Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
007 - Appendix G - Infrastructure Phase Exhibits
INV=4703 FG=11.0INV=4704.35(LOWEST 0.5%) FG=11.5INV=4705.17 (LOWEST 0.5%) FG=14.0INV=4706.5(LOWEST 0.5%) FG=13.2INV=4707.02(LOWEST 0.5%) FG=20.7INV=4707.56 (LOWEST 0.5%)INV=11.1 FG=19.2INV=4709.46 (LOWEST 0.5%)INV=13.0 FG=21.0INV=4709.76 (LOWEST 0.5%)INV=14.0 FG=21.7INV=4710.89(LOWEST 0.5%)INV=14.7 FG=23.0INV=4711.56(LOWEST 0.5%)INV=16.0 FG=19.5INV=4707.05(LOWEST)INV=10.05 FG=19.0INV=4709.0(LOWEST)INV=4712.0 INV=4709.75(LOWEST)INV=4714.0FG=21.0 INV=4710.44-lowestinv=4714.5fg=21.5 FG=24.0INV=4711.0 lowestINV=4716.0 (8 ft deep) INV=4706.5 FG=10.6INV=4706.9 all slopes 0.5%until top slope=0.3% FG=10.6INV=7.20 OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 18SD 18SD 8 SS 8 SS G21S 8W 10 W 10 W 10 W 10 W 10 W 10 W 10 W W W OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 21S 8W 8 W8 W//////////////////////////////////// /// OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 21S 8W U U UUUUUUUUUU UUUUUU UUUUUU UUUUUUUUUUUUU U U U U U U UUUUUN GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 9:21 AM H:\2128\002\ACAD\SHEETS\PHASING\INFRASTRUCTURE PHASE 1A.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 02/09/2026 DJH PHASE 1A INFRASTRUCTURE DIAMOND 8 2128.002 PH-1A HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAY - COLLECTORFUTURE TO U C H S T O N E D R I V E PHASE 1A NO WATER OR SEWER INFRASTRUCTURE IS PLANNED TO BE INSTALLED IN PHASE 1A. FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANTEXISTING FIRE HYDRANT EXISTING 8" WATER MAIN EXISTING 21" SEWER MAIN EXISTING 10" WATER MAIN OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 18SD 18SD 8 SS 8 SS G21S 8W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W W W OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 21S 8W ///////////////////////////////////////12 W12 W12 W12 W12 W12 W12 W8 SS8 SS8 SS8 SS8 SS8 SS8 SS U U UUUUUUUUUUUUUUUU UUU UUU UUUUUUUU UUUUUUUUUUU UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU U U U U U U UUUUU16 SD WSWS WSWS8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 21S 8W 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 8 W 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SSWSWSWSWSWS4 SS4 SS4 SS8 W 8 W 8 W 8 W 4 SS 4 SS 4 SS 4 SS 4 SSWSWSWSWS 12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W U U UUUUUUUUUUUUUUUU UUU UUU UUUUUUUUUUUUU U U U U U U UUUUU15 SD 15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 9:22 AM H:\2128\002\ACAD\SHEETS\PHASING\INFRASTRUCTURE PHASE 1B.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 03/06/26 DJH PHASE 1B INFRASTRUCTURE DIAMOND 8 2128.002 PH-1B HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAY - COLLECTORFUTURE TO U C H S T O N E D R I V E PHASE 1B THE COLORED WATER, SEWER & STORM LINES ARE PROPOSED TO BE INSTALLED IN PHASE 1B. INSTALL 12" WATER & 21" SEWER MAIN FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 INSTALL 8" WATER & 21" SEWER MAIN INSTALL 8" WATER & 21" SEWER MAIN INSTALL 12" WATER MAIN INSTALL SEWER SERVICES EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANTEXISTING FIRE HYDRANT CONNECT TO EXISTINGNWX 8" WATER MAIN CONNECT TO EXISTING NWX 21" SEWER MAIN INSTALL WATER & SEWER SERVICE INSTALL 8" WATER MAIN AND HYDRANT INSTALL 12" WATER & 8" SEWER MAIN INSTALL FIRE HYDRANT (TYP.) 8" WATER & 8" SEWER STUB OUTS FOR FUTURE CONNECTION CONNECT TO EXISTING 10" WATER MAIN IN OAK STREET. INSTALL FIRE HYDRANT AT DEAD END INSTALL FIRE HYDRANT (TYP.) 8" WATER & 21" SEWER STUB OUTS FOR FUTURE CONNECTION EXISTING 10" WATER MAIN INSTALL WATER SERVICE PROPOSED 12'ACCESS ROAD PROPOSED POND (TYP.) PIPE EXISTING DITCH INSTALL NEW HEADGATE BAXT E R C R E E K EXISTING FIRE HYDRANT STORM POND, TYP STORM POND, TYP EXISTING 15" STORM MAIN END OF 8" SEWER MAIN OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 18SD 18SD 8 SS 8 SS G21S 8W W W OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 