HomeMy WebLinkAbout000 - Phase 1A - Diamond 8 Narrative
Diamond 8
Phase 1A
Site Plan Application
April 2026
TABLE OF CONTENTS
1. Forms & Checklists
2. Project Team
Executive Summary
3. Narrative
a. General Site Information
b. Site Plan Checklist
Appendices / Reference Information Appendix A - Green Plan
Appendix B - Vicinity Map
Appendix C - Future Land Use Map
Appendix D - Existing Zoning
Appendix E – Parks Master Plan
Appendix F – Existing COS 2552B
Appendix G – Traffic Study
Appendix H – Streamline Memo
Appendix I – Stormwater Design Report
Appendix J – Groundwater Monitoring
Appendix K – Flood Analysis Memo
Appendix L – Ditch Notification
Appendix M – Aquatic Delineation Report
Appendix N – Wetland Application Package
Appendix O – DNRC NOI Approval
Appendix P – CILWR Memo
Appendix Q – Adjacent Property Easements
Appendix R.1 – Onsite Easement Exhibit
Appendix R.2 – Baxter Street & Utility Easement Draft
Appendix R.3 – Harvest Parkway Street & Utility Easement Draft
Appendix R.4 – Oak Street & Utility Easement Draft
Appendix S – Weed Management
Appendix T – Neighboring Plats
Appendix U – Baxter 80 Annexation Agreement
Appendix U.2 – Baxter 80 Annexation Resolution
Appendix V – Geotechnical Report
1. Application Information, Forms & Checklists
The Site Plan Application has been included per City requirements, and the applicant will
submit the required fee once the application has been deemed adequate for review. Please
see the estimated site plan fee amount below:
Component Fee Quantity Total
Base $ 4,180 1 $ 4,180
Total $ 4,180
2. Project Team
OWNER / APPLICANT 4 Bozeman, LLC
(Attn: David Hargrove)
David@4rland.com
PROJECT CONSULTANTS
PLANNING & Intrinsik Architecture
ARCHITECTURE (Attn: Tyler Steinway)
tsteinway@intrinsikarchitecture.com
106 East Babcock Street Suite 1A
Bozeman, Montana 59715
p. 406.582.8988
CIVIL ENGINEERING Headwaters Engineering
(Attn: Garrett Schultz)
gschultz@headwatersmt.net
1105 Reeves Road West, Suite 6
Bozeman, Montana 59718
p. 406.570-3676
LANDSCAPE Design 5
ARCHITECTURE (Attn: Troy Scherer)
Troy@design5la.com
111 North Tracy Avenue
Bozeman, Montana 59715
p. 406.587.4873
SPORTS DESIGN Ampere
(Attn: Andy Huss)
Andy.huss@ampyourdesign.com
1617 Walnut Street
Kansas City, Missouri 64108
p. 573.823.4405
Executive Summary
This unique 80-acre parcel will be transformed into a park forward addition to the city and is
intended to stand as a model facility in the region. In order to create something extraordinary for
the community we will need to approach and process this project in unique ways. While
otherwise following the code, we hope to have overlapping reviews that will allow us to begin
building the baseball park while rest of the projects trail. In the end, the landscape intensive
park is completed as significant roads are later finished, and the neighborhood plat is finalized.
This Site Plan Application is for the first phase of the project which will allow for rough grading
and fields to start to be installed.
3. Site Plan Narrative
A. General Site Information
The applicant is proposing to develop a portion of the 80-acre parcel that was recently
annexed as “Baxter 80”. The overall goal of the project is to create a state-of-the-art
baseball park/complex (Diamond 8) on a majority of the site. Time is of the essence to
create this extraordinary and unique park project for the community.
This Site Plan is considered the first phase or Phase 1A and the intention with this
application is to get approval as quickly as possible to allow grading and some site
improvements to occur while the rest of the Diamond 8 facility is being permitted. Grading
and grass growing is a key component to when the facility will be able to open and thus this
phase has been submitted ahead of the rest of the project.
The project site is located west of the Northwest Crossing neighborhood and north of the
Laurel Glen neighborhood. The site is bounded by Oak Street to the south, Baxter Lane to
the north, and Laurel Parkway (unbuilt) to the east.
