Loading...
HomeMy WebLinkAbout026_L2.1_LANDSCAPE DETAILSPRELIMINARY - FOR REVIEWFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION----LANDSCAPE DETAILSBIKEFILL COMMUNITY BIKE PARKPATH AND ON-SITE IMPROVEMENTSBOZEMAN, MTL2.1 RPE22147.01_LS_DETAILS.DWGDME04/29/2026SITE PLAN SUBMITTAL--------------22147.01DECIDUOUS TREE N.T.S. 2'-8" LENGTH NON-ABRASIVE RUBBER TIES (2)3" DIA LODGE POLE PINE STAKES 1-1/2' FROM TRUNK. STAKE LOCATION SHALL NOT INTERFERE WITH PERMANENT BRANCHES 3" DEPTH MULCH FINISH GRADE BOTTOM OF ROOT BALL RESTS ON EXT OR RECOMPACTED SOIL EXISTING SOIL TOP OF ROOT FLARE 2" ABOVE EXT GRADE. NO SOIL ON ROOT FLARE LOOSENED SOIL. DIG AND TURN THE SOIL TO REDUCE COMPACTION TO THE AREA TO DEPTH OF ROOT BALL. 3 X DIA ROOT BALL MINNOTES: 1.REMOVE NURSERY STAKES. 2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING. 3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL. 4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT BALL TO SETTLE THE SOIL. 5.BACKFILL WITH AMENDED SOIL. 6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON. 7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION. 1 3" DEPTH MULCH FINISH GRADE CONIFEROUS TREE N.T.S. 32" LENGTH NON-ABRASIVE RUBBER TIES AT 1/3 HEIGHT OF TREE (2)3" DIA LODGE POLE PINE STAKES 1-1/2' FROM TRUNK. BOTTOM OF ROOT BALL RESTS ON EXT OR RECOMPACTED SOIL EXT SOIL TOP OF ROOT FLARE 2" ABOVE EXT GRADE. NO SOIL ON ROOT FLARE LOOSENED SOIL. DIG AND TURN THE SOIL TO REDUCE COMPACTION TO THE AREA TO DEPTH OF ROOT BALL. NOTES: 1.REMOVE NURSERY STAKES. 2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING. 3.REMOVE WIRE TIES AND BURLAP FROM TOP 1/2 OF ROOT BALL. 4.REMOVE ALL BASKETS. 5.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT BALL TO SETTLE THE SOIL. 6.BACKFILL WITH AMENDED SOIL. 7.REMOVE STAKES FOLLOWING FIRST GROWING SEASON. 8.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 9.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION. 3 X DIA ROOT BALL MIN 2 AMENDED EXISTING NATIVE TOPSOIL, REMOVE ALL LARGE DEBRIS AND ROCKS OVER 1/2" EXISTING VEGETATION SEEDING N.T.S. NOTE: 1.EXISTING TOPSOIL WILL BE PLACED BY SITE WORK CONTRACTOR TO ROUGH GRADE. 2.LANDSCAPE CONTRACTOR SHALL AMEND SOIL ACCORDING TO SOIL TEST ANALYSIS AT A MINIMUM OF 6" DEPTH. 3.LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL GRADING AND SEEDING PREPARATION. SEEDED AREA 4 ROCK BOULDERS LOCATED PER PLANS; DO NOT SCAR OR DAMAGE FINISH GRADE 1/3 BOULDER BURIED BELOW GRADE COMPACTED SUBGRADE ROCK MULCH BOULDER PLACEMENT N.T.S.3 EDGING DETAIL N.T.S.4" BELOW GRADE MIN18" REBAR STAKES TACK WELDED AT 4' O.C NOTES: 1.FINISH TO BE NATURAL, RAW STEEL GROUND VARIES, SEE PLANS 1/4" x 4" STEEL FLAT BAR EDGING, STAKES SHALL BE ON BACK SIDE 5 p:\22147_01_bikefill_bike_park_design\CADD_C3D\production_dwg\22147.01_LS_DETAILS.dwg, L2.1, 5/1/2026 11:21:44 AM, amartoncik, 1:1