21S 8W 8 W8 W///////////////////////////////////////8 SS8 SS8 SS8 SS8 SS8 SS8 SS 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 21S 8W 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 8 W 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SSWSWSWSWSWS4 SS4 SS4 SS8 W 8 W 8 W 8 W 4 SS 4 SS 4 SS 4 SS 4 SSWSWSWSWS 12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W U U UUUUUUUUUUUUUUUU UUU UUU UUUUUUUUUUUUU U U U U U U UUUUU15 SD 15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD15 SD N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 9:23 AM H:\2128\002\ACAD\SHEETS\PHASING\INFRASTRUCTURE PHASE 1C.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 02/09/2026 DJH PHASE 1C INFRASTRUCTURE DIAMOND 8 2128.002 PH-1C HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAY - COLLECTORFUTURE TO U C H S T O N E D R I V E PHASE 1C NO INFRASTRUCTRE IS PLANNED TO BE INSTALLED IN PHASE 1C. EXISTING 12" WATER & 21" SEWER MAIN FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 EXISTING 8" WATER & 21" SEWER MAIN EXISTING 8" WATER & 21" SEWER MAIN EXISTING 12" WATER MAIN EXISTING WATER SERVICE EXISTING SEWER SERVICES EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANTEXISTING FIRE HYDRANT EXISTING WATER & SEWER SERVICE EXISTING 8" WATER MAIN EXISTING 12" WATER & 21" SEWER MAIN EXISTING FIRE HYDRANT (TYP.) EXISTING 8" WATER & 21"SEWER STUB OUTS FOR FUTURE CONNECTION EXISTING HYDRANT AT DEAD END EXISTING FIRE HYDRANT (TYP.) EXISTING 10" WATER MAIN EXISTING 8" WATER & 21" SEWER STUB OUTS FOR FUTURE CONNECTION EXISTING FIRE HYDRANT PROPOSED 12'ACCESS ROAD EXISTING 15" STORM MAIN OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 18SD 18SD 8 SS 8 SS G21S 8W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W W W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP 21S 8W 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SSWSWSWSWSWS4 SS4 SS4 SSWS WS WS WS WS WS WS //////////////////////////////////// ///12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W8 SS8 SS8 SS8 SS8 SS8 SS 8 SS 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 10 SS10 SS10 SS10 SS8 W8 W8 W8 W8 W8 W8 W8 W8 W8 W 10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SSSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD16 SD 8 W 8 W 8 W 8 WWSWSWSWS 4 SS 4 SS 4 SS 4 SS 4 SS N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 9:24 AM H:\2128\002\ACAD\SHEETS\PHASING\INFRASTRUCTURE PHASE 2.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 02/09/2026 DJH FUTURE SUBDIVISION INFRASTRUCTURE DIAMOND 8 2128.002 PH-2 HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAY - COLLECTORFUTURE TO U C H S T O N E D R I V E FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 INSTALL 8" WATER & 21" SEWER MAIN INSTALL 8" WATER & 10" SEWER MAIN - FINAL LOCATION TBD INSTALL 10" SEWER MAIN INSTALL 12" WATER MAIN FUTURE SUBDIVISION PHASE (PHASE 2) THE COLORED WATER AND SEWER LINES ARE PROPOSED TO BE INSTALLED IN PHASE 2. INSTALL FIRE HYDRANT (TYP.) INSTALL 12" WATER MAIN CONNECT TO 12" EXISTING WATER MAIN IN LAUREL CONNECT TO EXISTING 8" WATER MAIN IN HARVEST CONNECT TO EXISTING 21" SEWER MAIN IN HARVEST EXISTING 12" WATER & 21" SEWER MAIN EXISTING 8" WATER & 21" SEWER MAIN EXISTING 8" WATER &21" SEWER MAIN EXISTING 12" WATER MAIN EXISTING WATERSERVICE EXISTING SEWER SERVICES EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING FIRE HYDRANTEXISTING FIRE HYDRANT EXISTING WATER & SEWER SERVICE EXISTING 8" WATER MAIN EXISTING 12" WATER & 21" SEWER MAIN EXISTING FIRE HYDRANT (TYP.) EXISTING 8" WATER & 21" SEWER STUB OUTS FOR FUTURE CONNECTION EXISTING FIRE HYDRANT EXISTING HYDRANT AT DEAD END EXISTING FIRE HYDRANT (TYP.) INSTALL FIRE HYDRANT AT DEAD END CONNECT TO EXISTING 8" WATER MAIN IN HARVEST CONNECT TO EXISTING 21" SEWER MAIN IN HARVEST CONNECT TO EXISTING 10" WATER MAIN IN OAK EXISTING 10" WATER MAIN INSTALL 8" WATER & 21" SEWER STUB OUTS FORFUTURE CONNECTION EXISTING 10" WATER MAIN