The primary entrance into the project will be off Laurel Parkway through the extension of
Harvest Parkway. This road will be extended down the middle of the site and will be the
backbone of the transportation network. For Diamond 8, the main parking lot will be located
off this road.
Phase 1A centers on establishing primary access and logistical support through the
preliminary development of temporary construction access, parking lots, grading, and
stormwater management infrastructure. This initial stage includes the development of
temporary construction access along Laurel Parkway from Oak Street to Harvest Parkway
and alongside the extension of Harvest Parkway from that junction to the western edge of
the parking lot.
Beyond access, the site will undergo significant earthworks to prepare for future structural
phases. Comprehensive site grading, subbase installation, and drainage work will be
completed from Harvest Parkway through to Baxter Lane. This infrastructure will be
accompanied by the installation of dedicated site storm ponds and preliminary stabilizations
for future building foundations.
One well will be installed to provide temporary irrigation across the site during construction.
Importantly, the scope of this phase is designed to have low impact, with no proposed
changes or disturbances to existing wetlands or watercourses. Furthermore, construction
activities remain localized; there is no work planned for Oak Street, Baxter Lane, or
Touchstone Drive at this time.
B. Site Considerations
Setbacks
This phase does not include any vertical construction other than initial preparation and
stabilization for the future installation of building foundations for the Hub, Lodge and
Maintenance buildings.
The setbacks applied to this project will be unique for the northern portion of the site. The
project site is currently zoned R-C and R-D, but the northern portion will be developed as a
public park. This area will eventually be dedicated to the city and potentially rezoned to PLI.
PLI setbacks are based on the adjacent zoning districts, which are a mix of REMU, R-A, and
R-B. There are necessary buildings for the function and success of the baseball facility that
will not be able to meet the maximum setback standards in those zoning districts. These
buildings are strategically placed near the central spine access. It is counterproductive for
the baseball facility to concentrate the buildings on one side, as walking distances would be
too long for the average pedestrian and would feel disconnected from the fields and viewing
experience.
Infrastructure
Phase 1A only includes major grading efforts, installation of the site storm ponds, and
temporary construction access . Due to the project not being ready to install city
infrastructure (sewer), official road construction is deferred to Phase 1B. There are no
impacts to the wetlands proposed as part of this site plan. The site has been
designed to minimize wetland impacts. Wetland impacts associated with City required
infrastructure will be included within Site Plan 2. Therefore most of that information
has not been included in this application.
Streets
The development of the road network in Phase 1A focuses on establishing site access
through temporary construction access, as city infrastructure is not yet ready to be installed
under future permanent roads. This phase includes the primary construction of temporary
construction access for Laurel Parkway, extending from Oak Street to Harvest Parkway, and
Harvest Parkway from its junction with Laurel Parkway to the western terminus of the future
parking lot. To support these access routes and ensure long-term stability, the scope
incorporates comprehensive site grading, subbase preparation, and drainage infrastructure
extending from Harvest Parkway toward Baxter Lane.
This stage also involves the creation of gravel staging areas, located specifically within the
footprint of the future permanent parking lot, to facilitate construction logistics. The legal
framework for this infrastructure will be solidified through the dedication of easements for all
main roadways. While these new connections are being established, the existing
surrounding infrastructure will remain undisturbed, as no work is currently planned for Oak
Street, Baxter Lane, or Touchstone Drive with this application.
Building Design
The Phase 1A portion of the project does not propose any vertical construction but rather is
the initial preparation and stabilization for the future three primary buildings located on site.
While the final architectural designs for these structures are still being refined, this initial
phase focuses on rough stabilization. This involves targeted site grading and the installation
of a compacted subbase. By performing this heavy earthwork now, the project ensures that
the conceptual footprints for each building are leveled and reinforced, preventing future
settling and providing a clear transition for the subsequent vertical construction permits.
Accessible Provision (ADA)
This development will be designed in compliance with the IBC, including its accessible
requirements; as well as ANSI 117.1 & ADA standards for accessible design. Specifically
pertaining to this site plan, the site design provides several accessible parking spaces
across the three planned parking areas. All building entries, the refuse areas, and
landscaped open space, are connected via an accessible pathway system which follows the
requirements for an accessible route.
Parking
Parking construction in Phase 1A focuses on site preparation and logistical support.
