Loading...
HomeMy WebLinkAbout032_L200 PARKING LOT HUB - HARDSCAPE PLAN471 54 7 1 0 4 7 0 5 47 0 0 4695 4690 4710470547004710 47 15 470 54700 WES WES WES WES GEY GEY GEY LUT LUT LUT LUT LUT LUT LUT LUT LUT GEY GEY GEY LUT LUT GEY GEY GEY GEY GEY GEY RED RED 6' 8' 10' 8' 10' 8' 8' 10' 8' AMU RED RED AMU AMU AMU RED RED RED RED RED PROPOSED WELL LOCATION T.B.D. SYMBOL PRODUCT SITE MATERIAL LEGEND - PARK CRUSHER FINES TRAIL NATURAL FINES DIRT TRAIL SINGE TRACK W BIKE RACK PET WASTE STATION SYMBOL PRODUCT SITE AMENITY LEGEND - PARK TRASH RECEPTACLE FENCING PEDESTRIAN GATES VEHICLE GATE ACCENT BOULDERS PICNIC TABLES WATERCOURSE CROSSING STACKED BOULDER WALL SECURE BIKE RACK PARKING LOT HUB - HARDSCAPE PLAN L2003015060 N 1 L200 1" = 30'-0" Parking Lot Hub - Hardscape Plan design5la.com 406.587.4873 date issue 04/29/26 SITE PLAN drawn by:checked by:filename:z:\bikefill\autocad\01_sheets\bikefill_landscape.dwgBikefill CommunityBike ParkBozeman, MontanaAV/GOTMS1 07/01/26 SITE PLAN RC1 07/20/26 SPR2 APPROX. DISTURBANCE EXTENTS. VERIFY WITH CIVIL GRADING. PUMP TRACK. FINAL DESIGN TBD. VEHICLE ACCESS GATE SURFACE MOUNTED BIKE RACKS, TYP TRASH AND RECYCLING RECEPTACLES TWO (2) ACCESS GATES. SEE DETAILS. SNOWFILL ACCESS GATES (2) PET WASTE STATION SMOOTH WIRE FENCE, TYP SMOOTH WIRE FENCE, TYP SHARED USE GRAVEL TRAIL, BY OTHERS CONCRETE WALK, BY OTHERS MOUNTAIN BIKE TRAILS. FINAL ALIGNMENT TBD IN FIELD. WATER COURSE ENDS HERE WATERCOURSE PLANTINGS. FINAL LOCATION TBD IN FIELD. CRUSHER FINES SURFACING WETLAND BOUNDARY ZONE 2 WATERCOURSE SETBACK ZONE 1 WATERCOURSE SETBACK WETLAND BOUNDARY WATERCOURSE PLANTINGS. FINAL LOCATION TBD BY OTHERS 20'30'30' 20' ZONE 2 WATERCOURSE SETBACK ZONE 1 WATERCOURSE SETBACK EXISTING FENCE AT SNOWFILL EXISTING TRAIL AT SNOWFILL VAULT TOILET, BY OTHERS PARK PAVILION, SEE ARCH PARK PAVILION AND VAULT TOILETS, SEE ARCH BOULDER RETAINING. FINAL RETAINING EXTENTS TBD IN FIELD. CRUSHER FINES ACCESS TRAIL PICNIC TABLE, TYP STORMWATER DRAINS, SEE CIVIL MOUNTAIN BIKE TRAILS. FINAL ALIGNMENT TBD IN FIELD. PARKING LOT LANDSCAPING BY OTHERS CONCRETE PAD TWO (2) ACCESS GATES. SEE DETAILS. CONCRETE PAD (2)SURFACE MOUNTED SECURE BIKE RACKS. RACKS SHALL BE SPACED 4' APART. (3)SURFACE MOUNTED SECURE BIKE RACKS. RACKS SHALL BE SPACED 4' APART.18' 13'17'14' 20' 1