Loading...
HomeMy WebLinkAbout26 - Submissions - Bozeman Library Children's Room Renovation (3)From:Bryson Buska To:Bozeman Procurement Cc:Shane Miller; Adam Senechal; Ty Nelson Subject:[EXTERNAL]RFP Bozeman Library Children"s Room Renovation, Golden Eagle Construction, August 13th 5:00PM Date:Thursday, August 13, 2026 4:21:08 PM Attachments:RFP Bozeman Library Children"s Room Renovation_Golden Eagle Construction_8-13-26.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good afternoon, Please see the attached RFP response from Golden Eagle Construction for the Bozeman Library Children's Room Renovation Project. We appreciate the opportunity to submit this RFP for this great project and look forward to hearing from you soon. If you have any questions regarding this RFP, please feel free to reach out to me directly. Regards, BRYSON BUSKA VICE PRESIDENT Office: 406.595.6447 Cell: 406.594.0748 Email: Bryson@GEConstruction.com Address: 7585 Shedhorn Dr, Bozeman, MT 59718 Website: GEConstruction.com 7585 Shedhorn Drive / Bozeman, MT 59718 (406) 595-6447 August 13 2026 City f Bea ie aas City Cer RE Request fr Prpsa – Bea Chidre’s R Revati Dear r. aas The seecti f a quaified Ctractr fr the Chi dre’s R Revati at the B ea !ibrary is critica fr the successfu cpeti f this wderfu pr&ect ad Gde Eage Cstructi brigs yu certaity i eetig budget ad schedue requireets by fferig) • axiiati f yur Budget! Due t ur si e Gde Eage Cstructi wi be the st cpetitive ctractr. ,ur wer peratig csts & verhead ad experiece i the pubic sectr esure we aitai a structure that wi wr / i the ca ar/etpace ad we everage this t brig the st vaue t yur pr&e ct. We wi hep yu axii e yur budget dars! • %utstadig reatiships with suppiers ad subc tractrs. We ta/e pride i ur great reatiships ad ctiue t buid thse wit hi ur cuity. Strg cuicati prpt payet ad expectig the best f urseves ad ur subctractrs heps fr these reatiships ad add vaue t yur pr&ect. • We are ivested i Bea . Gde Eage Cstructi estabished the B ea ffice i 2021 ad has a ca tea f Pr&ect 4aagers S uperitedets ad st iprtaty tradespepe t hep ead this pr&ect. ,ur tea su pprts the B ea cuity i a variety ways by vuteerig tie i ur schs c achig ad ceaig up ur streets. Gde Eage Cstructi’s depth f experiece s/ied tea ad true ivestet i this cuity a/es us a great fit fr these pr&ects. Tha/ yu fr yur csiderati. Brys Busa Vice Presidet Gde Eage Cstructi Ic. QUA-IFICAIT%1S %F THE FIR F%R SC%PE %F SERVICES5 C%ST SEE ATTACHED 6 BID B%1D 00 21 16 (SCA11ED C%PY 1%T6SEARCHAB-E) 6 CERTIFICATE %F 1%16SEGREGATED FACI-ITIES 00 21 14 6 CERTIFICATE %F C%P-IA1CE WITH I1SURA1CE REQUIPEE1 TS 00 21 15 6 BID F%R 00 41 00 & GEC BY DIVISI%1 PRICI1G BREABD%W1 6 A-TER1ATES F%R 00 4323 6 PR%P%SED SUBC%1TRACT%RS F%R 00 43 36 6 1%1DISCRII1ATI%1 A1D EQAU- PAY AFFIRATI%1 00 61 9 0 Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF NON-SEGREGATED FACIL ITIES MSR Design #2025021BCR Page 1 of 2 CERTIFICATE OF NON-SEGREGATED FACILITIES (Applicable to federally assisted construction contracted and related subcontracts exceeding $1,000 which are not exempt from the Equal Opportunity Clauses) The federally assisted construction contractor certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction contractor certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The federally assisted construction contractor agrees that (except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. Date Signature Name and Title of Signer (Please Type) NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. 