HomeMy WebLinkAbout26 - Submissions - Bozeman Library Children's Room Renovation (3)From:Bryson Buska
To:Bozeman Procurement
Cc:Shane Miller; Adam Senechal; Ty Nelson
Subject:[EXTERNAL]RFP Bozeman Library Children"s Room Renovation, Golden Eagle Construction, August 13th 5:00PM
Date:Thursday, August 13, 2026 4:21:08 PM
Attachments:RFP Bozeman Library Children"s Room Renovation_Golden Eagle Construction_8-13-26.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Good afternoon,
Please see the attached RFP response from Golden Eagle Construction for the Bozeman Library
Children's Room Renovation Project. We appreciate the opportunity to submit this RFP for this great
project and look forward to hearing from you soon.
If you have any questions regarding this RFP, please feel free to reach out to me directly.
Regards,
BRYSON BUSKA
VICE PRESIDENT
Office: 406.595.6447
Cell: 406.594.0748
Email: Bryson@GEConstruction.com
Address: 7585 Shedhorn Dr, Bozeman, MT 59718
Website: GEConstruction.com
7585 Shedhorn Drive / Bozeman, MT 59718
(406) 595-6447
August 13 2026
City f Bea
ie aas City Cer
RE Request fr Prpsa – Bea Chidre’s R Revati
Dear r. aas
The seecti f a quaified Ctractr fr the Chi dre’s R Revati at the B ea
!ibrary is critica fr the successfu cpeti f this wderfu pr&ect ad Gde Eage
Cstructi brigs yu certaity i eetig budget ad schedue requireets by fferig)
• axiiati f yur Budget! Due t ur si e Gde Eage Cstructi wi be the st
cpetitive ctractr. ,ur wer peratig csts & verhead ad experiece i the pubic
sectr esure we aitai a structure that wi wr / i the ca ar/etpace ad we
everage this t brig the st vaue t yur pr&e ct. We wi hep yu axii e yur budget
dars!
• %utstadig reatiships with suppiers ad subc tractrs. We ta/e pride i ur
great reatiships ad ctiue t buid thse wit hi ur cuity. Strg cuicati
prpt payet ad expectig the best f urseves ad ur subctractrs heps fr
these reatiships ad add vaue t yur pr&ect.
• We are ivested i Bea . Gde Eage Cstructi estabished the B ea ffice
i 2021 ad has a ca tea f Pr&ect 4aagers S uperitedets ad st iprtaty
tradespepe t hep ead this pr&ect. ,ur tea su pprts the B ea cuity i a
variety ways by vuteerig tie i ur schs c achig ad ceaig up ur streets.
Gde Eage Cstructi’s depth f experiece s/ied tea ad true ivestet i this
cuity a/es us a great fit fr these pr&ects. Tha/ yu fr yur csiderati.
Brys Busa
Vice Presidet
Gde Eage Cstructi Ic.
QUA-IFICAIT%1S %F THE FIR F%R SC%PE
%F SERVICES5 C%ST
SEE ATTACHED
6 BID B%1D 00 21 16 (SCA11ED C%PY 1%T6SEARCHAB-E)
6 CERTIFICATE %F 1%16SEGREGATED FACI-ITIES 00 21 14
6 CERTIFICATE %F C%P-IA1CE WITH I1SURA1CE REQUIPEE1 TS
00 21 15
6 BID F%R 00 41 00 & GEC BY DIVISI%1 PRICI1G BREABD%W1
6 A-TER1ATES F%R 00 4323
6 PR%P%SED SUBC%1TRACT%RS F%R 00 43 36
6 1%1DISCRII1ATI%1 A1D EQAU- PAY AFFIRATI%1 00 61 9 0
Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF NON-SEGREGATED FACIL ITIES MSR Design #2025021BCR Page 1 of 2 CERTIFICATE OF NON-SEGREGATED FACILITIES (Applicable to federally assisted construction contracted and related subcontracts exceeding $1,000 which are not exempt from the Equal Opportunity Clauses) The federally assisted construction contractor certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction contractor certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The federally assisted construction contractor agrees that (except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. Date Signature Name and Title of Signer (Please Type) NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. 8/13/26
Bryson Buska, Vice President
Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF NON-SEGREGATED FACIL ITIES MSR Design #2025021BCR Page 2 of 2
Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF COMPLIANCE WITH INSURANCE REQUIREMENTS MSR Design #2025021BCR Page 1 of 2 CERTIFICATE OF COMPLIANCE WITH INSURANCE REQUIREMENTS The undersigned Contractor hereby acknowledges that he/she has read and understands the insurance requirements specified in this contract, and hereby agrees (1) that such insurance will be maintained in at least the amounts and types specified in this contract and during any modifications and/or time extensions granted thereto; (2) that these required insurance policies will each contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interest of the City of Great Falls in such insurance will not be effective for such period as may be prescribed by the Laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof has been given to the contracting officer; (3) that Montana Workmen's Compensation Insurance, or letter of reciprocal agreement with another state, will be maintained on this contract for and during the entire performance period and for and during any modifications and/or time extensions granted thereto; and (4) that this agreement will become a part of and be incorporated into the above referenced contract, and will be legally binding and enforceable at law. INSURANCE COMPANY (IES): PHONE NO. CONTRACTOR: Date: (Authorized Signature) ACCEPTANCE The undersigned authorized representative, on behalf of the City of Great Falls, hereby accepts and ratifies the above agreement and hereby incorporates the above agreement into the above referenced contract. By: (Date) (Authorized representa tive) Golden Eagle Construction, Inc.
