Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
016_Wetlands Impacts Site Plan_Exhibit
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS PRELIMINARY-FOR REVIEW FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION OVERALL EXISTING CONDITIONS AND DEMOLITION PLAN BIKEFILL BIKE PARK INFRASTRUCTURE MCILHATTAN ROADWAY AND PATH IMPROVEMENTS BOZEMAN, MTC2.1RPE 22147_WETLAND.DWG DME ## # # # # # # # # # # # # ## 22147.010150SCALE: 1" = 150'30075150SITE DEMOLITION NOTES:1.ALL LOCATIONS AND DIMENSIONS OF EXISTING AND PROPOSED FEATURES ARE APPROXIMATE ANDTHE PROJECT DRAWINGS MAY NOT INCLUDE ALL EXISTING FEATURES WITHIN THE PROJECTBOUNDARIES. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE SITE PRIOR TO BIDDING ANDCONSTRUCTION TO BECOME FAMILIAR WITH THE EXISTING SITE FEATURES AND CONDITIONS. IFDISCREPANCIES ARE FOUND BETWEEN THE PROJECT DRAWINGS AND FIELD CONDITIONS THECONTRACTOR SHALL CONTACT THE PROJECT ENGINEER FOR CLARIFICATION.2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PAYING FOR ALL PERMITS NECESSARYTO COMPLETE THE PROPOSED WORK INCLUDING DEMOLITION, RIGHT-OF-WAY AND ENVIRONMENTALPERMITS.3.ALL PUBLIC AND PRIVATE UTILITY TERMINATIONS, DISCONNECTS AND REMOVALS TO BECOORDINATED WITH THE APPLICABLE UTILITY PROVIDERS AND PERFORMED IN ACCORDANCE TOTHEIR RESPECTIVE STANDARDS AND SPECIFICATIONS.4.ALL EXISTING MATERIALS TO BE REMOVED AND PROPERLY DISPOSED IN ACCORDANCE TO ALLFEDERAL, STATE AND LOCAL REGULATIONS.5.ALL REMOVED, DISTURBED OR DAMAGED EXISTING ASPHALT AND PAVEMENT MARKINGS TO BERESTORED IN ACCORDANCE WITH MTPWSS, 7TH EDITION, APRIL, 2021. ALL ASPHALT MATCH LINESSHALL BE SAW CUT TO PROVIDE FLUSH TRANSITION AND SEALED.6.ALL EXCAVATIONS OR VOIDS CREATED DURING DEMOLITION SHALL BE BACKFILLED AND COMPACTEDIN A CONTROLLED MANNER PER THE PROJECT GEOTECHNICAL REQUIREMENTS. SEE REQUIREMENTS INTHE GEOTECHNICAL REPORT.7.ALL UTILITY JUNCTION BOXES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.8.ALL TREES AND SHRUBS SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.P:\22147_01_Bikefill_Bike_Park_Design\CADD_C3D\PRODUCTION_DWG\22147_WETLAND.dwg, WETLANDS, 12/12/2025 11:56:16 AM, mbasile, 1:1 Wetland impacts from Infrastructure project: - Temporary impacts: 475 square feet- Permanent impacts: 295 square feet- 48 Linear feet of water body impactedWetland impacts from Infrastructure project: - Temporary impacts: 308 square feet- Permanent impacts: 90 square feet- No water body in this locationWetland impacts from Site Plandevelopment described in the separateJoint Application for the Site PlandevelopmentTotal wetland impacts from Infrastructure project: - Temporary impacts: 783 square feet- Permanent impacts: 385 square feet- 48 Linear feet of water body impacted in Churn Creek