HomeMy WebLinkAbout026_L2.1_LANDSCAPE DETAILSPRELIMINARY - FOR REVIEWFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION----LANDSCAPE DETAILSBIKEFILL COMMUNITY BIKE PARKPATH AND ON-SITE IMPROVEMENTSBOZEMAN, MTL2.1 RPE22147.01_LS_DETAILS.DWGDME04/29/2026SITE PLAN SUBMITTAL--------------22147.01DECIDUOUS TREE
N.T.S.
2'-8" LENGTH NON-ABRASIVE RUBBER
TIES
(2)3" DIA LODGE POLE PINE STAKES 1-1/2'
FROM TRUNK. STAKE LOCATION SHALL
NOT INTERFERE WITH PERMANENT
BRANCHES
3" DEPTH MULCH
FINISH GRADE
BOTTOM OF ROOT BALL RESTS
ON EXT OR RECOMPACTED SOIL
EXISTING SOIL
TOP OF ROOT FLARE 2" ABOVE EXT
GRADE. NO SOIL ON ROOT FLARE
LOOSENED SOIL. DIG AND TURN
THE SOIL TO REDUCE
COMPACTION TO THE AREA TO
DEPTH OF ROOT BALL.
3 X DIA ROOT BALL MINNOTES:
1.REMOVE NURSERY STAKES.
2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING.
3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL.
4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO
NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT
BALL TO SETTLE THE SOIL.
5.BACKFILL WITH AMENDED SOIL.
6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON.
7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS,
CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS.
8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION.
1
3" DEPTH MULCH
FINISH GRADE
CONIFEROUS TREE
N.T.S.
32" LENGTH NON-ABRASIVE RUBBER
TIES AT 1/3 HEIGHT OF TREE
(2)3" DIA LODGE POLE PINE
STAKES 1-1/2' FROM TRUNK.
BOTTOM OF ROOT BALL RESTS
ON EXT OR RECOMPACTED SOIL
EXT SOIL
TOP OF ROOT FLARE 2" ABOVE EXT
GRADE. NO SOIL ON ROOT FLARE
LOOSENED SOIL. DIG AND TURN
THE SOIL TO REDUCE
COMPACTION TO THE AREA TO
DEPTH OF ROOT BALL.
NOTES:
1.REMOVE NURSERY STAKES.
2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING.
3.REMOVE WIRE TIES AND BURLAP FROM TOP 1/2 OF ROOT BALL.
4.REMOVE ALL BASKETS.
5.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO
NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT
BALL TO SETTLE THE SOIL.
6.BACKFILL WITH AMENDED SOIL.
7.REMOVE STAKES FOLLOWING FIRST GROWING SEASON.
8.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS,
CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS.
9.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION.
3 X DIA ROOT BALL MIN
2
AMENDED EXISTING NATIVE
TOPSOIL, REMOVE ALL LARGE
DEBRIS AND ROCKS OVER 1/2"
EXISTING VEGETATION
SEEDING
N.T.S.
NOTE:
1.EXISTING TOPSOIL WILL BE PLACED BY SITE WORK CONTRACTOR TO ROUGH GRADE.
2.LANDSCAPE CONTRACTOR SHALL AMEND SOIL ACCORDING TO SOIL TEST ANALYSIS AT A
MINIMUM OF 6" DEPTH.
3.LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL GRADING AND SEEDING
PREPARATION.
SEEDED AREA
4
ROCK BOULDERS LOCATED PER PLANS;
DO NOT SCAR OR DAMAGE
FINISH GRADE
1/3 BOULDER BURIED BELOW GRADE
COMPACTED SUBGRADE
ROCK MULCH
BOULDER PLACEMENT
N.T.S.3
EDGING DETAIL
N.T.S.4" BELOW GRADE MIN18" REBAR STAKES TACK
WELDED AT 4' O.C
NOTES:
1.FINISH TO BE NATURAL, RAW STEEL
GROUND VARIES,
SEE PLANS
1/4" x 4" STEEL
FLAT BAR EDGING,
STAKES SHALL BE
ON BACK SIDE
5
p:\22147_01_bikefill_bike_park_design\CADD_C3D\production_dwg\22147.01_LS_DETAILS.dwg, L2.1, 5/1/2026 11:21:44 AM, amartoncik, 1:1