Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
004 - C002 - SITE DEMO PLAN
ss ss ss ss ss ss ssssssssssss ssbpbpbp bpbpbpbpbpbpbpbpbpbpbpbpbp bp bp bp bp bp bp bp bp bp oh oh oh oh oh oh oh oh oh oh ohgasgasga s gasgasgasgasgasgasgasgasgasgasgasgasgasgasgasgasgasbt bt bt bt bt bt bt bt bt bt btbt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt btWSSEEEEE ETTTTTFOFOFOFOTTTTTTTwm wmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwm WwmWWWWTEEX XWSSDstssssssSstDwmwmwmwmELot 3AMinor Subd iv is ion 503CCommon Open Space AMinor Subdivision 503CPublic Right-of-Way DedicationMinor Subdivision 503CKagy BoulevardWidth VariesSouth 19th Avenue Width Varies S 88°36'18" E 191.26' (R1)S 89°52'03" E 191.26' (M)S 28°49'39" E9.81' (C)S 27°33'54" E9.81' (R1)S 00°20'06" W 245.17' (M) S 01°33'21" W 245.27' (R1)S 89°44'45" W 126.63' (M)N 88°56'52" W 126.64' (R1)N 01°03'08" E 44.41' (R1) N 00°12'23" W 44.48' (M)S 89°44'40" W 81.63' (M)N 88°56'52" W 81.67' (R1)S 00°12'31" E20.80' (M)S 01°03'08" W20.83' (R1)S 89°45'28" W 33.87' (C)N 88°56'53" W 34.00' (R1)N 01°03'08" E 179.47' (R1)N 00°12'37" W 179.44' (C)S 88°56'52" E 48.50' (R1)N 89°47'23" E 48.50' (C)N 01°03'08" W 51.97' (R1)N 00°12'37" W 51.97' (C)Lot 2A-1Minor Subdivision 503CArea = 1.262 acres10' Public Utility EasementPer Minor Subdivision 50310' Public Utility Easement Per Minor Subdivision 503 30' Sewer and Water and Access EasementDocument No. 2471376 30' Easement perDocument No. 2471376Easement perDocument No. 2841657Middle Creek Ditch TREES TO BE REMOVED, TYP.ELECTRIC PEDESTAL TO BE REMOVED.COORDINATE WITH NORTHWESTERN ENERGY.UNUSED WATER AND FIRE TAPS TO BE CUTAND CAPPED AT MAIN.EXISTING BURIEDTELEPHONE LINES.EXISTING BURIEDPOWER LINES.CURB AND GUTTER,PROTECT IN PLACE.GRAVEL DRIVEWAYTO BE REMOVED.ASPHALT ROADTO BE REMOVED.CURB AND GUTTERTO BE REMOVED.CURB AND GUTTERTO BE REMOVED.CURB AND GUTTERTO BE REMOVED.CITY SIDEWALK TOBE REMOVED.EXISTING OVERHEADPOWER LINES.EXISTING UTILITY POLES, TYP.EXISTING TELEPHONESTRUCTURES, TYP.ASPHALT TO BEREMOVED.EXISTING WATER SERVICESAND STRUCTURES TO BEREMOVED, TYP.EXISTING FIBER OPTIC ANDELECTRICAL METERS, TYP.REMOVE EXISTINGWEIR PLATE.REMOVE EXISTING FLARED ENDSECTION OF CULVERT.CONTRACTOR TOCOORDINATE PEDESTRIANDETOUR ROUTING ANDSIGNAGE WITH THE CITYOF BOZEMAN.CONTRACTOR TOCOORDINATE PEDESTRIANDETOUR ROUTING ANDSIGNAGE WITH THE CITYOF BOZEMAN.REMOVE CURB CHANNELINTO EXISTING POND.UNUSED SEWER, WATER AND FIRE TAPS TOBE CUT AND CAPPED AT MAIN.EXISTING STORM POND TOBE PROTECTED IN PLACE.TREE TO BE REMOVED.SEE LANDSCAPE FORREPLACEMENT.©| ALL RIGHTS RESERVED®DRAWN BY |REVISIONSREVIEWED BY |DESIGNED BY |PROJ# |BOZEMAN BRANCH WHITEFISH CREDIT UNION2026SITE PLAN SUBMITTAL 04.30.2026WFCU_BOZ07.29.2026 CITY COMMENTS #17/29/2026 12:52 PM | L:\WFCU_BOZ\BIMCAD\Civil\Sheets\WFCU_BOZ_C002.dwgC002SITE DEMOLITION PLANMIRANDAMIRANDASCHLEGEL-1C002SITE DEMOLITION PLAN0102040SCALE: 1" = 20'NORTHPROJECT CONDITIONS1.CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BEMAINTAINED BY OWNER AS PRACTICABLE. VARIATIONS WITHIN STRUCTURES MAY OCCURBY OWNER'S REMOVAL AND SALVAGE OPERATIONS PRIOR TO START OF DEMOLITION WORK.2.UNLESS OTHERWISE INDICATED IN CONTRACT DOCUMENTS OR SPECIFIED BY THE OWNER,ITEMS OF SALVAGEABLE VALUE TO CONTRACTOR SHALL BE REMOVED FROM SITE ANDSTRUCTURES. STORAGE OR SALE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTEDAND SHALL NOT INTERFERE WITH OTHER WORK SPECIFIED IN CONTRACT DOCUMENTS.3.EXPLOSIVES SHALL NOT BE USED.SITE