Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
008 - C4.1 SITE PLAN-S
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP10 W10 W10 W10 W10 W10 W10 W10 W10 W10 W10 W10W10W10W18SD18SD8 SS8 SSG //////////////////////////////////////////////////////////////////////////////////// /// //////////// /////////////// //////////// /// //////////// /// /////////////////////////////////////////////////////////////// //////////////////////////////////// /// //////////// /// ///////// //////////// /// ////////////11"X17": 1"= 200 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )50100100100HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\SITEPLANS\SITEPLAN 1.dwg Plot Date: 7/2/2026 4:49 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN07/01/2604/22/26JRMSITE PLAN SOUTHSITE PLAN 1DIAMOND 82128.002C4.1FUTURE LAUREL PARKWAY HARVEST PARKWAYDELINEATEDWETLANDS50' W. C . S E T B A C K ZONE 1 50' W.C. SETBACKZONE 1PROPERTY BOUNDARY PROPERTY BOUNDARY 45' R.O.W.DOC#264928045' PROPOSEDR.O.W.BAXTE R C R E E K 66' R.O.W.DOC#2782199BAXTE R C R E E K FIELD 1TURFFIELD 2TURFFUTUREBUILDING 120' CENTER WALKWAY &EMERGENCY SERVICES ACCESSSTORMPONDTEST PIT, TYPMONITORING WELL, TYP10'PROPOSEDPUESTORMPOND10' PROPOSED PUE70' PROPOSEDR.O.W.10' PUEPER NWX PH1GRAVELCONSTRUCTIONACCESS ROAD TOOAK STREETPHASE 1A DISTURBANCEEXISTING HYDRANTEXISTING 8" D.I.P. WATER MAINEXISTING 8" PVC SEWER MAINNOTES:1. NO WATER OR SEWER INFRASTRUCTURE IS PLANNED2. SEE PRIVATE STORM WATER PIPE PLANS FOR INTERNAL STORM PIPE DETAIL.R - D ZONINGR - C ZONINGPROPERTY BOUNDARYEXISTING IRRIGATIONDIVERSIONNIEBEL PUCKETT DITCH60' ROWLAUREL GLEN SUBDIVISIONJ-44265' PROPOSEDR.O.W.10' PROPOSED PUEEXISTING HYDRANTEXISTING HYDRANTEXISTING HYDRANTFOREST GLEN DR.60' R.O.W.EXISTINGSTORMPONDEXISTING OVERHEAD POWEREXISTING NATURAL GASEXISTING STREET LIGHTEXISTING STREET LIGHTEXISTING CULVERTSETBACKSR-CPRIMARY STREET : 10'SIDE STREET : 10'STREET FACING GARAGE : 20'SIDE : 5'REAR : 10'R-DPRIMARY STREET : 10'SIDE STREET : 10'SIDE : 5'REAR : 10'NO SETBACKS ARE SHOWN ON THIS DRAWINGSINCE THE 10' PUBLIC UTILITY EASEMENTSHOWN MEETS OR EXCEEDS ALL SETBACKSAND NO BUILDINGS ARE PROPOSED.NOTES:1) CONTOUR INTERVAL = 1.0'2) NO HISTORIC, CULTURAL OR ARCHAEOLOGICAL RESOURCES ARE KNOWNTO EXIST ONSITE.3) NO MAIL BOX IS PLANNED FOR THIS SITE4) PARKING & BIKE PARKING WAS CALCULATED WITHIN THE MASTER SITE PLANAND WILL BE FURTHER REFINED WITHIN SUBSEQUENT SITE PLAN SUBMITTALS.5) SNOW STORAGE WAS SHOWN ON THE MASTER SITE PLAN.6) NO SETBACK ENCROACHMENTS ARE PROPOSED7) NO BUILD-TO FRONTAGE AREAS ARE DEPICTED.8) NO SIDEWALKS,TRASH, TRAILS, PARKING LOTS, BIKE RACKS, OR ROADWAYSARE PROPOSED WITH SITE PLAN 1.9) NO HISTORIC, CULTURAL OR ARCHAEOLOGICAL RESOURCES EXIST ONSITE.10) NO NEARBY TRAILS EXIST AT THIS TIME.TRACT 2COS 2552AAS ZONING (COUNTY)TRACT 3DCOS 2552AAS ZONING (COUNTY)LOT 7NORTHWEST CROSS INGREMU LOT 14NORTHWEST CROSSINGREMUTRACT 1COS 3181AS ZONING (COUNTY)PHASE 2LAUREL GLEN SUBDIVISIONRB ZONING PHASE 2LAUREL GLEN SUBD IV IS IONRC ZON ING PHASE 2LAUREL GLEN SUBDIV IS IONRC ZON ING PHASE 2LAUREL GLEN SUBD IV IS IONRB ZON ING OAK STREETFUTUREPARKINGLOT