Loading...
HomeMy WebLinkAbout001 - CVR - COVER SHEETPROJECT LOCATIONADDRESS: TBDBOZEMAN, MT 59715LocatorLAND USE MAPZONING MAPSUBJECTPROPERTYWHITEFISH CREDIT UNION - BOZEMANLOT 2A-1 OF MINOR SUBDIVISION 503CAPPLICATION DATA:ZONING: B-2M COMMUNITY MIXED USECURRENT LAND USE: VACANTCOMMUNITY PLAN: ------------------------NEIGHBORHOOD CONSERVATION: NOHISTORIC DISTRICT: NOLEGAL DESCRIPTION:A SUBDIVISION OF TRACT 2A-1 OF MINOR SUBDIVISION NO. 503CLOCATED IN THE SOUTHEAST ONE-QUARTER OF SECTION 14TOWNSHIP 2 SOUTH, RANGE 5 EAST, P.M.M., CITY OF BOZEMAN,GALLATIN COUNTY, STATE OF MONTANAPROPERTY OWNER/APPLICANTWhitefish Credit Union300 Baker AvenueWhitefish, MT 59937406.863.3956Project Contact: Steve HaugenGEOTECHTD&H Engineering234 E. Babcock, Suite 2Bozeman, MT 59715406.586.0277Project Manager: Craig NadeauSITE DESCRIPTION: LOT 2A-1SITE AREA54,994 SQUARE FEETPROPOSED BUILDING FOOTPRINT6,488 SQUARE FEETPROPOSED BUILDING PERCENTAGE11.80 %DRIVEWAY CIRCULATION AND PARKING34,241 SQUARE FEETDRIVEWAY CIRCULATION AND PARKING PERCENTAGE 62.26 %SITE PERCENTAGE: BLOCK 2 - LOT 1WETLAND/WATERCOURSE: MIDDLE CREEK DITCH (ALONGSIDE S. 19TH AVE)FLOOD ZONE: NO; FIRM PANEL 30031C0812D, ZONE XPROPOSED LAND USE: COMMUNITY BUSINESSADDRESS: TBD, 59715TO THE BEST OF MY KNOWLEDGE THE FACILITIES PROVIDEDMEET ALL OF THE MINIMUM ACCESSIBILITY REQUIREMENTSACCEPTED BY: _____________________________ ___________ CITY ENGINEER DATEACCEPTED BY: _____________________________ ___________PROFESSIONAL ENGINEER DATESITE PLAN REVIEW SUBMITTAL04.30.2026©| ALL RIGHTS RESERVED®DRAWN BY |REVISIONSREVIEWED BY |DESIGNED BY |PROJ# |BOZEMAN BRANCH WHITEFISH CREDIT UNION2026SITE PLAN SUBMITTAL 04.30.2026WFCU_BOZ07.29.2026 CITY COMMENTS #1NORTHNORTHNORTHB2-MB2-MPROJECTAREAPROJECTAREACOMMERCIALBANKMULTI-FAMILYRESIDENTIALMULTI-FAMILYRESIDENTIALVACANTVACANTVACANTCHURCHADMINISTRATIVEPROFESSIONAL7/29/2026 1:41 PM | L:\WFCU_BOZ\BIMCAD\Civil\Sheets\WFCU_BOZ_CVR.dwgCVRCOVER SHEETMIRANDAMIRANDASCHLEGELARCHITECT / ENGINEERCushing Terrell745 S Main St,Kalispell, MT 59901406.407.7776Project Manager: Lauren CebullaREQUIREDMINIMUM:PERSONAL AND GENERAL SERVICE: 2 PER 1,000 GFA = 2 * (15,132 - 1,500) / 1000 = 28 SPACESMAXIMUM:PERSONAL AND GENERAL SERVICE: 4 PER 1,000 GFA = 4 * (15,132) / 1000 = 61 SPACESBIKE SPACES = 1 PER 1,000 SF = (15,132) / 1,000 = 15 SPACESPARKING DATA:PROVIDEDOFF-STREET:NEW STANDARD SPACES = 48NEW ADA SPACES = 3 (1 REGULAR + 2 VAN)EXISTING STALLS = 13COMPACT SPACES = 0ON-STREETPARALLEL SPACES PROVIDED = 0TOTAL PARKING SPACES PROVIDED = 61BICYCLE = 12 SHORT TERM (75%), 4 LONG TERM (25%) = 16 TOTALPOWER AND GAS SERVICENORTHWESTERN ENERGY121 E. Griffin DrBozeman, MT 59715Engineer Contact: Garret Driller406.818.1802UTILITY CONTACTSTELEPHONECENTURYLINK502 S 19th AveBozeman, MT 59715Contact: Elaine Castillo406.500.3030elain.castillo@centurylink.comFIBER OPTICCHARTER1500 N 19th AveBozeman, MT 59715Contact: Jared Phillips, Rob Leiva866.874.2389PUBLIC WATER SUPPLYCITY OF BOZEMAN814 N. Bozeman StreetBozeman, MT 59715Contact: Nick Pericich or John Alston406.582.3200GAS PIPELINEPHILLIPS 66318 W. Griffin DrBozeman, MT 59715Engineer Contact: Chase Keith406.587.6060CIVILXXV001SITE SURVEYXXC001GENERAL NOTES & LEGENDXXC002SITE DEMO PLANXXC003EROSION & SEDIMENT CONTROL PLANXC004EROSION & SEDIMENT CONTROL DETAILSXXC100SITE PLANXXC200GRADING PLANXXC210STORMWATER PLANXXC300UTILITY PLANXXC400CIVIL DETAILSXC401CIVIL DETAILSXC402CIVIL DETAILSXC403CIVIL DETAILSXC404CIVIL DETAILSSHEET INDEXGENERALXXCVRCOVER SHEETLANDSCAPEXXL100LANDSCAPE NOTES AND TABLESXXL101LANDSCAPE SITE PLANXXL301PLANTING PLANXXL401IRRIGATION PLANXXL501LANDSCAPE DETAILSXXL502IRRIGATION DETAILSXXL503IRRIGATION DETAILSARCHITECTUREXXG100ZONING BUILDING PLANXXG101ZONING ELEVATIONSXXA101FLOOR PLANSXXA201BUILDING ELEVATIONS & MATERIALSXXA210BUILDING PERSPECTIVESREMUSITE PLAN - 04.30.2026 ELECTRICALXXE100ELECTRICAL SITE PLANXXE101ELECTRICAL ELEVATIONSLAND USEPERCENTAGEOF PARCELSQUAREFOOTAGE(SF)BUILDING11.80%6630UNDISTURBED AREA16.65%9158LANDSCAPED AREAS (IRRIGATED)21.25%11686PUBLIC STREET RIGHT-OF-WAYSEMIPUBLIC LANDN/AN/APARKSN/AN/AOPEN SPACE CALCULATIONSN/AN/APARKLAND CALCULATIONSN/AN/APROJECTLOCATIONW KAGY AVESITE PLAN RESUBMITTAL - 07.29.2026