7585 Shedhorn Drive
Bozeman MT 59718
8/13/26
MarshMcLennanAgency
1108 Livingston Ave
Helena MT 59601
406-442-5360
Bryson Buska, Vice President
Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF COMPLIANCE WITH INSURANCE REQUIREMENTS MSR Design #2025021BCR Page 2 of 2
Bozeman Public Library Children’s Room and Teen Corner Remodel
Bozeman,MT 59715
MSR Design #2025021BCR
00 41 00
BID FORM
Page 1 of 2
SECTION 00 41 00
BID FORM
THE PROJECT AND THE PARTIES
1.01 TO:
A.City of Bozeman (Owner)
121 North Rouse Avenue
Bozeman,Montana 59715
_______
_______
1.02 FOR:
A.Project:BPL Children and Teen Area Remodel
626 E.Main Street
Bozeman,Montana 59715
B.MSR Design Project Number:2025021BPL
1.03 DATE:______________(BIDDER TO ENTER DATE)
1.04 SUBMITTED BY: (BIDDER TO ENTER NAME AND ADDRESS)
A.Bidder's Full Name _________________________
Address _____________________________
City,State,Zip:________________________
Phone:______________________________
1.05 OFFER
A.Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and
the Contract Documents prepared by MSR Design and their subconsultantsfor the above mentioned
project,we,the undersigned,hereby offer to enter into a Contract to perform the Work for the Sumof:
B._________________________________________________________ dollars
($______________________),in lawful money of the United States of America.
C.We have included the required security depositas required by the Instruction to Bidders.
D.We have included the required performance assurance bonds in the Bid Amount as required by the
Instructions to Bidders.
1.The cost of the required performance assurance bonds is ________________dollars
($___________),in lawful money of the United States of America.
E.All applicable federal taxes are includedand State of Montanataxes are included inthe Bid Sum.
F.All Cashand ContingencyAllowances described in Section 01 21 00 -Allowancesare included in the Bid
Sum.
1.06 ACCEPTANCE
A.This offer shall be open to acceptance and is irrevocable for thirty (30)days from the bid closing date.
B.If this bid is accepted by Owner within the time period stated above,we will:
1.Execute the Agreement within seven (7)days of receipt of Notice of Award.
2.Furnish the required bonds within seven (7)days of receipt of Notice of Award.
3.Commence work within seven (7)days after written Notice to Proceedof this bid.
C.If this bid is accepted within the time stated,and we fail to commence the Work or we fail to provide
the required Bond(s),the security deposit shall be forfeited as damages to Ownerby reason of our
failure,limited in amount to the lesser of the face value of the security deposit or the difference
between this bid and the bid upon which a Contract is signed.
D.In the event our bid is not accepted within the time stated above,the required security deposit shall be
returned to the undersigned,in accordance with the provisions of the Instructions to Bidders;unless a
mutually satisfactory arrangement is made for its retention and validity for an extended period of time.
1.07 CONTRACT TIME
A.If this Bid is accepted,we will:
B.Complete the Work in ___calendar weeks from Notice to Proceed.(Bidder to enter number of weeks.)
