Loading...
HomeMy WebLinkAbout012 - Appendix L - Ditch Notification-PKG-021626First class mail on 02/17/26 Dan Triemstra 2200 Durston Rd Bozeman MT 59718 Richard Paugh 378 Hulbert Rd E Bozeman MT 59718 Dustland Fairytale, LLC 407 Bleeker Street New York, NY 10014 SD Baxter MT, LLC 2639 Professional Circle Suite 101 Naples, FL 34119 Bridger Creek D Ranch, Inc 2141 Skokie Place Billings, MT 59105 Farmers Canal Company Atn: Bill Tatarka PO Box 10686 Bozeman, MT 59719 1105 REEVES ROAD W, STE 6 BOZEMAN, MT 59718 406-581-5730 www.headwatersmt.net Page 1 of 1 February 16, 2026 Ditch User Niebel-Baxter Ditch Re: Diamond 8 Baseball Ballfield Dear Ditch User/Water Rights Holder, Please find attached a copy of the site plan for the proposed Diamond 8 Baseball Field. The project aims to provide a total of 8 fields, including high school baseball fields, high school softball fields and youth baseball fields. The 80-acre parcel is Tract 4 of COS 2552B, located Section 4, Township 2 South, Range 5 East. Baxter Lane is the north boundary of the property; Oak Street is the south boundary, and future Laurel Parkway is the east boundary. The property has been annexed into the City of Bozeman. Since the project is within the City of Bozeman, they require the surrounding roads (Laurel Parkway, Baxer Lane and Oak Street) to be brought up to City standard and connected. The required construction of Laurel Parkway is in conflict with the Niebel-Baxter Ditch which runs along the northeast corner of the subject property. I met with Dan Triemstra on December 23rd to discuss the possibility of piping the ditch and replacing the headgate structure on Baxter Creek. Preliminary research suggests an 18” -24” pipe would be needed from the headgate on Baxter Creek to Baxter Lane. Piping the ditch would reduce loss and risk. The pipe is planned to have 2 manholes to aid in access to the pipe. The pipe slope will roughly be 0.5%, so it will have the ability to push sediment. A 20’ irrigation easement will be filed over the pipe to allow access and maintenance. The manholes will be easily accessible from Laurel Parkway which is proposed to have parking on both sides of the street. Your quick response is greatly appreciated so that comments can be addressed as early in the process as possible. Your response in writing (email or letter) regarding the proposed ditch modification and easement is greatly appreciated. If you have any questions or comments, please contact me at 406-581-5730 or jmay@headwatersmt.net. Sincerely, ________________ Jeremy May, P.E. Headwaters Engineering, Inc. www.headwatersmt.net H:\2128\002\DOCS\IRRIGATION\Ditch Notification Letter.doc NDRAWN BY:DATE:Plot Date: 2/16/2026 9:43 AMH:\2128\002\ACAD\SHEETS\PERMITTING\WATERCOURSE.dwgREVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT #:LOCATION:DIAMOND 8BALLPARKVICINITY MAPJRM02/16/262128.002BOZEMANSUBJECT PROPERTYBAXTER LANEOAK STREETLAUREL PARKWAY NIEBEL-BAXTER DITCHBAXTER DITCHDIVERSION/HEADGATEDIVERSION & PUMPBAXTER CREEKFUTURE LAUREL PARKWAY WASTE DITCHCOTTONWOOD ROAD OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHP////////////////////////////////////////////////////////////////// ////// ///////// ////// /// ////// ////// ////////////////////////////////////////////////////////////////////////////////////////////////////////////21S8W///////////////////////////////// /// ////// ////// /// ////// ////// /// ////// ////// /// ////// ////// /// ///////// /// ////// ////// /// ////// ////// /// ////// ////// /// /// /// /// ////// ////////////10 