Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
005 - C-4 SOUTH-CIVIL PLAN
21 SS21 SS21 SS21 SS21 SS8 W8 W8 W8 W8 W21 SS WS 4 SS///////////////////////////////////////12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 8 W8 WUSD8 SS8 SS8 SS8 SS8 SS8 SS8 SSOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP10 W10 W10 W10 W10 W10 W10 W10 W10 W10 W10 W10W10W10W18SD8 SS8 SSG/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////11"X17": 1"= 120 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )30606060HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\SITEPLANS\SOUTH SITE PLAN.dwg Plot Date: 7/2/2026 11:44 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN07/01/2603/02/26JRMSOUTH - CIVIL PLANMASTER SITE PLANDIAMOND 82128.002C-4LAUREL PARKWAY40' TBC-TBC90' R.O.W.HARVEST PARKWAY36' TBC-TBC70' R.O.W.DELINEATEDWETLANDSDELINEATEDWETLANDSDELINEATEDWETLANDS50' W.C. SETBACKZONE 1 50' W.C. SETBACK ZONE 1 50' W.C. SETBACKZONE 1PROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY30' EASEMENTFILM 95 PG 273OAK STREET32' TBC-TBC (2)125' R.O.W.EXISTING 10" WATER MAINEXISTING OVERHEAD POWEREXISTING DETENTION POND OUTLET PIPEEXISTING 8" SEWER MAIN45' R.O.W.PER NWX PH1PROPOSED 8" SEWER MAIN PROPOSED 12" WATER MAIN PROPOSED 21" SEWER MAINPROPOSED 8" WATER MAIN45' PROPOSEDR.O.W.62.5' PROPOSEDR.O.W.10' PROPOSED PUEBAXTER CREEK66' R.O.W.PER NWX PH1EXISTINGOVERHEAD POLE10' SHARED USE PATHMONITORING WELL, TYPTEST PIT, TYP100-YEAR FLOODPLAIN LIMITSPER NORTHWEST CROSSINGSUBDIVISION REPORT10' PROPOSED PUE10' PROPOSED PUE10' SHARED USE PATHEND OF 8" WATER MAINEND OF 21" SEWER MAINSTORM INLETS FOR LAUREL PARKWAYSTORMWATEREXISTINGLIGHT POLEEXISTINGLIGHT POLETRAFFIC FLOWCONSTRUCTIONTRAFFICR-C ZONING R-D ZONING 10' PUEPER NWX PH1TEMPORARY STORM POND FORHARVEST PARKWAY10' SHARED USE PATHTEMPORARY PUBLIC STORMWATER EASEMENT