8/13/26 Bryson Buska, Vice President Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF NON-SEGREGATED FACIL ITIES MSR Design #2025021BCR Page 2 of 2 Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF COMPLIANCE WITH INSURANCE REQUIREMENTS MSR Design #2025021BCR Page 1 of 2 CERTIFICATE OF COMPLIANCE WITH INSURANCE REQUIREMENTS The undersigned Contractor hereby acknowledges that he/she has read and understands the insurance requirements specified in this contract, and hereby agrees (1) that such insurance will be maintained in at least the amounts and types specified in this contract and during any modifications and/or time extensions granted thereto; (2) that these required insurance policies will each contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interest of the City of Great Falls in such insurance will not be effective for such period as may be prescribed by the Laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof has been given to the contracting officer; (3) that Montana Workmen's Compensation Insurance, or letter of reciprocal agreement with another state, will be maintained on this contract for and during the entire performance period and for and during any modifications and/or time extensions granted thereto; and (4) that this agreement will become a part of and be incorporated into the above referenced contract, and will be legally binding and enforceable at law. INSURANCE COMPANY (IES): PHONE NO. CONTRACTOR: Date: (Authorized Signature) ACCEPTANCE The undersigned authorized representative, on behalf of the City of Great Falls, hereby accepts and ratifies the above agreement and hereby incorporates the above agreement into the above referenced contract. By: (Date) (Authorized representa tive) Golden Eagle Construction, Inc. 7585 Shedhorn Drive Bozeman MT 59718 8/13/26 MarshMcLennanAgency 1108 Livingston Ave Helena MT 59601 406-442-5360 Bryson Buska, Vice President Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman, MT 59715 CERTIFICATE OF COMPLIANCE WITH INSURANCE REQUIREMENTS MSR Design #2025021BCR Page 2 of 2 Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman,MT 59715 MSR Design #2025021BCR 00 41 00 BID FORM Page 1 of 2 SECTION 00 41 00 BID FORM THE PROJECT AND THE PARTIES 1.01 TO: A.City of Bozeman (Owner) 121 North Rouse Avenue Bozeman,Montana 59715 ​_______​ ​_______​ 1.02 FOR: A.Project:BPL Children and Teen Area Remodel 626 E.Main Street Bozeman,Montana 59715 B.MSR Design Project Number:2025021BPL 1.03 DATE:______________(BIDDER TO ENTER DATE) 1.04 SUBMITTED BY: (BIDDER TO ENTER NAME AND ADDRESS) A.Bidder's Full Name _________________________ Address _____________________________ City,State,Zip:________________________ Phone:______________________________ 1.05 OFFER A.Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by ​​​​MSR Design and their subconsultants​​​​for the above mentioned project,we,the undersigned,hereby offer to enter into a Contract to perform the Work ​​​​for the Sum​​​​of: B._________________________________________________________ dollars ($______________________),in lawful money of the United States of America. C.We have included the required security ​​​deposit​​​as required by the Instruction to Bidders. D.We have included the required performance assurance bonds in the Bid Amount as required by the Instructions to Bidders. 1.The cost of the required performance assurance bonds is ________________dollars ($___________),in lawful money of the United States of America. E.All applicable federal taxes are ​​included​​and ​​State of Montana​​taxes are ​​included in​​the Bid ​​Sum​​. F.All Cash​​​and Contingency​​​Allowances described in Section ​​​01 21 00 -Allowances​​​are included in the Bid ​​​Sum​​​. 1.06 ACCEPTANCE A.This offer shall be open to acceptance and is irrevocable for thirty (30)days from the bid closing date. B.If this bid is accepted by Owner within the time period stated above,we will: 1.Execute the Agreement within ​seven (7)​days of receipt of ​Notice of Award​. 