Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
016 - P-5 POND DETAIL
BOTTOM OF SWALE = 4717.33POND G11"X17": 1"= 20 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )5101010HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\EXHIBITS\POND GRADING_SITE_SUBMITTAL.dwg Plot Date: 4/23/2026 5:24 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN04/23/2026ABWET DETENTION POND G4 BOZEMAN, LLCDIAMOND 8 SPORTS COMPLEX2128.002P-5TOP=4720.26FINISHED GROUNDEXISTING GROUNDAASTORM POND CROSSSECTION A3:13:13:114,026 CFT VOLUMEFUTURE PIPE FROMPARKING LOT INLETNOTE:-OUTLET STRUCTURE AND OUTLET PIPES TO BE DESIGNED AND INSTALLED WITH PHASE 1B SITE PLAN.-GW ELEVATIONS CALCULATED USING RELATIONSHIPS TO HIGH GROUNDWATER IN NEARBY MONITORING WELLS IN 2025.