Because the park and associated building will not be open with the completion of this phase
technically no parking is required. That said, a central component of this phase is the
construction of gravel staging areas located specifically within the footprint of the future
permanent parking lots. This approach allows the area to serve current construction needs
while establishing the subgrade for a parking supply that has been intentionally moderated
to minimize impervious surfaces near adjacent wetlands. These staging areas will help to
facilitate the broader site grading, subbase installation, and drainage work extending from
Harvest Parkway to Baxter Lane.
Neighborhood Center
The neighborhood center for this property is the Diamond 8 baseball complex. This park is
intended to be a destination for all of Bozeman. The center of the site appears to be right
around where the Lodge building will be located. This is perfectly situated at the front door of
the park. This first phase of construction is primarily centered around the grading effort. This
park/neighborhood center won’t open until the completion of the later phases. This Site Plan
kicks off the construction effort to establish this neighborhood center.
Signs
During Phase 1A no signs will be proposed. Any future signage will be reviewed and
approved under a comprehensive sign permit and subsequent sign permit applications.
These applications will conform with the rules in place at the time of submittal.
Parkland
Phase 1A represents the initial activation of the Diamond 8 parkland, a state-of-the-art
baseball facility. This phase focuses on the foundational work required to navigate
Montana's limited growing seasons and expedite the construction timeline. Essential
infrastructure improvements includes the temporary construction access for Laurel Parkway
and Harvest Parkway, providing the necessary access for the park’s future amenities.
Additionally, the installation of an on-site well for temporary irrigation is a critical early step,
ensuring that the project can begin establishing the grass which is essential to the park’s
success.
To support the significant community investment this parkland represents, Phase 1A
executes heavy civil work intended to stabilize the site for long-term use. This involves
extensive site grading, subbase installation, and drainage from Harvest Parkway to Baxter
Lane, along with the installation of dedicated site storm ponds to manage runoff without
impacting adjacent wetlands. By dedicating roadway easements and preparing the
stabilizing the site the applicant is laying the groundwork for a seamless, continuous
construction process.
These early investments in public infrastructure and parkland readiness are designed to
facilitate concurrent entitlements and justify the pursuit of Park CIL (Cash-in-Lieu) credits for
the facility’s substantial contributions to the Bozeman community.
Landscaping
During Phase 1A, landscaping efforts focus on preliminary site preparation to establish the
foundation for a cohesive and high-quality streetscape. This initial work includes extensive
site grading and drainage improvements from Harvest Parkway to Baxter Lane, alongside
the installation of site storm ponds that will eventually be integrated into the broader plan.
The final installation of permanent irrigation, street frontage plantings, and the screening of
utility equipment will occur at later stages. This phase ensures that all preliminary grading
and utility coordination are in place to support a comfortable pedestrian experience and
long-term visual interest across the site’s public spaces.
Please note given that there are no plantings or permanent irrigation included in this
phase there are no landscape plans included in this application. That information is
anticipated in the Phase 1B Site Plan.
Water Rights
Phase 1A initiates the project's long-term water management strategy through the
installation of an onsite well, which will provide temporary irrigation during the earliest stages
of development. This well is supported by a DNRC-approved Notice of Intent and functions
as a critical backup source for the state-of-the-art baseball facility's future needs. By
establishing this infrastructure now, alongside the installation of site storm ponds and
comprehensive grading, the project prepares for the future utilization of water rights 41H-
30159830 and 41H-30159834. This broader irrigation plan, which involves diverting water
from Baxter Creek and potentially incorporating Farmers Canal shares, is designed to
sustain the parkland without immediate impact on the city's domestic supply. While the
domestic water requirements for the Lodge and other facilities will be addressed via the
Cash-In-Lieu of Water Rights (CILWR) process in subsequent site plan reviews, Phase 1A
secures the necessary infrastructure to protect the grounds throughout the initial
construction period.
Irrigation
The irrigation strategy for Phase 1A is anchored by the installation of one onsite well, which
provides the immediate and reliable water source necessary for temporary irrigation and
dust control as the site transitions from grading to development. This well represents the first
operational component of a larger, redundant water system designed to sustain the state-of-
the-art baseball fields and professional-grade landscaping throughout the Diamond 8
complex. While subsequent phases will integrate the diversion of water from Baxter Creek
and the utilization of potential Farmers Canal shares, the Phase 1A well ensures the project
remains self-sufficient during its initial construction and growing seasons.
