Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
006 -Appendix F - PHASE EXHIBITS
SD SDSDSDSDSDSDSDSDSD SDSDSDSDSDSD N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 7:34 AM H:\2128\002\ACAD\SHEETS\PHASING\PHASE 1A.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 04/22/26 DJH PHASE 1A DIAMOND 8 2128.002 PH-1A HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAYFUTURE TO U C H S T O N E D R I V E PHASE 1A - INCLUDED ITEMS 1. CONSTRUCT CONSTRUCTION ACCESS ROAD ALONG LAUREL PARKWAY FROM OAK STREET TO HARVEST PARKWAY TO A GRAVEL STANDARD. 2. CONSTRUCT CONSTRUCTION ACCESS ROAD ALONG HARVEST PARKWAY FROM LAUREL PARKWAY TO THE WEST END OF THE PARKING LOT TO A GRAVEL STANDARD. 3. SITE GRADING, SUBBASE & DRAINAGE FROM HARVEST PARKWAY TO BAXTER LANE. 4. CONSTRUCT GRAVEL STAGING AREAS IN LOCATION OF FUTURE PARKING LOTS. 5. INSTALLATION OF SITE STORM PONDS, FIELD DRAINS & INFRASTRUCTURE 6. DEDICATE EASEMENTS FOR MAIN ROADWAYS AND PUBLIC UTILITY EASEMENTS. 7. INSTALL WELL FOR TEMPORARY IRRIGATION. 8. PREP FOR BUILDING FOUNDATIONS. 9. NO WETLANDS OR WASTEWATER IMPACTS PROPOSED. NO WORK PLANNED ON OAK STREET, BAXTER LANE, AND TOUCHSTONE DRIVE. GRAVEL STAGING AREA IN LOCATION OF FUTURE PARKING SITE GRADING, SUBBASE & DRAINAGE OF SITE EXISTING 45' PUBLIC STREET & UTILITY EASEMENT PER DOC#2649280 PROPOSED 70' PUBLIC STREET & UTILITY EASEMENT PROPOSED 45' PUBLIC STREET & UTILITY EASEMENT CONSTRUCT GRAVEL CONSTRUCTION ACCESS GRAVEL STAGING AREA IN LOCATION OFFUTURE PARKING PROPOSED 62.5' PUBLIC STREET & UTILITY EASEMENT PROPOSED 50' PUBLIC STREET & UTILITY EASEMENT INSTALL WELL FOR TEMPORARYIRRIGATION FIELD 8 FIELD 7 FIELD 6 FIELD 5 FIELD 4 FIELD 3 FIELD 2 FIELD 1 INCLUDE SUB BASE, BASE, DRAINAGE IMPROVEMENTS, AND FOUNDATIONS, TYP. PREP FOR FOOTINGS & FOUNDATIONS PREP FOR FOOTINGS & FOUNDATIONS PREP FOR FOOTINGS & FOUNDATIONS EXISTING 60' COUNTY ROAD EASEMENT R - DR - CPROPOSED 10' PUE PROPOSED 10' PUE PROPOSED 10' PUE DELINEATED WETLANDS DELINEATED WETLANDS DELINEATED WETLANDS CONSTRUCT STORM PONDS CONSTRUCT STORM SWALE INSTALL STORM PIPE & FIELD DRAINS GRAVEL SECTION FOR CENTER ACCESS AISLE INSTALL STORM PIPES AND DRAINS TEMPORARY CONSTRUCTION ACCESS DETAIL 18" OF 6" MINUS PITRUN 26.0'EDGE R.O.W.FUTURE 10' SHARED PATH PITRUN TO BE REMOVED & UTILIZED TO CONSTRUCT ADJACENT ROADWAY TEMP STORM POND TOP: 4725.00 BOTTOM: 4724.00 VOLUME: 712 CF 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21S 8W 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 8 W 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SSWSWSWSWSWS4 SS4 SS4 SS8 W 8 W 8 W 8 W 4 SS4 SS 4 SS 4 SS 4 SSWS WS WSWS12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W U U UU UUUUUUUUUUUUUUUUU UUU UUUUUUUUUUUUUUUU U U U UUUUUSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDN GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 9:08 AM H:\2128\002\ACAD\SHEETS\PHASING\PHASE 1B.