Loading...
HomeMy WebLinkAbout005 - C003 - EROSION & SEDIMENT CONTROL PLANss ss ss ss ss ss ssssssssssss ssbpbpbp bpbpbpbpbpbpbpbpbpbpbpbpbp bp bp bp bp bp bp bp bp bp oh oh oh oh oh oh oh oh oh oh ohgasgasgasgasgasgas gasbt bt bt bt bt bt bt bt bt bt btbt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt btWSSEEEE ETTTTTFOFOFOFOTTTTTTTwm wmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwm wmTEEX XSSDstssssssSstDwmwmwmwmELot 3AMinor Subd iv is ion 503CCommon Open Space AMinor Subdivision 503CPublic Right-of-Way DedicationMinor Subdivision 503CKagy BoulevardWidth VariesSouth 19th Avenue Width Varies S 88°36'18" E 191.26' (R1)S 89°52'03" E 191.26' (M)S 28°49'39" E9.81' (C)S 27°33'54" E9.81' (R1)S 00°20'06" W 245.17' (M) S 01°33'21" W 245.27' (R1)S 89°44'45" W 126.63' (M)N 88°56'52" W 126.64' (R1)N 01°03'08" E 44.41' (R1) N 00°12'23" W 44.48' (M)S 89°44'40" W 81.63' (M)N 88°56'52" W 81.67' (R1)S 00°12'31" E20.80' (M)S 01°03'08" W20.83' (R1)S 89°45'28" W 33.87' (C)N 88°56'53" W 34.00' (R1)N 01°03'08" E 179.47' (R1)N 00°12'37" W 179.44' (C)S 88°56'52" E 48.50' (R1)N 89°47'23" E 48.50' (C)N 01°03'08" W 51.97' (R1)N 00°12'37" W 51.97' (C)Lot 2A-1Minor Subdivision 503CArea = 1.262 acres10' Public Utility EasementPer Minor Subdivision 50310' Public Utility Easement Per Minor Subdivision 503 30' Sewer and Water and Access EasementDocument No. 2471376 30' Easement perDocument No. 2471376Easement perDocument No. 2841657Middle Creek Ditch SSBPBP BPWSWSWSWSWSWSWSWS WS WS WS W SFFFFFFFFFF F F F F GA S GAS GAS GAS GAS GASGASHYDFBPPROPOSED BUILDING15,057 SF4921.00 FFESFSFSF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SFSFCFCF CF CF CF CF CF CF CF DSTSTDCOSTC O STSTSFSFSFSFSFSFSF SF SF STWCFCFCF CF CFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFCFSFSF SF SF SF SF SF SF SF CONCRETEWASHOUT.EXISTING STORM PONDPROPOSEDSTORMINFILTRATIONFACILITY©| ALL RIGHTS RESERVED®DRAWN BY |REVISIONSREVIEWED BY |DESIGNED BY |PROJ# |BOZEMAN BRANCH WHITEFISH CREDIT UNION2026SITE PLAN SUBMITTAL 04.30.2026WFCU_BOZ07.29.2026 CITY COMMENTS #17/29/2026 12:50 PM | L:\WFCU_BOZ\BIMCAD\Civil\Sheets\WFCU_BOZ_C003-004.dwgC003EROSION & SEDIMENTCONTROL PLANMIRANDAMIRANDASCHLEGEL-1.CONCRETE WASHOUT. SEE DETAIL 1/C004.2.SILT FENCE. SEE DETAIL 2/C004.3.SEDIMENT CONTROL WATTLE. SEE DETAIL 3/C004.4.TRACKING CONTROL PAD. SEE DETAIL 4/C004.5.INLET PROTECTION. SEE DETAIL 5/C004. SITE PLAN KEY NOTES#SILT FENCEINLET PROTECTIONCFSFCONSTRUCTION FENCESTAGING AREAVEHICLE TRACKINGEROSION CONTROL LEGENDGENERAL NOTES1.CONTRACTOR RESPONSIBLE FOR IMPLEMENTATION OFAPPROPRIATE EROSION AND SEDIMENT CONTROL MEASURESDURING CONSTRUCTION.2.CONTRACTOR TO OBTAIN SWPPP PERMIT AND CITY OFBOZEMAN PERMIT, AND COMPLY WITH PERMITREQUIREMENTS IN REGARD TO MANAGING CONSTRUCTIONSTORMWATER.FLOW DIRECTION ARROWPROJECTLOCATIONNORTH/SOUTH ON S. 19TH AVETO SERVE AS PRIMARYCONSTRUCTION ROUTE2C003NOT TO SCALECONSTRUCTION HAUL ROUTENORTH1C003EROSION & SEDIMENT CONTROL PLAN0102040SCALE: 1" = 20'NORTHSTWSTRAW WATTLETOP SOIL STOCKPILE AREA