PREPARATION1.PROVIDE, ERECT, AND MAINTAIN EROSION CONTROL DEVICES, TEMPORARY BARRIERS, ANDSECURITY DEVICES PRIOR TO THE START OF DEMOLITION.2.PROTECT EXISTING LANDSCAPING MATERIALS, APPURTENANCES, AND STRUCTURES WHICHARE NOT TO BE DEMOLISHED. REPAIR DAMAGE CAUSED BY DEMOLITION OPERATIONS ATNO COST TO OWNER.3.THE CONTRACTOR IS RESPONSIBLE TO PREVENT MOVEMENT OR SETTLEMENT OFADJACENT STRUCTURES. PROVIDE BRACING AND SHORING AS NEEDED.4.MARK LOCATION OF UTILITIES. PROTECT AND MAINTAIN IN SAFE AND OPERABLE CONDITIONUTILITIES THAT ARE TO REMAIN. PREVENT INTERRUPTION OF EXISTING UTILITY SERVICE TOOCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIESHAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TOEXISTING UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES AND OWNER.5.THE CONTRACTOR IS RESPONSIBLE TO CALL 1-800-424-5555 (OR 811) AT LEAST 2 WORKINGDAYS PRIOR TO ANY DEMOLITION ACTIVITIES.DEMOLITION NOTES1.THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS ANDPINS.2.THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTINGIMPROVEMENTS DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE,UTILITIES, PAVEMENT, STRIPING, CURB, ETC. REPAIRS SHALL BE EQUAL TO OR BETTERTHAN EXISTING CONDITIONS3.ALL WORK ON THIS PLAN SHALL BE DONE IN STRICT ACCORDANCE WITH THE PROJECTSPECIFICATIONS.4.THE CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH THE LATEST STANDARDSOF OSHA DIRECTIVES OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION ANDTRENCHING PROCEDURE. CONTRACTOR SHALL USE SUPPORT SYSTEMS, SLOPING,BENCHING, AND OTHER MEANS OF PROTECTION. THIS IS TO INCLUDE, BUT NOT LIMITED,FOR ACCESS AND EGRESS FROM ALL EXCAVATION AND TRENCHING. CONTRACTOR ISRESPONSIBLE TO COMPLY WITH PERFORMANCE CRITERIA FOR OSHA.5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE PUBLIC DURINGDEMOLITION, WHICH INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION FENCING,BARRICADES, SIGNAGE, ETC.6.THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT OWNER AS TO SPECIFIC DETAILSREGARDING REMOVAL OF EXISTING BUILDINGS, CONTENTS AND ASSOCIATEDAPPURTENANCES.7.THE CONTRACTOR IS RESPONSIBLE TO INSPECT THE SITE PRIOR TO BIDDING AND INCLUDEIN THE BID ANY AND ALL ITEMS TO BE REMOVED, DEMOLISHED, OR MAINTAINED ASNECESSARY FOR THE CONSTRUCTION OF THIS PROJECT WHETHER THEY ARE SHOWN ONTHIS PLAN OR NOT.8.ALL MATERIAL GENERATED FROM DEMOLITION ACTIVITIES SHALL BE DISPOSED OF OFF-SITEAT THE CONTRACTORS EXPENSE UNLESS OTHERWISE INDICATED BY THE OWNER. ANAPPROPRIATE DUMP SITE SHALL BE NOMINATED BY THE CONTRACTOR PRIOR TO THE STARTOF CONSTRUCTION.9.THE CONTRACTOR SHALL VERIFY LOCATIONS AND MATERIAL TYPES OF ALL UTILITIES PRIORTO THE START OF DEMOLITION.10.PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREA. DO NOTALLOW WATER TO POND IN EXCAVATION AREAS, AND MAINTAIN ALL EXISTING DRAINAGEPATTERNS.11.TRAFFIC, BOTH VEHICULAR AND PEDESTRIAN SHALL BE PROTECTED BY EFFECTIVEBARRICADES AND SIGNS IN ACCORDANCE WITH MUTCD GUIDANCE AND AS REQUIRED BYTHE JURISDICTION HAVING AUTHORITY. EFFECTIVE LIGHTING OF OBSTRUCTIONS SHALL BEPROVIDED AT NIGHT.12.PROTECTION OF PROPERTY - THE CONTRACTOR SHALL BE RESPONSIBLE FOR THEPROTECTION OF PUBLIC AND PRIVATE PROPERTY ADJACENT TO HIS WORK, AND SHALLEXERCISE DUE CAUTION TO AVOID DAMAGE TO SUCH PROPERTY. THE CONTRACTOR SHALLREPLACE OR REPAIR TO THEIR ORIGINAL CONDITION, ALL IMPROVEMENTS WITHIN ORADJACENT TO THE WORK AREA WHICH ARE NOT DESIGNATED FOR REMOVAL, AND WHICHARE DAMAGED OR REMOVED AS A RESULT OF OPERATIONS.