Site Lighting
Phase 1A focuses on the foundational civil work and easement dedication required to
support the future Diamond 8 lighting network. While the comprehensive lighting plan, which
may feature specialized field lighting to extend playing times, as well as illumination for
intersections, parking lots, and pedestrian ways, is currently being designed to meet all
Bozeman UDC photometric standards, the physical installation of these fixtures is reserved
for later development stages. This initial phase establishes the essential utility corridors
through the dedication of easements for Laurel Parkway and Harvest Parkway, ensuring
that the necessary infrastructure for future mid-block crossings and street lighting is
seamlessly integrated into the site’s core access. Detailed lighting specifications and formal
photometric plans will be submitted alongside the subsequent Site Plan Application, allowing
the project to proceed with its primary grading and infrastructure while the technical lighting
designs are finalized.
Traffic
In Phase 1A, traffic-related improvements focus on establishing the primary circulation
skeleton through temporary construction access. To ensure long-term transportation
upgrades can be implemented in subsequent phases as identified in the Traffic Study,
Phase 1A includes the dedication of easements for all main roadways, securing the
necessary right-of-way for future full-width paving and pedestrian infrastructure, such as the
planned crosswalk at the Laurel and Harvest intersection. By utilizing temporary
construction access it will allow for underground infrastructure to be installed before the full
road width is constructed ion Phase 1B.
Phasing
Phase 1A serves as the critical initial step in a coordinated, multi-phase delivery strategy
designed to expedite the construction of the Diamond 8 baseball facility. Recognizing that
timing is the project's most vital factor, particularly regarding the need to establish grass
within Montana’s limited growing seasons, this phase focuses on high-impact civil work
while concurrent entitlements are pursued. By establishing temporary construction access
for Laurel Parkway and Harvest Parkway and dedicating the necessary roadway
easements, Phase 1A secures the essential ingress and EMS access required for site
operations. These paths will be paved for pedestrian use once construction access is no
longer required and official roads are completed in later phases.
These efforts, combined with early site grading, subbase installation, and the commissioning
of an onsite irrigation well, provide the foundational infrastructure needed to ensure that
once construction begins, it can proceed without interruption.
Response to 38.410.010.B (Natural Environment)
The applicant is to the maximum extent possible (and consistent with other requirements)
preserving the natural terrain, natural drainage, existing topsoil, trees and other existing
vegetation. For example, this site has several wetlands onsite and rather than fill them in to
create a more efficient site layout the applicant has worked around the wetlands. There is
very little impact on the wetlands with this project. There are no impacts in this phase of the
project.
The site will have to be graded to ensure the fields are usable and the walkways and
gathering areas around the site meet accessibility requirements. While the site is being
graded, the topsoil will be screened and redistributed across the site where possible. There
are very few trees onsite due to this land being primarily agricultural but the few trees that
do exist onsite appear to be within the wetland and watercourse setback areas. These areas
are not proposed to be impacted with this application and as such the vegetation will largely
remain intact.
Concurrent Construction
In Phase 1A, the project initiates the concurrent construction plan outlined in the Master Site
Plan. This strategy is used to address the complex logistical and timing requirements of the
Diamond 8 development. This approach allows essential on-site preparation, specifically site
grading, subbase installation, and the preliminary stabilization for future foundations for the
Lodge, Maintenance, and Hub buildings, to proceed in tandem with the establishment of
temporary construction access.
B. Site Plan Checklist
1. Boundary line of property with dimensions;
Response: This information is shown on Civil Site Plans.
2. Date of plan preparation and changes;
Response: This information is in all drawings and is specifically called out on the
coversheet.
3. North point indicator;
Response: This information is on all drawings.
4. Suggested scale of one inch to 20 feet, but not less than one inch to 100 feet;
Response: Understood. All drawings are to a scale that fits on the page and is in line with
this requirement.
