Loading...
HomeMy WebLinkAbout005 - C200 - EROSION CONTROL PLANSDSD SD SD SD SD SD SD SD SD SD SD SDSD WWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWHYD WHYD HYD HYD SS S S S S S S S S S SS S S S S S S S S W X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XXXXX OHPOHPBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BT BT BT BT BT BT BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV ■■■■■■SSSSSSSSSSBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTS S S S S S S S FIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREWSWSWSWSWSWSSDSDSDSDSD SD ■■■■■■SDSDSDSDSDSD SDSDSDSDSDSD SDSDSDSD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SDSD SDSD SD SD SD SD SDSDSDSDSD■■FIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREFIREWSWSWSWSWSWSWSWSFIREFIREDYHSDSDSDSDSDSDSSSSSSSSSSSSSSSSSS SD SDSFSFVERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! 2026COPYRIGHT © MORRISON-MAIERLE, SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\10549\002 - ALTA AND CONCEPT PLAN\ACAD\SHEETS\C200 EROSION CONTROL PLAN.DWGREVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle PLOTTED BY:ROSIE NICKELSON ON Jan/07/2026 ROERS-BOZEMAN APARTMENTS BOZEMAN MONTANA EROSION CONTROL PLAN 10549.002 4 C200 RSN CMS MEE 1/6/2026   40 8020400 SCALE IN FEET 1 C703 Know what's below. before you dig.Call R Know what's below. before you dig.Call R EROSION & SEDIMENT CONTROL NOTES: 1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE (BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016. 2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN. 3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION. 6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED. 7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY. NOTES BY SYMBOL: INSTALL TYPE D INLET PROTECTION FILTER PER DETAIL 3 ON SHEET C703 PRIOR TO THE DISTURBANCE OF ANY PORTION OF THE SITE. 3 INSTALL TRACKOUT CONTROL SYSTEM PER DETAIL 4 ON SHEET C703 OR AS RECOMMENDED BY MANUFACTURER 1 INSTALL CONCRETE WASHOUT FACILITY PER DETAIL 2 ON SHEET C7032 LEGEND PROPOSED CONCRETE SURFACE CONSTRUCTION LIMITS SILT FENCE AREA TO BE PAVED THIS SITE HAS BEEN DESIGNED TO BE ACCESSIBLE TO INDIVIDUALS WITH DISABILITIES IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. No. 49499 CELINE M PROFESSIONA L E N G INEERM O N T ANA LICEN S E D SAUCIER HUFFINE LANE VALLEY COMMONS DRIVE LAUREL PARKWAYBLOC K 3 PARK C BLOC K 3 OPEN SPAC E A 1.CONSTRUCTION DEBRIS WILL BE STORED AND COLLECTED IN A DEBRIS BOX SIMILAR TO THE ONE SHOWN BELOW. THE LOCATION OF SAID DEBRIS BOX DURING CONSTRUCTION IS SHOWN ON C200 EROSION AND SEDIMENT CONTROL PLAN. THE TYPE OF MATERIALS STORED AND COLLECTED WILL BE NORMAL CONSTRUCTION MATERIALS SUCH AS WOOD, METAL, DRYWALL, STONE AND BRICK. 2.RENTAL SIZES: 10 CUBIC YARDS - 12' X 8' X 3' | 4 TON WEIGHT LIMIT TEMPORARY DEBRIS BOX: 1 1 2 3 3 3 3 PROPOSED BUILDING A PROPOSED BUILDING B 3 3 3 3 3 33 3 3 PHASE 2 CONSTRUCTION FENCE TEMPORARY JOB SITE DUMPSTER PROPOSED STRAW WATTLE REFER TO DETAIL 4/C603 CONSTRUCTION LIMITS TEMPORARY SPOILS STORAGE TEMPORARY JOB SITE TRAILER TEMPORARY SANITARY FACILITY 2