Loading...
HomeMy WebLinkAbout010 - CM PLAN 1A-SP1SDSDSDSDSDSDSD 10 W 10 W 10 W 10 W 10 W 10W N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 4/20/2026 5:47 PM H:\2128\002\ACAD\SHEETS\PHASING\CM PLAN 1A.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 04/22/26 DJH CONST. MANAGEMENT PLAN PH1A DIAMOND 8 2128.002 CM-P1A HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAY - COLLECTORFUTURE TOUCHSTONE DRIVEFIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4FIELD 5FIELD 6 20 CYD ROLLOFF DUMPSTER OUTHOUSE STAKED DOWN PHASE 1A TOPSOIL STOCK PILE CONSTRUCTION MANAGEMENT NOTES:1. NORTH TOPSOIL STOCKPILE WILL BE REMOVED ASSOON AS CURB & GUTTER IS INSTALLED AND TOPSOILREDISTRIBUTION CAN BE COMPLETED. SOUTHTOPSOIL PILE WILL REMAIN UNTIL ALL UTILITY WORK ISCOMPLETED.2. SWPPP PLAN MUST BE COORDINATED WITH THECONSTRUCTION MANAGEMENT PLAN3. NO WETLAND IMPACTS WILL OCCUR WITH PHASE 1A PHASE 1A STAGING AREA CONSTRUCTIONFENCE ORSILT FENCE PHASE 1A LIMITSCONSTRUCTIONFENCE ORSILT FENCE UTILIZE FOR CONSTRUCTION ACCESS ACCESS FLOW TOPSOILSTOCKPILEPHASE 1ASTAGINGAREANO ACCESSPHASE 1A WIDEN EXISTINGAPPROACH FORTEMPORARYCONSTRUCTION ACCESS CONSTRUCTION FENCE OR SILT FENCE