Loading...
HomeMy WebLinkAbout25 - Amendments Amendment 1 - Sanbell - West Oak and Fergeson DesignAMEND. TO SERVICES AGREE. OCTOBER 2024PAGE 1 OF 1 AMENDMENT TO SERVICES AGREEMENT – NO. 1 1. PROJECT/SERVICES AGREEMENT INFORMATION Effective Date of Original Services Agreement: 2/4/25 Project Name: TE23-006 West Oak St & Ferguson Intersection Design Project Number: 22367.07 Client Name: City of Bozeman Transportation & Engineering Department 2. NATURE OF AMENDMENT ☒Modifications to Sanbell scope of work and/or contract fee amount ☒Modifications to project schedule 3. DESCRIPTION OF SERVICES AGREEMENT MODIFICATIONS Phase 5 – Construction Bidding Services Phase 6 – Construction Admin & Inspection 4. FEE MODIFICATIONS Original services agreement fee: $48,5000 Total fees for prior Amendments: $0 Total services agreement fee with prior Amendments: $48,500 Proposed fee for this Amendment: $22,940 Total services agreement fee with all Amendments: $71,440 Client and Sanbell hereby agree to modify the above-referenced Services Agreement as set forth in this Amendment. All provisions of the Services Agreement not specifically modified by this or any prior Amendments shall remain in effect. The effective date of this Amendment shall be the signature date of the Client as shown below. CLIENT SANBELL Signature: Signature: Printed: Chuck Winn Printed: Danielle Scharf Title: City Manager Title: Principal Date: Date: Docusign Envelope ID: 65813CBB-7AE3-44C1-BAFC-61558A226CD2 10/24/202510/24/2025 Transportation Engineering Term Contract Amendment #1 – West Oak St & Ferguson Avenue Intersection Design Task Order No. TE23-006 9/15/25 Sanbell is pleased to provide this Amendment #1 for limited construction administration and inspection of intersection improvement at the West Oak Street & Ferguson Avenue intersection. The intersection improvements will incorporate Oak Street and Ferguson Avenue left-turn lanes, removal of Ferguson Avenue northbound right-turn only lane and Oak Street median closure of Ryun Sun Way. A detailed scope of services is outlined below. This work is to be done as a part of the Transportation Engineering term contract for engineering services. Scope of Work: Phase 5 – Construction Bidding Services This phase of the project will consist of construction bidding services, including the following: • Contractor coordination through public bid solicitation (previously scoped private bid solicitation) • Electrical items procurement assistance Phase 6 – Construction Administration & Inspection This phase of the project will consist of construction inspection and on-going administration, including the following: • Attend bid opening, prepare bid tabulation and recommendation of award letter • Process contracts for a single contract • Facilitate pre-construction meeting, prepare agenda and distribute minutes • Shop Drawing Review • Construction observation and documentation based on assumed observation of 30 hours • Respond to contractor RFI’s • Process Pay applications submitted by Contractor and any necessary work change directives, verify material quantities on all contractor pay requests • Process the Certificate of Substantial Completion, coordinate final inspection, prepare punch lists and verify completion Docusign Envelope ID: 65813CBB-7AE3-44C1-BAFC-61558A226CD2 • Prepare as-built (record) drawings • Prepare City of Bozeman close-out submittal • Conduct two-year warranty walkthrough, prepare punch list and verify completion The following items are specifically excluded from this scope of work: • Coordination of material testing and payment (By City Term Contract) • Construction Staking (By selected contractor) • Community Outreach (By City Staff) Fees and Billing Arrangements: Fee Phase 5 – Construction Bidding Services $2,600 Phase 6 – Construction Administration & Inspection $20,340 Total Fee $22,940 Sanbell will bill for its services on a time and materials basis with a not to exceed amount of $22,940 as specified in the fee table above and attached detailed hourly breakdown. Sanbell shall submit invoices to the Client for work accomplished during each calendar month. The amount of each monthly invoice shall be determined on the “time-and-material basis” according to the attached current standard rate sheets for Sanbell-Rocky Mountain. Monthly invoices shall include, separately listed, any charges for service for which time charges and/or units’ costs shall apply. Project Schedule: The anticipated schedule for this project is a Spring/Summer 2026 construction with construction documents ready by January 2026. Docusign Envelope ID: 65813CBB-7AE3-44C1-BAFC-61558A226CD2 TE23-006 West Oak St & Ferguson Ave Intersection AMD#1 Construction Admin & Limited Inspection 9/15/2025 Labor Category Total Plan Hours Rate Total Plan Bill Amount Task 001: Contractor Coordination through Public Bid Solicitation Senior Engineer II 8.00 195.00 $1,560.00 Task 002: Electrical Items Procurement Assistance Senior Engineer II 4.00 195.00 $780.00 Staff Engineer II 2.00 130.00 $260.00 Task 003: Bid Opening, Bid Tab & Award Rec Senior Engineer II 4.00 195.00 $780.00 Task 004: Process Contracts Senior Engineer II 4.00 195.00 $780.00 Staff Engineer II 2.00 130.00 $260.00 Senior Construction Engineering Tech 2.00 145.00 $290.00 Task 005: Facilitate Pre-Con Senior Engineer II 2.00 195.00 $390.00 Staff Engineer II 4.00 130.00 $520.00 Task 006: Shop Drawing Review Senior Engineer II 4.00 195.00 $780.00 Senior Construction Engineering Tech 4.00 145.00 $580.00 Task 007: Construction Inspection Senior Engineer II 4.00 195.00 $780.00 Staff Engineer II 30.00 130.00 $3,900.00 Task 008: Contractor RFI Senior Engineer II 8.00 195.00 $1,560.00 Staff Engineer II 8.00 130.00 $1,040.00 Senior Construction Engineering Tech 8.00 145.00 $1,160.00 Task 009: Process Pay Applications Senior Engineer II 4.00 195.00 $780.00 Senior Construction Engineering Tech 4.00 145.00 $580.00 Task 010: Process Certificate of Substantial Completion/Final Inspection Senior Engineer II 4.00 195.00 $780.00 Task 011: Prepare As-Built Drawings Senior Engineer II 2.00 195.00 $390.00 Staff Engineer II 12.00 130.00 $1,560.00 Senior Construction Engineering Tech 8.00 145.00 $1,160.00 Task 012: City of Bozeman Close-out submittal Senior Engineer II 4.00 195.00 $780.00 Staff Engineer II 4.00 130.00 $520.00 Task 013: Conduct 2-year Warranty walkthrough Senior Engineer II 2.00 195.00 $390.00 Senior Construction Engineering Tech 4.00 145.00 $580.00 Total for West Oak St & Ferguson Ave Intersection AMD#1 146.00 22,940.00 Docusign Envelope ID: 65813CBB-7AE3-44C1-BAFC-61558A226CD2