2.Furnish the required bonds within ​seven (7)​days of receipt of ​Notice of Award​. 3.Commence work within ​seven (7)​days after written ​Notice to Proceed​of this bid. C.If this bid is accepted within the time stated,and we fail to commence the Work ​or we fail to provide the required Bond(s)​,the security deposit shall be forfeited as damages to ​Owner​by reason of our failure,limited in amount to the lesser of the face value of the security deposit or the difference between this bid and the bid upon which a Contract is signed. D.In the event our bid is not accepted within the time stated above,the required security deposit shall be returned to the undersigned,in accordance with the provisions of the Instructions to Bidders;unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time. 1.07 CONTRACT TIME A.If this Bid is accepted,we will: B.Complete the Work in ___calendar weeks from Notice to Proceed.(Bidder to enter number of weeks.) 8/13/26 Golden Eagle Construction, Inc 7585 Shedhorn Drive Bozeman, MT 59718 406-595-6447 26 Seven Thousand 7,000.00 Six Hundred Twenty Six Thousand, One Hundred Forty Four 626,144.00 Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman,MT 59715 MSR Design #2025021BCR 00 41 00 BID FORM Page 2 of 2 1.08 ALTERNATES -SEE SECTION 01 23 00 A.Alternates are identified by number and describe the basic changes to be incorporated into the Work only when that Alternate is made a part of the Work by specific provisions in the Owner-Contractor Agreement. Bidder,in submitting his bid proposal,shall include,in addition to his base bid,the following alternates.The numerical order of listing these alternates does not necessarily imply their priority.The Owner may decide to use any one or more of all the items. Coordinate pertinent related work and modify surrounding work as required to properly integrate the work under each Alternate and to provide the complete construction required by the Contract Documents. B.Alternates identified on the Alternates Form will be reviewed and accepted or rejected at Owner's option. Accepted alternates will be identified in the Owner-Contractor Agreement. 1.09 CHANGES TO THE WORK A.When Architect establishes that the method of valuation for Changes in the Work will be net cost plus a percentage fee in accordance with General Conditions,our percentage fee will be: 1.______percent overhead and profit on the net cost of our own Work; 2.______percent on the cost of work done by any Subcontractor. B.On work deleted from the Contract,our credit to Owner shall be Architect-approved net cost plus _________of the overhead and profit percentage noted above. 1.10 ADDENDA A.The following Addenda have been received. The modifications to the Bid Documents noted below have been considered and all costs are included in the Bid Sum. 1.Addendum #__ Dated _______ 2.Addendum #__ Dated _______ 3.Addendum #__ Dated _______ 1.11 BID FORM SUPPLEMENTS A.The following Supplements are attached to this Bid Form and are considered an integral part of this Bid Form: 1.Document ​00 43 23 -Alternates Form​: Include the cost variations to the Bid ​Sum​applicable to the Work as described in Section ​01 23 00​. 2.Document 00 43 36 -Proposed Subcontractors Form: Include the names of Subcontractors and the portions of the Work they will perform. 