Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
021_A21_MAIN PAVILION - ELEVATIONS
WD ST1 WD CS 1 1/2" / 1'-0" ST1 CS WD WD WD 1 7/8" / 1'-0" 3 1 /2 " / 1 '-0 " 1" / 1'-0" WD14' - 0"10' - 0"CS ST1 WD WD WD 3 1 /2 " / 1 '-0 " 1" / 1'-0" ST1 CS WD 1 1/8" / 1'-0" CS 3/4" CORRUGATED STEEL STRUCTURAL STEELST WD FINISH: NATURAL PATINA ROUGH SAWN TIMBER FRAMING FINISH: NATURAL STAIN FINISH: NATURAL PATINA CON PRECAST BOARD FORM CONCRETE FINISH: PAINTED EXTERIOR FINISH LEGEND CONCRETE SLAB FLOORFL FINISH: BROOM FINISHED -VAULT TOILET EXACT CONFIGURATION TBD -ALL DIMENSIONS ARE WITNESSED FROM GRID AN/OR FACE OF FRAMING U.O.N OVERALL FLOOR PLAN GENERAL NOTES 214 E. Mendenhall St. Suit 201 Bozeman, MT 59715 aspektarch.com 406.317.5333 ARCHITECTURE & DESIGN SHEET PROJECT REVISIONS DRAWINGS FOR PLANNING REVIEW ONLY © 2026 ASPEKT ARCHITECTURE LLCC:\Aspekt_Shared\ASPEKT ARCHITECTURE\ASPEKT - PROJECTS\BFP - Bike Fill\REVIT\BFP-R25.rvtA21 BIKEFILL PARK MAIN PAVILION - ELEVATIONS BOZEMAN, MT 04.29.2026 BFP 1/4" = 1'-0" A215 EAST ELEVATION -MAIN PAVILION 1/4" = 1'-0" A218 WEST ELEVATION -MAIN PAVILION 1/4" = 1'-0" A212 SOUTHELEVATION -MAIN PAVILION 1/4" = 1'-0" A213 NORTH ELEVATION -MAIN PAVILION No.Description Date