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 03/02/26 DJH PHASE 1B DIAMOND 8 2128.002 PH-1B HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAYFUTURE TO U C H S T O N E D R I V E PHASE 1B - INCLUDED ITEMS 1. CURB & PAVE LAUREL PARKWAY AT 40' WIDE FROM OAK STREET TO BAXTER LANE WITH A SHARED USE PATH ON BOTH SIDES, AND STOP SIGN AT OAK STREET AND BAXTER LANE. 2. EXTEND 21" SEWER MAIN FROM THE EXISTING END ON TOUCHSTONE DRIVE TO LAUREL PARKWAY, SOUTH ALONG LAUREL PARKWAY TO HARVEST PARKWAY, AND THEN WEST ON HARVEST PARKWAY TO THE WEST END OF DEPICTED HARVEST PARKWAY. INSTALL 12' GRAVEL ACCESS ROADS IN AREAS NOT WITHIN CURRENTLY CONSTRUCTED ROADWAYS. 3. CURB & PAVE HARVEST PARKWAY AT 36' WIDE FROM LAUREL PARKWAY TO THE WEST WITH A SHARED USE PATH ON BOTH SIDES. 4. INSTALL WATER MAIN IN LAUREL PARKWAY, NORTH OF TOUCHSTONE DRIVE TO FUTURE BAXTER INTERSECTION. 5. INSTALL WATER MAIN AND HYDRANT BY FIELD 7. 6. INSTALL WATER & SEWER SERVICES TO FUTURE BUILDINGS. 7. CURB & PAVE BOTH PARKING LOTS 8. FINE GRADE & TURF FIELDS 9. CONSTRUCT 20' CENTER ACCESS AISLE 10. INSTALL DUGOUTS, FENCES & PADS FOR BLEACHERS 11. INSTALL ONE BATHROOM BUILDING. 12. INSTALL POWER & GAS TO BATHROOM BUILDING & FUTURE BUILDING 13. INSTALL TRAILS. 14. LANDSCAPE FINISHED EDGES OF HARVEST PARKWAY AND LAUREL PARKWAY. 15. LANDSCAPE PARKING LOTS. 16. INSTALL 8" SEWER ON LAUREL PARKWAY, 735' SOUTH OF HARVEST PARKWAY. 17. INSTALL WATER MAIN IN TOUCHSTONE DRIVE, IN LAUREL PARKWAY FROM TOUCHSTONE DRIVE TO OAK STREET AND HARVEST PARKWAY FROM LAUREL PARKWAY TO THE END OF HARVEST PARKWAY. 18. IRRIGATION INFRASTRUCTURE FROM BAXTER CREEK TO SITE. 19. WETLAND PERMITTING FOR AS NECESSARY FOR CONSTRUCTION IN THIS PHASE. 20. STREET LIGHTING FOR LAUREL PARKWAY NO WORK PLANNED ON OAK STREET & BAXTER LANE EXISTING 45' PUBLIC ACCESS & UTILITY EASEMENT PER DOC#2649280 PROPOSED PUBLIC ACCESS & UTILITY EASEMENT PROPOSED 45' PUBLIC ACCESS & UTILITY EASEMENT INSTALL 10' SHARED USE PATH INSTALL BUILDING WITH BATHROOMS 22' WIDE CENTERGRAVEL PATH CONSTRUCT 40' WIDE LAUREL PARKWAY CONSTRUCT HARVEST PARKWAY FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 INSTALL WATER & SEWER SERVICES TO FUTURE BUILDING INSTALL WATER MAIN & SEWER SERVICES 60' PUBLIC ACCESS & UTILITY EASEMENT PER DOC#2782198 CONNECT TO EXISTING WATER & SEWER STUBS PERMITTING FOR CROSSING OF BAXTER CREEK & WETLANDIMPACTS 12' GRAVEL ACCESS ROAD GAP IN 12' GRAVEL ACCESS ROAD FOR BAXTER CREEK REMOVE EXISTING SHED INSTALL WATER & SEWER MAINS R - DR - CPERMITTING FORWETLAND CROSSING BAXTER CREEK CENTERLINE PROPOSED CULVERT FORBAXTER DITCH CROSSING PERMITTING FOR CROSSING DELINEATED WETLANDS DELINEATED WETLANDS PERMITTING FOR TEMPORARY WETLAND IMPACT PERMITTING FOR WETLAND IMPACTS REPLACE DIVERSION STRUCTURE PIPE EXISTING DITCH SD SDSDSDSDSDSDSDSDSD SDSDSDSDSDSD 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 21S 8W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21S 8W 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 8 W 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS8 W 8 W 8 W 8 W 12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W U U UU UUUUUUUUUUUUUUUUU UUU UUUUUUUUUUUUUUUU U U U UUUUUN GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 9:13 AM H:\2128\002\ACAD\SHEETS\PHASING\PHASE 1C.