1.12 BID FORM SIGNATURE(S) The Corporate Seal of ____________________________________________ (Bidder -print the full name of your firm) (Seal) ____________________________________________ (Authorized signing officer,Title) END OF SECTION 5 5 5 1 8/7/26 Golden Eagle Construction, Inc. Vice President Golden Eagle Page 2 Bozeman Childrens Room Library BID DAY Spreadsheet Level Total Amount 1000.000 GENERAL REQUIREMENTS 135,2001000.000 GENERAL REQUIREMENTS 2000.000 DEMOLITION 25,8622000.000 DEMOLITION 3000.000 CONCRETE 8063000.000 CONCRETE 5000.000 METALS 2,3645000.000 METALS 6000.000 WOOD & PLASTICS 21,4356000.000 WOOD & PLASTICS 7000.000 THERMAL & MOISTURE PROT 6617000.000 THERMAL & MOISTURE PROT 8000.000 DOORS & WINDOWS 13,3008000.000 DOORS & WINDOWS 9000.000 FINISHES 225,8899000.000 FINISHES 10000.000 SPECIALTIES 10,32010000.000 SPECIALTIES 11000.000 EQUIPMENT 40311000.000 EQUIPMENT 12000.000 FURNISHINGS 24,41812000.000 FURNISHINGS 21000.000 FIRE SUPPRESSION 16,11721000.000 FIRE SUPPRESSION 22000.000 PLUMBING 61,78122000.000 PLUMBING 23000.000 HVAC 18,44723000.000 HVAC 26000.000 ELECTRICAL 65,70326000.000 ELECTRICAL 28000.000 ELECTRONIC SAFETY & SECURITY 3,43828000.000 ELECTRONIC SAFETY & SECURITY Estimate Totals Golden Eagle Page 2 Bozeman Childrens Room Library BID DAY Description Amount Totals Rate Cost Basis Cost per Unit Percent of Total Labor 143,964 19.195 /sqft 22.99% Material 37,438 4.992 /sqft 5.98% Subcontract 423,307 56.441 /sqft 67.61% Equipment Other 21,435 2.858 /sqft 3.42% 626,144 626,144 83.486 /sqft 100.00%100.00% Total 626,144 83.486 /sqft GEC Pricing Breakdown by Divison Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman,MT 59715 MSR Design #2025021BCR 00 43 23 ALTERNATES FORM Page 1 of 2 SECTION 00 43 23 ALTERNATES FORM PARTICULARS 1.01 THE FOLLOWING IS THE LIST OF ALTERNATES REFERENCED IN THE BID SUBMITTED BY: 1.02 (BIDDER)_______________________________ 1.03 TO (OWNER ): CITY OF BOZEMAN 1.04 DATED ________________AND WHICH IS AN INTEGRAL PART OF THE BID FORM. ALTERNATES LIST 2.01 THE FOLLOWING AMOUNTS SHALL BE ADDED TO OR DEDUCTED FROM THE BID AMOUNT. REFER TO SECTION 01 23 00 -ALTERNATES. ALTERNATE​#1 (ACPNL-4): ADD /(DEDUCT)$________________________ ALTERNATE #2 (ACPNL-5A/B/C AND ACPNL-6A/B/C): ADD /(DEDUCT)$________________________ END OF SECTION Golden Eagle Construction, Inc. 8/13/26 14,300.00 14,850.00 Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman,MT 59715 MSR Design #2025021BCR 00 43 23 ALTERNATES FORM Page 2 of 2 Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman,MT 59715 MSR Design #2025021BCR 00 43 36 PROPOSED SUBCONTRACTORS FORM Page 1 of 2 SECTION 00 43 36 PROPOSED SUBCONTRACTORS FORM PARTICULARS 1.01 HEREWITH IS THE LIST OF SUBCONTRACTORS REFERENCED IN THE BID SUBMITTED BY: 1.02 (BIDDER)____________________________________ 1.03 TO (OWNER ): CITY OF BOZEMAN 1.04 DATED ___________________AND WHICH IS AN INTEGRAL PART OF THE BID FORM. 1.05 THE FOLLOWING WORK WILL BE PERFORMED (OR PROVIDED)BY SUBCONTRACTORS AND COORDINATED BY US: LIST OF SUBCONTRACTORS WORK SUBJECT SUBCONTRACTOR NAME _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ END OF SECTION Golden Eagle Construction, Inc 8/13/26 Demolition Framing Finish Carpentry Drywall Flooring Painting ACT Specialties Fire Suppression Plumbing HVAC Electrical/Fire Alarm/Low Voltage SML Demolition GEC Silver City Stone/GEC GEC Richs Modern Flooring Jones Painting Split Beam GEC Pye Barker Kuusisto & Sons Western Sky GPS Electrical Service Bozeman Public Library Children’s Room and Teen Corner Remodel Bozeman,MT 59715 MSR Design #2025021BCR 00 43 36 PROPOSED SUBCONTRACTORS FORM Page 2 of 2 NONDISCRIMINATION AND EQUAL PAY AFFIRMATION ____________________________________(name of entity submitting) hereby affirms it will not discriminate on the basis of race, color, religion, creed, sex, age, marital status, national origin, or because of actual or perceived sexual orientation, gender identity or disability and