Loading...
HomeMy WebLinkAbout008 - Appendix H - Construction Management PlansSDSDSDSDSDSDSD10 W 10 W 10 W 10 W 10 W 10W N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 5/14/2026 11:34 AM H:\2128\002\ACAD\SHEETS\PHASING\CM PLAN 1A.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 05/14/26 04/22/26 DJH CONST. MANAGEMENT PLAN PH1A DIAMOND 8 2128.002 CM-P1A HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAY - COLLECTORFUTURE TO U C H S T O N E D R I V E FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 20 CYD ROLLOFF DUMPSTER OUTHOUSE STAKED DOWN PHASE 1A TOPSOIL STOCK PILE CONSTRUCTION MANAGEMENT NOTES: 1. NORTH TOPSOIL STOCKPILE WILL BE REMOVED AS SOON AS CURB & GUTTER IS INSTALLED AND TOPSOIL REDISTRIBUTION CAN BE COMPLETED. SOUTH TOPSOIL PILE WILL REMAIN UNTIL ALL UTILITY WORK IS COMPLETED. 2. SWPPP PLAN MUST BE COORDINATED WITH THE CONSTRUCTION MANAGEMENT PLAN 3. NO WETLAND IMPACTS WILL OCCUR WITH PHASE 1A PHASE 1A STAGING AREA CONSTRUCTION FENCE OR SILT FENCE PHASE 1A LIMITS CONSTRUCTION FENCE OR SILT FENCE ALONG WATERCOURSE SETBACK UTILIZE FOR CONSTRUCTION ACCESS ACCESS FLOW TOPSOIL STOCK PILE PHASE 1A STAGING AREA NO ACCESS PHASE 1A WIDEN EXISTING APPROACH FOR TEMPORARY CONSTRUCTION ACCESS CONSTRUCTION FENCE OR SILT FENCE 50' SETBACK ZONE 1 SDSDSDSDSDSDSD10 W 10 W 10 W 10 W 10 W 10W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 21 SS21 SS21 SS21 SSWSWS8 W 8 WWSWS 12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 WUUUUUUUUUUUUUUUUUUU U U UUN GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 7/2/2026 11:50 AM H:\2128\002\ACAD\SHEETS\PHASING\CM PLAN 1B.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 03/02/26 DJH CONST. MANAGEMENT PLAN PH1B DIAMOND 8 2128.002 CM-P1B HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAYFUTURE TO U C H S T O N E D R I V E FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 PHASE 1B CONSTRUCTION MANAGEMENT NOTES: 1. TOPSOIL STOCKPILE WILL BE REMOVED AS SOON AS CURB & GUTTER IS INSTALLED AND TOPSOIL REDISTRIBUTION CAN BE COMPLETED. ANY EXCESS TOPSOIL WILL BE HAULED OFFSITE AT THAT TIME. 2. SWPPP PLAN MUST BE COORDINATED WITH THE CONSTRUCTION MANAGEMENT PLAN CONSTRUCTION FENCE OR SILT FENCE PHASE 1B LIMITS CONSTRUCTION FENCE OR SILT FENCE ACCESS ARROW (TYP.) PROPOSED POND (TYP.) 20 CYD ROLLOFF DUMPSTER OUTHOUSE STAKED DOWN TOPSOIL STOCK PILE STAGING AREA STAGING AREA STAGING AREA TOPSOIL STOCK PILE BAXTER CREEK SD SDSDSDSDSDSDSDSDSD SDSDSDSDSDSD 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 21S 8W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21S 8W 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 8 W 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS8 W 8 W 8 W 8 W 12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W U U UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU U U U U U U UUUUUN GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 6/26/2026 2:58 PM H:\2128\002\ACAD\SHEETS\PHASING\CM PLAN 1C.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 03/06/26 JRM CONST. MANAGEMENT PLAN PH1C DIAMOND 8 2128.002 CM-P1C HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAY - COLLECTORFUTURE TO U C H S T O N E D R I V E HITTING FACILITY& ENTRY BUILDING FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 UTILIZE FOR CONSTRUCTION ACCESS PHASE 1C UTILIZE FOR CONSTRUCTION ACCESS CONSTRUCTION MANAGEMENT NOTES: 1. TOPSOIL WILL BE REMOVED IMMEDIATELY. 2. SWPPP PLAN MUST BE COORDINATED WITH THE CONSTRUCTION MANAGEMENT PLAN PHASE 1C LIMITS 20 CYD ROLLOFF DUMPSTER OUTHOUSE STAKED DOWN 20 CYD ROLLOFF DUMPSTER OUTHOUSE STAKED DOWN MATERIAL STORAGE MATERIAL STORAGE OUTHOUSE STAKED DOWN OUTHOUSE STAKED DOWN STABILIZED PARKING AREA STABILIZED PARKING AREA