5. Parcel and site coverage information:
1. a. Parcel size in gross acres and square feet;
2. b. Estimated total floor area with a breakdown by land use;
3. c. Location, percentage of parcel and total site, and square footage for the
following:
1. Existing and proposed buildings and structures;
2. Driveway and parking;
3. Areas to remain undisturbed,
4. Landscaped areas, with and without irrigation,
5. Recreational uses areas, parks, school sites, etc., and
6. Public street right-of-way;
Response: This information is on the coversheet, the civil plans, and throughout several
parts of the narrative and other exhibits.
6. Total number, type and density per type of dwelling, and total net and gross
residential density and density per residential parcel;
Response: There are no dwelling units proposed within the Diamond 8 Project. The phase
1A application focuses exclusively on establishing the initial infrastructure and phasing for
the Diamond 8 baseball complex.
7. Location, identification and dimension of the following existing and proposed
data, on-site and to a distance of 100 feet outside site plan boundary, exclusive of
public rights-of-way, unless otherwise stated:
1. a. Topographic contours at a minimum interval of one foot, or as determined
by the review authority;
2. b. Adjacent streets and street rights-of-way to a distance of 150 feet, except
for sites adjacent to major arterial streets where the distances must be 200
feet;
3. c. On-site streets and rights-of-way;
4. d. Ingress and egress points;
5. e. Traffic flow on-site;
6. f. Traffic flow off-site;
7. g. Utilities and utility rights-of-way or easements including but not limited
to:
1. Electric;
2. Natural gas;
3. Telephone, cable TV, optic fiber, and similar utilities;
4. Water;
5. Sewer (sanitary, treated effluent and storm);
8. h. Surface water and groundwater, including:
1. Holding ponds, streams and irrigation ditches;
2. Watercourses, water bodies and wetlands:
1. a. If wetlands information was provided with a prior
subdivision, provide delineation of on-site wetlands per the
subdivision work on the site plan. The developer must
provide recertification from a wetlands professional per
38.610 that site wetlands mapped with the subdivision are
still accurate or provide new delineation.
2. b. If no wetlands delineation was done with a prior
subdivision, the developer must complete such delineation of
on-site wetlands consistent with the process in 38.610.
3. Floodplains as designated on the effective federal insurance rate
map and delineated per requirements of 38.600 or that may
otherwise be identified as lying within a 100-year floodplain through
additional floodplain delineation, engineering analysis, topographic
survey or other objective and factual basis;
4. A floodplain hazard evaluation report in compliance with article 6 of
this chapter if not previously provided with subdivision review;
5. Agricultural water user facilities and easements and contact
requirements per 38.310.010 unless:
1. a. Such information was previously provided through a
subdivision review process; or
2. b. The provision of such information was waived in writing
during subdivision review of the land to be developed;
6. Depth to the high water table must be determined from tests taken
during the period of major concern;
9. i. Grading and drainage plan, including provisions for on-site
retention/detention and water quality improvement facilities as detailed in a
Stormwater Drainage Plan:
1. All drainageways, streets, arroyos, dry gullies, diversion ditches,
spillways, reservoirs, etc., which may be incorporated into the storm
drainage system for the property must be designated:
1. a. The name of the drainageway (where appropriate);
2. b. The downstream conditions (developed, available
drainageways, etc.);
3. c. Any downstream restrictions;
10. j. Slopes of greater than 15% or other significant topographic features;
11. k. Sidewalks, walkways, drive aisles, loading areas and docks, bicycle
facilities, including typical details and interrelationships with vehicular
circulation system, indicating proposed treatment of points of conflict, a
statement requiring lot accesses to be built to the standard contained in this
section, the City of Bozeman Design and Construction Standards, and the
City of Bozeman Modifications to Montana Public Works Standard
Specifications;
12. l. Provision for site accessibility, including, but not limited to, wheelchair
ramps, parking spaces, handrails and curb cuts, including construction
details and the applicant’s certification of ADA compliance;
13. m. Fences and walls, including typical details;
14. n. Exterior signs;
15. o. Exterior refuse, recycling, and composting collection areas, including
typical details;
16. p. A site plan, complete with all structures, parking spaces, building
entrances, traffic areas (both vehicular and pedestrian), vegetation that
might interfere with lighting, and adjacent uses, containing a layout of all
proposed fixtures by location and type. The materials required in
38.710.050.A.18, if not previously provided;
17. q. Curb, asphalt section and drive approach construction details;