acknowledges and understands the eventual contract will contain a provision prohibiting discrimination as described above and this prohibition on discrimination shall apply to the hiring and treatments or proposer’s employees and to all subcontracts. In addition, ____________________________________(name of entity submitting) hereby affirms it will abide by the Equal Pay Act of 1963 and Section 39-3-104, MCA (the Montana Equal Pay Act), and has visited the State of Montana Equal Pay for Equal Work “best practices” website, https://equalpay.mt.gov/BestPractices/Employers, or equivalent “best practices publication and has read the material. ______________________________________ Name and title of person authorized to sign on behalf of submitter Golden Eagle Construction, Inc. Golden Eagle Construction, Inc. Bryson Buska, Vice President SCHEDU-E SEE ATTACHED PRE-II1ARY PR%EECT SCHEDU-E ID Task Name Duration Start Finish1Construction 135 days Mon 9/28/26 Fri 4/2/272Notice to Proceed 0 days Mon 9/28/26 Mon 9/28/263Issue Subcontracts 5 days Mon 9/28/26 Fri 10/2/26 4 Submittals & Procurement 10 days Mon 10/5/26 Fri 10/16/26 5 Mobilize 0 days Mon 10/5/26 Mon 10/5/26 6 Remove/Relocate Casework 2 days Mon 10/5/26 Tue 10/6/26 7 Demo Mechanical 2 days Mon 10/5/26 Tue 10/6/26 8 Demo Plumbing 3 days Mon 10/5/26 Wed 10/7/26 9 Demo Electrical & Data 4 days Mon 10/5/26 Thu 10/8/26 10 Demo Doors, Storefronts 6 days Wed 10/7/26 Wed 10/14/26 11 Demo Walls 3 days Thu 10/15/26 Mon 10/19/26 12 Remove Bath Items 2 days Tue 10/20/26 Wed 10/21/26 13 Disassemble & Remove Shelving 3 days Thu 10/22/26 Mon 10/26/26 14 Demo All Flooring 13 days Tue 10/27/26 Thu 11/12/26 15 Demo Bath Tile 4 days Fri 11/13/26 Wed 11/18/26 16 Demo Ceilings 1 day Thu 11/19/26 Thu 11/19/26 17 Clean Up 1 day Fri 11/20/26 Fri 11/20/26 18 Demo Complete 0 days Fri 11/20/26 Fri 11/20/26 19 Drill Concrete for Floor Boxes 1 day Mon 11/23/26 Mon 11/23/26 20 Frame New Walls 3 days Mon 11/23/26 Wed 11/25/26 21 MEP Rough-Ins 12 days Thu 11/26/26 Fri 12/11/26 22 Install Insulation 2 days Mon 12/14/26 Tue 12/15/26 23 Hang Drywall on Walls & Ceilings 5 days Wed 12/16/26 Tue 12/22/26 24 Tape and Mud 5 days Wed 12/23/26 Tue 12/29/26 25 Prime & First Coat 5 days Wed 12/30/26 Tue 1/5/27 26 Install ACT Grid 1 day Wed 1/6/27 Wed 1/6/27 27 (Re)Install Casework 5 days Thu 1/7/27 Wed 1/13/27 28 Install Tile in Restrooms 6 days Thu 1/7/27 Thu 1/14/27 29 Install Flooring 15 days Thu 1/14/27 Wed 2/3/27 30 Install Doors, Storefronts 8 days Fri 1/15/27 Tue 1/26/27 31 Install Bath Accessories 2 days Wed 1/27/27 Thu 1/28/27 32 Install Wall Coverings 10 days Wed 1/27/27 Tue 2/9/27 33 Trim Out MEP 10 days Wed 2/10/27 Tue 2/23/27 34 Paint/Install ACT 5 days Wed 2/24/27 Tue 3/2/27 35 Reinstall Shelving (Owner)3 days Wed 3/3/27 Fri 3/5/27 36 Install Shelving Top & End Panels 3 days Mon 3/8/27 Wed 3/10/27 37 Final Paint 10 days Mon 3/8/27 Fri 3/19/27 38 Rough Clean 3 days Mon 3/22/27 Wed 3/24/27 39 Punch Walk - Architect/Owner 1 day Thu 3/25/27 Thu 3/25/27 40 Substaintial Completion 0 days Thu 3/25/27 Thu 3/25/27 41 Correct Punch Items 5 days Fri 3/26/27 Thu 4/1/27 42 Final Clean 1 day Fri 4/2/27 Fri 4/2/27 9/28Issue Subcontracts Submittals & Procurement 10/5 Remove/Relocate Casework Demo Mechanical Demo Plumbing Demo Electrical & Data Demo Doors, Storefronts Demo Walls Remove Bath Items Disassemble & Remove Shelving Demo All Flooring Demo Bath Tile Demo Ceilings Clean Up 11/20 Drill Concrete for Floor Boxes Frame New Walls MEP Rough-Ins Install Insulation Hang Drywall on Walls & Ceilings Tape and Mud Prime & First Coat Install ACT Grid (Re)Install Casework Install Tile in Restrooms Install Flooring Install Doors, Storefronts Install