Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
008 - C-7-NORTH SITE PLAN
SDSD SD SD SD SD SD SD SD SDSD SD SD SD SDSD 8 W8 W8 W8 W8 W8 W8 W8 W8 W8 W21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21S8W21 SS21 SS21 SS21 SS21 SS8 W8 W8 W8 W8 W21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS WS WS WS WS WS4 SS 4 SS 4 SS 8 W8 W8 W8 W4 SS4 SS4 SS4 SS4 SSWSWSWSWS12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W12 W12 W12 W12 W12 W12 W12 WUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU U U U U SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD8 SSOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP////////////////////////////////////////////////////////////////////////////////////////// /////////////// /////////////// ////////////////////////////////////////////////////////////////////////////////////////////////////////////21S8W////////////////// //////////// /// //////////// /////////////// /////////////// //////////////////////// //////////// /// //////////// /// ///////// /// /////////////// /////////11"X17": 1"= 200 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )50100100100HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\SITEPLANS\NORTH SITE PLAN.dwg Plot Date: 7/2/2026 11:32 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN07/01/263/2/26JRMNORTH - CIVIL SITE PLANMASTER SITE PLANDIAMOND 82128.002C-7LAUREL PARKWAY40' TBC-TBC90' R.O.W.HARVEST PARKWAY36' TBC-TBC70' R.O.W.BAXTER LANEDELINEATEDWETLANDSDELINEATEDWETLANDS50' W. C . S E T B A C K ZONE 1 50' W.C. SETBACKZONE 1 PROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY 45' R.O.W.PER NWX PH145' PROPOSEDR.O.W.VISION TRIANGLE BAXTE R C R E E K 66' R.O.W.PER NWX PH1PROPOSED 10" WATER MAINPROPOSED 10' SHARED USE PATHPROPOSED 10' SHARED USE PATHPROPOSED 21" SEWER MAINPROPOSED 8" WATER MAINPROPOSED 21" SEWER MAINPROPOSED 8" SEWER MAINPROPOSED 21" SEWER MAINPROPOSED 8" WATER MAINPROPOSED 6'GRAVEL TRAILPROPOSED JOINTPOWER/GAS/COMMEXISTING OHP60' R.O.W.PER NWX PH1B A X T E R C R E E K 60' COUNTY ROAD R.O.W.FIELD 1TURFFIELD 2TURFFIELD 3GRASSFIELD 4GRASSFIELD 5GRASSFIELD 6GRASSFIELD 7TURFFIELD 8GRASSBUILDING 3BUILDING 1BUILDING 220' CENTER WALKWAY &EMERGENCY SERVICES ACCESSENTRY GATEENTRY GATEBATTING CAGEBATTINGCAGEBATTINGCAGE50' RIGHT OF WAY TO BE DEDICATEDSTORMPONDSTORMPONDROADSTORMPONDSTORMPONDPROPOSED 15" STORM MAIN10' PAVED TRAIL6' PAVED TRAIL6' GRAVEL TRAILDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUT10' PROPOSED PUE10'PROPOSEDPUESTORM SWALESETBACKSR-CPRIMARY STREET : 10'SIDE STREET : 10'STREET FACING GARAGE : 20'SIDE : 5'REAR : 10'R-DPRIMARY STREET : 10'SIDE STREET : 10'SIDE : 5'REAR : 10'NO SETBACKS ARE SHOWN ON THIS DRAWINGSINCE THE 10' PUBLIC UTILITY EASEMENTSHOWN MEETS OR EXCEEDS ALL SETBACKS.NOTES:1) CONTOUR INTERVAL = 1.0'2) NO HISTORIC, CULTURAL OR ARCHAEOLOGICAL RESOURCES AREKNOWN TO EXIST ONSITE.3) NO MAIL BOX IS PLANNED FOR THIS SITE4) BIKE PARKING WILL BE CALCULATED AT 1 PER 1000 SF OF BUILDINGSPACE. 25% WILL REQUIRED TO BE LONG TERM BIKE PARKING. THOSESPACES WILL BE ASSOCIATED WITH ONE OF THE BUILDINGS. THE SHORTTERM SPACES WILL BE SPREAD OUT ACROSS THE PARK AT ENTRYPOINTS. SOME EXAMPLE LOCATIONS ARE SHOWN ON THIS MAP5) TRASH ENCLOSURES WILL BE CONSTRUCTED AT ONE OR BOTHPARKING LOTS. THE ENCLOSURES WILL BE PLACED DURING THE SITEPLAN PROCESS.6) 66 ONSTREET PARKING SPACES ARE SHOWN7) BATTING CAGES ARE NOT STRUCTURES - THEY WILL BE FENCED AREASON A CONCRETE SLAB.8) SNOW STORAGESOUTH PARKING LOT - THE PARKING CALCULATIONS ARE FOR WHEN THEOUTDOOR FIELDS ARE IN USE. IF THERE IS SNOW ON THE GROUND THEFIELDS WILL NOT BE USED AND THEREFORE THE MAJORITY OF THEPARKING LOT WILL BE UNUSED. FOR USE OF THE HITTING FACILITY OROTHER BUILDINGS, THE SNOW CAN BE PUSHED TO THE EAST SIDE OF THEPARKING LOT AS SHOWN, STILL LEAVING OVER 70% OF THE SPACESAVAILABLE. THIS LOCATION DRAINS DIRECTLY INTO THE STORM POND.NORTH PARKING LOT - IT IS UNLIKELY THAT THIS PARKING LOT WILL BEPLOWED, BUT IF IT WERE, THE DEPICTED AREA PROVIDES THE 15% SNOWSTORAGE REQUIRED AND LEAVES 70% OF THE PARKING USEABLE.9) BIKE PARKING TO BE DISTRIBUTED THROUGH THE SITE. FINALLOCATIONS TO BE DETERMINED AS PART OF THE SITE PLAN REVIEW FORPHASE 1B.10) WAYFINDING SIGNS FOR THE SHARED USE PATHS SHALL BE DESIGNEDPER THE PARKS, RECREATION, AND ACTIVE TRANSPORTATIONWAYFINDING DESIGN INTENT DRAWINGS.BATTINGCAGEVISION TRIANGLEVISION TRIANGLE24.009.0040.0024.0090.0090.0026.0099.0099.0099.00ADA SPACESADA SPACES22.5022.5099.0099.00WIDENED FOR FIRE TRUCK TURNAROUND70' PROPOSEDR.O.W.10' PUEPER NWX PH110' SIDEWALKIRRIGATION PUMPON-STREET PARKING, TYP15% SNOW STORAGE15% SNOW STORAGEREPLACE DIVERSION10' SHARED USE PATH (PH2)- SEE SIGN NOTEPROPOSED PUBLIC STORMWATER EASEMENT