18. r. Landscaping and irrigation (detailed plan showing plantings, irrigation
layout, and other relevant information as required in 38.710.090);
19. s. Unique natural features, significant wildlife areas and vegetative cover,
including existing trees and shrubs having a diameter greater than two and
one-half inches, by species;
20. t. Snow storage areas. All parking facilities containing five (5) or more
parking spaces shall provide a snow management plan. The plan shall
contain the following:
1. Locations for snow storage, which may include on-site landscaped
areas, and other open space for at least 15% of the total area of the
site used for parking, access drives, walkways and other paved
surfaces;
2. Snow storage is prohibited:
1. a. Within the public right-of-way;
2. b. Where it would obstruct line of sight or vision triangle;
3. c. In a location where it blocks fire hydrants, emergency
vehicle access or access to other properties;
4. d. Where it will cause unmanageable freeze/thaw and icing of
sidewalks, pathways and other paved surfaces;
5. e. Where it obstructs on-site amenities, including but not
limited to points of egress, mailboxes, storage areas, and
trash enclosures;
6. f. Within any access easement;
7. g. Where placed in a manner which violates the Clean Water
Act (CWA) and/or the Montana Pollutant Discharge
Elimination System (MPDES), and/or any other federal, state
or local law or statute.
8. h. Where it will cause damage to trees located in the public
right-of-way;
21. u. Location of city limit boundaries if within 200 feet of the development;
22. v. Historic, cultural and archaeological resources, describe and map any
designated historic structures or districts, and archaeological or cultural
sites;
23. w. Public facilities, including schools, parks, trails, etc.;
Response: This information is shown in the drawing set—primarily the civil site plans—
though information is included throughout the drawings. Please note the only Engineering
design report included in this application is the stormwater design report. There is no Water
or Sewer infrastructure included in this application and therefore is not included.
8. Detailed plan of all parking facilities, including circulation aisles, access drives,
bicycle racks, compact spaces, accessible spaces and motorcycle parking,
on-street parking, number of employee and non-employee parking spaces,
existing and proposed, and total square footage of each.
1. a. If electronic vehicle chargers are included or expected for future use
identify location, path of electrical service, and layout for chargers and
transformers;
Response: Phase 1A involves the construction of gravel staging areas within the footprints
of the future permanent parking lots to facilitate construction access and staging. The
location of these lots is shown in the Civil drawing set. The Northern parking lot will be
accessed from the existing Baxter Lane. The southern lot will be accessed from Oak Street
through the construction of a temporary construction access along Laurel Parkway and
Harvest Parkway to temporary construction access.
Because this phase does not complete out the park, there is no public traffic generated with
this application. A TIS is included for reference though.
9. The information related to transportation capacity required by 38.710.050.A.11,
subject to the following exceptions:
1. a. Such information was previously provided through a subdivision review
process and the proposed development does not generate more trips than
estimated during the subdivision review; or
2. b. The provision of such information was waived in writing during
subdivision review of the land to be developed; or
3. c. The provision of such information is waived in writing by the DRC prior to
submittal of a site plan application; or
4. d. The application for site plan approval involves the redevelopment of
property located within the in the city's established neighborhood
conservation overlay district. In such cases, the city may require the
property owner to sign a waiver of right to protest creation of a special
improvement district, or other form of agreement, assuring participation, on
a fair share, pro-rata basis, in future improvements to intersections in the
vicinity of the development proposal; or
5. e. The application for site plan approval involves the adaptive reuse of an
existing building, regardless of its location within the city, or the
redevelopment of a property located within one of the city's urban renewal
districts. In cases where an existing building or complex of buildings is to
be torn down and replaced with a larger building or complex of buildings,
the city engineer may require the information described in 38.710.050.A.11
to evaluate the additional traffic impacts resulting from development of the
larger building or complex of buildings; or
6. f. Unless waived by the DRC, updated information will be required if
previous approvals or waivers are more than five (5) years old.
Response: A Traffic Impact Study is included as Appendix G to evaluate the proposed
phased transportation upgrades and the connectivity provided by the new Laurel and
Harvest Parkways.
