push button locking: Pushing and turning inside button locks outside lever, requiring use of key until button is manually unlocked. Pushing button locks outside lever until unlocked with key or inside lever is turned. Inside lever always free for immediate egress. CL2-82-SFIC CL2-82 ANSI F109 Entry / Office Non-keyed functions Inside lever locked by push button and unlocked by emergency release outside, rotating inside lever or closing door. Inside lever always free for immediate egress. CL2-76 ANSI F76 Privacy Surface mounted rigid lever. Use as door pull or matching inactive trim. No latch. Both levers always unlocked and always free for immediate egress. CL2-75 ANSI F75 Passage CL2-SD Single Dummy Trim Prepped for (SFIC) Small Format Interchangeable Core (less core). Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Bozeman, MT QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments 1 EA $ 2,555.00 $ 2,555.00 $ - $ - $ - $ 127.75 Total Cost $ 2,682.75 ADDITIONAL CONTRACT DAYS REQUESTED:45 DAYS Contractors Fee (5%) Date: 04/02/2026Authorized Signature Description Contractors Fee (15%) SUBCONTRACT:200A Meter Base Description MATERIALS:N/A Contractors Fee (15%) Description EQUIPMENT:N/A Contractors Fee (15%) Description LABOR:N/A DOWL FAX:December 15, 2025 DESCRIPTION:Field Order 07: Elec Meter Base Description: Provide 200 A meter base to the building in place of the 100 A meter base. P.O. Box 1426 Belgrade, MT 59714 PROJECT LOCATION: PHONE: 406-539-6559 REQUESTED FROM: ON DATE: Field Order - Pricing Detail CONTRACTOR: CK May Excavating PROJECT NAME:Riverside Lift Station and Force Main REPRESENTATIVE:Jim Blair ADDRESS: Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 6131 Homestead Blvd PO Box 1934 Colstrip, MT 59323 TEL: (406) 748-4048 FAX: (406) 748-3135 647 S. 18th Street W. Billings, MT 59102 TEL: (406) 656-4365 FAX: (406) 656-4534 4105 S. Broadway Minot, ND 58701 TEL: (701) 500-1007 FAX: (406) 748-3135 www.ceionline.com Page 1 of 1 January 13, 2026 CK MAY RE: Riverside Lift 200A Meter Attn: Jim Blair Per your request, CEI would like to offer the following price for the above-mentioned project located in Bozeman, MT. Estimate: Total $ 2,555.00 Notes: 1) Estimate includes the return of the 100A meter and the purchase of a 200A meter. If you have any further questions, please call me at (406)670-4183. Respectfully, Brodie McDonald Project Manager Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Bozeman, MT QTY Hours Unit Price Cost Comments 17.50 $ 67.50 $ 506.25 17.50 $ 13.44 $ 100.80 16.00 $ 54.00 $ 324.00 16.00 $ 13.44 $ 80.64 15.50 $ 48.00 $ 264.00 15.50 $ 13.44 $ 73.92 12.00 $ 51.00 $ 102.00 12.00 $ 13.44 $ 26.88 $ - $ 221.77 QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments 1 LS $ 1,635.00 $ 1,635.00 1LS 3,200.00$ $ 3,200.00 $ - $ 241.75 Total Cost $ 6,777.01 ADDITIONAL CONTRACT DAYS REQUESTED:45 DAYS Contractors Fee (5%) Date: 04/02/2026Authorized Signature Description Contractors Fee (15%) SUBCONTRACT:Bighorn Customs: Fabrication, welding, misc. parts, removal on original exhaust, and installation of Generac exhaust. CEI Electrical Contractors: Supply Generac open set exhaust components. Description MATERIALS:N/A Contractors Fee (15%) Description EQUIPMENT:N/A Contractors Fee (15%) Description LABOR:TH (OT Wage) TH (Hourly Fringe Benefit) CL (OT Wage) CL (Hourly Fringe Benefit) JM (OT Wage) JM (Hourly Fringe Benefit) CP (OT Wage) CP (Hourly Fringe Benefit) DOWL FAX:February 9, 2026 DESCRIPTION:Field Order 08: Generator Enclosure Removal Description: Remove the weather/sound enclosure from the emergency generator assembly. Modify engine exhaust connection to discharge as shown in the drawings. P.O. Box 1426 Belgrade, MT 59714 PROJECT LOCATION: PHONE: 406-539-6559 REQUESTED FROM: ON DATE: Field Order - Pricing Detail CONTRACTOR: CK May Excavating PROJECT NAME:Riverside Lift Station and