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 03/02/26 DJH PHASE 1C DIAMOND 8 2128.002 PH-1C HARVEST PARKWAY OAK STREET - EXISTING HALF BAXTER LANE - EXISTING LAUREL PARKWAYFUTURE TO U C H S T O N E D R I V E PHASE 1C - INCLUDED ITEMS 1. COMPLETE BUILDINGS ONSITE 2. LANDSCAPING AROUND FIELDS NO WORK PLANNED ON OAK STREET & BAXTER LANE PAVE CENTER AISLE FIELD 8 FIELD 7 FIELD 1 FIELD 2 FIELD 3 FIELD 4 FIELD 5 FIELD 6 R - DR - CDELINEATED WETLANDS DELINEATED WETLANDS BLDG 1 BLDG 2 BLDG 3 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10 W 10W 10W 10W 10 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS 21 SS8 W 8 W 8 W 8 W 8 W 8 W 8 W 8 W 21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS21 SS8 W 8 W 8 W 8 W ///////////////////////////////////////12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W 12 W U U UU UUUUUUUUUUUUUUUUU UUU UUUUUUUUUUUUUUUU U U U UUUUU10 SS10 SS10 SS10 SS8 W8 W8 W8 W8 W8 W8 W8 W8 W8 W10 SS10 SS10 SS10 SS 10 SS 10 SS 10 SS 10 SS SD8 SS8 SS8 SS8 SS8 SS8 SS8 SS SD SDSDSDSDSDSDSDSDSD SDSDSDSDSDSD N GRAPHIC SCALE 1 inch = ft. 0 ( IN FEET ) 60120 120 120 11"X17": 1"= 240 ft HEADWATERS PROJECT NUMBER DRAWING NUMBER DRAWN BY: DATE: 2026 VERIFY SCALE THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYPlot Date: 8/21/2026 9:17 AM H:\2128\002\ACAD\SHEETS\PHASING\PHASE 2.dwg © HEADWATERS ENGINEERING, INC. REVISION DATE: 1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718 HEADWATERSMT.NET 406-581-5730 PROJECT LOCATION MONTANA BOZEMAN 07/01/26 03/02/26 DJH FUTURE SUBDIVISION PHASE DIAMOND 8 2128.002 PH-2 HARVEST PARKWAY OAK STREET BAXTER LANE LAUREL PARKWAYFUTURE TO U C H S T O N E D R I V E FUTURE SUBDIVISION PHASE - INCLUDED ITEMS 1. INSTALL WATER, SEWER & ROADWAY INFRASTRUCTURE WITHIN SUBDIVISION BOUNDARY. 2. CONSTRUCT NORTH HALF OF OAK STREET ADJACENT TO SUBDIVISION, INCLUDING TURN LANES. 3. INSTALL SEWER MAIN FROM FORESTGLEN DRIVE TO WEST END OF OAK STREET FOR FUTURE CONNECTION. 4. BUILD BAXTER LANE ADJACENT TO SUBDIVISION WITH SHARED USE TRAIL ONLY ON THE SOUTH SIDE OF THE ROAD. 5. INSTALL WATER INFRASTRUCTURE IN BAXTER LANE ADJACENT TO SUBDIVISION. 6. EXTEND HARVEST PARKWAY TO THE WEST, ACROSS THE WATERCOURSE. INCLUDING THE 8" WATER MAIN AND 21" SEWER MAIN. MOVE OVERHEAD POWER POLE INSTALL TURN LANEINSTALL SEWER MAIN TO WEST END OF ROW. INSTALL TURN LANE IMPROVE BAXTER LANE WITH 10' SHARED USE PATH ON SOUTH SIDE COMPLETE HARVEST PARKWAY, STAY SHORT OF WETLANDS AT THIS TIME PERMITTING FOR WETLAND IMPACTS POSSIBLY REALIGN PATH TO AVOID WETLANDS FORESTGLEN DRIVE10' SHARED USE PATH FUTURE ROAD, WATER, AND SEWER CONNECTION LOCATION TO BE DETERMINED WITH SUBDIVISION.R - DR - CDELINEATED WETLANDS DELINEATED WETLANDS CULVERT INSTALLATION & ENVIRONMENTAL PERMITS