8/13/26
Golden Eagle Construction, Inc
7585 Shedhorn Drive
Bozeman, MT 59718
406-595-6447
26
Seven Thousand
7,000.00
Six Hundred Twenty Six Thousand, One Hundred Forty Four
626,144.00
Bozeman Public Library Children’s Room and Teen Corner Remodel
Bozeman,MT 59715
MSR Design #2025021BCR
00 41 00
BID FORM
Page 2 of 2
1.08 ALTERNATES -SEE SECTION 01 23 00
A.Alternates are identified by number and describe the basic changes to be incorporated into the Work
only when that Alternate is made a part of the Work by specific provisions in the Owner-Contractor
Agreement. Bidder,in submitting his bid proposal,shall include,in addition to his base bid,the
following alternates.The numerical order of listing these alternates does not necessarily imply their
priority.The Owner may decide to use any one or more of all the items. Coordinate pertinent related
work and modify surrounding work as required to properly integrate the work under each Alternate and
to provide the complete construction required by the Contract Documents.
B.Alternates identified on the Alternates Form will be reviewed and accepted or rejected at Owner's
option. Accepted alternates will be identified in the Owner-Contractor Agreement.
1.09 CHANGES TO THE WORK
A.When Architect establishes that the method of valuation for Changes in the Work will be net cost plus a
percentage fee in accordance with General Conditions,our percentage fee will be:
1.______percent overhead and profit on the net cost of our own Work;
2.______percent on the cost of work done by any Subcontractor.
B.On work deleted from the Contract,our credit to Owner shall be Architect-approved net cost plus
_________of the overhead and profit percentage noted above.
1.10 ADDENDA
A.The following Addenda have been received. The modifications to the Bid Documents noted below have
been considered and all costs are included in the Bid Sum.
1.Addendum #__ Dated _______
2.Addendum #__ Dated _______
3.Addendum #__ Dated _______
1.11 BID FORM SUPPLEMENTS
A.The following Supplements are attached to this Bid Form and are considered an integral part of this Bid
Form:
1.Document 00 43 23 -Alternates Form: Include the cost variations to the Bid Sumapplicable to the
Work as described in Section 01 23 00.
2.Document 00 43 36 -Proposed Subcontractors Form: Include the names of Subcontractors and
the portions of the Work they will perform.
1.12 BID FORM SIGNATURE(S)
The Corporate Seal of
____________________________________________
(Bidder -print the full name of your firm)
(Seal)
____________________________________________
(Authorized signing officer,Title)
END OF SECTION
5
5
5
1 8/7/26
Golden Eagle Construction, Inc.