Force Main REPRESENTATIVE:Jim Blair ADDRESS: Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 6131 Homestead Blvd PO Box 1934 Colstrip, MT 59323 TEL: (406) 748-4048 FAX: (406) 748-3135 647 S. 18th Street W. Billings, MT 59102 TEL: (406) 656-4365 FAX: (406) 656-4534 4105 S. Broadway Minot, ND 58701 TEL: (701) 500-1007 FAX: (406) 748-3135 www.ceionline.com Page 1 of 1 April 2, 2026 CK MAY RE: Riverside Lift Generator Exhaust Attn: Jim Blair Per your request, CEI would like to offer the following price for the above-mentioned project located in Bozeman, MT. Estimate: Total $ 3,200.00 Notes: 1) Estimate includes exhaust parts from Generac. If you have any further questions, please call me at (406)670-4183. Respectfully, Brodie McDonald Project Manager Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 DATES ACCOUNTING TIME in Calendar Days C.O. No. DESCRIPTION INITIATED NEGOTIATED FINALIZED COST / (CREDIT) CUMULATIVE AMOUNT TO DATE EXTENSION ADJUSTED TOTAL Misc. Generator Exhaust Parts 04/02/26 $385.00 $385.00 Exhaust Welding 04/02/26 $400.00 $400.00 Exhaust Labor 04/02/26 $850.00 $850.00 Change Order Total:Total:$1,635.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACTOR SHEETS REFERENCED RESPONSE DATE Big Horn Customs Gen Set Exhaust Riverside Lift Station and Force Main 2 04/02/25 Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Bozeman, MT QTY Hours Unit Price Cost Comments 15.00 $ 67.50 $ 337.50 15.00 $ 13.44 $ 67.20 15.00 $ 54.00 $ 270.00 15.00 $ 13.44 $ 67.20 15.00 $ 54.00 $ 270.00 15.00 $ 13.44 $ 67.20 $ - $ 161.87 QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments 2 EA $ 18.41 $ 36.82 2EA $ 10.00 $ 20.00 1EA $ 8.15 $ 8.15 $ - $ 9.75 QTY Units Unit Price Cost Comments $ - $ - $ - Total Cost $ 1,315.68 ADDITIONAL CONTRACT DAYS REQUESTED:1 DAY Contractors Fee (5%) Date: 04/02/2026Authorized Signature Description Contractors Fee (15%) SUBCONTRACT:N/A Description MATERIALS:2" X 6" SCH 40 304SS WELDED NIPPLE TBE 1" X 12" GALVANIZED NIPPLE 1" GALVANIZED Ml COUPLING Contractors Fee (15%) Description EQUIPMENT:N/A Contractors Fee (15%) Description LABOR:TH (OT Wage) TH (Hourly Fringe Benefit) CL (OT Wage) CL (Hourly Fringe Benefit) JM (OT Wage) JM (Hourly Fringe Benefit) DOWL FAX:February 23, 2026 DESCRIPTION:Field Order 09: ARV Discharge Description: In order to prevent sewer gas buildup inside of the lift station building, per the City of Bozeman request, the air release valve discharge inside shall be routed out of the building rather than to the floor drain as shown in the bid drawings. Add building penetration near the existing bypass pipe to the south and provide a 90 degree downward bend at the end of the pipe. Additionally, the pipe connecting the air release valve to the process piping in the building shall be stainless steel, not galvanized. Replace any galvanized fittings between the saddle and air release valve with stainless steel. P.O. Box 1426 Belgrade, MT 59714 PROJECT LOCATION: PHONE: 406-539-6559 REQUESTED FROM: ON DATE: Field Order - Pricing Detail CONTRACTOR: CK May Excavating PROJECT NAME:Riverside Lift Station and Force Main REPRESENTATIVE:Jim Blair ADDRESS: Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Bozeman, MT QTY Hours Unit Price Cost Comments 12.00 $ 67.50 $ 135.00 12.00 $ 13.44 $ 26.88 12.00 $ 54.00 $ 108.00 12.00 $ 13.44 $ 26.88 $ - $ 44.51 QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments 2 EA $ 30.96 $ 61.92 1EA $ 733.00 $ 733.00 0.5 EA $ 350.00 $ 175.00 $ - $ 145.49 QTY Units Unit Price Cost Comments $ - $ - $ - Total Cost $ 1,456.68 ADDITIONAL CONTRACT DAYS REQUESTED:1 DAY Field Order - Pricing Detail CONTRACTOR: CK May Excavating PROJECT NAME:Riverside Lift Station and Force Main REPRESENTATIVE:Jim Blair ADDRESS: DOWL FAX: DESCRIPTION:Field Order XX: Description: Replace valve box lids (2) with word “sewer” lids Add second watertight/gasketed MH lid