Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
004 - C2.0 CIVIL-UTIL PLAN
SDSD SD SD SD SD SD SD SD SDSD SD SD SD SDSD OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP////////////////////////////////////////////////////////////////////////////////////////// /// /////////////// //////////// /// ///////////////////////////////////////////////////////////////////////////////////////////////////////////////21S8W////////////////////////////// /// //////////// /////////////// /////////////// /////////////// ///////// /////////////// //////////// /// //////////// /// //////////// /// ////////////11"X17": 1"= 200 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )50100100100HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\SITEPLANS\SITEPLAN 1.dwg Plot Date: 7/2/2026 4:47 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN07/01/2604/22/26JRMCIVIL & UTILITY PLAN NORTHSITE PLAN 1DIAMOND 82128.002C2.0FUTURE LAUREL PARKWAYHARVEST PARKWAYBAXTER LANE (24' PAVED)DELINEATEDWETLANDSDELINEATEDWETLANDS50' W.C . S E T B A C K ZONE 1 50' W.C. SETBACKZONE 1 PROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY 45' R.O.W.DOC#264928045' PROPOSEDR.O.W.BAXT E R C R E E K 66' R.O.W.DOC#2782199EXISTING OHP60' R.O.W.DOC#2782198BAXTE R C R E E K 60' COUNTY ROAD R.O.W.FIELD 1TURFFIELD 2TURFFIELD 3GRASSFIELD 4GRASSFIELD 5GRASSFIELD 6GRASSFIELD 7TURFFIELD 8GRASSFUTUREBUILDING 1FUTUREBUILDING 3FUTUREBUILDING 220' CENTER WALKWAY &EMERGENCY SERVICES ACCESS50' RIGHT OF WAY TO BE DEDICATEDSTORMPONDSTORMPONDSTORMPONDTEST PIT, TYPMONITORING WELL, TYP10' PROPOSED PUE10'PROPOSEDPUESTORMPONDTRAFFIC FLOWCONSTRUCTIONTRAFFIC10' PROPOSED PUE70' PROPOSEDR.O.W.10' PUEPER NWX PH1EXISTING APPROACH TO BE WIDENEDBAXTER DITCH STORM WATER PIPESSTORM WATER PIPESFIELD DRAINSFIELD DRAINSGRAVEL CONSTRUCTIONACCESS ROAD TO OAK STREETPHASE 1A DISTURBANCEPHASE 1A DISTURBANCEEXISTING HYDRANTEXISTING 8" D.I.P. WATER MAINEXISTING 21" PVC SEWER MAINNOTES:1. NO WATER OR SEWER INFRASTRUCTURE IS PLANNED2. SEE PRIVATE STORM WATER PIPE PLANS FOR INTERNAL STORM PIPE DETAIL.3. SHEET CM-P1A FOR THE CONSTRUCTION MANAGEMENT PLAN.4. PHASE 1A IMPROVEMENTS ARE TO BE FURTHER REFINED WITH THE SITE PLANSUBMITTAL FOR PHASE 1B AND THEREFORE FINAL LOCATIONS AND DESIGN MAY BEADJUSTED ACCORDINGLY.R - DR - C NIEBEL PUCKETT DITCHSTORMPOND EXISTING OHPFUTUREPARKINGLOTFUTUREPARKINGLOTPROPOSEDIRRIGATIONWELL