Bath Accessories Install Wall Coverings Trim Out MEP Paint/Install ACT Reinstall Shelving (Owner) Install Shelving Top & End Panels Final Paint Rough Clean Punch Walk - Architect/Owner 3/25 Correct Punch Items Final Clean 3 8 13 18 23 28 2 7 12 17 22 27 2 7 12 17 22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24 1 6 11 16 21 26 31 5 10 15 20 25 30 5 10 15 20August 2026 September 2026 October 2026 November 2026 December 2026 January 2027 February 2027 March 2027 April 2027 May 2027BOZEMAN LIBRARY CHILDREN'S ROOM REMODEL SCHEDULE Page 1 of 1 RE-ATED EXPERIE1CE WITH SII-AR PR%EECTS Gde Eage Cstructi (GEC) has bee based i H eea sice 1986 ad this suer we are ceebratig beig i busiess fr 40 years. We have cpeted hudreds f pr&ects bth arge ad sa. Se f ur ciets icude State f 4taa Departet f 4iitary Affairs City f Heea B ea Sch District !ewis ad Car/ Cuty Gaati Cuty ad =effers Cuty. I 2021 GEC peed ur B ea ffice t pursue a pr&ect i 4ight Basi. These past few years have awed ur tea t sette it the vaey estabish prcesses ad reatiships with subctractrs ad better uderstad the ar/et. We are very iterested i wr/ig with the City f B ea estabishig a ist f success fu pr&ects tgether which wi aw GEC t be part f the cuity agside the City. GEC has cpeted ay siiar pr&ects that cpare t the B ea Chidre’s R revati ad fur exapes icude the US Iigrati Services Teat Buid?,ut !ithia =eep Iterir Rede Gaati Cuty Guether Bdg TI ad Federa ,ffice Buidig Iterir Revatis. U.S. CITIGE1’S A1D IIGRATI%1 SERVICES RE%DE- This pr&ect successfuy et the striget requireets t ear !EED Siver certificati fr a rede. The pr&ect csisted f a 11000 square ft rede ad 2500 square ft additi t a peratia buidig. Extreey strict security easures were efrced thrughut the pr&ect t cpy with gvereta ease bigatis. This pr&ect required discipied scheduig ad cuicati t t disrupt peratis. -ITHIA EEEP RE%DE- Tta Ctract) $1413000 Pr&ect Schedue) 8 4ths 8000 SF Iterir Rede f the Existig !ithia =eep Deaership i Heea 4T. Wr/ icuded verhau f the Deaership shwr ad frt f huse ffices as we as saes service & parts areas icudig 4EP ad fire systes. Wr/ was cpeted i 8 ths a whie awig the buidig t aitai perati ad daiy custer traffic. GA--ATI1 C%U1TY GUE1THER B-DG TI Tta Ctract) $395000 Pr&ect Schedue) 4 4ths Iterir Rede f the existig Gaati Cuty Gu ether Buidig i B ea 4T. Wr/ icudes a&r TI iterir scpe icudig ew ffi ces bathrs gatherigCc spaces strage areas ad haway redeig t prvide fre sh ad vibrat ew spaces fr the Cuty’s testig faciity. Pr&ect was cpete whie ait aiig 100% ccupacy ad we wr/ed csey with the cuty t esure we did t disrupt their peratis. Pr&ect was cpeted tie ad uder budget. FEDERA- %FFICE BUI-DI1G TE1A1T RE%DE-S Tta Ctract) $1803000 Pr&ect Schedue) 6 4ths Ciet) SDA Ic. Ctract icuded a 4aster Agreeet with eight id ividua Wr/ ,rders received ragig fr $1300 dr swap uts t $600000 fu ffice tea t rede spaces. Tw f the arger pr&ects icuded a&r rede f the ATF (Ach Tbacc & Firears) & IRS (Itera Reveue Service) ffices icudig a ew dr access ad security upgrades ag with fresh pait ad frig thrughut. ,e f the wr/ rders was a cpete buidig wide teperature ctrs upgrade that icuded wr/ i eary every fficeCteat space t hrughut the etire buidig. Ad ather wr/ rder was fr buidig??wide acces s ctr ad security upgrades fr the c spaces f the buidig ag with exterir c crete ad right f way wr/ t freshe up se very d ad defated ccrete etryways that had bee destryed by ice et. !asty we did a cpete upgrade t the data syste & IT r fr the Scia Security Adiistrati. This ciet had ay differet eeds fr their bui dig ad GEC achieved the requested upgrades tie ad uder budget. C-%SI1G Tha/ yu fr csiderig Gde Eage Cstructi as yur ctractr fr this great pr&ect.