HomeMy WebLinkAbout015 - Appendix O - DNRC NOI ApprovalMarch 5, 2026
41H 30173948
Page 1 of 2
INTENT TO APPROPRIATE ABSTRACT
STATE OF MONTANA
DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION
1424 9TH AVENUE P.O. BOX 201601 HELENA, MONTANA 59620-1601
INTENT TO APPROPRIATE ABSTRACT
AN INTENT TO APPROPRIATE GROUNDWATER IS NOT A WATER RIGHT.
MCA 85-2-102(32)(b)
Water Right Number:41H 30173948 GROUND WATER CERTIFICATE
Version:1 -- INTENT TO APPROPRIATE
Version Status:NOI AUTHORIZED
Owners:TRUE NORTH PARTNERS LLC
60 AAJKER CREEK RD
BOZEMAN, MT 59718-8225
Priority Date:PRIORITY DATE WILL BE ASSIGNED UPON SUBMISSION OF NOTICE OF
COMPLETION OF GROUNDWATER DEVELOPMENT.
Enforceable Priority Date:N/A
Purpose (Use):LAWN AND GARDEN
Maximum Flow Rate:FLOW RATE WILL BE ASSIGNED UPON SUBMISSION OF NOTICE OF COMPLETION
OF GROUNDWATER DEVELOPMENT.
Maximum Volume:9.80 AC-FT
Maximum Acres:7.00
Source Name:GROUNDWATER
Source Type:GROUNDWATER
Point of Diversion and Means of Diversion:
ID Govt Lot Qtr Sec Sec Twp Rge County
1 3 NENW 4 2S 5E GALLATIN
Period of Diversion:APRIL 1 TO OCTOBER 31
Diversion Means:WELL
Source Aquifer:MULTIPLE SOURCE AQUIFERS MAY EXIST BENEATH THE AUTHORIZED POINT OF
DIVERSION. THE GROUNDWATER DEVELOPMENT MAY BE COMPLETED IN ONE
OF THE FOLLOWING SOURCE AQUIFERS:
BASIN FILL AND ALLUVIAL SEDIMENTS
FRACTURED ROCK
Survey Tract:COS 2552B, TRACT 4
Purpose (Use):LAWN AND GARDEN
Volume:9.80 AC-FT
Period of Use:APRIL 1 to OCTOBER 31
Place of Use:
ID Acres Govt Lot Qtr Sec Sec Twp Rge County
1 7.00 E2NW 4 2S 5E GALLATIN
Total:7.00
Geocodes/Valid:06-0798-04-2-01-01-0000 - Y
March 5, 2026
41H 30173948
Page 2 of 2
INTENT TO APPROPRIATE ABSTRACT
Remarks:
IMPORTANT INFORMATION
GROUND WATER WILL BE USED TO SUPPLEMENT SURFACE WATER APPLIED TO BASEBALL FIELDS.
DNRC AUTHORIZES SOURCE AQUIFER(S) BASED ON THE LOCATION OF THE AUTHORIZED POINT OF
DIVERSION. MORE INFORMATION ABOUT SOURCE AQUIFER DETERMINATION IS AVAILABLE AT THE DNRC
WEBSITE.
BACKFLOW PREVENTOR
PURSUANT TO SECTION 85-2-505, MCA, TO PREVENT GROUND WATER CONTAMINATION, AN OPERATIONAL
BACKFLOW PREVENTOR MUST BE INSTALLED AND MAINTAINED BY THE APPROPRIATOR IF A CHEMICAL OR
FERTILIZER DISTRIBUTION SYSTEM IS CONNECTED TO THE DIVERSION MEANS.
COMPLETION DEADLINE
THE DEADLINE TO COMPLETE THIS AUTHORIZATION AND FILE A NOTICE OF COMPLETION OF GROUNDWATER
DEVELOPMENT (FORM 602) IS FEBRUARY 27, 2031. YOU MAY FILE ONE FORM 602E REQUEST FOR EXTENSION
FOR AUTHORIZED NOTICE OF INTENT TO APPROPRIATE GROUNDWATER, BY FEBRUARY 27, 2031. IF NEITHER
ARE RECEIVED BY FEBRUARY 27, 2031, THIS AUTHORIZATION WILL EXPIRE.