Vice President
Golden Eagle Page 2
Bozeman Childrens Room Library BID DAY
Spreadsheet Level Total
Amount
1000.000 GENERAL REQUIREMENTS 135,2001000.000 GENERAL REQUIREMENTS
2000.000 DEMOLITION 25,8622000.000 DEMOLITION
3000.000 CONCRETE 8063000.000 CONCRETE
5000.000 METALS 2,3645000.000 METALS
6000.000 WOOD & PLASTICS 21,4356000.000 WOOD & PLASTICS
7000.000 THERMAL & MOISTURE PROT 6617000.000 THERMAL & MOISTURE PROT
8000.000 DOORS & WINDOWS 13,3008000.000 DOORS & WINDOWS
9000.000 FINISHES 225,8899000.000 FINISHES
10000.000 SPECIALTIES 10,32010000.000 SPECIALTIES
11000.000 EQUIPMENT 40311000.000 EQUIPMENT
12000.000 FURNISHINGS 24,41812000.000 FURNISHINGS
21000.000 FIRE SUPPRESSION 16,11721000.000 FIRE SUPPRESSION
22000.000 PLUMBING 61,78122000.000 PLUMBING
23000.000 HVAC 18,44723000.000 HVAC
26000.000 ELECTRICAL 65,70326000.000 ELECTRICAL
28000.000 ELECTRONIC SAFETY & SECURITY 3,43828000.000 ELECTRONIC SAFETY & SECURITY
Estimate Totals
Golden Eagle Page 2
Bozeman Childrens Room Library BID DAY
Description Amount Totals Rate Cost Basis Cost per Unit Percent of Total
Labor 143,964 19.195 /sqft 22.99%
Material 37,438 4.992 /sqft 5.98%
Subcontract 423,307 56.441 /sqft 67.61%
Equipment
Other 21,435 2.858 /sqft 3.42%
626,144 626,144 83.486 /sqft 100.00%100.00%
Total 626,144 83.486 /sqft
GEC Pricing Breakdown by Divison
Bozeman Public Library Children’s Room and Teen Corner Remodel
Bozeman,MT 59715
MSR Design #2025021BCR
00 43 23
ALTERNATES FORM
Page 1 of 2
SECTION 00 43 23
ALTERNATES FORM
PARTICULARS
1.01 THE FOLLOWING IS THE LIST OF ALTERNATES REFERENCED IN THE BID SUBMITTED BY:
1.02 (BIDDER)_______________________________
1.03 TO (OWNER ): CITY OF BOZEMAN
1.04 DATED ________________AND WHICH IS AN INTEGRAL PART OF THE BID FORM.
ALTERNATES LIST
2.01 THE FOLLOWING AMOUNTS SHALL BE ADDED TO OR DEDUCTED FROM THE BID AMOUNT. REFER TO
SECTION 01 23 00 -ALTERNATES.
ALTERNATE#1 (ACPNL-4): ADD /(DEDUCT)$________________________
ALTERNATE #2 (ACPNL-5A/B/C AND ACPNL-6A/B/C): ADD /(DEDUCT)$________________________
END OF SECTION
Golden Eagle Construction, Inc.
8/13/26
14,300.00
14,850.00
Bozeman Public Library Children’s Room and Teen Corner Remodel
Bozeman,MT 59715
MSR Design #2025021BCR
00 43 23
ALTERNATES FORM
Page 2 of 2
Bozeman Public Library Children’s Room and Teen Corner Remodel
Bozeman,MT 59715
MSR Design #2025021BCR
00 43 36
PROPOSED SUBCONTRACTORS FORM
Page 1 of 2
SECTION 00 43 36
PROPOSED SUBCONTRACTORS FORM
PARTICULARS
1.01 HEREWITH IS THE LIST OF SUBCONTRACTORS REFERENCED IN THE BID SUBMITTED BY:
1.02 (BIDDER)____________________________________
1.03 TO (OWNER ): CITY OF BOZEMAN
1.04 DATED ___________________AND WHICH IS AN INTEGRAL PART OF THE BID FORM.
1.05 THE FOLLOWING WORK WILL BE PERFORMED (OR PROVIDED)BY SUBCONTRACTORS AND COORDINATED
BY US:
LIST OF SUBCONTRACTORS
WORK SUBJECT SUBCONTRACTOR NAME
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
END OF SECTION
Golden Eagle Construction, Inc
8/13/26
Demolition
Framing
Finish Carpentry
Drywall
Flooring
Painting
ACT
Specialties
Fire Suppression
Plumbing
HVAC
Electrical/Fire Alarm/Low Voltage
SML Demolition
GEC
Silver City Stone/GEC
GEC
Richs Modern Flooring
Jones Painting
Split Beam
GEC
Pye Barker
Kuusisto & Sons
Western Sky
GPS Electrical Service
Bozeman Public Library Children’s Room and Teen Corner Remodel
Bozeman,MT 59715
MSR Design #2025021BCR
00 43 36
PROPOSED SUBCONTRACTORS FORM
Page 2 of 2
NONDISCRIMINATION AND EQUAL PAY AFFIRMATION
____________________________________(name of entity submitting) hereby affirms it will not
discriminate on the basis of race, color, religion, creed, sex, age, marital status, national origin,
or because of actual or perceived sexual orientation, gender identity or disability and
acknowledges and understands the eventual contract will contain a provision prohibiting
discrimination as described above and this prohibition on discrimination shall apply to the hiring
and treatments or proposer’s employees and to all subcontracts.
In addition, ____________________________________(name of entity submitting) hereby
affirms it will abide by the Equal Pay Act of 1963 and Section 39-3-104, MCA (the Montana Equal
Pay Act), and has visited the State of Montana Equal Pay for Equal Work “best practices” website,
https://equalpay.mt.gov/BestPractices/Employers, or equivalent “best practices publication and
has read the material.
______________________________________
Name and title of person authorized to sign on behalf of submitter
Golden Eagle Construction, Inc.
Golden Eagle Construction, Inc.
