Loading...
HomeMy WebLinkAbout009.01 - Appendix I.1 - Field Drain Memo 1105 REEVES RD. WEST, SUITE 6 BOZEMAN, MT 59718 406-581-5730 www.headwatersmt.net Page 1 of 2 June 22, 2026 Engineering Department City of Bozeman Re: Diamond 8 MSP & Site Plan 1 – Field Drain Memo COB # 26161 & 26282 Dear Engineering Staff, Thank you for the video meeting on June 15th, it was a helpful discussion. This memo is in response to the field drain & wet pond questions from that meeting. 1. Field drain pipes discharging into wetlands. As discussed, the pipes that were shown discharging into the wetlands were underground groundwater dewatering pipes. WET conducted a groundwater analysis for the site and it was shown that we could not install the groundwater dewatering pipes without lowering groundwater in the areas of the delineated wetland, therefore these pipes were removed. Sheet C2.0 as submitted with Site Plan 1 has been updated to remove these pipes. 2. Drain pipes for fields The fields have perimeter and internal storm pipes proposed to collect surface water that is collected from storms and transport it to the nearest storm pond. The fields were designed to be a minimum of 24” above the max groundwater elevation. The proposed 8” storm pipes are to be placed at around 26” below the field surface so the field drains will be above the high groundwater for the majority of the site. There are a few places where the high groundwater will be above the pipe inverts for a short time in the spring. To account for the potential groundwater that will be captured, we plan to add an outlet pipe to the storm pond with a control valve. This will allow the groundwater to be passed through the storm pond without reducing the volume of the pond. This statement has also been added to the Site Plan 1 stormwater design report. 3. Wet Ponds The groundwater elevations have been measured on this site for over 1 year, with some additional wells added in January 2026. Using this data, we have designed the retention ponds to be at least 24” above the high groundwater. The wet ponds have been designed to have a portion of the bottom at or below the lowest groundwater elevation recorded. The storage volume will be calculated using the volume above the high groundwater elevation. This statement has also been added to the Site Plan 1 stormwater design report. Page 2 of 2 Let me know if you need anything additional for this request. Sincerely, ________________ Jeremy May, P.E. Headwaters Engineering, Inc. www.headwatersmt.net H:\2128\002\DOCS\SITEPLAN\MASTER SITE PLAN\Resubmittal 2 - Engineering\Field Drain Memo.docx