Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
012 - CCON
ss ss ss ss ss ss ssssssssssss ssbpbpbp bpbpbpbpbpbpbpbpbpbpbpbpbp bp bp bp bp bp bp bp bp bp oh oh oh oh oh oh oh oh oh oh ohgasgasg a s gasgasgasgasgasgasgasgasgasgasgasgasgasgasgasgasgasbt bt bt bt bt bt bt bt bt bt btbt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt btWSSEEEE ETTTTTFOFOFOFOTTTTTTTwm wmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwm wmTEEX XSSDstssssssSstDwmwmwmwmELot 3AMinor Subd ivision 503CCommon Open Space AMinor Subdivision 503CPublic Right-of-Way DedicationMinor Subdivision 503CKagy BoulevardWidth VariesSouth 19th Avenue Width Varies S 88°36'18" E 191.26' (R1)S 89°52'03" E 191.26' (M)S 28°49'39" E9.81' (C)S 27°33'54" E9.81' (R1)S 00°20'06" W 245.17' (M) S 01°33'21" W 245.27' (R1)S 89°44'45" W 126.63' (M)N 88°56'52" W 126.64' (R1)N 01°03'08" E 44.41' (R1) N 00°12'23" W 44.48' (M)S 89°44'40" W 81.63' (M)N 88°56'52" W 81.67' (R1)S 00°12'31" E20.80' (M)S 01°03'08" W20.83' (R1)S 89°45'28" W 33.87' (C)N 88°56'53" W 34.00' (R1)N 01°03'08" E 179.47' (R1)N 00°12'37" W 179.44' (C)S 88°56'52" E 48.50' (R1)N 89°47'23" E 48.50' (C)N 01°03'08" W 51.97' (R1)N 00°12'37" W 51.97' (C)Lot 2A-1Minor Subdivision 503CArea = 1.262 acres10' Public Utility EasementPer Minor Subdivision 50310' Public Utility Easement Per Minor Subdivision 503 30' Sewer and Water and Access EasementDocument No. 2471376 30' Easement perDocument No. 2471376Easement perDocument No. 2841657Middle Creek Ditch SSBPBP BPWSWSWSWSWSWSWSWS WS WS WS W SFFFFFFFFFF F F F F GA S GAS GAS GAS GAS GASGASHYDFBPPROPOSED BUILDING15,057 SF4921.00 FFEDD©| ALL RIGHTS RESERVED®DRAWN BY |REVISIONSREVIEWED BY |DESIGNED BY |PROJ# |BOZEMAN BRANCH WHITEFISH CREDIT UNION2026SITE PLAN SUBMITTAL 04.30.2026WFCU_BOZ07.29.2026 CITY COMMENTS #17/29/2026 4:42 PM | L:\WFCU_BOZ\BIMCAD\Civil\Sheets\WFCU_BOZ_CCON.dwgCCONCONCURRENTCONSTRUCTIONPLANMIRANDAMIRANDASCHLEGEL-1CCONCONCURRENT CONSTRUCTION PLAN0102040SCALE: 1" = 20'NORTHEXISTING 8" WATER MAINEXISTING 8" SEWER MAINEXISTING BURIED POWEREXISTINGELECTRICAL ANDCOMMUNICATIONSTRUCTURES, TYP.EXISTING STREET LIGHT POLE, TYP.PROPOSED BURIED POWER ANDGAS TO BE COORDINATED WITHUTILITY PROVIDERSEXISTING GAS LINEEXISTING OVERHEAD POWEREXISTING BURIED TELECOM LINESEXISTING BURIED POWER1.5" DOMESTIC SERVICE CONNECTIONAT BUILDING. SEE PLUMBING.6" FIRE SERVICE CONNECTION ATBUILDING. SEE FIRE PLANS.SANITARY SEWER SERVICEINSTALL FIRE SERVICE LINE, SEEDETAIL 4/C402.PROPOSED FIRE HYDRANTASSEMBLY1.5" WATER MAIN TAP FOR DOMESTICSERVICE, SEE DETAIL 5/C402.6" WATER MAIN TAP FOR FIRESERVICE, SEE DETAIL 4/C402.4" SEWER MAIN TAP.EXISTING TELEPHONESTRUCTURES, TYP.EXISTING FIBER OPTICPEDESTAL, TYP.PROPOSED STORM INFILTRATION EXISTING SITE ACCESS FROMSOUTH 19TH AVENUEEXISTING FIRE HYDRANTEXISTING SITE ACCESS FROMWEST KAGY BOULEVARD PHASING NOTE:THE PROPOSED PROJECT CONSISTS OF A SINGLEBUILDING AND ASSOCIATED PARKING LOT, SIDEWALKS,AND UTILITY SERVICES (DOMESTIC WATER, SANITARYSEWER, GAS, ELECTRIC, TELECOM), DRAINAGEIMPROVEMENTS AS WELL AS THE ADDITION OF A NEWFIRE HYDRANT.THE PROJECT WILL TAKE PLACE IN THE TWOCONSECUTIVE PHASES DESCRIBED BELOW BY A SINGLEGENERAL CONTRACTOR COMMENCING FALL OF 2026THROUGH WINTER OF 2027.THE PROJECT IS LOCATED WITHIN AN EXISTINGDEVELOPED AREA WITH EXISTING OFFICE BUILDING TOTHE SOUTH AND APARTMENT BUILDING TO THE WEST.PHASE 1 - NEW HYDRANT, WATER SERVICE LINES, AND PARKING LOTAREA BROUGHT TO GRAVEL.PHASE 2 - VERTICAL BUILDING CONSTRUCTION AND ALL REMAINING SITE IMPROVEMENTS INCLUDING ADDITIONAL UTILITIES AND LANDSCAPING.