Bryson Buska, Vice President
SCHEDU-E
SEE ATTACHED PRE-II1ARY PR%EECT SCHEDU-E
ID Task Name Duration Start Finish1Construction 135 days Mon 9/28/26 Fri 4/2/272Notice to Proceed 0 days Mon 9/28/26 Mon 9/28/263Issue Subcontracts 5 days Mon 9/28/26 Fri 10/2/26
4 Submittals & Procurement 10 days Mon 10/5/26 Fri 10/16/26
5 Mobilize 0 days Mon 10/5/26 Mon 10/5/26
6 Remove/Relocate Casework 2 days Mon 10/5/26 Tue 10/6/26
7 Demo Mechanical 2 days Mon 10/5/26 Tue 10/6/26
8 Demo Plumbing 3 days Mon 10/5/26 Wed 10/7/26
9 Demo Electrical & Data 4 days Mon 10/5/26 Thu 10/8/26
10 Demo Doors, Storefronts 6 days Wed 10/7/26 Wed 10/14/26
11 Demo Walls 3 days Thu 10/15/26 Mon 10/19/26
12 Remove Bath Items 2 days Tue 10/20/26 Wed 10/21/26
13 Disassemble & Remove Shelving 3 days Thu 10/22/26 Mon 10/26/26
14 Demo All Flooring 13 days Tue 10/27/26 Thu 11/12/26
15 Demo Bath Tile 4 days Fri 11/13/26 Wed 11/18/26
16 Demo Ceilings 1 day Thu 11/19/26 Thu 11/19/26
17 Clean Up 1 day Fri 11/20/26 Fri 11/20/26
18 Demo Complete 0 days Fri 11/20/26 Fri 11/20/26
19 Drill Concrete for Floor Boxes 1 day Mon 11/23/26 Mon 11/23/26
20 Frame New Walls 3 days Mon 11/23/26 Wed 11/25/26
21 MEP Rough-Ins 12 days Thu 11/26/26 Fri 12/11/26
22 Install Insulation 2 days Mon 12/14/26 Tue 12/15/26
23 Hang Drywall on Walls & Ceilings 5 days Wed 12/16/26 Tue 12/22/26
24 Tape and Mud 5 days Wed 12/23/26 Tue 12/29/26
25 Prime & First Coat 5 days Wed 12/30/26 Tue 1/5/27
26 Install ACT Grid 1 day Wed 1/6/27 Wed 1/6/27
27 (Re)Install Casework 5 days Thu 1/7/27 Wed 1/13/27
28 Install Tile in Restrooms 6 days Thu 1/7/27 Thu 1/14/27
29 Install Flooring 15 days Thu 1/14/27 Wed 2/3/27
30 Install Doors, Storefronts 8 days Fri 1/15/27 Tue 1/26/27
31 Install Bath Accessories 2 days Wed 1/27/27 Thu 1/28/27
32 Install Wall Coverings 10 days Wed 1/27/27 Tue 2/9/27
33 Trim Out MEP 10 days Wed 2/10/27 Tue 2/23/27
34 Paint/Install ACT 5 days Wed 2/24/27 Tue 3/2/27
35 Reinstall Shelving (Owner)3 days Wed 3/3/27 Fri 3/5/27
36 Install Shelving Top & End Panels 3 days Mon 3/8/27 Wed 3/10/27
37 Final Paint 10 days Mon 3/8/27 Fri 3/19/27
38 Rough Clean 3 days Mon 3/22/27 Wed 3/24/27
39 Punch Walk - Architect/Owner 1 day Thu 3/25/27 Thu 3/25/27
40 Substaintial Completion 0 days Thu 3/25/27 Thu 3/25/27
41 Correct Punch Items 5 days Fri 3/26/27 Thu 4/1/27
42 Final Clean 1 day Fri 4/2/27 Fri 4/2/27
9/28Issue Subcontracts
Submittals & Procurement
10/5
Remove/Relocate Casework
Demo Mechanical
Demo Plumbing
Demo Electrical & Data
Demo Doors, Storefronts
Demo Walls
Remove Bath Items
Disassemble & Remove Shelving
Demo All Flooring
Demo Bath Tile
Demo Ceilings
Clean Up
11/20
Drill Concrete for Floor Boxes
Frame New Walls
MEP Rough-Ins
Install Insulation
Hang Drywall on Walls & Ceilings
Tape and Mud
Prime & First Coat
Install ACT Grid
(Re)Install Casework
Install Tile in Restrooms
Install Flooring
Install Doors, Storefronts
Install Bath Accessories
Install Wall Coverings
Trim Out MEP
Paint/Install ACT
Reinstall Shelving (Owner)
Install Shelving Top & End Panels
Final Paint
Rough Clean
Punch Walk - Architect/Owner
3/25
Correct Punch Items
Final Clean
3 8 13 18 23 28 2 7 12 17 22 27 2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24 1 6 11 16 21 26 31 5 10 15 20 25 30 5 10 15 20August 2026 September 2026 October 2026 November 2026 December 2026 January 2027 February 2027 March 2027 April 2027 May 2027BOZEMAN LIBRARY CHILDREN'S ROOM REMODEL SCHEDULE
Page 1 of 1
RE-ATED EXPERIE1CE WITH SII-AR
PR%EECTS
Gde Eage Cstructi (GEC) has bee based i H eea sice 1986 ad this suer we
are ceebratig beig i busiess fr 40 years. We have cpeted hudreds f pr&ects bth
arge ad sa. Se f ur ciets icude State f 4taa Departet f 4iitary Affairs
City f Heea B ea Sch District !ewis ad Car/ Cuty Gaati Cuty ad
=effers Cuty.