for MH 2 that is now in the floodway on account of relocation P.O. Box 1426 Belgrade, MT 59714 PROJECT LOCATION: PHONE: 406-539-6559 REQUESTED FROM: ON DATE: Contractors Fee (15%) Description EQUIPMENT:N/A Contractors Fee (15%) Description LABOR:TH (OT Wage) TH (Hourly Fringe Benefit) CL (OT Wage) CL (Hourly Fringe Benefit) Description MATERIALS:5-1/4" VALVE BOX DROP LID 1-1/2" 6800 MARKED 30.960 61.92 JIM "SEWER" DOMESTIC #06800030 EJIW 6" X 24" RING WITH HINGED GASKETED AND LOCKING COVER MARKED "SEWER" DOMESTIC OLYMPIC FOUNDRY #15-11- 3865SET FREIGHT FOR RING AND COVER Date: 04/02/2026Authorized Signature Description Contractors Fee (15%) SUBCONTRACT:N/A Contractors Fee (5%) Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 To: T-0 ~H.D. FOWLER COMPANY REMIT: PO Box 84368, Seattle, WA 98124 Invoice Number 17268094 CK MAY EXCAVATING INC PO BOX 1426 BELGRADE MT 597141426 BZWH # 031133 .. Corporate Office 3633 136th Pl SE, Ste 100, Bellevue, WA 98006 PO Box 160, Bellevue, WA 98009-0160 Phone 425-654-8800 * Fax 425-641-8885 Bozeman Branch 101 Barrelman St Belgrade, MT 59714 (406) 388-1169 Fax (406) 388-4963 Ship to: Order# 08843568 HD Fowler Company -Bozeman Belgrade MT 59714 Inv Date: Order Writer: 03/30/26 Bryan Binder 1 /1 Terms: 10P+30 Due: 05/10/26 PO/JOB: RIVERSIDE FOB: H. D. FOWLER Ship Via: WILL CALL Line Qty Ship'd Qty Part# BO'd UoM Description RIVERSIDE LIFT STATION AND F Unit Price Extended T Price X 1 2 0 EA 5-1/4" VALVE BOX DROP LID 1-1/2" 6800 MARKED 30.960 61.92 JIM "SEWER" DOMESTIC #06800030 EJIW Serving the Pacific Northwest since 1911 www.hdfowler.com Terms & Conditions: hdfowler.com/tcs Sub total Freight Tax Grand Total 61.92 0.00 0.00 61.92 Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 PO Box 160 * Bellevue, WA * 98009-0160 To:BRYAN bryanbi@hdfowler.com CK MAY EXCAVATING INC (031133) 03/26/26 10:38:10am From:Bryan Binder Phone: (406) 388-1169 x3030 Order Acknowledgement This order requires confirmed receipt of this acknowledgement because it contains special order items which are indicated by two asterisks (**). Please approve this order by simply replying to this email message, or by printing the attachment, signing and returning it back to us. Non-Stocks, Special Orders or Engineered items may not be returnable. Those that are returnable are subject to a minimum 25% restock fee. Some orders may also have applicable freight charges not shown on this Order Acknowledgement. I accept this as written. Please get this order for me as listed below. Signature Date Print Name Your PO: Ordered By: Est. Ship Date: Shipping From: Project: Order Date: Order #: Ship VIA: Freight Terms: RIVERSIDE JIM 04/02/26 Bozeman Warehouse RIVERSIDE LIFT STATION AND FORCE MAIN 03/26/26 O8855421 WILL CALL Line#Item Unit Qty Price Ext. Price Tax 1 6" X 24" RING WITH HINGED GASKETED AND LOCKING **EA 2 733.00 1,466.00 N COVER MARKED "SEWER" DOMESTIC OLYMPIC FOUNDRY #15-11-3865SET 2 FREIGHT ESTIMATE FOR RING AND COVER EA 1 350.00 350.00 N Total 1,816.00 Freight 0.00 Tax 0.00 Grand Total 1,816.00 Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 .iverside LIft Station and Force Main (#9506981)Owner: Bozeman MT, City ofSolicitor: Bozeman MT, City of4/8/2026 Quantity .econciliationCK May Excavating, Inc.Section TitleLine ItemItem CodeItem DescriptionUofMQuantityUnit PriceExtensionQuanity InstalledQuantity DifferenceCost DifferenceLift Station and FM$1,782,351.002101Mobilization-DemobilizationLS1$120,000.00$120,000.0010$0.003102Taxes, Bonds, InsuranceLS1$22,850.00$22,850.0010$0.004103General .equirementsLS1$10,600.00$10,600.0010$0.005104Install 6-inch HDPE Force Main Open CutLF3544$110.00$389,840.0035440$0.006105Install 10-inch HDPE Casing- HDDLF453$390.00$176,670.004530$0.007106Install 6-inch HDPE Force Main- HDDLF274$110.00$30,140.002740$0.008107Install 6-inch HDPE inside 10-inch HDPE CasingLF453$22.00$9,966.004530$0.0091086-inch