WWW8 W8 W8 W8 W8 W8 W8 W 8 W8 W8 W21 SS21 SS21 SS21 SS 21 SS21 SS21 SS21 SS21 SS21 SS21S8W21 SS21 SS21 SS21 SS21 SS8 W8 W8 W8 W8 W8 W8 W8 W21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS WS WS WS WS WS 4 SS 4 SS 4 SS 8 W8 W8 W8 W 4 S S 4 SS4 SS4 SS4 SSWSWSWSWS12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 8 SS12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 WUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU U U U U 11"X17": 1"= 200 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )50100100100HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\EXHIBITS\SITE MAP FOR DITCH NOTIFICATION.dwg Plot Date: 2/16/2026 9:18 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN2/16/26JRMSITE PLANBALL FIELDDIAMOND 82128.002C-1LAUREL PARKWAY40' TBC-TBC90' R.O.W.HARVEST PARKWAY35' TBC-TBC70' R.O.W.BAXTER LANE26' TBC-TBC100' R.O.W.DELINEATEDWETLANDS50' W.C . S E T B A C K ZONE 1 PROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY 45' R.O.W.PER NWX PH1LANDSCAPE BLOCK FRONTAGE 45' PROPOSEDR.O.W.VISION TRIANGLE NOTES:CONTOUR INTERVAL = 1.0'BAXTE R C R E E K 66' R.O.W.PER NWX PH1FUTURE BAXTER LANE IMPROVEMENTS, BY OTHERSPROPOSED 10" WATER MAINPROPOSED 10" WATER MAINPROPOSED 10' SHARED USE PATHPROPOSED 10' SHARED USE PATHPROPOSED 21" SEWER MAINPROPOSED 8" WATER MAINPROPOSED 21" SEWER MAINPROPOSED 8" SEWER MAINPROPOSED 21" SEWER MAINPROPOSED 10" WATER MAINPROPOSED PRESSURIZEDSEWER SERVICEPROPOSED 4"SEWER SERVICEPROPOSED 1.5"WATER SERVICEPROPOSED TRAILPROPOSED JOINTPOWER/GAS/COMMEXISTING OHP60' R.O.W.PER NWX PH1BAXTE R C R E E K 60' COUNTY ROAD R.O.W.FIELD 1TURFFIELD 2TURFFIELD 3GRASSFIELD 4GRASSFIELD 5GRASSFIELD 6GRASSFIELD 7TURFFIELD 8GRASSBUILDING 3BUILDING 1BUILDING 2PROPOSEDHYDRANT, TYP20' CENTER WALKWAY &EMERGENCY SERVICES ACCESSENTRY GATEENTRY GATEBATTING CAGEBATTINGCAGEBATTINGCAGEBATTINGCAGEREPLACEDIVERSION/HEADGATEADD SCREWGATEPROPOSED 4"SEWER SERVICEPROPOSED IRRIGATION DITCH PIPEDAYLIGHT IRRIGATION DITCH PIPEBUILD NEW DITCH TO CONNECTPROPOSED ACCESS MANHOLEFILL EXISTING NIEBEL-BAXTER DITCHFILL EXISTING NIEBEL-BAXTER DITCH OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHP 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 18SD 18SD 8 SS 8 SS G//////////////////////////////////// /// ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// /// ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ///////////////////// ///////////////////// ///////////////////// SD SDSDSDSDSDSDSDSDSD SDSDSDSDSD SD10 W 8 W 8 W 8 W 8 W21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SSWSWSWSWSWS4 SS4 SS4 SS8 W 8 W 8 W 8 W 4 SS 4 SS 4 SS 4 SS 4 SSWSWSWSWS ///////////////////////////////////////12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W U U UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU U U U U U U UUUUU16 SD N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 50100 100 100 11"X17": 1"= 200 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 2/16/2026 9:27 AM H:\2128\002\ACAD\SHEETS\EXHIBITS\SITE MAP FOR DITCH NOTIFICATION.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 2/16/26 JRM SITE MAP OVERALL DIAMOND 8 BALLPARK 2128.002 C-2 BAXTER LANE OAK STREET LAUREL PARKWAYHARVEST PARKWAY REPLACEDIVERSION/HEADGATE ADD SCREWGATE PROPOSED IRRIGATION DITCH PIPE DAYLIGHT IRRIGATION DITCH PIPE BUILD NEW DITCH TO CONNECT PROPOSED ACCESS MANHOLE FILL EXISTING NIEBEL-BAXTER DITCH FILL EXISTING NIEBEL-BAXTER DITCH EXISTING PUMP EXISTING DIVERSION PROPOSED IRRIGATION DITCH PIPEBAXTER CREEKBAXTER CREEK