Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
004 - C-3 NORTH-CIVIL PLAN
SDSD SD SD SD SD SD SD SD SDSD SD SD SD SDSD 8 W8 W8 W8 W8 W8 W8 W8 W8 W8 W21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21S8W21 SS21 SS21 SS21 SS21 SS8 W8 W8 W8 W8 W21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS WS WS WS WS WS 4 SS 4 SS 4 SS 8 W8 W8 W8 W4 SS4 SS4 SS4 SS4 SSWSWSWSWS12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W12 W12 W12 W12 W12 W12 W12 WUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU U U U U SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD8 SSOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP////////////////////////////////////////////////////////////////////////////////////////// /// /////////////// //////////// /// ///////////////////////////////////////////////////////////////////////////////////////////////////////////////21S8W////////////////////////////// /// //////////// /////////////// /////////////// /////////////// ///////// /////////////// //////////// /// //////////// /// //////////// /// ////////////11"X17": 1"= 200 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )50100100100HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2128\002\ACAD\SHEETS\SITEPLANS\NORTH SITE PLAN.dwg Plot Date: 7/2/2026 11:33 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN07/01/263/2/26JRMNORTH - CIVIL PLANMASTER SITE PLANDIAMOND 82128.002C-3LAUREL PARKWAY40' TBC-TBC90' R.O.W.HARVEST PARKWAY36' TBC-TBC70' R.O.W.BAXTER LANEDELINEATEDWETLANDSDELINEATEDWETLANDS50' W.C . S E T B A C K ZONE 1 50' W.C. SETBACKZONE 1 PROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY 45' R.O.W.PER NWX PH145' PROPOSEDR.O.W.BAXT E R C R E E K 66' R.O.W.PER NWX PH1PROPOSED 12" WATER MAINPROPOSED 10' SHARED USE PATHPROPOSED 10' SHARED USE PATHPROPOSED 21" SEWER MAINPROPOSED 8" WATER MAINPROPOSED 21" SEWER MAINPROPOSED 8" SEWER MAINPROPOSED 21" SEWER MAINPROPOSED 8" WATER MAINPROPOSED 6'GRAVEL TRAILPROPOSED JOINTPOWER/GAS/COMMEXISTING OHP60' R.O.W.PER NWX PH1BAXTE R C R E E K 60' COUNTY ROAD R.O.W.FIELD 1TURFFIELD 2TURFFIELD 3GRASSFIELD 4GRASSFIELD 5GRASSFIELD 6GRASSFIELD 7TURFFIELD 8GRASSBUILDING 1BUILDING 3BUILDING 220' CENTER WALKWAY &EMERGENCY SERVICES ACCESSENTRY GATEENTRY GATEBATTING CAGEBATTINGCAGEBATTINGCAGE50' RIGHT OF WAY TO BE DEDICATEDSTORMPONDSTORMPONDROADSTORMPONDSTORMPONDTEST PIT, TYPMONITORING WELL, TYPPROPOSED 15" STORM MAIN10' PAVED TRAIL6' PAVED TRAIL6' GRAVEL TRAILDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUTDUGOUT10' PROPOSED PUE10'PROPOSEDPUESTORM SWALESTORMPONDROADSTORMPOND(PH2)TRAFFIC FLOWCONSTRUCTIONTRAFFIC10' PROPOSED PUEFUTURE CROSS WALK (SEE NOTE 1)100-YEAR FLOODPLAIN LIMITSPER NORTHWEST CROSSINGSUBDIVISION REPORTBATTINGCAGECROSSWALK70' PROPOSEDR.O.W.10' PUEPER NWX PH120' WATERMAINEASEMENTNOTES:1. FINAL CROSS WALK TREATMENTS ALONG LAUREL PARKWAY WILL BEDETERMINED WITH FUTURE SITE PLAN SUBMITTALS AND INFRASTRUCTURE REVIEW.2. BIKE PARKING TO BE DISTRIBUTED THROUGH THE SITE. FINAL LOCATIONS TO BEDETERMINED AS PART OF THE SITE PLAN REVIEW FOR PHASE 1B.PIPE EXISTING DITCHREPLACE DIVERSIONPROPOSEDIRRIGATIONSYSTEMTEMPORARY STORM POND (PH1B)TO BE REMOVED IN PHASE 2END ASPHALT, PHASE 1B10' SHARED USE PATH (PH2)TEMPORARY PUBLIC STORM WATEREASEMENTTEMPORARY PUBLICSTORM WATER EASEMENT