HDPE BendsEA5$2,180.00$10,900.004-1($2,180.00)101096-inch CouplingsEA5$1,650.00$8,250.0050$0.00111106" Plug Valves & BoxEA2$6,100.00$12,200.0020$0.0012111Force Main Air .elief Valves & MHLS1$31,000.00$31,000.0010$0.0013112Tracer Wire Test StationsEA9$290.00$2,610.0090$0.0014113Connect To Existing COB W.F manholeLS1$10,500.00$10,500.0010$0.0015114Install 10" Gravity Sewer MainLF52$110.00$5,720.007826$2,860.001611548-inch Gravity Sewer ManholesEA2$8,100.00$16,200.0020$0.0017116Underground Utility CrossingsEA13$375.00$4,875.00130$0.0018117Surface .estoration - TurfLF3159$12.00$37,908.0031590$0.0019118Surface .estoration - AsphaltLF109$1.00$109.001090$0.0020119Surface .estoration - GravelLF276$1.00$276.002760$0.0021120Erosion ControlLS1$3,800.00$3,800.0010$0.0022121Traffic ControlLS1$6,000.00$6,000.0010$0.0023122Excavation, Dewatering, Site Work and GradingLS1$44,500.00$44,500.0010$0.0024123Lift Station Wet Well, Lid, HatchLS1$36,300.00$36,300.0010$0.0025124Process Mech., Pumps, Control Panel, Pipe, Fittings and EquipmentLS1$275,000.00$275,000.0010$0.0026125Building EnclosureLS1$230,835.00$230,835.0010$0.0027126Building Mechanical (HPV)LS1$56,500.00$56,500.0010$0.0028127Process and Building ElectricalLS1$150,000.00$150,000.0010$0.0029128Instrumentation and Controls (SCADA)LS1$50,000.00$50,000.0010$0.0030129Tree .emovalLS1$1.00$1.0010$0.0031130Water Main DropLS1$7,250.00$7,250.000.35-0.65($4,712.50)32131Landscaping .estorationLS1$1.00$1.0010$0.0033132DewateringLS1$17,000.00$17,000.0010$0.0034133MDT BondLS1$4,550.00$4,550.0010$0.00Base Bid Total:$1,782,351.00($4,032.50)Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86 Bozeman, MT QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Hours Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments $ - $ - $ - QTY Units Unit Price Cost Comments $ - $ - $ - Total Cost: $ - Increase in Contract Time: 30 DAYS Contractors Fee (5%) Date: 12/18/2025Authorized Signature Description Contractors Fee (15%) SUBCONTRACT:N/A Description MATERIALS:N/A Contractors Fee (15%) Description EQUIPMENT:N/A Contractors Fee (15%) Description LABOR:N/A FAX: DESCRIPTION:Contract Time Extension Request due to NorthWestern Energy Power Relocation CK May requests a contract time extension due to the delay in relocation of the existing NorthWestern Energy primary power that ran directly beneath the proposed building. The City of Bozeman initially requested relocation of the primary power 06/12/2025. NorthWestern Energy was generally unresponsive in scheduling relocation of the power. CK May completed all work at the lift station site that was not hindered by the existing location of the primary power 08/01/2025. To note, with the power not relocated during the wet well installation, some inefficiencies were forced. One such example is that CK May would typically have installed the piping from the wet well through the building floor at the time of installation of the wet well which required temporary backfill and re-excavation. The unknown date of primary power relocation also created challenges with scheduling of crews and subcontractors. This primarily affected the concrete subcontractor and delayed the foundation pour schedule. Eventually, NorthWestern Energy related the primary power 08/14/2025. CK may crews were able to remobilize and begin work 08/25/2025. Due to the delays in the project cause by NorthWestern Energy's relocation of the existing primary power, CK May requests 30 calendar days be added to the contract time. No increase in contract value is requested due to the delay. P.O. Box 1426 Belgrade, MT 59714 PROJECT LOCATION: PHONE: 406-539-6559 REQUESTED FROM: ON DATE: Request for Additional Contract Time CONTRACTOR: CK May Excavating PROJECT NAME:Riverside Lift Station and Force Main REPRESENTATIVE:Jim Blair ADDRESS: Docusign Envelope ID: 06777E90-FF95-87E3-8300-713633A1DC86