I 2021 GEC peed ur B ea ffice t pursue a pr&ect i 4ight Basi. These past
few years have awed ur tea t sette it the vaey estabish prcesses ad reatiships
with subctractrs ad better uderstad the ar/et. We are very iterested i wr/ig with
the City f B ea estabishig a ist f success fu pr&ects tgether which wi aw GEC t
be part f the cuity agside the City.
GEC has cpeted ay siiar pr&ects that
cpare t the B ea Chidre’s R
revati ad fur exapes icude the US
Iigrati Services Teat Buid?,ut !ithia
=eep Iterir Rede Gaati Cuty
Guether Bdg TI ad Federa ,ffice Buidig
Iterir Revatis.
U.S. CITIGE1’S A1D
IIGRATI%1 SERVICES
RE%DE-
This pr&ect successfuy et the striget
requireets t ear !EED Siver certificati
fr a rede. The pr&ect csisted f a
11000 square ft rede ad 2500 square
ft additi t a peratia buidig.
Extreey strict security easures were
efrced thrughut the pr&ect t cpy with
gvereta ease bigatis. This pr&ect
required discipied scheduig ad
cuicati t t disrupt peratis.
-ITHIA EEEP RE%DE-
Tta Ctract) $1413000
Pr&ect Schedue) 8 4ths
8000 SF Iterir Rede f the Existig
!ithia =eep Deaership i Heea
4T. Wr/ icuded verhau f the
Deaership shwr ad frt f huse
ffices as we as saes service & parts
areas icudig 4EP ad fire systes.
Wr/ was cpeted i 8 ths a
whie awig the buidig t aitai
perati ad daiy custer traffic.
GA--ATI1 C%U1TY GUE1THER B-DG TI
Tta Ctract) $395000
Pr&ect Schedue) 4 4ths
Iterir Rede f the existig Gaati Cuty Gu ether Buidig i B ea 4T. Wr/
icudes a&r TI iterir scpe icudig ew ffi ces bathrs gatherigCc spaces
strage areas ad haway redeig t prvide fre sh ad vibrat ew spaces fr the Cuty’s
testig faciity. Pr&ect was cpete whie ait aiig 100% ccupacy ad we wr/ed csey
with the cuty t esure we did t disrupt their peratis. Pr&ect was cpeted tie
ad uder budget.
FEDERA- %FFICE BUI-DI1G TE1A1T RE%DE-S
Tta Ctract) $1803000
Pr&ect Schedue) 6 4ths
Ciet) SDA Ic.
Ctract icuded a 4aster Agreeet with eight id ividua Wr/ ,rders received ragig fr
$1300 dr swap uts t $600000 fu ffice tea t rede spaces.
Tw f the arger pr&ects icuded a&r rede f the ATF (Ach Tbacc & Firears) &
IRS (Itera Reveue Service) ffices icudig a ew dr access ad security upgrades
ag with fresh pait ad frig thrughut.
,e f the wr/ rders was a cpete buidig wide teperature ctrs upgrade that
icuded wr/ i eary every fficeCteat space t hrughut the etire buidig.
Ad ather wr/ rder was fr buidig??wide acces s ctr ad security upgrades fr the
c spaces f the buidig ag with exterir c crete ad right f way wr/ t freshe up
se very d ad defated ccrete etryways that had bee destryed by ice et.
!asty we did a cpete upgrade t the data syste & IT r fr the Scia Security
Adiistrati.
This ciet had ay differet eeds fr their bui dig ad GEC achieved the requested
upgrades tie ad uder budget.
C-%SI1G
Tha/ yu fr csiderig Gde Eage Cstructi as yur ctractr fr this great pr&ect.