10. Building design information (on-site):
1. a. Building heights and elevations of all exterior walls of the building or
structure;
2. b. Height above mean sea level of the elevation of the lowest floor and
location of lot outfall when the structure is proposed to be located in a
floodway or floodplain area;
3. c. Floor plans depicting location and dimensions of all proposed uses and
activities;
4. d. All on-site utilities and mechanical equipment;
Response: This phase is limited to primarily grading. There are not buildings proposed with
this application.
11. Description and mapping of soils existing on the site, accompanied by analysis as
to the suitability of such soils for the intended construction. Soil in proposed
landscaping areas must comply with requirements outlined in the most recent
version of the City of Bozeman Landscape and Irrigation Performance and Design
Standards Manual.
Response: A Geotechnical investigation was conducted by IMEG engineering. Their findings
are included in this application as Appendix V.
12. Temporary facilities plan showing the location of all temporary model homes,
sales offices and/or construction facilities, including temporary signs and parking
facilities;
Response: No permanent sales offices or model homes are proposed for this phase;
however, a contractor's job trailer and construction-related items may be placed on-site
within the designated gravel staging areas during construction. Because a contractor has
not been selected for this project, the specific items required for construction have not been
provided.
13. Unless already provided through a previous subdivision review, a noxious weed
control plan complying with 38.710.050.A.5.c;
Response: The property owner is currently maintaining the site per the weed management
plan provided in Appendix S, a responsibility that will continue until the parkland is formally
transferred to the City of Bozeman.
14. Drafts of applicable supplementary documents as set forth in 38.720;
Response: Because Phase 1A is focused on the construction of a public park facility and
does not include residential components, covenants and bylaws are not provided; the Parks
Master Plan serves as the primary design regulation for the park construction.
15. The information necessary to complete the determination of density change and
parkland provision required by 38.420.020.B, unless such information was
previously determined by the city to be inapplicable and written confirmation is
provided to the applicant prior to submittal of a preliminary site plan application. If
a new park will be created by the development the park plan materials of
38.710.050.A.14 must be provided;
Response: Requirements for the creation of the new park are outlined in the project
narrative and further detailed within the provided Parks Master Plan.
16. Affordable housing. If the application includes requests for incentives provided in
38.340, describe how the site plan will satisfy any requirements of 38.340 which
have either been established for that lot through the subdivision process or, if no
subdivision has previously occurred, are applicable to a site plan. The description
must be of adequate detail to clearly identify those lots and dwellings designated
as subject to 38.340 compliance requirements and to make the obligations placed
on the affected lots and dwellings readily understandable;
Response: This project is not contemplating the residential component at this time.
Affordable housing may be considered in the future with a subdivision application.
17. Phased site plans:
1. a. A phasing plan showing the location of phase boundaries and that each
phase will be fully functional if subsequent phases are not completed;
2. b. A utilities plan showing that each phase will be able to be fully functional
if subsequent phases are not completed;
3. c. A revegetation and grading plan showing how disturbed areas will be
revegetated to control weeds and site grading and drainage control will be
maintained as phased construction proceeds;
4. d. If the applicant intends for multiple phases to be under construction
simultaneously, evidence of financial commitment from the project lender
for the completion of all phases to be undertaken at once. Evidence of
financial commitment may be provided at the time the building permits for
the multiple phases are sought.
Response: Phasing is established through the Master Site Plan Application. This application
is to enact the first subphase (Phase 1A).
18. When 38.420.020 requires parkland dedication in association with a site plan, and
cash-in-lieu of parkland will not be provided, the materials required by
38.710.050.A.14.
Response: There are no dwelling units proposed with this application. The Master Site Plan
Application will set the direction for any development or possible park credits.
19. The information related to water adequacy required by 38.710.050.A.19, unless the
information was previously provided through a subdivision review process and
the proposed development does not generate more demand than addressed
during the subdivision review. At the discretion of the Director of Utilities, updated
information will be required if previous approvals or determination of no impact
are more than 5 years old.
Response: The applicant has two surface water rights—one from Baxter Creek and the
other from the Gallatin River. The applicant intends to use these surface water rights in
addition to the Farmers Canal Ditch Shares for irrigation purposes. The applicant intends to
pay CILWR for any water usage above their allocated water rights. More information is
included in the CILWR Memo (Appendix P).