Loading...
HomeMy WebLinkAbout006 - C3.0 GRADINGOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP////////////////////////////////////////////////////////////////////////////////////////// /////////////// /////////////// ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// //////////// //////////// /// //////////// /// //////////// /// /////////////// /// /////////////// //////////// /////////////// ////////////SDSD SD SD SD SD SD SD SD SDSD SD SD SD SD SDSD 11"X17": 1"= 200 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )50100100100HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\SITEPLANS\SITEPLAN 1-GRADING.dwg Plot Date: 4/23/2026 3:29 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN04/22/26DJHGRADING AND DRAINAGE PLANSITE PLAN 1DIAMOND 82128.002C3.0FUTURE LAUREL PARKWAY BAXTER LANEDELINEATEDWETLANDSDELINEATEDWETLANDS50' W. C . S E T B A C K ZONE 1 50' W.C. SETBACKZONE 1 PROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY BAXTE R C R E E K 66' R.O.W.PER NWX PH160' R.O.W.PER NWX PH1B A X T E R C R E E K 60' COUNTY ROAD R.O.W.FIELD 6TURFFIELD 5TURFFIELD 4GRASSFIELD 3GRASSFIELD 2GRASSFIELD 1GRASSFIELD 7TURFFIELD 8GRASSFUTUREBUILDING 3FUTUREBUILDING 1FUTUREBUILDING 220' CENTER WALKWAY &EMERGENCY SERVICES ACCESS50' RIGHT OF WAY TO BE DEDICATEDSTORMPONDSTORMPONDSTORMPOND70' PROPOSEDR.O.W.R - D ZONINGR - C ZONING PHASE 1A DISTURBANCEPHASE 1A DISTURBANCEFUTUREPARKINGLOTFUTUREPARKINGLOTFUTUREPONDSTORMPONDSTORMPONDSTORM MANHOLE(TYP.)STORM SWALESTORM SWALENOTES:1. PHASE 1A IMPROVEMENTS ARE TO BE FURTHER REFINED WITH THE SITE PLANSUBMITTAL FOR PHASE 1B AND THEREFORE FINAL LOCATIONS AND DESIGN MAY BEADJUSTED ACCORDINGLY.2. SEE INDIVIDUAL STORM POND SHEETS FOR ADDITIONAL DETAILS AND CROSSSECTIONS.3. NO SNOW STORAGE INCLUDED IN PHASE 1A SINCE NO PAVING OR CONCRETE ISINCLUDED.4. NO ROCK OUTCROPPINGS EXIST ONSITE.5. NO MAPPED FLOODPLAIN EXISTS ONSITE.UNNAMED WATERCOURSE50' W.C. SETBACKZONE 1PROPOSED FLOW DIRECTION100-YEAR FLOODPLAIN PER NXW PHASE 1